0% found this document useful (0 votes)
36 views4 pages

Jay Bhatt CV Updated

CV

Uploaded by

bhattjay161196
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views4 pages

Jay Bhatt CV Updated

CV

Uploaded by

bhattjay161196
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

CURRICULUM VITAE

Name: Bhatt Jay Lalitkumar


Mobile No: +91-8153082009
Email: bhattjay566@gmail.com

 Professional Summary:
• Civil Engineer with more than 4 years of experience in execution of Building
work, Viaduct work, sinking of well, Micro Tunnelling Work, and Road work.
• Exposure in handling Project execution, Site Planning, Estimation & Billing,
Variation, Technical Field solutions & Documentation.
• Well familiar with Indian Standards. Also well versed CPWD specification and
Special Conditions of Contracts.
• Excellent knowledge of all rules, regulations and documentation required in the
construction industry.

 Career Objective:

To build career in a growing organization, where I can get the opportunities to prove my
abilities by accepting challenges, fulfilling the organization goal and climb the career
ladder through continuous learning and achievement. A job that gives me opportunities
to learn, innovate and enhance my skills and strengths in conjunction with company
goals and objectives.

 Work Experience
1). 01st -August-2021 to Current.
 Company Name: National High Speed Rail Corporation Limited( On Pay roll
of Godawari farms & Services) (From 01 August 2021 to till now)
Posting: National High Speed Rail Corporation Limited, Vadodara Office.
Project: Mumbai Ahmedabad High Speed Rail Project. (MAHSR C-5, C-6, &
Utilities)
Position Held: Assistant Executive (Civil) & Office Assistant (Civil)

Job Responsibilities:

1. Execution & Supervision of Pile boring & Casting, and pile cap activity.
Supervision of execution of Pilling Work for elevated viaduct. Pile depth varying
from 35m to 40m and up to 1.5m dia for MAHSR C-5 Package.
2. Execution & Supervision of viaduct related activities e.g. Pile, Pile Cap, Pier, Pier
Cap work etc.
3. Execution & supervision of Reconstruction of Part Railway RUB No. 593 near
Priyalaxmi Mill/Platform no.7 of Vadodara Railway Station in connection with
MAHSR project for C-5 package. Which also include piling work to protect
Railway Track and Embankment during the course of construction of RUB 593.
Project status: Completed
4. Execution and Supervision of Construction of ARME (Accidental Relief Medical
Equipment) Pit near Vadodara Railway Station in Connection with MAHSR C-5
Project. Project status: Completed
5. Execution & supervision of shifting various underground services (Sewerage,
Water, Storm water pipe line from janmahal to pandya bridge (Approx 1.2km) by
Well Sinking, manual pushing method and Micro Tunneling Method in connection
with MAHSR project for C-5 package. Project status: Completed.
6. Shifting Sewer line in sayaji colony and near foot over bridge of Vadodara
Railway Station in connection with MAHSR C5 Package.
7. Launching of Pre-cast RUB with 6 RCC Boxes of size 4.65 m X 6.00 m (3 M long
segments) weighing 110 MT each under BG track (Connecting chord line
between ADI- BRC line & GDA- BRC line) in MAHSR alignment with help of
three cranes having capacity 700 MT, 500 MT & 340 MT, completed in a record
time of 6 Hrs under power and traffic block by cut and cover method. - Project
Status: Completed.
8. Erection of precast compound wall 2.0M high including RCC foundation of
Suncity paradise society near vishwamitri station in connection with MAHSR-C5
Package. Project status: Completed
9. Construction of RCD office (G+1), and Temple in vadodara area in Connection
with MAHSR C5 Package. Project status: Completed
10. Construction of SSE/Bridge Building (G+2) In Vadodara railway station area.
11. Shifting of road and utilities adjoining to MAHSR station building on old chhani
road of Vadodara in connection with Mumbai-Ahmedabad High Speed Rail
Project. Project Status: In progress.
12. RA Bill certification and approval for payments, processing and verification of
Variations, Extra Items, Extension of Time (EOT) in line with the Contract
Conditions, preparing of estimates for various work.
13. Correspondence with contractors and other stakeholders
14. Coordinates with Western Railway & local bodies like PWD/R&B, Vadodara
Municipal Corporation to get all kind of permission for doing construction within
the city.
2). 25th August to 2020 to 30th July 2021.- Structure Engineer Intern.
 Company Name: Gurukrupa Infrastructure

Job Responsibilities:
I was working as a site engineer, where I was responsible for carrying out following
work
1. Supervision and Execution of cross drainage works like RCC Box Culvert of
sizes 1* 6m*6m, 1*6*5, 2*5*3, 1*2*2.
2. Supervision and execution of RCC Protection wall work.
3. Earth work, GSB, WMM laying and road profile making work.
4. Making bar bending schedule for various structures.
5. Checking of bills submitted by sub-contractors as per work done.
6. Liaisonning work related to site.

 Academic Qualification:

Achievement Stream Board/University Percentage/CGPA


B.E. Civil Gujarat Technological 9.45 CGPA
Engineering University
DIPLOMA Civil The Maharaja Sayajirao 64.29%
Engineering University
SSC - GSEB 82.2%
CERTIFICATE Autocad Bright Education A(Grade)
COURSE
CERTIFICATE Primavera P6 Synergy Business School -
COURSE

 Key Skills & Attributes:

I have good knowledge of civil engineering activities and technical aspects of civil
engineering work and able to implement it in real working environment. I am good at
supervising, delivering and assuring the quality of work. I am also familiar with billing
and estimation work. I have a super critical thinking skill and ability evaluates design,
plans and project. Apart from this I have following skills.
 Site Execution
 Project management
 Primavera P6
 Project Scheduling, Tracking, Reporting
 Good hands on Autocad 2D&3D
 Good hands on MS Office
 Soft Skills:
 Team player and ability to work in high pressure environments, with stringent
deadlines.
 Ability to plan jobs and assign them to the appropriate person.
 Ability to communicate efficiently with clients and superiors.
 Timely decision-making skills in case of critical situations
 Quick and always eager to learn new technologies
 References
1. Name: Shri Pradeep Ahirkar,
PCPM-NHSRCL,
National High-Speed Rail Corporation Ltd, Vadodara
Mobile No.: +91-7227909600

2. Name: Shri Anup Khare


Chief Inspector, JICC
Mobile No:+91-7227909595

3. Name: Shri Gaurav Boolchandani


Assistant Engineer Track, JICC
Mobile No:+91-9033228603