Safety Deployment for TDI TA025

Uploaded by

Mirza S. Baig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
454 views4 pages

Safety Deployment for TDI TA025

Uploaded by

Mirza S. Baig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

1: Title:

 Title: Safety Personnel Deployment Plan for TDI TA025 NAC &
SAC
 Date: - 30.10.2024
 Presenter’s Name: - MIRZA S. BAIG
 Organization: - GACC
 Department: - EHS

2: Introduction
 Overview of TDI TA025:
 Scope of work: - removal and installation of GL Pipping,
vessels towers, exchangers, pressure washing/hydro-jetting
removal of handrail and gratings installation LCG, lifting
operations, Working in the hazardous chemical area such as
sulfuric acid and nitric acid. Confined space entry.
3: Potential hazards associated with work:
 Chemical Exposure: Working with hazardous substances like
sulfuric acid and nitric acid poses significant health risks,
including chemical burns, respiratory issues, and potential
long-term health effects.
 Confined Spaces: Entry into confined spaces presents risks of
entrapment, toxic atmospheres, and limited access for rescue
operations. Proper procedures and monitoring are essential.
 Lifting Operations: Installing and removing heavy GL piping,
vessels, and towers involves lifting operations that carry the
risk of accidents and injuries if not conducted safely.
 Pipelines and Vessels: Ensuring that GL piping and vessels
are properly handled and secured is crucial to prevent leaks,
spills, or catastrophic failures during installation and removal.
 Pressure Washing & Hydro-Jetting: Using high-pressure
equipment requires precautions to prevent recoil injuries,
slipping hazards, and ensuring that the right nozzles and
protective gear are used.
4: General Safety Requirements:
 Hazard Assessment: Conduct a thorough risk assessment for
all planned activities to identify potential hazards associated
with the materials involved, equipment used, and work
environment.
 Safety Training: Ensure all personnel are trained in safe
working practices, particularly those related to hazardous
materials handling, confined space entry, and specific
equipment operation (e.g., lifting operations, pressure
washing).
5: Personal Protective Equipment (PPE):
 Chemical-resistant PPE: Depending on the chemicals in the
work area (sulfuric acid, nitric acid), provide appropriate PPE,
including:
o Chemical-resistant gloves
o Mono goggles along with face shields
o Chemical-resistant suits
o Chemical resistant boots
 Fall Protection: Utilize harnesses, lanyards, and other fall
protection systems when working at heights or accessing
elevated work areas.
6. Confined Space Entry:
 Permit System: Ensuring confined space entry permit that
includes pre-entry requirements, monitoring procedures, and
emergency response plans.
 Atmospheric Testing: Before entry, conduct atmospheric
testing for oxygen levels, flammable gases, and toxic
substances. Continuous monitoring may be necessary during
occupancy.
 Rescue Plan: ensuring rescue plan specific to confined
spaces, and proper communication with SADARA emergency
team.
7. Equipment Safety:
 Lifting Operations: Adhere to proper lifting protocols,
including the use of certified lifting equipment, load limits, and
clear communication (such as hand signals or radios) among
crew members.
 Pressure Washing / Hydro-jetting: Implement safety
measures such as using appropriate PPE, ensuring equipment
is in good working condition, and conducting proper setup to
prevent accidents or injuries.
8. Objective of the Deployment Plan
 Goals:
o Ensure personnel safety & protection of property during
NAC & SAC TA activities operations.
o Establish clear lines of communication with TA EHS TEAM.
o Optimize the use of personnel resources.

9: Personnel Roles and Responsibilities


 Key Safety Personnel:
o Safety Supervisor: Overall responsibility for safety
oversight.
o Safety Officers: On-ground monitoring and immediate
response.
o In case of Emergency communication with SADARA IRL
o Coordination and information dissemination with TA25
Management team.

10: Deployment Strategy


 Personnel Distribution: 14 safety personnel will be deployed
day and night on the NAC & SAC area including two safety
supervisors
 Shift Patterns: Day shift 1 safety supervisor and 6 safety
officers and night shift 1 safety supervisor and 6 safety
officers.

11: Monitoring and Reporting


 Safety Monitoring: SADARA TA025 Plan will be adhered
during the operation.
 Safety Reporting: all incidents, near misses, safety violation
and observation will be reported to TA EHS team.
 Review: Incidents and observations will be reviewed to
improve health and safety cultures at work.