1 of 4
Course
SL.No                           Title of course                           duration   Fee in INR
                                                                          (weeks)
1.00    COOLING LOAD ESTIMATION                                              4          5000
 A      BASICS OF COOLING LOAD ESTIMATION
1.01    Standards & reference handbooks
1.02    Psychrometrics - Terms, chart
1.03    Solar heat gain through glazing
1.04    Transmisson gain through glazing
1.05    Solar heat gain & Transmisson gain through exposed wall
1.06    Solar heat gain & Transmisson gain through exposed roof
1.07    Transmisson gain through partition wall
1.08    Transmisson gain through partition glass
1.09    Transmisson gain through floor
1.10    Transmisson gain through ceiling
1.11    Sensible heat gain through people
1.12    Sensible heat gain through fresh air
1.13    Sensible heat gain through lighting
1.14    Sensible heat gain through equipments
1.15    Latent heat gain through people
 B      CLASSIFICATION OF COOLING LOAD
1.16    Room sensible heat gain
1.17    Effective room sensible heat gain
1.18    Room latent heat gain
1.19    Effective Room latent heat gain
1.20    Effective Total room heat gain
1.21    Outside air heat gain
1.22    Return air gain
1.23    Grand Total room heat gain
1.24    Question & Answers session
 C      EXAMPLES FOR VARIOUS APPLICATIONS
        IT offices with server room,cafeteria, training rooms, cabins &
1.25
        meeting rooms
        Hospitals - OPD areas, casualty, O.T, ICUs, MRI, CT scan room,
1.26
        patient rooms
1.27    Hotels - Restaurants, banquet halls, guest rooms, party halls
        Malls - Retail stores, hyper markets, departmental stores, food
1.28
        courts & cinema halls
1.29    Pharmacytical industries
2.00    CLASSIFICATION OF AC EQUIPMENT & SELECTION                           4          5000
2.01    TYPES OF AC EQUIPMENT
2.02    BASIC REFRIGERATION CYCLE
2.03    DX UNITS
   i    Hi-wall units
  ii    Cassette units
 iii    Fan coil units
                                                 2 of 4
                                                           Course
SL.No                          Title of course            duration   Fee in INR
                                                          (weeks)
 iv     Ductable units
  v     Package units
 vi     DX AHUs
 vii    Precision air conditioners
 viii   Inrow cooling or rack cooling
2.04    VRF SYSTEM
 A      INDOOR UNITS
   i    Hi-wall units
  ii    Cassette units
 iii    Fan coil units
 iv     Ductable units
 v      Package units
 vi     VRF AHUs
  B     OUTDOOR UNITS
2.05    CHILLED WATER SYSTEM
   i    Water chilling machine / chiller (Water cooled)
  ii    Water chilling machine / chiller (Air cooled)
  iii   Chilled water Pumps
 iv     Cooling tower
  v     Condenser water Pumps
 vi     Air Handling Units
 vii    Hi-wall units
 viii   Cassette units
 ix     Fan coil units
  x     Ceiling suspended AHUs
 xi     Vertical air handling Units
 xii    Precision air conditioners
 xiii   Inrow cooling or rack cooling
2.06    QUESTION & ANSWERS SESSION
2.07    SELECTION OF EQUIPMENT
2.08    DX UNITS
2.09    VRF SYSTEM
2.10    CHILLED WATER SYSTEM
2.11    QUESTION & ANSWERS SESSION
3.00    DUCT SIZING, PIPE SIZING & QUANTIFICATION            4          5000
3.10    Duct sizing
3.20    Chilled water & condenser water pipe sizing
3.30    Refrigerant pipe sizing
4.00    POWER REQUIREMENT CALCULATIONS                       2          1000
4.10    Chiller
                                                   3 of 4
                                                                              Course
SL.No                            Title of course                             duration   Fee in INR
                                                                             (weeks)
4.20    Pump
4.30    AHU
4.40    PAC
4.50    Humidifier
4.60    De-Humidifier
4.70    Heater
5.00    SELECTION OF REFRIGERANTS                                               2          1000
6.00    U-VALUES                                                                2          2000
6.10    Wall
6.20    Glazing
6.30    Ceiling
6.40    Roof with insulation
7.00    PUMP HEAD & FAN STATIC CALCULATIONS                                     2          5000
7.10    Pump head calculations
7.20    Fan static pressure calculation
8.00    PSYCHROMETRY& PSYCHROMETRIC CHART                                       2          1000
9.00    TREATED FRESH AIR UNIT SELECTION                                        1          1000
9.10    Calculation of treated fresh air load
9.20    Types & selection of TFA
9.30    TFA with heat recovery option
10.00   DIRECT & INDIRECT EVAPAORATIVE COOLING                                  2          1000
10.10   Working principle
10.20   Calculations & selection
10.30   Applications
10.00   AIR TERMINALS,DAMPERS,VAV & THRMO FUSE                                  2          1000
        Fire dampers - fusible plug type, motorised type, UL listed & CBRI
10.10
        liisted
10.20   Volume conrol dampers
10.30   Butterfly dampers, collar dampers, non return dampers
10.40   Air terminals - Diffuser, grilles, slot diffusers, jet nozzles
10.50   VAV boxes vs Therma fuse
        VALVES, GUAGES FOR CHILLED WATER CIRCUIT - APPLICATION &
11.00                                                                           2          1000
        SPECIFICATION
11.10   Butterfly valves, Ball valves & Gate valve
11.20   Balancing Valve
11.30   2-way / 3-way modulating valves & motorised ON/OFF valves
11.40   PICV valve
11.50   Non return valve / Check valve
11.60   Y-strainer, suction guide & Pot strainer
11.70   Pressure guages, thermo meters, thermo wells & test points
                                                 4 of 4
                                                                 Course
SL.No                          Title of course                  duration   Fee in INR
                                                                (weeks)
12.00   HEATER AND HUMIDIFIER                                      1          1000
12.01   Humidifer calculations & selection
12.02   Heater calculations & selection
13.00   PRESSURIZATION                                             2          5000
13.01   Staircase
13.02   Liftwell
13.03   Lift lobby
13.04   Question & Answers session
14.00   VENTILTION & EXHAUST                                       2          5000
14.01   Basements - Natural ventilation
14.02   Basements - Mechanical ventilation-Normal & Fire mode
14.03   STP
14.04   DG rooms
14.05   Pump rooms
14.06   Kitchen, hood
14.07   Fume hoods
14.08   Toilets
14.09   Cafeteria
14.10   Auditoriums, Warehouses - Smoke exhaust system
14.11   Question & Answers session
        DESIGN PROCESS – DBR, BOQ, EQUIPMENT SCHEDULE &
15.00                                                              4         15000
        TECHNICAL SPECIFICATIONS
15.01   HVAC drafting & Quantification                                        5000
15.02   Design brief report preparation                                       5000
        BOQ, equipment schedule & specification preparation,
15.03                                                                         5000
        technical submittal preparation
16.00   APPLICATIONS - SELECTION & DESIGN OF HVAC SYSTEM           4          8000
16.01   Office spaces - small, medium & large                                 1000
16.02   Semiconductor labs, Server rooms, data centers                        1000
16.03   Hotels                                                                1000
16.04   Hospitals                                                             1000
16.05   Auditorium & cinema halls                                             1000
16.06   Ware houses                                                           1000
16.07   Shopping malls                                                        1000
16.08   Clean rooms - Pharmaceutical labs                                     1000