Contractor: Client:
Ref: HSE-RA-TEX-01-21
Date: 18/05/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 1 of 4
TITLE: Trench Excavation PROJECT: Rev:00
DEVELOPED BY: HSE Team DATE: 19/09/16 APPROVED BY: SIGN: DATE:
Mandatory PPE to be
PPE worn as
→ required
→
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK SUPERVISORY REQUIREMENTS
HSE team to assess continuously the
Work condition not safe conditions of work in the assigned area
Procedures and tasks One person to issue work permits PTW system Activity supervisor
not clear Toolbox talks / Foreman
Lack of supervisory Competency of personnel and Tool box
Permitting Miscommunication High supervisory for the activity Talk Low
work Not correct PPE worn Define hierarchy and reporting PTW system
Equipment not flowcharts Inspection coordinator
inspected and certified Define proper PPE to be used for the certificates
work
Check inspection certificates of
equipment for the job
Wear correct PPE PPE
Punch point / hand injuries Smart grip / 3 points of contact when Activity supervisor
Checking Falling from machines Medium climbing onto machines Ladder Low
equipment Diesel / oil spill Use proper ladders / steps HSE Officer
Use containment cans/ plastic covers to Plastic covers
prevent spills
/conversion/tmp/activity_task_scratch/810563688.docx Page 1 of 4
Contractor: Client:
Ref: HSE-RA-TEX-01-21
Date: 18/05/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 2 of 4
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK SUPERVISORY REQUIREMENTS
Equipment structure damaged Have competent banksman at workplace
by heavy machines Ground personnel to wear high visibility
Personnel crushed by jackets
excavated materials Machines operators watch for ground
Ground personnel hit by heavy workers PPE Activity supervisor
machines High Put a dust mask Low
Use of heavy Exposure to dust environment Put ear defenders Subterranean HSE Officer
machines High noise area Wear seat-belts while operating machine. plan
Falling of the operator from the Keep doors closed so that guarding is
machine effective when working.
Swing of machines and roll-over Do not exceed machines capacity
Damage to buried power lines Respect approved plan of buried power lines
and/or pipelines and pipelines
Personnel injury or structure Position Excavator far from objects, consider
damage by backload due to close objects or structures distances from
Excavator rotation Excavator rotation shape
Excavator tilting due to bad Fire extinguisher in place
ground stability (mud, sand…) Preventive maintenance
Risk of fire due to the engine
failure
/conversion/tmp/activity_task_scratch/810563688.docx Page 2 of 4
Contractor: Client:
Ref: HSE-RA-TEX-01-21
Date: 18/05/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 3 of 4
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK SUPERVISORY REQUIREMENTS
Person fall in the trench Install stakes and warning tape around
Dust goes in respiratory system trench
Mishandled or poorly placed Ground personnel to wear high visibility
material jackets
Excavated material or other Inspect trenches at the start of each shift.
objects falling on workers Remove debris and excavated soil near
Personnel hit by excavator or excavation site PPE
Trench wheel loader Wear respiratory mask if working downwind Activity supervisor
excavation Mobile equipment incident due High Place excavated material at safe distance First aid kit Low
to unstable adjacent structures from the trench HSE Officer / Supervisor
Workers go down in the trench Never walk under and beside excavator Warning tape
while trenching loader, wheel loader or screening machines
Back injury when working with Be aware of nearby vehicles and mobile High visibility
shovel under bad posture equipment causing soil to vibrate jackets
Personnel trip / falling hazards Keep heavy equipment away from trench
due to excavated material edges
Automotive vehicle accident Do not go down in the trench while
Personnel get bite by snakes or excavating the trench
scorpions Never go inside the trench
Risk of collision with overhead Wear correct safety boots and mind steps /
powerline do not rush
Underground utilities. Park light vehicles away from activity
Watch for venomous animals and wear
safety boots and leather gloves
Goal post in place and banksman presence
is mandatory
Respect approved plan of buried power lines
and pipelines
Equipment and tools remain on Put back equipment to proper place Plastic bags Activity supervisor
House site Medium Clear all work place from trash Low
keeping Slip trip and fall Segregate trash Trash bins HSE Officer
Trash left in the work place
Participants / Work Crew JSA Reviewed By: Name: Date:
Name (Print Clearly): Signature: Date: Review Comments:
/conversion/tmp/activity_task_scratch/810563688.docx Page 3 of 4
Contractor: Client:
Ref: HSE-RA-TEX-01-21
Date: 18/05/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 4 of 4