54
Cost Estimate
Providing and fixing the Tar paper bearing complete as per drawing and
5.09 Technical specifications and as directed by the Engineer-in-charge. sqm -
Supplying, fitting and fixing in position true to line and level elastomeric
bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of
5.10
MoRTH specifications complete including all accessories as per drawing and
cucm -
Technical Specifications.
Providing and laying 65 mm wearing course on top of deck slab consisting of
25 mm thick mastic asphalt wearing course and 40 mm thick Bituminous
concrete laid to required level and slope after cleaning the surface, including
providing antiskid surface with bitumen precoated finegrained hard stone
5.11 chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at sqm -
an approximate spacing of 10 cm center to center in both directions, pressed
into surface when the temperature of surfaces is not less than 1000C,
protruding 1 mm to 4 mm over mastic surface, all complete as per clause
507 and 516.
Providing and laying 75 mm wearing course on top of deck slab consisting of
25 mm thick mastic asphalt wearing course and 50 mm thick Bituminous
concrete laid to required level and slope after cleaning the surface, including
providing antiskid surface with bitumen precoated finegrained hard stone
5.12 chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at sqm -
an approximate spacing of 10 cm center to center in both directions, pressed
into surface when the temperature of surfaces is not less than 1000C,
protruding 1 mm to 4 mm over mastic surface, all complete as per clause
507 and 516.
Construction of precast RCC railing of M35 Grade, true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, leaving adequate
5.16 space between vertical post for expansion, complete as per drawing and m -
Technical specifications and as directed by the Engineer-in-charge.
55
Cost Estimate
Printing of culvert No. and span arrangement of any shade with synthetic
enamel paint black or any other approved colour to give an even shade as
5.26
complete as per Technical specifications and as directed by the Engineer-in-
nr 38 38.00
charge.
5.27 Wearing Coat 65mm thk Sqm 2204.68 2,204.68
56
Cost Estimate
SUMMARY OF QUANTITIES OF BOX CULVERTS
(1x2x2) D (1x2x3) D (1x3x3) D (1x2x2) D
(1x2x2) (1x3x2) (2x3x3)
Sl. No. Description Unit Left Left Left Right Quantity
8 2 3 1 1 2 1
1 Earthwork in excavation cum 530.56 208.63 136.52 45.51 54.58 89.63 88.09 1,153.51
2 PCC M15 levelling course cum 339.53 121.21 92.72 30.91 33.39 60.20 28.40 706.34
3 RCC M30 for structure cum 377.32 121.91 165.38 55.13 64.88 91.82 190.05 1,066.47
4 RCC M30 grade in Approach Slab cum 246.96 61.74 88.57 29.52 29.52 56.35 30.87 543.53
5 RCC M40 grade for Crash barrier -
6 Filler board type expansion joint Rm 201.60 50.40 72.30 24.10 24.10 46.00 25.20 443.70
7 Drainage spouts Nr. 16.00 4.00 6.00 2.00 2.00 4.00 2.00 36.00
8 Elastomeric Bearing Cu.Cm. -
9 Flexible Apron cum 25.92 6.48 4.86 1.62 1.62 3.24 - 43.74
10 Filter media cum 278.21 69.55 143.15 47.72 47.72 63.48 106.60 756.43
11 Back filling cum 923.58 230.90 681.86 227.29 227.29 210.74 1,084.70 3,586.36
12 RCC M25 in footpath cum -
13 PVC Pipe 100 mm dia Nr. -
14 Weep holes Nr. 432.00 162.00 156.00 52.00 78.00 100.00 81.00 1,061.00
15 Reinforcement Tonne 41.50 13.41 18.19 6.06 7.14 10.10 20.91 117.31
16 Wearing Coat 65mm thk Sqm 957.60 267.12 343.43 114.48 126.53 218.50 177.03 2,204.68
17 Painting of structure no. Nr. 16.00 4.00 6.00 2.00 2.00 4.00 4.00 38.00
57
Cost Estimate
Box Culvert
No of Cell 1
Total Proposed Width 13.50 m
Clear Span 2.00 m
Clear Height of Box 2.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.30 m
Thickness of Side Wall of Box 0.25 m
Thickness of middle Wall of Box m
Projection of Bottom Slab m
Width of wearing coat 13.50 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath 1.50 m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath 2.00
Width of PCC for Box 2.80 m
Thickness of PCC 0.15 m
Wearing Coat Thickness 0.065 m
58
Cost Estimate
59
Cost Estimate
Box Culvert
No of Cell 1
Total Proposed Width 13.50 m
Clear Span 3.00 m
Clear Height of Box 2.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.30 m
Thickness of Side Wall of Box 0.30 m
Thickness of middle Wall of Box m
Projection of Bottom Slab m
Width of wearing coat 13.50 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath
Width of PCC for Box 3.90 m
Thickness of PCC 0.15 m
Wearing Coat Thickness 0.065 m
60
Cost Estimate
61
Cost Estimate
Box Culvert
No of Cell 1
Total Proposed Width 12.95 m
Clear Span 2.00 m
Clear Height of Box 2.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.30 m
Thickness of Side Wall of Box 0.25 m
Thickness of middle Wall of Box m
Projection of Bottom Slab m
Width of wearing coat 12.95 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath 1.50 m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath 2.00
Width of PCC for Box 2.80 m
Thickness of PCC 0.15 m
Wearing Coat Thickness 0.065 m
62
Cost Estimate
63
Cost Estimate
Box Culvert
No of Cell 1
Total Proposed Width 12.95 m
Clear Span 2.00 m
Clear Height of Box 3.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.30 m
Thickness of Side Wall of Box 0.25 m
Thickness of middle Wall of Box m
Projection of Bottom Slab m
Width of wearing coat 12.95 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath 1.50 m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath 2.00
Width of PCC for Box 2.80 m
Thickness of PCC 0.15 m
Wearing Coat Thickness 0.065 m
64
Cost Estimate
65
Cost Estimate
Box Culvert
No of Cell 1
Total Proposed Width 12.95 m
Clear Span 3.00 m
Clear Height of Box 3.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.30 m
Thickness of Side Wall of Box 0.25 m
Thickness of middle Wall of Box m
Projection of Bottom Slab m
Width of wearing coat 12.95 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath 1.50 m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath 2.00
Width of PCC for Box 3.80 m
Thickness of PCC 0.15 m
Wearing Coat Thickness 0.065 m
66
Cost Estimate
67
Cost Estimate
Box Culvert
No of Cell 1
Total Proposed Width 12.40 m
Clear Span 2.00 m
Clear Height of Box 2.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.30 m
Thickness of Side Wall of Box 0.25 m
Thickness of middle Wall of Box m
Projection of Bottom Slab m
Width of wearing coat 12.40 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath 2.00
Width of PCC for Box 2.80 m
Thickness of PCC 0.15 m
Wearing Coat Thickness 0.065 m
68
Cost Estimate
69
Cost Estimate
Box Culvert
No of Cell 2
Total Proposed Width 13.50 m
Clear Span 3.00 m
Clear Height of Box 3.00 m
Depth of Top Slab 0.30 m
Depth of Bottom Slab 0.35 m
Thickness of Side Wall of Box 0.35 m
Thickness of middle Wall of Box 0.35 m
Projection of Bottom Slab m
Width of wearing coat 13.50 m
No of approach slab 2
Width of approach slab 3.50 m
Thickness of approach slab 0.35 m
Width of Footpath 1.50 m
Proposed Formation Level m
Existing Ground Level (Avg) m
STEEL for Box 110 kg/m3
Invert Level m
No of Foothpath 2.00
Width of PCC for Box 7.25 m
Thickness of PCC 0.10 m
Wearing Coat Thickness 0.065 m
No of Drain 2
Width 1.50 m
Side Wall (Drain) m
70
Cost Estimate
71