0% found this document useful (0 votes)
18 views1 page

Concrete Tank Sub Structure

Uploaded by

raja.race07
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Concrete Tank Sub Structure

Uploaded by

raja.race07
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONCRETE ORDER FORM

Customer Name: Jumaira Beach Building Contracting L.L.C Date: 11/18/2024


Job No.: J:160 Delivery Date: 18/11/2024 18:00 PM
Project Name: Proposed G Only Workshop, G+M Office, Open Maintenance Location: DIC, Saih Shuaib-2, Plot-No: 5320153
Platform, Diesel Tank, O.G Tank, U.G Tank& Guard Rooms
Temp. Pump
Sr. No. LPO no. Mix Code Mix Description Controlled Quatity (m3) Time Interval between Truck Remarks
(Yes/No)
(Yes/No)

1 2376 C40+ W/P C40/20 - 34%OPC + 66% GGBS - yes, 32 yes 54 18:00PM
SUBSTRUCTURE- M3 1.00+
Waterproofing Conc

Customer Shafa Al Nahdah Ready Mix


Name & Designation: S.Raja & Construction Manager Production Department Contact Nos Mr.Suresh / Mr. Jobin / Mr.Hareesh / Mr.Kumaran/ Mr.Jaleesh
Contact No. 544632101 Contact No: 056 995 6797/ 050 1901350/ 050 190 1652
production@shafaconstruction.net

Signature: sr.raja Email ID: sales@shafaconstruction.com, purchase@shafaconstruction.net,jaleesh@shafaconstruction.com


Date: 11/18/2024 CC sankar@shafaconstruction.com

F/PUR/003 REV:00 30.01.2020

You might also like