Modification work
APH erosion rate will get minimise and elimination of
1 Modification work of BAC outlet line Box to be provided with divertion plate
clinkeraization
2 Provision to operate air blaster in DCS
Platform to be made in CFBC fly ash silo for
3
opening and closing of bulker door
4 Reduction of service air compressor power
5 Optimaisation in ACW pressure
6 Optimaisation in BFP power at low load
7 Optimisation of BFP Power by improvement in
attemperator efficiency.
8 Optimize the Boiler Fans powerby optimise the
pressure Drop
9 CHP Power consumption
10 Plant Heat rate rate improvement by DM water
auto spray
11 Machine guarding as per safety satadard in belt
conveyors with limit switch
12 Automation of Secondary air Upper& lower
nozzle with respect to Boiler Loading
13 Firing the Alternative Fuel ratio
14
Proper Drainage to be required for reject water
15 proper coverage of HRSCC top to avoid bacterial
growth & foreign particles/ matter
16
proper Tagout and Tagin of drives to be provided