JECON ENGINEERS PVT.
LTD
Welding Machine Checklist
Plant :- Location :- Date:-
Index 1 2 3 4 5 6 7 8 9 10
Machine ID No
Model/Make
Power Supply
Condition (Ok/Not
Ok)
Incoming terminal
condition(Ok/Not
Ok)
Out going
Termination With
Lugs(Ok/Not Ok)
Body Erthing
Condition Two
Different Location
Welding cable
condition (Ok/Not
Ok)
Blue colour Gas
hoses are using for
CO2 /Argon
Welding(ok/Not Ok)
On/Off Switch Knob
condition (Ok/Not
Ok)
Remote control
condition (Ok / Not
Ok)
Power Saver
Working Condition
(Ok/Not Ok)
Job erthing
condition (Ok/Not
Ok)
Remarks
Inspected By :- (Name & Signature) Reviewed By :- (Name & Signature)
JECON ENGINEERS PVT.LTD
Grinding Machine Monthly Checklist
Plant :- Location :- Date:-
Sr No 1 2 3 4 5 6 7 8 9 10
Machine ID No
Model/Make
Power Supply Condition
(Ok/Not Ok)
Dead Man Switch Condition
(Ok/Not Ok)
Machine RPM
Wheel RPM
Wheel Nuts Condition
(Ok/Not Ok)
Wheel Guard Condition
(Ok/Not Ok)
Machine Vibration (Ok/Not
Ok)
Remarks
Inspected By :- (Name & Signature) Reviewed By :- (Name & Signature)
JECON ENGINEERS PVT.LTD
Gas Cutting Set Checklist
Plant :- Location :- Date:-
Sr No 1 2 3 4 5 6 7 8 9 10
Gas- Cutting Trolly ID Number.
Pressure Gauges Condition.
Flash back (NRV) Arrestors
Oxy-acetylene
NM Type Torch Use.
Valve / Safety Cap Condition.
Regulators Condition.
Gas Hose Pipe Condition.
Availability Of Soap Solution
Bottle.
45 Degree In Stand & Properly
Secured (chained)
Hydro Tested Cylinders Using At
Site. (yes/No)
Remarks
Inspected By :- (Name & Signature) Reviewed By :- (Name & Signature)