Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 1 of 4
TITLE: Pipeline Tie-In PROJECT: Rev: 00
DEVELOPED BY: HSE Team DATE: 06/07/20 APPROVED BY: SIGN: DATE:
Mandatory PPE to be
PPE worn as
→ required
→
SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS
HSE team to assess continuously the
Work condition not safe conditions of work in the assigned area
Procedures and tasks not clear One person to issue work permits PTW system Activity supervisor
Lack of supervisory Toolbox talks / Foreman
Permitting Miscommunication High Competency of personnel and supervisory Tool box Low
work Not correct PPE worn for the activity Talk
Equipment not inspected and Define hierarchy and reporting flowcharts PTW system
certified Define proper PPE to be used for the work Inspection coordinator
Check inspection certificates of equipment certificates
for the job
Lifting equipment failure Check and inspect lifting gears
Pipe falling on personnel Never work under suspended pipe PPE
Moving pipe hitting workers or Control lifted pipes with ropes / tag lines
Lifting pipe equipment Machine operator to watch for ground First aid kit Activity supervisor
with Heavy machine hitting ground High personnel Low
excavator or personnel Keep heavy machines at safe distance from High visibility HSE officer / supervisor
side-boom Trench collapse due to heavy machine the trench jackets
vibration Have good communication / visibility with the
Miscommunication with excavator / excavator or side-boom operator Tag lines
side-boom operator Never insert hand / finger in between the
Trapped hand /finger between pipe and pipe and choker-belt
choker-belt when slinging
Page 1 of 4
Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 2 of 4
SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS
Personnel fall in the trench Keep working at safe distance from the
Worker slip / trip and fall when getting in trench PPE
and out of the trench Use correct ladder to get in and out of the Activity supervisor
Working in Personnel hit by the pipe when lowering High trench First aid kit Low
the trench / spotting in the trench Keep away from the trench when lowering or HSE officer / supervisor
Equipment / tools / objects falling on the spotting the pipe in the trench Ladder
personnel working in the trench Keep equipment and tools at safe distance
Trench collapse on the employees from the trench Rope
inside Keep heavy machines at safe distance from
Personnel hit by gas bottles falling in the trench to avoid collapse from vibration
the trench Do not stand gas bottles at trench edges
Lower tools carefully with ropes if necessary
Ignition source Isolate area from combustibles Labelling
Fire High Keep away from flammable liquid and gases Low Activity supervisor
Explosion Use designated welding area Fire extinguisher
Electrical shocks Fire extinguisher in place HSE officer / supervisor
Electrical isolation between lifting equipment Electrical isolation
and pipe
Welding Burns Wear long sleeves leather gloves PPE Activity supervisor
And Fire catch to clothes and PPE High Wear fire retardant uniforms Low
Grinding Wounds by hot torch at the face or Wear welding mask when welding Fire retardant HSE officer / supervisor
parts of the body Wear face shield when grinding uniform
Welding fumes harming to eyes Protect face and eyes with welding mask PPE Activity supervisor
Welding fumes go with respiratory High Use mask ventilation system Low
system causing suffocation and Wear respiratory system protection with Ventilation system HSE officer / supervisor
diseases replaceable cartridges
Have ventilation system if enclosed area
Page 2 of 4
Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 3 of 4
SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS
Compressed gas bottles explosion Inspect gas bottles before transportation and
Person hit by fallen bottle use PPE Activity supervisor
Bottle on the ground causing tripping Use proper lifting machines and trolley
hazard High Keep gas bottles stand and protected from Fire extinguisher Low HSE officer / supervisor
Bottle valve failure falling
Gas hoses burst causing fire or Continuously check hoses condition and Trolley
suffocation replace if necessary, respect expiry date
Check valve failure causing explosion stamped on the hose
Inspect check valves between hoses and
replace if expired
Toxic gas harm to health and cause Have correct labelling on the gas bottles Activity supervisor
suffocation and / death High Always check the valves on the bottles for Labelling Low
Welding correct working or storage position HSE officer / supervisor
And Keep storage area ventilated
Grinding
Eyes harmed by welding arc radiation Wear welding mask to protect eyes from Welding mask Activity supervisor
Eyes harmed by welding fumes High radiation Low
Have a sufficient ventilation system in the Ventilation system HSE officer / supervisor
mask
Finger / hand cut by grinder Wear long sleeves leather gloves Activity supervisor
Laceration or scratch due to file High Inspect tools before use PPE Low
slippage Use proper tools for filing and hammering HSE officer / supervisor
Finger / hand injuries by hammering
Power tools vibration harming to the Avoid long exposure to vibration Fatigue Activity supervisor
body or parts of the body Medium Wear ear defenders when working with management Low
High noise when using grinder grinder or driller HSE Officer
Ear defender
Page 3 of 4
Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 4 of 4
SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS
Equipment and tools remain on site Put back equipment to proper place Plastic bags Activity supervisor
House Slip trip and fall Medium Clear all work place from trash Low
keeping Trash left in the work place Segregate trash Trash bins HSE Officer
Participants Reviewed By: Name: Date:
Name (Print Clearly): Signature: Date: Review Comments:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Responsible Supervisors / Foreman
1.
2.
Page 4 of 4