Generator Check LST

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views10 pages

Generator Check LST

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Maintenance Log (Compressor)

Frequency : D-Daily, W-Weekly, M-Monthly, Q-Quarterly, H-Half-yearly, A-Annually Date:


Action performed (Yes = Y, No = N, Not Applicable = N/A)
S. Freque
No
Description ncy
1 2 3 4 5 6 7 8 9 10###
###
###14###16###18 19 20###
###23 24 25 26 27 28 29 30###
1 Inspect all air leaks D
Check and replace air
filter and oil filters,if
2 W
required to manufacturer’s
specification.
3 Check Pump Oil Level D
4 Inspection oil Leak D
Check for any unusual
5 D
noise or vibration.
6 Drain water in tank D
Regularly check the
7 condition and tension of W
drive belts where fitted
8 Check safety relief valve M
9 Check and tighten all bolts M
Check service pump or
10 A
engine
Check operating
11 temperatures and D
pressures.
Visual check of mains
electrical switches, wiring
and/or conduit (cracks,
12 W
broken controls etc.)
Arrange for immediate
repair of any faults.
Clear away all dust, fines,
grit, and waste from inside
13 D
and around housings,
cabinets etc.

Page 1 of 10
Maintenance Log (Compressor)
Frequency : D-Daily, W-Weekly, M-Monthly, Q-Quarterly, H-Half-yearly, A-Annually Date:
All guards around moving
14 W
parts in place
Action performed (Yes = Y, No = N, Not Applicable = N/A)
S. Frequ
Description 1 2 3 4 5 6 7 8 9 10###
###
###14###16###18 19 20###
###23 24 25 26 27 28 29 30###
No ency
Compressor in safe
15 W
working condition
Conduct any checks as
required to the
16 D
manufacture
specifications.
Log book available and
17 W
in use
Service and lubricate
the compressor as per
18 W
the manufacturer’s
specification.
Be sure to inspect the
19 Q
motor bearings
Check all control valves
20 A
for proper operation.
Check all safety devices
21 for proper settings and A
operation
Check control panel for
22 complete and proper A
operation.
Check safety shutdown
23 A
system.

Page 2 of 10
Maintenance Log (Compressor)
Frequency : D-Daily, W-Weekly, M-Monthly, Q-Quarterly, H-Half-yearly, A-Annually Date:
Check drive motor amps
at compressor full
24 M
capacity and design
pressure.valve inspection
Perform
25 per manufacturer’s Q
manual.
Inspect cylinder or
26 cylinder liner, through Q
valve port, for scoring.
Remove and clean
27 crankcase lubricant A
strainer.

Signature of Generatorr Operator Verify By: Md. Saiful Islam, Electrical I/C

Page 3 of 10
R&G (BD) GARMENT CO., LTD.
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh

Generator Maintenance Schedule


Procedure Frequency
X-Action D-Daily,W-
R-Replace if needed Weekly,M-
Monthly,Q-
S. No Item Remarks
Visual Check Change Clean Test Quarterly,H-
Inspection Half-yearly,
A-Annually

1 Main supply tank level W


2 Day tank level W
3 Day tank float switch W
Supply or transfer pump
4 W
operation
Solenoid valve
5 W
operation
6 Water in system W
7 Oil tank level W
8 Lub oil heater W
9 Cooling system level W

Adequate cooling water


10 W
to heat exchanger

Adequate fresh air


11 W
through radiator
12 Water pump W
Condition of flexible
13 W
house and connection.
14 Jacket water heater W
Exhaust system
15 W
leakage
Exhaust system drain
16 W
condesnsate trap

17 Battery electrolyte level W

Electrical general
18 W
inspection
Prime mover general
19 W
inspection
Generator brush,
20 length, apprearace, free W
to move in holder.

Page 4 of 10
R&G (BD) GARMENT CO., LTD.
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh

Generator Maintenance Schedule


Procedure Frequency
X-Action D-Daily,W-
R-Replace if needed Weekly,M-
Monthly,Q-
S. No Item Remarks
Visual Check Change Clean Test Quarterly,H-
Inspection Half-yearly,
A-Annually

General condition of
EPSS, any unusual
condition of viration,
21 W
leakage, noise,
temperature or
deterioration

Service room or
22 W
housing house-keeping
Restore system to
23 automatic operation W
condition
Battery system remove
24 corrosing, case exterior M
clean and dry
Specific gravity or state
25 M
of charge

26 Charge and charge rate M

27 Equlize charge M
Prime mover govermer
28 M
oil leveland linkage
Strainer, filter,dirt,leg or
29 Q
combination
30 Crankease breather Q
Insulation and fire
31 Q
hazards
Battery terminals clean
32 Q
and tight
Wire chafing where
33 Q
subjects to movements
Antifreeze protection
34 S
level

35 Fexible exhaust section S

Operations of safeties
36 S
and alarm
Boxes, panels,and
37 S
cabinets
38 Service and air cleanr S

Page 5 of 10
R&G (BD) GARMENT CO., LTD.
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh

Generator Maintenance Schedule


Procedure Frequency
X-Action D-Daily,W-
R-Replace if needed Weekly,M-
Monthly,Q-
S. No Item Remarks
Visual Check Change Clean Test Quarterly,H-
Inspection Half-yearly,
A-Annually

Choke setting and


39 S
carburetor adjustment
Comutater and slip
40 S
rings
Fuel system flexible
41 A
house and connectors
Tank vent and overflow
42 A
piping unobstructed
43 Piping A

44 Anntifreeze A

45 Rod out heat exchanger A

46 Clean exiterior radiator A


Inspect duck work,
47 A
clean louvers
Excessive
48 A
backpressure
Exhaust system
49 A
hangers and supports
Tighten control and
50 power wairing A
connection
Transfer switch main
51 A
contacts

52 Governor oil A

Ignition system, plug,


points,, coil, cap, rotor,
53 A
secondary wire
insulation
Injector pump and
injectors for flow
54 A
ratepressure and spray
pattern
55 Rotor and stator A

56 Bearings A

57 Bearing grease A

58 Excitor A

Page 6 of 10
R&G (BD) GARMENT CO., LTD.
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh

Generator Maintenance Schedule


Procedure Frequency
X-Action D-Daily,W-
R-Replace if needed Weekly,M-
Monthly,Q-
S. No Item Remarks
Visual Check Change Clean Test Quarterly,H-
Inspection Half-yearly,
A-Annually

59 Voltage regulator A

Measure and recored


resistance readingsof
60 A
widings with insulation
testor
61 Oilil change 50 or A

62 Oil filter 50 or A

Circute breaker, fuse


Note: Do not crvak
63 manufacturs seals or 2 or M
perfom internal
inspection on the divice

Calibration of voltage -
64 5 or A
sensing relays / device
Wire inspestion
65 5/500 A
breakdown
EPS at minimum of
66 3/4e
80% nameplate rating

67 Valve clearnce 3/500b

68 Tourqu bolts 3/500b

Note : Pictorial evidences with date stamp should be preserved while performing each task. This format is for demonstration
purpose only, this cannot be used as a reference. Based on compressor arrangement, the number of items and frequency of
performance might need to be modified.

Prepared by Authorized by

Page 7 of 10
R&G (BD) GARMENT CO., LTD.
Weekly Maintenance Log
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh (Generator)
Month of:- January-2023
Date:
S.
Items 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
No
1 Main supply tank level N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A F N/A N/A N/A

2 Day tank level N/A N/A N/A N/A N/A R N/A N/A N/A N/A N/A R N/A N/A N/A N/A N/A R N/A N/A N/A N/A N/A R N/A N/A N/A

3 Day tank float switch N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A I N/A N/A N/A

Supply or transfer pump


4 N/A N/A N/A N/A N/A D N/A N/A N/A N/A N/A D N/A N/A N/A N/A N/A D N/A N/A N/A N/A N/A D N/A N/A N/A
operation
Solenoid valve
5 N/A N/A N/A N/A N/A A N/A N/A N/A N/A N/A A N/A N/A N/A N/A N/A A N/A N/A N/A N/A N/A A N/A N/A N/A
operation
6 Water in system N/A N/A N/A N/A N/A Y N/A N/A N/A N/A N/A Y N/A N/A N/A N/A N/A Y N/A N/A N/A N/A N/A Y N/A N/A N/A

7 Oil tank level N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

8 Lub oil heater N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

9 Cooling system level N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Adequate cooling water


10 N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A F N/A N/A N/A
to heat exchanger
Adequate fresh air N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
11 through radiator R R R R
12 Water pump N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A I N/A N/A N/A
Condition of flexible N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
13 house and connection. D D D D
14 Jacket water heater N/A N/A N/A N/A N/A A N/A N/A N/A N/A N/A A N/A N/A N/A N/A N/A A N/A N/A N/A N/A N/A A N/A N/A N/A

15 Exhaust system leakage N/A N/A N/A N/A N/A Y N/A N/A N/A N/A N/A Y N/A N/A N/A N/A N/A Y N/A N/A N/A N/A N/A Y N/A N/A N/A
Exhaust system drain N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
16 condesnsate trap
17 Battery electrolyte level N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Electrical general N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
18 inspection
Prime mover general N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
19 inspection
Generator brush, length,
apprearace, free to N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
20 move in holder. F F F F

Page 8 of 10
R&G (BD) GARMENT CO., LTD.
Weekly Maintenance Log
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh (Generator)
Month of:- January-2023
Date:
General condition of
EPSS, any unusual
condition of viration, N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
leakage, noise,
temperature or
21 deterioration R R R R
Service room or housing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
22 house-keeping I I I I
Restore system to
automatic operation N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
23 condition

Prepeard by Verify By: Md. Saiful Islam, Electrical I/C

Page 9 of 10
R&G (BD) GARMENT CO., LTD.
Monthly Maintenance Log
Bhabanipur, Gazipur Sadar, Gazipur-1700, Bangladesh (Generator)
Month of:- January-2023

S.
Items 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
No
Battery system remove
1 corrosing, case exterior clean N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A N/A F N/A N/A N/A N/A N/A N/A F N/A N/A N/A
and dry

2 Specific gravity or state of charge N/A N/A N/A N/A N/A R N/A N/A N/A N/A N/A N/A R N/A N/A N/A N/A N/A N/A R N/A N/A N/A N/A N/A N/A R N/A N/A N/A

3 Charge and charge rate N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A N/A I N/A N/A N/A N/A N/A N/A I N/A N/A N/A

4 Equlize charge N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Prime mover govermer oil
5 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
leveland linkage

Prepeard by Verify By: Md. Saiful Islam, Electrical I/C

Page 10 of 10