CIVIL
        Table of Contents
        Page Verification Sheet
        2G     General Requirements
        2H     Topographical Surveys
                         Drawing – Monument Installation
                         Drawing – Monument Plug Marker
        2J     Earthwork
                         Guide Specification - Earthwork
        2K     Irrigation
                         Drawing - Interior Irrigation Controller Wall Mounted
                         Drawing - Exterior Pedestal Mounted Controller
                         Drawing - Exterior Irrigation Controller Wall Mounted
                         Drawing - Irrigation Point of Connection Assembly
                         Drawing - Quick Coupler Anchor Assembly and Installation
                         Drawing - Exterior Single Zone Valve Assembly
                         Drawing - Pop-Up Sprinkler Assembly and Installation
                         Drawing - Pop-Up Head Set-Back and Location
                         Drawing - Exterior Dedicated Drip Filter & PRV Assembly
                         Drawing - ½” Air/Vacuum Relief Valve for Dripline
                         Drawing - Automatic Flush Valve For Dripline
                         Drawing - Dripline Trench
                         Drawing - Typical Drip Manifold Connections
                         Drawing - Dripline Check Valve
                         Drawing - Dripline Operation Indicator
                         Drawing - Tree Bubbler Detail
        2L     Curbs
                         Drawing – Typical Type A-1 Curb & Gutter
                         Drawing – Concrete Curb & Gutter Cast In Place
                         Drawing – Extruded Curb Concrete
        2M     Parking Lots
                         Drawing – Parking Area Right Angle Parking
                         Drawing – Typical Parking Area Spacing
                         Drawing – Precast Parking Block
        2N     Roadways
                         Drawing - Roadway & Utility Corridor Arrangement
                         Drawing – Road Superelevation Typical
                         Drawing – Removable Bollard
REV:10 – SEPT2017                                                                           Table of Contents 0D - 01
                                   © University of Washington – Engineering Services 2017
U NIVERSI TY     OF   W ASHI NG TON
Facilities Services
Design Guide                                                                                Table of Contents
                        Drawing – Fixed Bollard
       2P      Sidewalks
                        Drawing – Roadway & Sidewalk Cross Section
                        Drawing – Sidewalk Wheelchair Ramp
       2Q      Water Distribution
       2R      Sanitary Sewer
                        Drawing – Acid Waste Manhole
       2S      Storm Drainage
                        Drawing – Area Way Drain at Buildings, Ramp, Balconies & Landings
                        Drawing – 54” or Larger Drop Manhole Interior
       2T      Gas Distribution
       2U      Utility Tunnels and Trenches
                        Drawing – Utility Tunnel Section
                        Drawing – Utility Trench Section
                        Drawing – Utility Tunnel Manhole Plan
                        Drawing – Utility Tunnel Electrical Tray Bracket Detail
                        Drawing – Utility Tunnel Mechanical Pipe Supports Detail 1
                        Drawing – Utility Tunnel Mechanical Pipe Supports Detail 2
STRUCTURAL
       Table of Contents
       Page Verification Sheet
       3A      General Requirements
       3B      Seismic Analysis & Upgrades
       3C      Modifications to Existing Structures
       3D      Shoring
       3E      Foundations and Piles
       3F      Slab on Grade
       3G      Sub-Grade Walls
       3H      Structured Floors
       3I      Roofs
       3J      Concrete
       3K      Reinforced Masonry
       3L      Structural Steel – Steel Joists and Decking
       3M      Timber
       3N      Cold Formed Metal Framing
       3P      Nonstructural Component Seismic Design
Table of Contents 0D - 02                                                                      REV:10 – SEPT2017
                                   © University of Washington – Engineering Services 2017
U NIVERSI TY     OF   W ASHI NG TON
Facilities Services
Design Guide                                                                                Table of Contents
ARCHITECTURAL
               Architectural & Accessibility Guidelines
       11F     Building Maintenance
       13A     Access Control System – CAAMS
                       Guide Specification - Access Control System
                       Drawing – Example of Typical CAAMS Backboard
       14A     Conveying Systems
                       Guide Specification – Elevators
MECHANICAL
       Table of Contents
       Page Verification Sheet
       15A   General Requirements
       15B   Plumbing
             15B1 Potable and Nonpotable Water
                              Drawing – Water Filter Header
                              Drawing – Typical Building Water Header
             15B2 Waste and Drains
             15B3 Acid and Laboratory Wastes
             15B4 Compressed Air, Vacuum, Natural Gas & Nitrogen
             15B5 RO/DI
             15B6 Plumbing Pressure Testing
       15C   Heating Ventilation and Air Conditioning
             15C1 Process and Environmental Chilled Water
             15C2 Central Cooling Water
                              Drawing – Central Cooling Water Building Header & Coil Connection
             15C3 Steam and Condensate
                              Drawing – Steam Trap Assembly
             15C4 Hydronic Heating
             15C5 Refrigeration
             15C6 Air Handlers and Ventilation Fans
             15C7 Filters
                              Guide Specification – Filters Used in HVAC Systems
             15C8 Coils
             15C9 Ductwork and Duct Accessories
             15C10 HVAC and HVAC Piping Pressure Testing
       15D   Piping, Valves & Accessories
       15E   Hangers and Supports
       15F   Pumps
       15G   Motors and VFDs
                     Guide Specification – Electric Motor in HVAC Applications
                     Guide Specification – Variable Frequency Drives
       15H   Metering and Gauges
                     Purchase Specification – 23 05 19.11 Steam Condensate or Hot Water Meter
                     Purchase Specification – 23 05 19.21 Central Cooling Water Meter
                     Purchase Specification – 23 05 19.31 Sewer Submeter
                     Purchase Specification – 23 05 19.41 Building Water Meter
                     Purchase Specification – 23 050 19.51 Gas Meter
                     Purchase Specification – 23 08 00.11 Mechanical Meter Integration and
                              Commissioning
REV:10 – SEPT2017                                                           Table of Contents 0D - 03
                                   © University of Washington – Engineering Services 2017
U NIVERSI TY     OF   W ASHI NG TON
Facilities Services
Design Guide                                                                                Table of Contents
       15J     Nonstructural Component Seismic Design
       15K     Identification
       15L     Insulation
       15M     Water Treatment and Flushing
       15N     Noise and Vibration Control
       15P     Cold/Environmental Rooms
       15Q     Computer Server Rooms
       15R     Environmental Control Systems
                        Guide Specification – Environmental (HVAC) Control System
       15T     Testing, Adjusting and Balancing
                        Guide Specification – Small Project (MACC less than $3 Million)
                        Guide Specification – Large Project (MACC more than $3 Million)
       15U     Commissioning
                        Guide Specification – Commissioning: General Requirements
                        Guide Specification – Commissioning: Functional Performance Testing
                        Guide Specification – Commissioning: Facility Start-Up
ELECTRICAL
       Table of Contents
       Page Verification Sheet
       16A     General Requirements
       16B     Primary Distribution
       16C     Emergency Power Systems
       16D     Building Services
       16E     Building Power Distribution
                        Drawing - Laboratory Demand Load
                        Drawing - Typical Building Power Distribution Riser
                        Drawing - Typical Floor Electrical Room
       16F     Raceways
       16G     Wire, Cable, and Terminations
                        Guide Specification – MV Wire, Cable and Terminations
       16H     Medium Voltage Switchgear
       16J     Vaults
       16K     Load Interrupter Switches
       16L     Transformers
       16M     Metering and Monitoring
                        Purchase Specification – 26 08 00.11 Electrical Meter Integration and Commissioning
                        Purchase Specification – 26 09 13.11 Data Collection Controller
                        Purchase Specification – 26 27 13 Electrical Meter
       16N     Switchboards
       16P     Panelboards
       16Q     Automatic Transfer Switches
                        Guide Specification - Automatic Transfer Switch
       16R     Motor Control Centers
       16S     Variable Frequency Drive Installations
       16T     Wiring Devices
       16U     Lighting
       16V     Grounding
       16W     Power Quality
       16Y     Clock and Bell Systems
       16Z     Miscellaneous Signal Systems
Table of Contents 0D - 04                                                                      REV:10 – SEPT2017
                                   © University of Washington – Engineering Services 2017
U NIVERSI TY    OF   W ASHI NG TON
Facilities Services
Design Guide                                                                               Table of Contents
       16AA   Electrical Identification
                       Guide Specification - Electrical Identification
                       Drawing - Equipment Label Format and Location
                       Drawing - Equipment “Fed From” Labels
                       Drawing - Medium Voltage Equipment Label
                       Drawing – Sample Arc Flash Warning Label
       16BB   Power System Studies
                       Guide Specification - Short Circuit and Coordination Studies
       16CC   Inspection, Calibration and Testing
                       Guide Specification - Inspection, Calibration and Testing
       16DD   Commissioning Support
                       Guide Specification - Commissioning Support
              END OF TABLE OF CONTENTS – FACILITIES SERVICES DESIGN GUIDE
                                  Other University Design Guides
                           (Not a part of the Facilities Services Design Guide)
      Capital Projects Office Design Guides
         o    Project and Record Documents
         o    Site Work - Contact the Capital Projects Office Landscape Architect
      Classroom Support Services Design Guide
         o    Classrooms
      Environmental Health & Safety (EH&S) Design Review & Guides
         o    Fire Safety
         o    Laboratory Safety
         o    Safe Access
         o    Environmental Protection
         o    Hazardous Materials
      Health Sciences Design Guide
         o    Health Sciences Casework Specification
      Other Facilities Services Design Guides
         o    Recycling & Solid Waste
REV:10 – SEPT2017                                                                          Table of Contents 0D - 05
                                  © University of Washington – Engineering Services 2017
U NIVERSI TY     OF   W ASHI NG TON
Facilities Services
Design Guide                                                                           Table of Contents
      University of Washington Tacoma
           o   Facilities Services Design Guide Exceptions for the UW Tacoma
               Campus
      UW SafeCampus
           o   Emergency Classroom Locking Devices (ECLD)
      UW-ITDesign Guide
           o   Voice, Data and Multimedia Communications
Table of Contents 0D - 06                                                                 REV:10 – SEPT2017