PERMIT CHECK POINTS
PTW NO : ………………. Location: ……………….
                                                                                                                    Validity From:___________ To:_______________
                                                                        Excavation Work Permit
Excavation work involves are all activities that required to dig soil for any purpose can not start without work permit.
                                            Measure                                                                                          Remarks
            Instruction to Personnel regarding hazards and working procedure (TBT record)
    1                                                                                                                YES                NO                      N/A
    2       Underground services are checked                                                                         YES                NO                      N/A
    3       Water level and soil condition checked.                                                                  YES                NO                      N/A
    4       Excavation plan clearly shows side sloping and width shoring                                             YES                NO                      N/A
            Barricading of the area done
    5                                                                                                                YES                NO                      N/A
    6       Access to excavator and worker is available                                                              YES                NO                      N/A
    7       Warning signs like “Deep excavation, work in progress” are displayed                                     YES                NO                      N/A
            Operator of all excavation machinery is having valid licenses
    8                                                                                                                YES                NO                      N/A
    9       Entry to unauthorized persons is restricted                                                              YES                NO                      N/A
            Proper side slope is maintained
   10                                                                                                                YES                NO                      N/A
            Suitable dewatering arrangement has been made
   11                                                                                                                YES                NO                      N/A
            All workers have been provided with suitable PPE
   12                                                                                                                YES                NO                      N/A
            All electrical connection has been checked for damage, and provided with ELCB
   13                                                                                                                YES                NO                      N/A
            No material is loaded near the edge of the pit(Minimum 1.5m distance must be
   14                                                                                                                YES                NO                      N/A
            maintained from the pit edge)
            Nobody is working in the excavated area without permission.
   15                                                                                                                YES                NO                      N/A
            Disposal area is clearly specified.
   16                                                                                                                YES                NO                      N/A
            Suitable ladder or steps provided if depth of pit is more than 1.2meter
   17                                                                                                                YES                NO                      N/A
            No person below 18 Yr. age is working on site
   18                                                                                                                YES                NO                      N/A
            Excavated pit is covered to avoid falling of personnel
   19                                                                                                                YES                NO                      N/A
   20       Sufficient illumination level available                                                                  YES                NO                      N/A
   21       Any other Precautions taken:- ………………………………………………………………………………………………………………..
Tick As Applicable
         Fire extinguisher at place                    Security Guard / Helper                       Non Sparking Tools                             Bucket of water
        Bucket Of Sand                                   Fire watcher                               Provision Of low Voltage Light                  Fire Hose prepared
        Post Work Fire inspection                       Communication                               Flying Sparks protection                       Escape route + kept Clear
        Fire resistant clothing                         Electrical Tools Grounded                     Ventilation                                  Barriers, Warning signs
        Respirators                                       Safety Harness With Life line              Miscellaneous
            I have checked the above points and found conditions suitable to undertake the work:
                                                                                            ________________________________________
                    Permit Applicant ( Site Enng/ Sr. Sup):-  Name ( in block letters) / date/ signature
Note: Excavation work Permit can be ontained for One shift only & it can be extended for the immediate next shift if the work could not be completed with in one shift.
            Section in-charge - Name/Signature/Date                                           Cross check by Safety person - Name/Signature/Date
Note :- We the undersigned, hereby confirm to perform the above mentioned work in compliance with the relevent legal requirements, industrial
practices, site rules and regulation and Rustomjee safety guidelines. Implemetation of above safety standards /precautions shall be the sole
responsibilty of the contractor performing the work. The site management of the Rustomjee assumes no liability in this regard.
                                                         PERMIT CHECK POINTS
Note :- We the undersigned, hereby confirm to perform the above mentioned work in compliance with the relevent legal requirements, industrial
practices, site rules and regulation and Rustomjee safety guidelines. Implemetation of above safety standards /precautions shall be the sole
responsibilty of the contractor performing the work. The site management of the Rustomjee assumes no liability in this regard.