1 ANALISA HARGA SATUAN PEKERJAAN
4
7
. Analisa Harga satuan Bandara
0
4 Jumlah Harga
0 Anls ID Res ID Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan JUMLAH
0 Upah Bahan Alat
.
0 Urugan dan Pemadatan Tanah untuk Sub Grade (m3) (Asumsi Jarak Angkut 5 km)
0 6001 201 Pekerja Oh 0.0087 75,000.00 652.50 - - 652.50
0 6001 206 Mandor Oh 0.0022 114,000.00 250.80 - - 250.80
, 6001 651 Water Tanker jam 0.0070 203,450.00 - - 1,424.15 1,424.15
0
6001 709 Excavator hari 0.0087 1,721,750.00 - - 14,979.22 14,979.22
0
6001 621 Dump Truck 5Ton jam 0.1839 184,500.00 - - 33,929.55 33,929.55
6001 637 Motor Greder jam 0.0020 237,000.00 - - 474.00 474.00
6001 649 Vibrator Roller jam 0.0543 649,650.00 - - 35,276.00 35,276.00
6001 1264 Tanah Urug m3 1.2000 65,000.00 - 78,000.00 - 78,000.00
903.30 78,000.00 86,082.92 164,986.22
Urugan dan Pemadatan Sirtu untuk Sub Base (m3)CBR>25% (Asumsi Jarak Angkut 5 km)
6002 201 Pekerja Oh 0.0225 75,000.00 1,687.50 - - 1,687.50
6002 206 Mandor Oh 0.0116 114,000.00 1,322.40 - - 1,322.40
6002 651 Water Tank jam 0.0104 203,450.00 - - 2,115.88 2,115.88
6002 637 Motor Greder jam 0.0090 237,000.00 - - 2,133.00 2,133.00
6002 643 Tandem Roller jam 0.0428 649,650.00 - - 27,805.02 27,805.02
6002 709 Excavator hari 0.0080 1,721,750.00 - - 13,774.00 13,774.00
6002 621 Dump Truck 5Ton jam 0.3014 184,500.00 - - 55,608.30 55,608.30
6002 1260 Sirtu m3 1.2000 102,600.00 - 123,120.00 - 123,120.00
3,009.90 123,120.00 101,436.20 227,566.10
Urugan dan Pemadatan Batu Pecah untuk Base Course (m3) > 80% (Asumsi Jarak Angkut 5 km)
6003 201 Pekerja Oh 0.0225 75,000.00 1,687.50 - - 1,687.50
6003 206 Mandor Oh 0.0170 114,000.00 1,938.00 - - 1,938.00
6003 621 Dump Truck 5 Ton jam 0.3091 184,500.00 - - 57,028.95 57,028.95
6003 709 Excavator hari 0.0080 1,721,750.00 - - 13,774.00 13,774.00
6003 637 Motor Greder jam 0.0090 237,000.00 - - 2,133.00 2,133.00
6003 651 Water Tank jam 0.0141 203,450.00 - - 2,868.65 2,868.65
6003 643 Tandem Roller jam 0.1071 649,650.00 - - 69,577.52 69,577.52
6003 1205 Agregat Pecah Mesin 20-30 mm m3 1.1000 374,500.00 - 411,950.00 - 411,950.00
3,625.50 411,950.00 145,382.11 560,957.61
Lean Concrete (m3)
6004 206 mandor oh 0.0201 114,000.00 2,291.40 - - 2,291.40
6004 201 pekerja oh 0.1205 75,000.00 9,037.50 - - 9,037.50
6004 202 tukang oh 0.0201 87,500.00 1,758.75 - - 1,758.75
6004 652 Whell Loader jam 0.0400 187,000.00 - - 7,480.00 7,480.00
6004 636 Mixer Truck jam 0.2400 67,500.00 - - 16,200.00 16,200.00
6004 609 Concrete Pan Mixer (Batching Plant) jam 0.0400 643,650.00 - - 25,746.00 25,746.00
6004 626 Generator Set jam 0.0400 250,850.00 - - 10,034.00 10,034.00
6004 1102 Semen pc kg 400.0000 1,670.00 - 668,000.00 - 668,000.00
6004 1205 Agregat Pecah Mesin 20-30 mm m3 0.8900 374,500.00 - 333,305.00 - 333,305.00
6004 1249 pasir beton m3 0.5400 180,000.00 - 97,200.00 - 97,200.00
6004 7005 Additive Ltr 1.0500 52,000.00 - 54,600.00 - 54,600.00
6004 7007 Air m3 0.2000 10,900.00 - 2,180.00 - 2,180.00
13,087.65 1,155,285.00 59,460.00 1,227,832.65
Beton Semen Bertulang Mutu K-350, Fr=45 Kg/cm3 untuk lapisan atas Apron, Runway danTaxiway (m3)
6005 202 tukang oh 0.0200 87,500.00 1,750.00 - - 1,750.00
6005 201 pekerja oh 0.0140 75,000.00 1,050.00 - - 1,050.00
6005 206 mandor oh 0.0207 114,000.00 2,359.80 - - 2,359.80
6005 671 Slip Form Paver jam 0.0007 245,950.00 - - 172.17 172.17
6005 652 Whell Loader jam 0.1200 187,000.00 - - 22,440.00 22,440.00
6005 651 Water Tank jam 0.1200 203,450.00 - - 24,414.00 24,414.00
6005 636 Mixer Truck jam 0.2400 67,500.00 - - 16,200.00 16,200.00
6005 609 Concrete Pan Mixer (Batching Plant) jam 0.0400 643,650.00 - - 25,746.00 25,746.00
6005 626 Generator Set jam 0.0400 250,850.00 - - 10,034.00 10,034.00
6005 1102 Semen pc kg 750.0000 1,670.00 - 1,252,500.00 - 1,252,500.00
6005 1205 Agregat Pecah Mesin 20-30 mm m3 0.8200 374,500.00 - 307,090.00 - 307,090.00
6005 1249 pasir beton m3 0.4700 180,000.00 - 84,600.00 - 84,600.00
6005 2617 Wire Mesh Kg 25.0000 18,500.00 - 462,500.00 - 462,500.00
6005 7005 Additive Ltr 1.0500 52,000.00 - 54,600.00 - 54,600.00
6005 7007 Air m3 0.2000 10,900.00 - 2,180.00 - 2,180.00
6005 7142 Joint Sealant m' 3.5000 16,500.00 - 57,750.00 - 57,750.00
3,409.80 2,163,470.00 99,006.17 2,265,885.97
Sirtu Padat CBR> 25 % (Sub Base) tebal 30 cm (m2)
6006 201 Pekerja Oh 0.0068 75,000.00 510.00 - - 510.00
6006 206 Mandor Oh 0.0035 114,000.00 399.00 - - 399.00
6006 606 Buldozer jam 0.0309 473,300.00 - - 14,624.97 14,624.97
6006 637 Motor Greder jam 0.0309 237,000.00 - - 7,323.30 7,323.30
6006 643 Tandem Roller jam 0.0309 649,650.00 - - 20,074.19 20,074.19
6006 651 Water Tank jam 0.0309 203,450.00 - - 6,286.61 6,286.61
6006 1260 Sirtu m3 0.3000 102,600.00 - 30,780.00 - 30,780.00
909.00 30,780.00 48,309.06 79,998.06
Lapisan Agregat Base Padat CBR> 80% tebal = 25 cm (m2)
6007 201 Pekerja Oh 0.0056 75,000.00 420.00 - - 420.00
6007 206 Mandor Oh 0.0291 114,000.00 3,317.40 - - 3,317.40
6007 621 Dump Truck 5 Ton jam 0.0258 184,500.00 - - 4,760.10 4,760.10
6007 637 Motor Greder jam 0.0258 237,000.00 - - 6,114.60 6,114.60
6007 649 Vibrator Roller jam 0.0234 649,650.00 - - 15,201.81 15,201.81
6007 651 Water Tank jam 0.0258 203,450.00 - - 5,249.01 5,249.01
6007 1205 Agregat Pecah Mesin 20-30 mm m3 0.3000 374,500.00 - 112,350.00 - 112,350.00
3,737.40 112,350.00 31,325.52 147,412.92
Lapisan Agregat Base Padat CBR> 80% tebal = 35 cm (m2)
6008 201 Pekerja Oh 0.0079 75,000.00 592.50 - - 592.50
6008 206 Mandor Oh 0.0408 114,000.00 4,651.20 - - 4,651.20
6008 621 Dump Truck 5 Ton jam 0.0361 184,500.00 - - 6,660.45 6,660.45
6008 637 Motor Greder jam 0.0361 237,000.00 - - 8,555.70 8,555.70
6008 649 Vibrator Roller jam 0.0328 649,650.00 - - 21,308.52 21,308.52
6008 651 Water Tank jam 0.0361 203,450.00 - - 7,344.55 7,344.55
6008 1205 Agregat Pecah Mesin 20-30 mm m3 0.3500 374,500.00 - 131,075.00 - 131,075.00
5,243.70 131,075.00 43,869.22 180,187.92
Lapisan / Overlay Aspal Beton (AC) tebal 7,5 cm padat (m2)
6011 201 pekerja oh 0.1875 75,000.00 14,062.50 - - 14,062.50
6011 206 mandor oh 0.0259 114,000.00 2,952.60 - - 2,952.60
6011 643 Tandem Roller jam 0.0033 649,650.00 - - 2,143.85 2,143.85
6011 652 Whell Loader jam 0.0050 187,000.00 - - 935.00 935.00
6011 645 Tire Roller jam 0.0048 562,500.00 - - 2,700.00 2,700.00
6011 621 Dump Truck 5 Ton jam 0.1550 184,500.00 - - 28,597.50 28,597.50
6011 603 Asphalt Finisher jam 0.0050 370,000.00 - - 1,850.00 1,850.00
6011 601 AMP jam 0.0082 4,321,650.00 - - 35,437.53 35,437.53
6011 626 Generator Set jam 0.0042 250,850.00 - - 1,053.57 1,053.57
6011 1003 Aspalt AC 60-70 kg 11.9000 16,000.00 - 190,400.00 - 190,400.00
6011 1204 Agregat Pecah Mesin 10-20 mm m3 0.0509 403,000.00 - 20,512.70 - 20,512.70
6011 1206 Agregat Pecah Mesin 5-10 mm m3 0.0518 345,000.00 - 17,871.00 - 17,871.00
6011 1248 Pasir Aspalt / Abu batu / screening m3 0.0518 245,000.00 - 12,691.00 - 12,691.00
17,015.10 241,474.70 72,717.45 331,207.25
Lapisan / Overlay Aspal Beton (AC) tebal 5 cm padat (m2)
6014 201 pekerja oh 0.1250 75,000.00 9,375.00 - - 9,375.00
6014 206 mandor oh 0.0173 114,000.00 1,972.20 - - 1,972.20
6014 643 Tandem Roller jam 0.0022 649,650.00 - - 1,429.23 1,429.23
6014 652 Whell Loader jam 0.0033 187,000.00 - - 617.10 617.10
6014 645 Tire Roller jam 0.0032 562,500.00 - - 1,800.00 1,800.00
6014 621 Dump Truck 5 Ton jam 0.1033 184,500.00 - - 19,058.85 19,058.85
6014 603 Asphalt Finisher jam 0.0033 370,000.00 - - 1,221.00 1,221.00
6014 601 AMP jam 0.0033 4,321,650.00 - - 14,261.45 14,261.45
6014 626 Generator Set jam 0.0028 250,850.00 - - 702.38 702.38
6014 1003 Aspalt AC 60-70 kg 7.9333 16,000.00 - 126,932.80 - 126,932.80
6014 1204 Agregat Pecah Mesin 10-20 mm m3 0.0339 403,000.00 - 13,661.70 - 13,661.70
6014 1206 Agregat Pecah Mesin 5-10 mm m3 0.0345 345,000.00 - 11,902.50 - 11,902.50
6014 1248 Pasir Aspalt / Abu batu / screening m3 0.0345 245,000.00 - 8,452.50 - 8,452.50
11,347.20 160,949.50 39,090.01 211,386.71
Lapisan Cement Treated Base Course (CTBC) (m3)
6015 201 pekerja oh 0.3797 75,000.00 28,477.50 - - 28,477.50
6015 206 mandor oh 0.0543 114,000.00 6,190.20 - - 6,190.20
6015 649 Vibrator Roller jam 0.0330 649,650.00 - - 21,438.45 21,438.45
6015 621 Dump Truck 5 Ton jam 0.1073 184,500.00 - - 19,796.85 19,796.85
6015 645 Tire Roller jam 0.2300 562,500.00 - - 129,375.00 129,375.00
6015 609 Concrete Pan Mixer (Batching Plant) jam 0.0590 643,650.00 - - 37,975.35 37,975.35
6015 651 Water Tank jam 0.0160 203,450.00 - - 3,255.20 3,255.20
6015 652 Whell Loader jam 0.0313 187,000.00 - - 5,853.10 5,853.10
6015 603 Asphalt Finisher jam 0.0400 370,000.00 - - 14,800.00 14,800.00
6015 1102 Semen pc kg 256.0000 1,670.00 - 427,520.00 - 427,520.00
6015 1205 Agregat Pecah Mesin 20-30 mm m3 1.2000 374,500.00 - 449,400.00 - 449,400.00
34,667.70 876,920.00 232,493.95 1,144,081.65
Lapisan Cement Treated Base Course tebal 25 cm (m2)
6016 201 pekerja oh 1.5625 75,000.00 117,187.50 - - 117,187.50
6016 206 mandor oh 0.1953 114,000.00 22,264.20 - - 22,264.20
6016 637 Motor Greder jam 0.3045 237,000.00 - - 72,166.50 72,166.50
6016 645 Tire Roller jam 0.0243 562,500.00 - - 13,668.75 13,668.75
6016 649 Vibrator Roller jam 0.0004 649,650.00 - - 259.86 259.86
6016 651 Water Tank jam 0.0243 203,450.00 - - 4,943.84 4,943.84
6016 652 Whell Loader jam 0.0021 187,000.00 - - 392.70 392.70
6016 1102 Semen pc kg 25.2000 1,670.00 - 42,084.00 - 42,084.00
6016 1204 Agregat Pecah Mesin 10-20 mm m3 0.0127 403,000.00 - 5,118.10 - 5,118.10
6016 1206 Agregat Pecah Mesin 5-10 mm m3 0.0130 345,000.00 - 4,485.00 - 4,485.00
139,451.70 51,687.10 91,431.65 282,570.44
Lapisan Asphalt Treated Base (ATB) tebal 7,5 cm (m2)
6017 201 pekerja oh 0.1875 75,000.00 14,062.50 - - 14,062.50
6017 206 mandor oh 0.0259 114,000.00 2,952.60 - - 2,952.60
6017 643 Tandem Roller jam 0.0033 649,650.00 - - 2,143.85 2,143.85
6017 652 Whell Loader jam 0.0050 187,000.00 - - 935.00 935.00
6017 645 Tire Roller jam 0.0048 562,500.00 - - 2,700.00 2,700.00
6017 621 Dump Truck 5 Ton jam 0.1550 184,500.00 - - 28,597.50 28,597.50
6017 603 Asphalt Finisher jam 0.0050 370,000.00 - - 1,850.00 1,850.00
6017 601 AMP jam 0.0082 4,321,650.00 - - 35,437.53 35,437.53
6017 626 Generator Set jam 0.0042 250,850.00 - - 1,053.57 1,053.57
6017 1003 Aspalt AC 60-70 kg 9.1402 16,000.00 - 146,243.20 - 146,243.20
6017 1248 Pasir Aspalt / Abu batu / screening m3 0.0023 245,000.00 - 563.50 - 563.50
6017 1205 Agregat Pecah Mesin 20-30 mm m3 0.0676 374,500.00 - 25,316.20 - 25,316.20
6017 1206 Agregat Pecah Mesin 5-10 mm m3 0.0475 345,000.00 - 16,387.50 - 16,387.50
17,015.10 188,510.40 72,717.45 278,242.95
Lapisan Asphalt Treated Base (ATB) tebal 5 cm (m2)
6018 201 pekerja oh 0.1250 75,000.00 9,375.00 - - 9,375.00
6018 206 mandor oh 0.0173 114,000.00 1,972.20 - - 1,972.20
6018 643 Tandem Roller jam 0.0022 649,650.00 - - 1,429.23 1,429.23
6018 652 Whell Loader jam 0.0033 187,000.00 - - 617.10 617.10
6018 645 Tire Roller jam 0.0032 562,500.00 - - 1,800.00 1,800.00
6018 621 Dump Truck 5 Ton jam 0.1033 184,500.00 - - 19,058.85 19,058.85
6018 603 Asphalt Finisher jam 0.0033 370,000.00 - - 1,221.00 1,221.00
6018 601 AMP jam 0.0055 4,321,650.00 - - 23,769.07 23,769.07
6018 626 Generator Set jam 0.0028 250,850.00 - - 702.38 702.38
6018 1003 Aspalt AC 60-70 kg 6.0935 16,000.00 - 97,496.00 - 97,496.00
6018 1248 Pasir Aspalt / Abu batu / screening m3 0.0015 245,000.00 - 367.50 - 367.50
6018 1205 Agregat Pecah Mesin 20-30 mm m3 0.0451 374,500.00 - 16,889.95 - 16,889.95
6018 1206 Agregat Pecah Mesin 5-10 mm m3 0.0317 345,000.00 - 10,936.50 - 10,936.50
11,347.20 125,689.95 48,597.63 185,634.79
Bekisting (m2)
6019 206 mandor oh 0.1000 114,000.00 11,400.00 - - 11,400.00
6019 205 Kepala Tukang Kayu oh 0.5000 100,000.00 50,000.00 - - 50,000.00
6019 202 Tukang Kayu oh 5.0000 87,500.00 437,500.00 - - 437,500.00
6019 201 Pekerja oh 2.0000 75,000.00 150,000.00 - - 150,000.00
6019 2201 Paku kg 4.0000 20,500.00 - 82,000.00 - 82,000.00
6019 6033 Kayu papan Kls III m3 0.4000 4,180,000.00 - 1,672,000.00 - 1,672,000.00
6019 6084 Multipleks t=6 mm lbr 1.7000 84,400.00 - 143,480.00 - 143,480.00
587,500.00 1,897,480.00 - 2,484,980.00
Pengadaan Dowel Bar D=25 mm
6021 2021 Dowel Bar D = 25 mm bh 1.0000 6,420.00 - 6,420.00 - 6,420.00
- 6,420.00 - 6,420.00
Slab Beton Mutu K-350, tebal 35cm (m2)
6022 202 tukang oh 0.0800 87,500.00 7,000.00 - - 7,000.00
6022 201 pekerja oh 0.0070 75,000.00 525.00 - - 525.00
6022 206 mandor oh 0.0072 114,000.00 820.80 - - 820.80
6022 609 Concrete Pan Mixer (Batching Plant) jam 0.0240 643,650.00 - - 15,447.60 15,447.60
6022 671 Slip Form Paver jam 0.0070 245,950.00 - - 1,721.65 1,721.65
6022 652 Whell Loader jam 0.0420 187,000.00 - - 7,854.00 7,854.00
6022 651 Water Tank jam 0.0420 203,450.00 - - 8,544.90 8,544.90
6022 626 Generator Set jam 0.0140 250,850.00 - - 3,511.90 3,511.90
6022 636 Mixer Truck jam 0.0840 67,500.00 - - 5,670.00 5,670.00
6022 1102 Semen pc kg 262.0000 1,670.00 - 437,540.00 - 437,540.00
6022 1205 Agregat Pecah Mesin 20-30 mm m3 0.2870 374,500.00 - 107,481.50 - 107,481.50
6022 1249 pasir beton m3 0.1645 180,000.00 - 29,610.00 - 29,610.00
6022 2617 Wire Mesh Kg 8.7500 18,500.00 - 161,875.00 - 161,875.00
6022 7005 Additive Ltr 0.3675 52,000.00 - 19,110.00 - 19,110.00
6022 7007 Air m3 0.0700 10,900.00 - 763.00 - 763.00
6022 7142 Joint Sealant m' 1.2250 16,500.00 - 20,212.50 - 20,212.50
1,345.80 756,379.50 42,750.05 800,475.35
Prime Coating 2,5 kg / m2
6023 201 pekerja oh 0.0018 75,000.00 135.00 - - 135.00
6023 206 mandor oh 0.0013 114,000.00 148.20 - - 148.20
6023 604 Asphalt Sprayer jam 0.2640 23,000.00 - - 6,072.00 6,072.00
6023 607 Compressor jam 0.0320 105,250.00 - - 3,368.00 3,368.00
6023 7026 Minyak Tanah m3 0.3166 9,630.00 - 3,048.86 - 3,048.86
6023 1003 Aspalt AC 60-70 kg 2.4000 16,000.00 - 38,400.00 - 38,400.00
283.20 41,448.86 9,440.00 51,172.06
Tack Coating 1,5 kg / m2
6024 201 pekerja oh 0.0113 75,000.00 847.50 - - 847.50
6024 206 mandor oh 0.0009 114,000.00 102.60 - - 102.60
6024 604 Asphalt Sprayer jam 0.2400 23,000.00 - - 5,520.00 5,520.00
6024 607 Compressor jam 0.0320 105,250.00 - - 3,368.00 3,368.00
6024 7026 Minyak Tanah m3 0.1166 9,630.00 - 1,122.86 - 1,122.86
6024 1003 Aspalt AC 60-70 kg 1.2000 16,000.00 - 19,200.00 - 19,200.00
950.10 20,322.86 8,888.00 30,160.96
Pengecatan / Marking (m2)
6025 201 pekerja oh 0.1000 75,000.00 7,500.00 - - 7,500.00
6025 206 mandor oh 0.0220 114,000.00 2,508.00 - - 2,508.00
6025 640 Sprayer Cat jam 0.0480 15,000.00 - - 720.00 720.00
6025 813 Alat bantu pengecatan Ls 1.00000 30,000.00 - - 30,000.00 30,000.00
6025 7045 Thinner Ltr 0.2100 40,000.00 - 8,400.00 - 8,400.00
6025 7118 Cat Marka (Thermoplastic) kg 1.0500 30,000.00 - 31,500.00 - 31,500.00
10,008.00 39,900.00 30,720.00 80,628.00
Pengukuran (m2)
6026 201 Pekerja oh 0.005 75,000.00 375.00 - - 375.00
6026 209 Juru Gambar oh 0.0020 90,000.00 180.00 - - 180.00
6026 272 Mandor (pengukuran) oh 0.0140 75,000.00 1,050.00 - - 1,050.00
6026 666 Theodolite jam 0.0240 79,000.00 - - 1,896.00 1,896.00
6026 667 Waterpass jam 0.024 17,500.00 - - 420.00 420.00
6026 674 Mistar Ukur jam 0.048 2,100.00 - - 100.80 100.80
1,605.00 - 2,416.80 4,021.80
Bekisting Slab Beton (plat besi) (m2)
6027 206 mandor oh 0.0667 114,000.00 7,603.80 - - 7,603.80
6027 202 Tukang oh 0.2000 87,500.00 17,500.00 - - 17,500.00
6027 201 Pekerja oh 0.8000 75,000.00 60,000.00 - - 60,000.00
6027 624 Flatbed Truck 3,5 ton jam 0.0386 329,700.00 - - 12,726.42 12,726.42
6027 802 Alat bantu Ls 1.0000 4,000.00 - - 4,000.00 4,000.00
6027 827 Fabrikasi Ls 1.0000 2,100.00 2,100.00 - - 2,100.00
6027 2012 Besi Plat kg 0.3240 16,500.00 - 5,346.00 - 5,346.00
6027 2014 Besi siku kg 2.6790 13,368.66 - 35,814.65 - 35,814.65
6027 2999 Material bantu bekisting plat besi Ls 1.0000 2,100.00 - - 2,100.00 2,100.00
87,203.80 41,160.65 18,826.42 147,190.87
Analisa Umum Gedung dan Jalan
Jumlah Harga
Anls ID Res ID Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan JUMLAH
Upah Bahan Alat
Membersihkan Lapangan dan Perataan (m2) (SNI 03-2835-04)
6 201 Pekerja oh 0.1000 75,000.00 7,500.00 - - 7,500.00
6 206 Mandor oh 0.0500 114,000.00 5,700.00 - - 5,700.00
13,200.00 - - 13,200.00
Galian tanah biasa sedalam 1 m (m3)
23 201 Pekerja oh 0.7500 75,000.00 56,250.00 - - 56,250.00
23 206 Mandor oh 0.0250 114,000.00 2,850.00 - - 2,850.00
59,100.00 - - 59,100.00
Pasang Pondasi Batu kali 1 Pc : 4 Ps(m3) (SNI 2836-2008-02)
45 201 Pekerja oh 1.5000 75,000.00 112,500.00 - - 112,500.00
45 206 mandor oh 0.0750 114,000.00 8,550.00 - - 8,550.00
45 211 Kepala Tukang batu oh 0.0750 100,000.00 7,500.00 - - 7,500.00
45 243 Tukang batu oh 0.7500 87,500.00 65,625.00 - - 65,625.00
45 1102 Semen pc kg 163.0000 1,670.00 - 272,210.00 - 272,210.00
45 1220 Batu Belah 15 / 20 m3 1.2000 205,000.00 - 246,000.00 - 246,000.00
45 1252 Pasir pasang m3 0.5200 123,100.00 - 64,012.00 - 64,012.00
194,175.00 582,222.00 - 776,397.00
Plasteran 1 Pc ; 3 Ps Tebal 15 mm (m2)
90 201 Pekerja oh 0.3000 75,000.00 22,500.00 - - 22,500.00
90 206 mandor oh 0.0150 114,000.00 1,710.00 - - 1,710.00
90 211 Kepala Tukang batu oh 0.0150 100,000.00 1,500.00 - - 1,500.00
90 243 Tukang batu oh 0.1500 87,500.00 13,125.00 - - 13,125.00
90 1102 Semen pc kg 7.7760 1,670.00 - 12,985.92 - 12,985.92
90 1252 Pasir pasang m3 0.0230 123,100.00 - 2,831.30 - 2,831.30
38,835.00 15,817.22 - 54,652.22
Plasteran siar adukan1 Pc ; 2 Ps (m2)
122 201 Pekerja oh 0.3000 75,000.00 22,500.00 - - 22,500.00
122 206 mandor oh 0.0150 114,000.00 1,710.00 - - 1,710.00
122 211 Kepala Tukang batu oh 0.0150 100,000.00 1,500.00 - - 1,500.00
122 243 Tukang batu oh 0.1500 87,500.00 13,125.00 - - 13,125.00
122 1102 Semen pc kg 6.3400 1,670.00 - 10,587.80 - 10,587.80
122 1252 Pasir pasang m3 0.0120 123,100.00 - 1,477.20 - 1,477.20
38,835.00 12,065.00 - 50,900.00
DAFTAR HARGA BAHAN / UPAH KERJA / PERALATAN
No. Res ID Nama Resource Harga di Lokasi
1 1208 Timbunan Tanah Pilihan /m3 Rp 65,000.00
2 1255 Pasir Urug /m3 Rp 90,000.00
3 1252 Pasir Pasangan /m3 Rp 123,100.00
4 1249 Pasir Beton /m3 Rp 180,000.00
5 1260 Sirtu /m3 Rp 102,600.00
6 1228 Batu Pecah 2 - 3 cm /m3 Rp 374,500.00
7 1204 Batu Pecah 1 - 2 cm /m4 Rp 403,000.00
8 1206 Batu Pecah 0,5 - 1 cm /m5 Rp 345,000.00
9 1248 Abu batu /m6 Rp 245,000.00
10 1222 Batu Kali /m3 Rp 195,000.00
11 1222 Batu Gunung /m3 Rp 195,000.00
12 1220 Batu belah 15/20 /m3 Rp 205,000.00
13 1256 Paving Blok t=8 cm K.300 /m2 Rp 170,500.00
14 1102 Semen Portland per kg /kg Rp 1,670.00
15 1126 Semen Portland 1 zak = 50 kg /sak Rp 83,800.00
16 1104 Semen Warna /kg Rp 3,900.00
17 2004 Besi Beton /kg Rp 11,500.00
18 2012 Besi Plat /kg Rp 16,500.00
19 2014 Besi Siku /kg Rp 13,368.66
20 2303 Kawat Beton /kg Rp 20,500.00
21 2617 Wire Mesh /kg Rp 18,500.00
22 6020 Kayu Klass I (Kayu Ulin) /m3 Rp 8,250,000.00
23 6021 Kayu Klass I (Bayam Senso) /m3 Rp 8,250,000.00
24 6031 Papan Klass I (Bayam G. Somil) /m3 Rp 7,095,000.00
25 6021 Kayu Klass II (Samarinda) /m3 Rp 7,425,000.00
26 6032 Papan Klass II (Samarinda) /m3 Rp 6,930,000.00
27 6030 Kayu Klass III /m3 Rp 3,850,000.00
28 6033 Papan Klass III /m3 Rp 4,180,000.00
29 6011 Dolken Kayu Dia 8 cm /btg Rp 25,300.00
30 7134 Geotextile Non Woven /m2 Rp 43,507.75
31 808 Alat Bantu Pes. Geotex /Ls Rp 90,640.00
32 1214 Batu Merah Standar (besar) Kls. 1 /bh Rp 700.00
33 2201 Paku Biasa /kg Rp 20,500.00
34 2201 Paku Seng /kg Rp 27,000.00
35 8315 (Nok) Bubungan Genteng Asbes /bh Rp 88,000.00
36 8214 Abes Eternit 100 x 100 cm2 /bh Rp 23,500.00
37 2131 Plat Seng tebal 0.050 lebar 0.90 /m' Rp 76,560.00
38 8015 Atap Seng gelombnag /lbr Rp 79,530.00
39 6041 Kayu Lis Plafond /m' Rp 11,000.00
40 7121 Cat Tembok /kg Rp 80,000.00
41 7113 Cat Dasar Tembok /kg Rp 65,000.00
42 7120 Cat Meni Kayu /kg Rp 45,000.00
43 7115 Cat Kayu/Besi /kg Rp 50,400.00
44 7153 Plamur /kg Rp 22,000.00
45 7023 Minyak Cat /ltr Rp 18,000.00
46 7045 Thinner /ltr Rp 40,000.00
47 7118 Cat Marka (Thermoplastic) /kg Rp 30,000.00
48 7144 Kapur Sirih /kg Rp 5,200.00
49 8005 Kertas Amplas /lbr Rp 10,000.00
50 7142 Joint Sealant m' Rp 16,500.00
51 6057 Playwood t=4mm /lbr Rp 90,000.00
52 6083 Tripleks t=4 mm /lbr Rp 70,000.00
53 6084 Tripleks t=6 mm /lbr Rp 84,400.00
54 6046 Multiplex (t=9 mm) /lbr Rp 124,400.00
55 2316 Kawat Las /kg Rp 35,000.00
56 2011 Besi Pengikat Galvanis /bh Rp 14,639.90
57 2411 Angkur Plat Landasan /bh Rp 35,000.00
58 7020 Karbit /kg Rp 25,000.00
59 1003 Asphalt AC 60-70 /kg Rp 16,000.00
60 7030 Pelumas Oil /ltr Rp 45,800.00
61 7022 Minyak Bekisting /ltr Rp 28,800.00
62 7018 Grease/Gemuk /kg Rp 77,000.00
63 7041 Solar /kg Rp 8,580.00
64 7026 Minyak Tanah Ltr Rp 9,630.00
65 7029 Oksigen /btl Rp 660,000.00
66 7007 Air /m3 Rp 10,900.00
67 3050 Pipa Peresapan Air PVC dia. 1½" /m' Rp 7,500.00
68 7003 acetelin @ 15 kg /btl Rp 159,500.00
69 7005 Additive Ltr Rp 52,000.00
70 514 Job Mix Desain /ls Rp 3,500,000.00
71 7165 Spals Guard/Splas Pro/Denso Tape /m2 Rp 2,726,350.00
72 527 Sounding /m2 Rp 3,500.00
73 528 Test Kuat Tekan /ls Rp 5,000,000.00
74 9924 Pagar BRC L=2.4 M' t=1.90 m /bh Rp 770,000.00
78 9229 Lantai Keramik 40 x 40 cm /bh Rp 13,200.00
79 9233 Lantai Keramik 20 x 20 cm /bh Rp 2,500.00
80 9239 Keramik Dinding 20 x 20 cm /bh Rp 3,000.00
81 9233 Lantai Keramik 30 x 30 cm /bh Rp 5,500.00
82 2405 Angkur dia. 25 mm /bh Rp 41,195.00
I. Res ID Nama Resource Harga
1 201 Pekerja /hari Rp 75,000.00
2 202 Tukang :
3 -. Batu /hari Rp 87,500.00
4 -. Kayu /hari Rp 87,500.00
5 -. Besi /hari Rp 87,500.00
6
7 205 Kepala Tukang
8 -. Batu /hari Rp 100,000.00
9 -. Kayu /hari Rp 100,000.00
10 -. Besi /hari Rp 100,000.00
11 -. Cat /hari Rp 100,000.00
12
13 206 Mandor /hari Rp 114,000.00
14 272 Mandor (Pengukuran) /hari Rp 75,000.00
15 239 Tenaga Ahli /hari Rp 167,250.00
16 201 Tukang Las /hari Rp 87,500.00
17 257 Operator /hari Rp 105,000.00
18 254 Pembantu Operator /hari Rp 75,000.00
19 209 Juru Gambar /hari Rp 90,000.00
20 220 Juru Ukur/Surveyor /hari Rp 157,500.00
21 226 Ass. Juru Ukur /hari Rp 105,000.00
22 209 Drafter /hari Rp 86,500.00
23 234 Satpam /hari Rp 52,500.00
24 247 Tukang Bongkar /hari Rp 83,500.00
25 207 Asisten Laboran /hari Rp 74,300.00
III. Res ID DAFTAR PERALATAN HARGA
1 731 water pas Jam Rp 17,500.00
2 730 Thedolite Jam Rp 79,000.00
3 674 Mistar Ukur Jam Rp 2,100.00
4 710 Genset Jam Rp 250,850.00
5 651 Water Tank Jam Rp 203,450.00
7 621 Dump Truk 5 ton Jam Rp 184,500.00
8 744 Dump Truk 10 ton Jam Rp -
9 709 Excavator hari Rp 1,721,750.00
10 624 Flatbed Truck Jam Rp 329,700.00
17 636 mixier truck Jam Rp 67,500.00
18 609 cocret pan mixer Jam Rp 643,650.00
19 649 Vibrator Roller Jam Rp 649,650.00
20 607 Compressor Jam Rp 105,250.00
21 606 Bull Dozer Jam Rp 473,300.00
22 637 Motor Greder Jam Rp 237,000.00
23 652 Whell Loader Jam Rp 187,000.00
24 643 Tandem Roller Jam Rp 649,650.00
25 645 Tire Roller Jam Rp 562,500.00
26 604 Asphalt Sprayer Jam Rp 23,000.00
27 603 Asphalt Finisher Jam Rp 370,000.00
28 601 AMP Jam Rp 4,321,650.00
29 640 Sprayer Cat Jam Rp 15,000.00
32 671 Slip Form Paver Jam Rp 245,950.00
33 801 Alat Bantu Jam Rp -
34 816 Alat Bantu Pengelasan/Potong Jam Rp -