0% found this document useful (0 votes)
57 views4 pages

Pipeline Tie-In

Uploaded by

Hse Group
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views4 pages

Pipeline Tie-In

Uploaded by

Hse Group
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Contractor: Client:

Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 1 of 4

TITLE: Pipeline Tie-In PROJECT: Rev: 00

DEVELOPED BY: HSE Team DATE: 06/07/20 APPROVED BY: SIGN: DATE:

Mandatory PPE to be
PPE worn as
→ required

SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS

 HSE team to assess continuously the


 Work condition not safe conditions of work in the assigned area
 Procedures and tasks not clear  One person to issue work permits PTW system Activity supervisor
 Lack of supervisory  Toolbox talks / Foreman
Permitting  Miscommunication High  Competency of personnel and supervisory Tool box Low
work  Not correct PPE worn for the activity Talk
 Equipment not inspected and  Define hierarchy and reporting flowcharts PTW system
certified  Define proper PPE to be used for the work Inspection coordinator
 Check inspection certificates of equipment certificates
for the job

 Lifting equipment failure  Check and inspect lifting gears


 Pipe falling on personnel  Never work under suspended pipe PPE
 Moving pipe hitting workers or  Control lifted pipes with ropes / tag lines
Lifting pipe equipment  Machine operator to watch for ground First aid kit Activity supervisor
with  Heavy machine hitting ground High personnel Low
excavator or personnel  Keep heavy machines at safe distance from High visibility HSE officer / supervisor
side-boom  Trench collapse due to heavy machine the trench jackets
vibration  Have good communication / visibility with the
 Miscommunication with excavator / excavator or side-boom operator Tag lines
side-boom operator  Never insert hand / finger in between the
 Trapped hand /finger between pipe and pipe and choker-belt
choker-belt when slinging

Page 1 of 4
Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 2 of 4

SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS

 Personnel fall in the trench  Keep working at safe distance from the
 Worker slip / trip and fall when getting in trench PPE
and out of the trench  Use correct ladder to get in and out of the Activity supervisor
Working in  Personnel hit by the pipe when lowering High trench First aid kit Low
the trench / spotting in the trench  Keep away from the trench when lowering or HSE officer / supervisor
 Equipment / tools / objects falling on the spotting the pipe in the trench Ladder
personnel working in the trench  Keep equipment and tools at safe distance
 Trench collapse on the employees from the trench Rope
inside  Keep heavy machines at safe distance from
 Personnel hit by gas bottles falling in the trench to avoid collapse from vibration
the trench  Do not stand gas bottles at trench edges
 Lower tools carefully with ropes if necessary

 Ignition source  Isolate area from combustibles Labelling


 Fire High  Keep away from flammable liquid and gases Low Activity supervisor
 Explosion  Use designated welding area Fire extinguisher
 Electrical shocks  Fire extinguisher in place HSE officer / supervisor
 Electrical isolation between lifting equipment Electrical isolation
and pipe

Welding  Burns  Wear long sleeves leather gloves PPE Activity supervisor
And  Fire catch to clothes and PPE High  Wear fire retardant uniforms Low
Grinding  Wounds by hot torch at the face or  Wear welding mask when welding Fire retardant HSE officer / supervisor
parts of the body  Wear face shield when grinding uniform

 Welding fumes harming to eyes  Protect face and eyes with welding mask PPE Activity supervisor
 Welding fumes go with respiratory High  Use mask ventilation system Low
system causing suffocation and  Wear respiratory system protection with Ventilation system HSE officer / supervisor
diseases replaceable cartridges
 Have ventilation system if enclosed area

Page 2 of 4
Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 3 of 4

SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS

 Compressed gas bottles explosion  Inspect gas bottles before transportation and
 Person hit by fallen bottle use PPE Activity supervisor
 Bottle on the ground causing tripping  Use proper lifting machines and trolley
hazard High  Keep gas bottles stand and protected from Fire extinguisher Low HSE officer / supervisor
 Bottle valve failure falling
 Gas hoses burst causing fire or  Continuously check hoses condition and Trolley
suffocation replace if necessary, respect expiry date
 Check valve failure causing explosion stamped on the hose
 Inspect check valves between hoses and
replace if expired

 Toxic gas harm to health and cause  Have correct labelling on the gas bottles Activity supervisor
suffocation and / death High  Always check the valves on the bottles for Labelling Low
Welding correct working or storage position HSE officer / supervisor
And  Keep storage area ventilated
Grinding

 Eyes harmed by welding arc radiation  Wear welding mask to protect eyes from Welding mask Activity supervisor
 Eyes harmed by welding fumes High radiation Low
 Have a sufficient ventilation system in the Ventilation system HSE officer / supervisor
mask

 Finger / hand cut by grinder  Wear long sleeves leather gloves Activity supervisor
 Laceration or scratch due to file High  Inspect tools before use PPE Low
slippage  Use proper tools for filing and hammering HSE officer / supervisor
 Finger / hand injuries by hammering

 Power tools vibration harming to the  Avoid long exposure to vibration Fatigue Activity supervisor
body or parts of the body Medium  Wear ear defenders when working with management Low
 High noise when using grinder grinder or driller HSE Officer
Ear defender

Page 3 of 4
Contractor: Client:
Ref: BO/HOO/TEND-02-20/131/2020
Date: 06/07/2020
Project: Tender (02/2020) Tie-In of New ESP Wells B-117 to Station (2) at Amal
Field Sheet No.: Page 4 of 4

SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES POST RISK
REQUIREMENTS

 Equipment and tools remain on site  Put back equipment to proper place Plastic bags Activity supervisor
House  Slip trip and fall Medium  Clear all work place from trash Low
keeping  Trash left in the work place  Segregate trash Trash bins HSE Officer

Participants Reviewed By: Name: Date:


Name (Print Clearly): Signature: Date: Review Comments:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Responsible Supervisors / Foreman