QUOTATION
To: Roberto's Resto
Subject: Rehabilitaion of 10kva genset due to flood.
Item Scope and
General Overhaul of engine of Work
cleaning of internal parts. Labor Charges
1 ( Dismantle and assembly of unit) 6000
Cleaning of Alternator and re insulation, Checking and Cleaning
2 of contacts for genset wirings. 1500
Cleanning of contacts, reinsulated windings of Starter motor.
3 Cleaning of tank and fuel system calibration. 500
Total
8000
Item Description Qty Unit Unit Price Total
1 Air Filter 1 piece 750 750
2 Fuel filter 1 piece 200 200
3 oil strainer 1 piece 350 350
4 SAE30 oil 2 liters 250 500
5 starter relay 100amps 1 piece 300 300
6 insulation varnish 1 liter 750 750
7 other materials (contact cleaner, WD40, Paint Brush, wires, ETC) 1 lot 1500 1500
Total 4350
8 AVR for 10 KVA 1 piece 5000 5000
* NOTE: AVR is subject to confirmation if
deffective upon testing of unit after
rehabilitazation. Total Parts 4350
Labor and Professional fees 8000
GRAND TOTAL PHP12,350
Prepared by:
Darell Jimenez