Contract 05 1-4

Uploaded by

frankieleeqs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views4 pages

plur剖,

Contract 05 1-4

Uploaded by

frankieleeqs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Contents

PAGE PAGE
Articles of Agreement 5 5.5 Nominated Supply Contract
documents
Attestation 8 5.6 Further drawings , details ,
descriptive schedules and similar
The General Conditions documents
5.7 Documents to be provided to
1 Interpretation and definitions 9 Contractor on time
5.8 Electronic copies of drawings
1 .1 Governing law 5.9 Documents on Site
1.2 Singular , plur剖, masculine and 5.10 Return of drawings
feminine 5.11 Submission of manuals and
1.3 Method of reference to clauses and assignment of warranties
Articles 5.12 Submission of as built drawings
>

1.4 Articles of Agreement , Conditions 5.13 Li mits to use of documents


and Appendix to be read as a whole 5.14 Issue of Architect's certificates
1.5 Clauses divided into sub-clauses to 5.15 Copy of notice to be given
be read as a whole to Employer
1.6 Definitions
1.7 The role of the Engineer 6 Statutory obligations 24
1.8 Sectional completion of the Works
1.9 Communications 6.1 Statutory Requirements
1.10 Notices of default or determination 6.2 Compliance with the Statutory
to be sent by special delivery Requirements
1 .11 Parties to act reasonably and 6.3 Fees or charges
expeditiously 6 .4 Statutory undertakers and utility
companles
2 Contractor's obligations 16
7 Setting out the Works 25
2.1 Contractor's obligations
2.2 Contractor's responsibility Setting out and levels
2.3 Contractor's skill and care
2.4 Contractor to inform Architect if 8 Materials , goods , workmanship
he finds ambiguities in documents and work 25
3 Master programme 17 8.1 Types , standards and quality
8.2 Inspection and tests
3.1 Master programme to be submitted 8.3 Materials , goods , workmanship
3.2 Programmes to be updated or work not in accordance with
3.3 Programme and other documents Contract
not to be documents forming 8 .4 Rectifying defects
the Contract 8.5 Dismissal from the Works
4 Architect's instructions 19 9 Intellectual prope付y rights 27
4.1 Architect may issue instructions up to 9.1 Intellectual prope付y in design of the
the issue of the Final Certificate Works
4 .2 Architect to issue instructions in writing 9.2 Intellectual property in materials and
4.3 Compliance with Architect's goods
instructions 9.3 Intellectual property i 們 plant and
4 .4 Contractor to carry out preventative equipment
work 9 .4 Payment of royalties included in
Valuation
5 Documents forming the Contract
and other documents 20 10 Contractor's site management team 27
5.1 The documents forming the Contract 10.1 Contractor's site management team
5.2 Architect and Quantity Surveyor to 10.2 Construction manager
keep documents available
5.3 Copies of documents for 11 Access for the Architect to the
Contractor Works 28
5 .4 Nominated Sub-Contract
documents Contractor to give access
PAGE PAGE
12 Architect's representative 28 18.4 Li quidated and ascertained damages
18.5 Damage by a Special Peril
12.1 Architect's representative
12.2 Delegation of duties and powers 19 Assignment and sub-Ietting 37
12.3 Instruction to bind parties
19.1 Assignment
13 Variations , Provisional Quantities , 19.2 Sub-Ietting
Provisional Items and Provisional
Sums 29 20 Injury to persons and property and
indemnity to Employer 38
131Archltect's
instructionsauthouPrirriotiny
requiring vgitsoa
aioiVsnsaaurl
ie
Variation Contractor to indemnify Employer
13.2 Instructions for Provisional Quantities ,
Provisional Items and Provisional 21 Insurance against inju 吋 to persons
Sums or property 39
13.3 Valuation of Contractor's work
13.4 Valuation rules 21.1 Employees' Compensation Insurance
13.5 Adjustment of Contract Sum 21.2 Third party liability insurance
13.6 Contractor's right to be present during 21.3 Insurers and terms to be approved
measurement on Site 21 .4 Policies to be produced
13.7 Variation necessitated by fault of 21.5 Event of failure to insure
Contractor 21.6 No prejudice to Contractor's indemnity
13.8 Valuation of Nominated Sub-
Contractor's work or Nominated 22 Insurance of the Works 40
Supplier's materials and goods
22.1 Alternative ciauses for Contractors'
14 Contract B iII s 33 AII Risks Insurance of the Works
222BAaHsRicisrkesq|unisreumraennctes for Contractors ,
14.1 Quality and quantity of work inciuded of the Works
in Contract Sum 22.3 Specific requirements for Contractors'
14.2 Standard Method of Measurement of AII Risks Insurance of the Works
Building Works 22 .4 Insurance of the Works to be in joint
14.3 Errors in Contract Bills names and period of insurances
22.5 Parties' obligations if loss or damage
15 Contract Sum 34 occurs
22.6 Contractor's payment not more than
Adjustment of Contract Sum insurance proceeds
22.7 Insurance without prejudice to
16 Materials and goods on or off-site 34 Contractor's obligations

Property in materials and goods 22A Insurance of the Works by the


Contractor 43
17 Substantial Completion and
defects liability 34 22 A. 1 Contractor to effect Contractors' AII
Risks Insurance of the Works
17.1 Substantial Completion Certificate 22 A. 2 Insurer to be approved and remedy
for the Works if Contractor fails to insure
17.2 Separate Defects Li ability Period for 22 A. 3 Use of annual policy maintained by
each Section and Relevant Part Contractor
17.3 Rectifying defects
17.4 Defects Rectification Certificate for 22B Insurance of the Works by the
the Works Employer 44
17.5 Separate certificate for each Section
or Relevant Part 22B.1 Employer to effect Contractors'
17.6 Damage by a Specified Peril AII Risks Insurance of the Works
17.7 Other rights and remedies 228.2 Remedy if Employer fails to insure

18 Partial possession by Employer 36 22C Insurance of existing building and


insurance of the Works by the
18.1 Partial possession Employer 44
18.2 Substantial Completion
18.3 Completion of rectifying defects 22C.1 Employer to effect insurance against
Specified Perils to the existing building

2
PAGE PAGE
22C.2 Employer to effect Contractors' 29 Nominated Sub-Contractors and
All Risks Insurance of the Works Nominated Suppliers 57
22C.3 Remedy if Employer fails to insure
29.1 Nomination of a sub-contractor or a
23 Possession, commencement and supplier
completion 45 29.2 Contractor's right of reasonable
objection
23.1 Possession of Site 29.3 Sub-contractor and supplier warranty
23.2 Commencement and completion to Employer
23.3 Postponement or suspension 29.4 Contractor's tender for work provided
for by a Prime Cost Sum
24 Damages for non-completion 45 29.5 Nomination using the standard
conditions
24.1 Architect to certify Contractor's failure 29.6 Contractor's responsibility for
to complete on time Nominated Sub-Contractors and
24.2 Liquidated and ascertained damages Nominated Suppliers
24.3 Refund if Completion Date revised 29.7 Quantity Surveyor's notification of
interim payments
25 Extension of time 46 29.8 Direct payment of Nominated Sub-
Contractors and Nominated Suppliers
25.1 Contractor's first notice of delay 29.9 Extension of time for completion
25.2 Contractor's second notice ' of Nominated SUb-Contract works or
25.3 Fixing new Completion Date delivery of Nominated Supply
25.4 Contractor's default involved in the Contract goods
delay 29.10 Substantial completion of Nominated
25.5 Rate of progress Sub-Contract works
25.6 Nominated Sub-Contractors and 29.11 Architect to certify Nominated Sub-
Suppliers to be kept informed Contractor's failure to complete on
time
26 Delay recovery measures 51 29.12 Early final payment to Nominated
Sub-Contractor or Nominated
26.1 Delay recovery measures Supplier
26.2 Delay recovery proposals 29.13 Re-nomination
26.3 Contractor to carry out delay recovery 29.14 Architect's consent
measures 29.15 Employer not liable to a Nominated
26.4 Extension of time to cover shortfall in Sub-Contractor or Nominated
recovering delay Supplier
26.5 Contractor to be reimbursed for the
cost of preparing the proposal if delay 30 Persons engaged by Employer 63
recovery not instructed
30.1 Persons for whom the Employer is
27 Direct loss and/or expense 53 responsible
30.2 Access to Site and permission to
27.1 Contractor's notice of claim for carry out work
! additional payment 30.3 Contractor to fulfil his obligations to
1
27.2 Quantity Surveyor's ascertainment of persons engaged by the Employer
I Contractor's claim
i 27.3 Contractor's default involved in the 31 Facilities for statutory undertakers

I delay or disruption
27.4 Nominated Sub-Contractor's claim
and utility companies 64

I• 28
for additional payment

Notice of claims for additional


Access to Site and facilities to carry
out work

I
J
i
payment

28.1 Contractor to give notice of claim


28.2 Contractor to submit particulars
55 32

32.1
Certificates and payments

Interim Certificates and interim


valuations
64

! 28.3 Condition precedent to Contractor's 32.2 Estimate of amount due in Interim


1 entitlement to additional payment Certificate
I
i 32.3 Off-site materials or goods
I

I,
,I 3
J
卡 iEjj!ji--lj
PAGE PAGE
32 .4 Calculation of Retention 37 .4 Quantity Surveyor to prepare finai
32.5 Retention Rules account
,7 The final settlement

RU 門
qunJ
32.6 Quantity Surveyor to prepare final 7t

b
account Architect to notify sub-contractors
32.7 Adjustment of the Contract Sum and suppliers
32.8 Issue of Final Certificate
32.9 Effect of Final Certificate 38 Fluctuations 84
32.10 Proceedings commenced before
Final Certificate 38.1 Fluctuation provisions only applicable
32.11 Proceedings commenced after Final if expressly stated to be
Certificate 38.2 Adjustment for fluctuations occurring
32.12 Effect of Architect's certificates after the Completion Date
32.13 Late payment
39 Notices. certificates and other
33 Sure句 Bond 73 communications 85

33.1 Contractor to obtain guarantee from Submission of notices , certificates and


insurance company or bank other communications
33.2 Release of insurance company or
bank 40 Recovery of money due to the
33.3 Employer's remedy if Contractor fails Employer 85
to deliver bond
o ecov e a mages
仁」 e
m比
nv ovyera-S nvo we
VFB
+L rl rt Hu

34 Antiquities 73

34.1 Effect of finding antiquities 41 Settlement of disputes 85


34.2 Architect's instructions concerning a
fossil , antiquity or object 41.1 Procedures and Designated
Representatives
35 Determination by Employer 74 41.2 Reference to Designated
Representatives
35.1 Default by Contractor 41.3 Reference to mediation
35.2 Insolvency of Contractor 41 .4 Reference to arbitration
35.3 Employer's rights upon notice of 41.5 Timing of arbitration
default or determination 41.6 Arbitrator's powers
35 .4 Consequences of determination 41.7 The place of arbitration
35.5 Quantity Surveyor to prepare final 41.8 Contractor to continue to proceed
account diligently
35.6 The final settlement
35.7 Delayed commencement of Appendix 89
completion works Schedule 1 90
35.8 Other rights and remedies Form of Surety Bond to be given by
the Contractor to the Employer
36 Determination by Contractor 78
Schedule 2 94
36.1 Default by Employer Form of Warranty to be given by the
36.2 Insolvency of Employer Nominated Sub-Contractor to the
36.3 Consequences of determination Employer in consideration of
36.4 Contractor to submit final account Nomination
36.5 Quantity Surveyor to check final
account Schedule 3 97
36.6 The final settlement Form of Warranty to be given by the
36.7 Architect to notify sub-contractors Nominated Supplier to the Employer
and suppliers in consideration of Nomination
36.8 Other rights and remedies
Index to The General Conditions
37 Determination by Employer or
Contractor 82
123
7 , 7 ,『/

quququ
Grounds for determination
Site security
Consequences of determination