Skip to main content Skip to search
Login links
                                                                      mrimranmazhar
                                                                             Logout
Secondary menu
Home » Content » Add a new rule » Add a new rule » Add a new rule » SAP Certified
Application Associate - SAP S/4HANA Asset Management - Full
SAP Certified Application Associate - SAP
S/4HANA Asset Management - Full
You got 0 of 68 possible points.
Your score was: 0 %
Question Results
Score 0 of 1
(skipped)
Question:
What is a characteristic of the SAP Fiori tile group?
Please choose the correct answer.
      Response:
             It provides an invisible group of SAP Fiori catalogs.
             It is a building block of the SAP Fiori catalog.
             It is assigned using the SET/GET parameters.
             It shows active tiles in SAP Fiori Launchpad.
Score 0 of 1
(skipped)
Question:
You have several defective parts that you need to send to a
subcontractor to get them refurbished. What must you do to trigger
the external refurbishment within the refurbishment order?
Please choose the correct answer.
     Response:
            Create a manual purchase requisition and add the refurbishment order
            number.
            Create an internal activity (control key PM01) and add the defective
            material as non-stock component.
            Create an external activity (control key PM02) within the
            refurbishment order.
            Create a manual purchase order and add the refurbishment order
            number
Score 0 of 1
(skipped)
Question:
You set up the process for Inspection Rounds, so that the technician
can enter measurement readings in a simplified way using the
overall t me confirmation.
What must you do before you set up a general maintenance task
list?
There are 2 correct answers to this question.
     Response:
            Assign a measuring point as a PRT to a Task List Operation.
            Assign a measuring point as inspect on point to the Task List Header.
            Create a piece of PRT equipment and allocate it using the PRT
            overview button.
            Assign a piece of equipment with allocated measuring point to a Task
            List Operation
Score 0 of 1
(skipped)
Question:
Which actions must the engineer perform to serialize a piece of
equipment?
There are 3 correct answers to this question.
     Response:
            Add a serialized material into the construction type field of the
            equipment master.
            Add a serialized material to the equipment serial data view.
            Assign a serial number profile to the equipment master.
            Add a serial number to an existing equipment master.
            Assign a serial number profile to the material master.
Score 0 of 1
(skipped)
Question:
Which of the following are valid scheduling parameters in the
multiple-counter plan?
There are 2 correct answers to this question.
     Response:
            OR-Link
            Start Counter Reading
            Scheduling Period
            Call Horizon
Score 0 of 1
(skipped)
Question:
In which object can you change the Offset of a Maintenance Plan
Strategy?
Please choose the correct answer.
     Response:
            Maintenance Package
            Maintenance Plan Item
            Maintenance Plan Header
            Maintenance Plan Category
Score 0 of 1
(skipped)
Question:
What are the effects when the planner technically completes the
maintenance order?
There are 2 correct answers to this question.
      Response:
            The system closes open reservations.
            The planner CANNOT add an order operation.
            The technician CANNOT create time confirmations.
            The system deletes open purchase orders
Score 0 of 1
(skipped)
Question:
Which options do you have to allow the assignment of order
operations to object list entries?
There are 3 correct answers to this question.
      Response:
            To all object list entries
            To all task lists
            To all maintenance plans
            To all notifications
            Only to notifications created via maintenance plans
Score 0 of 1
(skipped)
Question:
Which of the following process features are part of breakdown
maintenance?
There are 3 correct answers to this question.
     Response:
            Maintenance orders always need planning of maintenance tasks.
            Notifications are used for documentation of technical findings and
            activities performed.
            Orders and notifications can be utilized in combination.
            Maintenance orders can be created as immediate orders without any
            planning.
            Orders created without notifications can be used within the
            Maintenance Event Builder
Score 0 of 1
(skipped)
Question:
Which of the following objects can you directly assign when you
define the work center master record?
There are 2 correct answers to this question.
     Response:
            Business Partner
            Capacity Category
            Calculation Key
            Organizational Unit
Score 0 of 1
(skipped)
Question:
Which of the following are mandatory parameters for a counter used
for performance-based maintenance planning?
There are 2 correct answers to this question.
     Response:
            Characteristic
            Counter Overflow Reading
            Code Group
            Estimated Annual Performance
Score 0 of 1
(skipped)
Question:
Which valuation category do you use to refurbish the material?
Please choose the correct answer.
     Response:
            Condition-based
            In house/External Procurement
            Retail
            Origin
Score 0 of 1
(skipped)
Question:
What is the function of the offset within a maintenance strategy?
Please choose the correct answer.
     Response:
            It shifts the next planned date due to the delay of the confirmation.
            It sets the start date of the maintenance plan.
            It extends the cycle length of a maintenance package.
            It determines the first due date of a maintenance package
Score 0 of 1
(skipped)
Question:
A pump requires regular maintenance based on the throughput in
liters. How can the planner specify the call horizon in the
performance-based maintenance plan?
Please choose the correct answer.
     Response:
            As a quantity of liters
            In hours
            In months
            As percentage of the cycle
Score 0 of 1
(skipped)
Question:
What does the structure indicator define?
There are 2 correct answers to this question.
     Response:
            The category of the functional location
            The field selection for the functional location list
            The hierarchy levels of the function allocation structure
            The allowed characters for a functional location
Score 0 of 1
(skipped)
Question:
What must you do before the system can generate entries in the
action log of an equipment?
Please choose the correct answer.
     Response:
            Define an additional business view for equipment category.
            Assign a user status profile to the equipment category.
            Maintain the setting for the usage history update.
            Set the corresponding flag when you maintain the equipment category
Score 0 of 1
(skipped)
Question:
What is the primary goal of SAP Predictive Maintenance and
Service?
Please choose the correct answer.
     Response:
            To pre-calculate maintenance projects
            To provide advanced cost controlling analyses
            To create a cloud-based equipment directory
            To collect and analyze machine data
Score 0 of 1
(skipped)
Question:
Which UI technologies are supported in SAP S/4HANA Asset
Management when you use SAP Fiori Launchpad?
There are 3 correct answers to this question.
     Response:
            Business Server Pages (BSP)
            Web Dynpro
            SAPU15
            SAP GUI for Windows
            SAP GUI for HTML
Score 0 of 1
(skipped)
Question:
The planner must add an activity to a notification which must be
executed in the future. Which option in the notification that can be
predefined in a catalog, does the planner use?
Please choose the correct answer.
     Response:
            A text in the notification item
            An activity in the notification item
            A text in the subject long text screen
            A task in the notification header
Score 0 of 1
(skipped)
Question:
What is the purpose of the SAP GUI Beize theme?
Please choose the correct answer.
     Response:
            Make SAPUl5 apps available for SAP GUI.
            Create a simplified copy of a transaction.
            Make Web Dynpro apps available for SAP GUI.
            Create a similar user experience as in SAP Fiori Launchpad.
Score 0 of 1
(skipped)
Question:
Which steps in the maintenance order are directly based on data
within the maintenance work center?
There are 2 correct answers to this question.
     Response:
            Cost calculation
            Material availability check
            Damage analysis
            Capacity planning
Score 0 of 1
(skipped)
Question:
What can a planner monitor with the Resource Scheduling for
Maintenance Planners SAP Fiori app?
There are 2 correct answers to this question.
     Response:
            Workload of work centers
            Non-available stock materials
            Maintenance orders NOT confirmed
            Notifications without maintenance orders
Score 0 of 1
(skipped)
Question:
Which of the following is a scheduling indicator?
Please choose the correct answer.
     Response:
            Time - fixed date
            Time - latest date
            Time - eariest date
            Time - key date
Score 0 of 1
(skipped)
Question:
You need to create a structuring element within a BOM without the
view for physical inventory. Which material type do you use?
Please choose the correct answer.
     Response:
            Spare part (ERSA)
            Non-valuated material (UNBW)
            Maintenance assembly (IBAU) O
            Operating supplies (HIBE)
Score 0 of 1
(skipped)
Question:
What must you define for the mater all master before you can
refurbish the corresponding material?
Please choose the correct answer.
     Response:
            MRP type replenishment
            Serial number profile
            Transport group 0001
            Spit valuation of stocks
Score 0 of 1
(skipped)
Question:
The maintenance engineer creates a single cycle plan with a cycle of
12 months and enters the scheduling indicator Time - key date.
Which further scheduling parameter must you enter so that the
calculated call date is always scheduled six months before the
planned date?
Please choose the correct answer.
     Response:
            Enter a Call Horizon of 50%.
            Enter a Tolerance of 50%.
            Enter an Offset of six months.
            Enter a Scheduling Period of six months
Score 0 of 1
(skipped)
Question:
Which of the following parameters are available when you define a
new Maintenance Plan Category?
There are 3 correct answers to this question.
     Response:
            Change Documents
            Maintenance Activity Type
            Call Object
            Order Type
            Completion Date
Score 0 of 1
(skipped)
Question:
Which of the following is a characteristic of SAP S/4HANA?
Please choose the correct answer.
     Response:
            It is a new product.
            It is only available as cloud-based product.
            It is an update of SAP ERP.
            It is available on AnyDB and SAP HANA.
Score 0 of 1
(skipped)
Question:
Which features does SAP S/4HANA include?
There are 2 correct answers to this question.
      Response:
            Unchanged data model
            SAPU15-based UI
            In-memory platform
            Support of any database
Score 0 of 1
(skipped)
Question:
Which parameters are calculated during scheduling of a
performance-based maintenance plan?
There are 2 correct answers to this question.
      Response:
            Monthly performance based on annual estimate
            Daily performance based on annual estimate
            Planned date based on sum of counter readings
            Planned date based on cycle and daily performance
Score 0 of 1
(skipped)
Question:
To which of the following organizational units can you directly
assign a maintenance plant?
Please choose the correct answer.
     Response:
            Standard purchasing organization
            Controlling area
            Personnel area
            Profit center
Score 0 of 1
(skipped)
Question:
What is the consequence when you activate alternative labelling?
Please choose the correct answer.
     Response:
            You can change the primary functional location label and keep the old
            label as a historical label.
            The labelling system must be assigned to the functional location
            category.
            You CANNOT deactivate an alternative labelling.
            You can change a primary functional location label and delete the old
            functional location label
Score 0 of 1
(skipped)
Question:
You are planning maintenance execution on the employee level.
Which combination of SAP objects is mandatory within SAP
S/4HANA?
Please choose the correct answer.
     Response:
            SAP User and Personnel Number
            Planner Group and Personnel Number
            Organizational Unit and Personnel Number
            Business Partner and Personnel Number
Score 0 of 1
(skipped)
Question:
You create a maintenance order with header-based costing. At
which level can the planner display the expected costs?
There are 2 correct answers to this question.
     Response:
            At the work center level
            At the cost element level
            At the value category level
            At the component level
Score 0 of 1
(skipped)
Question:
Which operations can the responsible person perform after a
maintenance order is technically completed?
There are 3 correct answers to this question.
     Response:
            Change the settlement rule.
            Lock or unlock the order.
            Change the planned costs.
            Update the estimated costs.
            Create invoice receipt for delivered materials
Score 0 of 1
(skipped)
Question:
When the planner checks the capacity load of a work center, which
data of the order is used?
There are 2 correct answers to this question.
     Response:
            Amount of work
            Scheduled start
            Duration of the activity
            Basic start
Score 0 of 1
(skipped)
Question:
Why do you create maintenance planner groups?
Please choose the correct answer.
     Response:
            To map a group of persons which plans maintenance budgets
            To map a group of persons responsible for maintenance plans
            To map a group of persons which plans maintenance activities of
            technical objects.
            To map a group of persons responsible for maintenance strategies
Score 0 of 1
(skipped)
Question:
What must you define before you can create a new functional
location?
There are 2 correct answers to this question.
     Response:
            Reference functional location
            Structure indicator
            Status profile
            Functional location category
Score 0 of 1
(skipped)
Question:
When the planner adds a stock material in the order, which
activities are performed next in relation to the order?
There are 3 correct answers to this question.
     Response:
            Perform the availability check.
            Print the material provision list.
            Post the goods receipt.
            Post the goods issue.
            Create the purchase order.
Score 0 of 1
(skipped)
Question:
What is a feature of the Technical Object Breakdowns SAP Fiori app?
Please choose the correct answer.
     Response:
            The underlying lnfoCube
            The presentation in an SAP BW Query
            The underlying CDS View
            The visualization in SAP Lumira
Score 0 of 1
(skipped)
Question:
Which object combination influences the display of fleet-specific tab
strips and fields?
Please choose the correct answer.
     Response:
            Equipment category and measuring point category
            Equipment category and Fleet Object Type
            Fleet Object Type and vehicle usage indicator
            Fleet Object Type and measuring point category
Score 0 of 1
(skipped)
Question:
What is a prerequisite to start a performance-based maintenance
plan?
Please choose the correct answer.
     Response:
            Call Horizon
            Initial Measurement Document
            Cycle Modification Factor
            Scheduling Period
Score 0 of 1
(skipped)
Question:
In which maintenance object can you use an activity type?
There are 2 correct answers to this question.
     Response:
            Maintenance Order Header
            Maintenance Order Operation
            Task List Header
            Work Center
Score 0 of 1
(skipped)
Question:
Which object is mandatory within a refurbishment order?
Please choose the correct answer.
     Response:
            Equipment
            Material
            Serial number
            Functional location
Score 0 of 1
(skipped)
Question:
What are the prerequisites to run SAP Work Manager?
There are 3 correct answers to this question.
     Response:
            Mobile Add-On for SAP S/4HANA
            SAP Geographical Enablement Framework
            SAP Mobile Platform
            Device operating system (iOS, Android, or Windows)
            Sybase Unwired Platform
Score 0 of 1
(skipped)
Question:
At which level can the planner estimate costs in a maintenance
order?
Please choose the correct answer.
     Response:
            At the component level
            At the value category level
            At the work center level
            At the cost center level
Score 0 of 1
(skipped)
Question:
Which materials are displayed when the planner checks the
availability list?
Please choose the correct answer.
     Response:
            Stock and non-stock materials
            Only the stock materials
            Only the non-available stock materials
            Stock materials and Production Resources Tools materials
Score 0 of 1
(skipped)
Question:
What must you assign for a cross-plant planning scenario?
Please choose the correct answer.
     Response:
            The same planner group to multiple planning plants
            The same planning plant to multiple maintenance plants
            Multiple planning plants to a maintenance plant
            The same planner group to multiple maintenance plants
Score 0 of 1
(skipped)
Question:
Which activities can the planner perform by using the Maintenance
Planning Overview with the default filters?
There are 3 correct answers to this question.
     Response:
            Display approved purchase requisitions for non-stock materials for
            which NO purchase order was generated.
            Analyze released maintenance orders whose end date is in the past
            and were NOT finally confirmed.
            Display purchase orders for non-stock materials for which the goods
            receipt was NOT posted.
            Analyze confirmed maintenance orders which were NOT settled.
            Analyze outstanding notifications that have NOT been assigned to a
            maintenance order.
Score 0 of 1
(skipped)
Question:
Where can you assign a main work center?
Please choose the correct answer.
     Response:
            Object list of a maintenance order
            Maintenance plan header
            Task list header
            Task list operation
Score 0 of 1
(skipped)
Question:
Which process step belongs only to the SAP Fiori-based process
report malfunction?
Please choose the correct answer.
     Response:
            Print
            Create measurement reading
            Pause work
            Put in process
Score 0 of 1
(skipped)
Question:
The maintenance engineer creates a single cycle plan with the
following parameters:
The call object is maintenance order
The indicator for separate completion of maintenance call date is NOT set
The indicator for completion requirement is NOT activated Both shift factors
are set to 100%
Which date is relevant for the calculation of further planned dates
for call objects?
     Response:
            Completion date of the maintenance plan
            Technical completion date of the maintenance order
            Planned date of the next call number
            Basic finish date of the maintenance order
Score 0 of 1
(skipped)
Question:
You use SAP Work Manager. Which operations can the Maintenance
Worker execute?
There are 2 correct answers to this question.
     Response:
            Schedule resources
            Change task list
            Create notification
            Create a measurement reading
            Change BOM
            Create a work order on the ESRI map
            Create equipment
            Install equipment
Score 0 of 1
(skipped)
Question:
How can you define the data transfer within a technical object
hierarchy?
There are 2 correct answers to this question.
     Response:
            Use the Data Origin function to change the supported fields for pieces
            of equipment.
            Use the Data Origin function to update the supported fields for bills of
            material.
            Use the reference functional locations to transfer data to the
            corresponding functional locations.
            Use the Data Or gin function to change the supported fields in the
            functional location
Score 0 of 1
(skipped)
Question:
The technical completion of the actual maintenance order was
posted with a delay of 10 days. How can the planner shift the next
planned date by the same amount?
Please choose the correct answer.
     Response:
            Set the shift factor for late completion to 10%.
            Set the shift factor for early completion to 100%.
            Set the shift factor for late completion to 100%.
            Set the shift factor for early completion to 10%.
Score 0 of 1
(skipped)
Question:
Which information does the usage list for equipment display?
Please choose the correct answer.
     Response:
            Failure frequency
            Validity periods
            Material consumption
            Operating hours
Score 0 of 1
(skipped)
Question:
Which actions can you perform with the Create Technical Object SAP
Fiori app?
There are 3 correct answers to this question.
     Response:
            Edit classification data and characteristics
            Create measuring point
            Assign documents
            Display asset viewer
            Change a reference location
Score 0 of 1
(skipped)
Question:
To which objects can you assign a safety plan?
There are 2 correct answers to this question.
     Response:
            Task List
            Maintenance Order
            Work Approval
            Permit
Score 0 of 1
(skipped)
Question:
Which order type do you need when you refurbish defective parts?
Please choose the correct answer.
     Response:
            Order type with refurbishment indicator
            Order type for preventive maintenance
            Order type for breakdown maintenance
            Order type with investment indicator
Score 0 of 1
(skipped)
Question:
Which activities can a planner perform with the Manage Malfunction
Report SAPUl5 app?
There are 3 correct answers to this question.
     Response:
            Print shop papers
            Enter effort
            Enter measurement reading
            Enter material
            Assign work to technician
Score 0 of 1
(skipped)
Question:
What does the planner use to trigger the procurement of external
services from a maintenance order?
Please choose the correct answer.
     Response:
            Special order type
            Special activity type
            Special maintenance activity type
            Special control key
Score 0 of 1
(skipped)
Question:
At which level does the system calculate costs of maintenance
orders?
Please choose the correct answer.
     Response:
            Always on header level depending on the maintenance plant
            On header level or on operation level depending on the controlling
            area
            On header level or on operation level depending on the order type and
            the maintenance planning plant
            Always on operation level depending on the order type and the
            maintenance planning plant
Score 0 of 1
(skipped)
Question:
Where can the planner check the mater al availability?
There are 3 correct answers to this question.
     Response:
            Within the SAP Fior-based background job
            Within an individual order
            From the reservation list
            From the list of orders
            Within the SAP Fiori-based Material Documents Overview
Score 0 of 1
(skipped)
Question:
When does the system create the entries in the web apply job list
for the technician?
Please choose the correct answer.
     Response:
            When the planner performs capacity planning.
            When the planner creates the maintenance order.
            When the planner prints the job card.
            When the planner releases the maintenance order.
Score 0 of 1
(skipped)
Question:
You plan to use the integration of maintenance orders and Project
System (PS) objects. To which PS objects can you assign a
maintenance order?
There are 2 correct answers to this question.
     Response:
            Network operation
            Network header
            WBS element
            Project definition
Score 0 of 1
(skipped)
Question:
You create a revision for a Maintenance Event Builder (MEB)
scenario. Which objects can you manually assign to a revision?
There are 2 correct answers to this question.
     Response:
            Manually created notifications
            Automatically created maintenance orders from a Maintenance Plan
            Manually created maintenance orders
            Automatically created notifications from a Maintenance Plan
Score 0 of 1
(skipped)
Question:
How do you activate subscreens for equipment master data in
customizing?
Please choose the correct answer.
     Response:
            Assign object information parameters to the equipment category.
            Create a view profile and assign it to the equipment category.
            Create a screen group info type and assign the group to the
            equipment category.
            Define the field select on for the equipment master data.
Score 0 of 1
(skipped)
Question:
To which SAP objects can the planner assign a maintenance order to
make a budget available for this order?
There are 2 correct answers to this question.
      Response:
             Investment program item with allocated budget
             WBS element with allocated budget
             Network header with allocated budget
             Functional location with allocated budget
mrimranmazhar
   My Premium Exams
   My account
  o Create content
             Testimonial
                                  Money Back Guarantee
                                        Testimonial
                                           FAQs
                                       Privacy Policy
                                   Terms and Conditions
                                         About Us
                                          Join Us
                                        Contact Us
  All trademarks, service marks, trade names, trade dress, product names and logos
             appearing on the site are the property of their respective owners.
      The site www.erpprep.com is in no way affiliated with SAP SE. Copyright © 2020
                          www.erpprep.com. All rights reserved.