Footing Formwork
Formworks NGL to tie Tie beam Base Area Side Area No. of
Above Footing: thickness NGL to footing base Length Width Perimeter (m) Height No. of units s Area
(sq.m) beam base thickness (sq.m.) (sq.m.) sides
(INPUT HERE) (sq.m.)
Short Column CF1 0.35 1.75 1 0.4 0.35 0.35 1.4 0.8 0.28 4 2 2.24
F1 0.325 1.75 1 0.4 0.35 0.35 1.4 0.825 0.28875 4 3 3.465
F2 0.35 1.75 1 0.4 0.35 0.35 1.4 0.8 0.28 4 1 1.12
F3 0.375 1.75 1 0.4 0.35 0.35 1.4 0.775 0.27125 5 1 1.35625
COMB_F1 0.4 1.75 1 0.4 0.35 0.35 1.4 0.75 0.2625 6 2 3.15
COMB_F2 0.5 1.75 1 0.4 0.35 0.35 1.4 0.65 0.2275 7 2 3.185
MAT_F1 0.5 1.75 1 0.4 0.35 0.35 1.4 0.65 0.2275 8 3 5.46
Stair Column 0.225 0.9 0 0.4 0.175 1.14 2.63 1.075 0.188125 9 1 1.693125
Total Length
Tie Beam 63.2 0.4 0.3 18.96 1.4 2 50.56
Total
Formworks 72.22938
(sq.m.)
No. of Pair (1
carpenter+1 3
helper)
Rate
8
(sqm/day)
Duration 3
Weight x
Weight x Total Area Base Course
Weight in kg. Weight (6m) Weight (7.5m) Pieces (6m) Pieces (7.5m) Pieces Sum Base Course Area No. of units
Pieces (6m) (sq.m.) Volume (cu.m)
(7.5m)
16mm Dia 9.474 11.8425 1 1 9.474 11.8425 21.3165 CF1 3 0 0 0
20mm Dia 14.796 18.495 63 32 932.148 591.84 1523.988 F1 3.0625 3 9.1875 0.91875
Total 1545.3045 F2 4 1 4 0.4
Rate in
200 F3 6.25 1 6.25 0.625
kg/day
No. of pair
(Steelman+ 3 COMB_F1 6.125 1 6.125 0.6125
Helper)
Duration 3 COMB_F2 6.125 1 6.125 0.6125
MAT_F1 15.75 1 15.75 1.575
Stair Footing 0.684 1 0.684 0.0684
Tie Beam 18.975 1 18.975 1.8975
Total
7.380615
Volume
Rate
1
(cu.m/day)
No. of Men 9
Duration 1
Column
20mm Dia.
Remaining Concrete Length per Subtotal Main bars 10mm Dia. Tie Length per Length per Subtotal Ties Total
RSB (kg) Label Development Length No. of Units Main Bars
Height cover cut Length weight (kg) (cuts/unit) cut (Tie 1) cut (Tie 2) Length weight Weight
(cut/unit)
(kg)
Short Column CF1 1.15 0.6 0.075 2 1.675 8 26.8 66.0888 11 1.32 0.68 44 27.104 93.1928
F1 1.15 0.6 0.075 3 1.675 8 40.2 99.1332 11 1.32 0.68 66 40.656 139.7892
F2 1.15 0.6 0.075 1 1.675 8 13.4 33.0444 11 1.32 0.68 22 13.552 46.5964
F3 1.15 0.6 0.075 1 1.675 8 13.4 33.0444 11 1.32 0.68 22 13.552 46.5964
COMB_F1 1.15 0.6 0.075 1 1.675 8 13.4 33.0444 11 1.32 0.68 22 13.552 46.5964
COMB_F2 1.15 0.6 0.075 1 1.675 8 13.4 33.0444 11 1.32 0.68 22 13.552 46.5964
MAT_F1 1.15 0.6 0.075 1 1.675 8 13.4 33.0444 11 1.32 0.68 22 13.552 46.5964
Column
16mm Dia. 10mm Dia.
Remaining Concrete Length per Subtotal Main bars Length per Length per Subtotal Ties
Label Development Length No. of Units Main Bars Main Bars Tie
Height cover cut Length weight (kg) cut (Tie 1) cut (Tie 2) Length weight
(cut/unit) (cuts/unit)
(kg)
Stair Column 1.3 0.32 0.075 1 1.545 6 9.27 14.63733 4 3.18 12.72 7.83552 22.47285
Scaffolding(1
Layouting Total
perimeter No. of units Total perimeter (m) 2 lengths per
Estimate perimeter (ft)
footing)
CF1 7 2 14 24
F1 7 3 21 36
F2 8 1 8 12
F3 10 1 10 12
COMB_F1 10.5 1 10.5 12
COMB_F2 10.5 1 10.5 12
MAT_F1 16 1 16 12
Stair Footing 3.48 1 3.48 12
Tie Beam 115.64 1 115.64 12
Total total
209.12 685.9136 144
perimeter
2x2x8 coco
85.7392 pcs 144 pcs
lumber
229 bd.ft 384 bd.ft
Duration 2 4