Bill of Quantity
PT. BORNEO MITRA SINERGI
28 Oktober 2024
Harga Satuan (Rp.) TOTAL HARGA
NO URAIAN PEKERJAAN VOL. TOTAL (Rp.)
UPAH BAHAN ALAT TRANSPORTASI SATUAN
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)=(9)x(3)
i Pekerjaan Persiapan Rp -
i.1 Pengurusan izin kerja 1.00 Lot/spk - -
i.2 Medical Check up 45.00 Org - -
i.3 Pembuatan Gudang Sementara / m2 150.00 m2 - -
i.4 Pembuatan Direction Kit / m2 (termasuk barak pekerja) 150.00 m2 - -
i.5 Tenaga Keamanan (1) 300.00 hari/org - -
Hal. 1 dari 4
COO PEMBUATAN/MODIFIKASI TANGKI & SISTEM PIPING PAPUA FIELD
Bill of Quantity
PT. BORNEO MITRA SINERGI
28 Oktober 2024
Harga Satuan (Rp.) TOTAL HARGA
NO URAIAN PEKERJAAN VOL. TOTAL (Rp.)
UPAH BAHAN ALAT TRANSPORTASI SATUAN
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)=(9)x(3)
iv.1.10 Pasang Valve 4" - 150# / Pcs 8.00 pcs - -
iv.1.11 Ball Valve Ø 4" 150# 8.00 pcs - -
iv.1.12 Ball Valve Ø 4" 300# 1.00 pcs - -
iv.1.13 Swing Check Valve Ø 4" 150# 4.00 pcs - -
iv.1.14 Spiral Wound Gasket Ø 4" 300# 3.00 pcs - -
iv.1.15 Spiral Wound Gasket Ø 4" 150# 21.00 pcs - -
iv.1.16 Flange WN Ø 4" 300# Sch.40 3.00 pcs - -
iv.1.17 Flange WN Ø 4" 150# Sch.40 21.00 pcs - -
iv.1.18 Hex Machine Bolt M 16 184.00 pcs - -
iv.1.19 Stel & las Flange Ø4" Sch.40 / Pcs 24.00 pcs - -
iv.1.20 Pengecatan External dan Asessories Tangki 1,720.20 m2 - -
iv.1.21 Stel & las Flange Ø4" Sch.40 / Pcs 24.00 pcs - -
iv.1.22 Lowering Pipa Ø4" Sch.40 / Mtr 5,492.00 Mtr - -
iv.2 Pemasangan pipe support - -
iv.2.1 Galian Tanah Biasa 157 m3 - -
iv.2.2 Ecer pipa 3" sch 40 @ 12 m 502.00 Jts - -
iv.2.3 Carbon Steel Pipe Ø 3" Sch.40 SRL, R1 502.00 Jts - -
iv.2.4 Potong dan bevel pipa 3" sch. 40 (Ttk) 1,025.00 Ttk - -
iv.2.5 Las Pipa 3" sch 40 @ 12 mtr (Jts) 1,025.00 Jts - -
iv.2.6 Potong plat baja (t +- 4 mm) 98.30 Mtr - -
iv.3 Road Crossing Pipa (Open Cut) @5 RC
iv.3.1 Galian tanah 879.80 m3 - -
iv.3.2 Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan 1,011.77 m3 - -
iv.3.3 Carbon Steel Pipe Ø 6" Sch.40 SRL, R1 42.00 Jts - -
iv.3.4 PIPE: VENTING, 2", SCH. 40, 0.154" THK, R-2, ASTM A-53 (GALVANIS) 10.00 Ea - -
iv.3.5 ELBOW: 90o, LR, 2", S-40, BW, A234WPB-W, ASME B16.9 30.00 Ea - -
iv.3.6 Pengeceran pipa 6" sch 40 (untuk casing) 42.00 Jts - -
iv.3.7 Potong dan bevel pipa casing 6" sch 40 (cross @ 20M) 42.00 Ttk - -
iv.3.8 Las Pipa Casing 6" Sch 40 @ 4 mtr (Jts) 42.00 Ttk - -
iv.3.9 CENTRALIZER: INNER f 4" 180.00 Ea - -
iv.3.10 Menyetel dan memasang sentralizer (1 pack @ 2 m panjang casing) 126.00 Pck - -
iv.3.11 END SEAL: 4" X 8" 42.00 Ea - -
iv.3.12 Pasang end seal (2 end seal @ 1 pipa) 84.00 Pck - -
iv.3.13 Pembalutan/wrapping pipa 4" dengan primer paste, 1st & 2nd layer and holiday test 5,492.00 mtr - -
Hal. 2 dari 4
COO PEMBUATAN/MODIFIKASI TANGKI & SISTEM PIPING PAPUA FIELD
Bill of Quantity
PT. BORNEO MITRA SINERGI
28 Oktober 2024
Harga Satuan (Rp.) TOTAL HARGA
NO URAIAN PEKERJAAN VOL. TOTAL (Rp.)
UPAH BAHAN ALAT TRANSPORTASI SATUAN
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)=(9)x(3)
iv.1.15 Lowering Pipa Ø4" Sch.40 / Mtr 50.00 mtr - -
iv.1.16 Lowering Pipa Ø2" Sch.40 / Mtr 50.00 mtr - -
iv.1.17 Pasang Valve 4" - 300# / Pcs 0.20 pcs - -
iv.1.18 Ball Valve Ø 4" 300# 0.20 pcs - -
iv.1.19 Spiral Wound Gasket Ø 4" 300# 0.60 pcs - -
iv.1.20 Flange WN Ø 4" 300# Sch.40 A 105 0.40 pcs - -
iv.1.21 Flange WN Ø 2" 300# Sch.40 A105 2.00 pcs - -
iv.1.22 Hex Machine Bolt M 16 46.80 pcs - -
iv.1.23 Stel & las Flange Ø4" Sch.40 / Pcs 4.80 pcs - -
iv.1.24 Pengecatan External dan Asessories Tangki 344.04 m2 - -
iv.1.25 Stel & las Flange Ø4" Sch.40 / Pcs 4.80 pcs - -
iv.1.26 Stel & las Flange Ø2" Sch.40 / Pcs 1.60 pcs - -
iv.1.27 Tee Reducer Ø 4" x 4" x 2" Sch.40 0.20 pcs - -
iv.1.28 Reducer 4" x 2" Sch.40 0.60 pcs - -
iv.1.29 Stel & las Tee Reducer Ø4 x 2" Sch.40 / Pcs 0.20 pcs - -
iv.1.30 Pasang Valve 2" - 300# / Pcs 0.20 pcs - -
iv.1.31 Elbow Ø 2" 90° Sch.40 1.40 pcs - -
iv.1.32 Elbow Ø 2" 45° Sch.40 1.80 pcs - -
iv.1.33 Ball Valve Ø 2" 300# 0.40 pcs - -
iv.1.34 Swing Check Valve Ø 2" 300# 'A216 WCB 0.40 pcs - -
iv.1.35 Spiral Wound Gasket Ø 3" 300# ASME B 16.20 1.60 pcs - -
iv.1.36 Elbow 4" 45derajat Sch 40 4.80 pcs - -
Hal. 3 dari 4
COO PEMBUATAN/MODIFIKASI TANGKI & SISTEM PIPING PAPUA FIELD
Bill of Quantity
PT. BORNEO MITRA SINERGI
28 Oktober 2024
Harga Satuan (Rp.) TOTAL HARGA
NO URAIAN PEKERJAAN VOL. TOTAL (Rp.)
UPAH BAHAN ALAT TRANSPORTASI SATUAN
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)=(9)x(3)
v.6 Holiday Test pipa 2"-6" 395.00 m - -
Gasline
v.1 Radiography Pipa Dia. Ø 4" / Jts 549.00 jts - -
v.2 Penetrant Test Pipa 2" - 6" 57.52 m - -
v.3 Pengujian Hydrostatic Test 6.00 hari - -
v.4 Nitrogen Purging 0.20 lot - -
v.5 Pigging 0.20 lot - -
v.6 Commisioning 0.20 lot/spk - -
v.7 Holiday Test pipa 2"-6" 79.00 m - -
SubTotal Rp -
Diajukan oleh,
PT Borneo Mitra Sinergi
Pandu Dwijaya
Direktur Utama