BERAT/6m BERAT/6m
UKURAN UKURAN
kg kg
50.36.5 mm 33.50 60.30.10.1,2 7.44
65.42.5,5 mm 42.50 60.30.10.2,3
75.40.5 mm 41.50 75.35.10.1,6 13.90
80.45.5 mm 47.00 75.45.15.2,3 19.50
100.50.5 mm 56.20 100.50.20.2,3 24.40
120.55.6 mm 75.00 100.50.20.3,2 33.00
125.55.6 mm 80.40 125.50.20.2,3 27.10
140.60.7 mm 96.00 125.50.20.3,2 36.80
150.75.6,5 mm 112.00 150.50.20.2,3 30.00
160.66.7 mm 115.50 150.50.20.3,2 40.60
180.75.7 mm 132.00 150.65.20.2,3 33.00
200.80.7,5 mm 152.00 150.65.20.3,2 45.10
220.80.9 mm 187.50 200.75.20.3,2 56.00
240.85.9,5 mm 205.00
250.80.7,1 mm 182.50
250.90.9 mm 208.00
260.90.10 mm 114.00
300.90.9 mm 229.00
300.100.10 mm 278.00
380.100.10,5 mm 337.50
PIPA PERSEGI
BERAT/6m
UKURAN ( mm ) TEBAL ( mm )
kg
12,5 X 12,5 0.90 0.3320
15 X 15 0.90 0.4030
20 X 20 0.90 0.5440
25 X 25 1.00 0.7590
30 X 30 1.00 0.9150
40 X 40 1.20 1.4680
10 X 20 0.90 0.4030
12,5 X 27,5 0.90 0.5440
15 X 30 0.90 0.6150
20 X 40 1.00 0.9150
25 X 50 1.40 1.5970
20 X 60 1.40 1.9260
LEBAR PANJANG BERAT/lbr
mm mm kg
16 6000 2.3
19 6000 2.7
25 6000 3.53
32 6000 4.52
38 6000 5.37
19 6000 4.03
25 6000 5.4
32 6000 6.8
38 6000 8.3
50 6000 10.6
19 6000 5.4
25 6000 7.1
32 6000 9.2
38 6000 10.7
50 6000 14.5
65 6000 18.5
75 6000 21.5
85 6000 25.5
100 6000 28.5
150 6000 44.5
25 6000 10.6
32 6000 14
38 6000 16.1
50 6000 21.2
65 6000 27.5
75 6000 32
85 6000 38.3
100 6000 42.5
150 6000 64
25 6000 14.2
38 6000 21.5
50 6000 28.5
65 6000 37
75 6000 42.5
100 6000 56.5
150 6000 85
38 6000 29
50 6000 38
100 6000 76
150 6000 113
38 6000 34
50 6000 45
65 6000 58.5
75 6000 67.5
100 6000 89.5
125 6000 112
150 6000 134
BESI W.F
BESI I.N.P
1 Batu Belah M3
2 Bata Congklak Bh
3 Semen 50kg Sak
4 Besi Beton Kg
5 Kawat Beton Kg
6 Pasir Beton M3
7 Pasir Pasang M3
8 Pasir Urug M3
9 Split M3
10 Papan Alba M3
11 Papan Borneo 2/20 M3
12 Triplek 9mm Lbr
13 Kaso Borneo 4x6 M3
14 Kayu Balok Borneo 6/15 M3
15 Paku (5,7,10) Kg
16 Seng Gelombang BJLS 20 Lbr
17 Gravel U 20 Bh
18 Dolken Batang
19 Tanah Urug M3
20 Pasir Urug M3
21 Wwter Proofing Coating Panthene M2
22 Batu Tempel Grooved Loose 40x20x15 cm M2
23 Kusen Meranti uk. 6/12 cm M3
24 Daun Pintu Panel unit
25 Daun Jendela t=2 mtr ,,,PJ1 unit
26 Daun Jendela t=1,25 mtr,,,J1 unit
J2 bh
J3 bh
27 Kaca Polos 5mm EX MULIA m2
28 Daun Pintu Double Teakwood unit
Daun Pintu Double Teakwood+NAT+MELAMINTO unit
29 Rangka Atap Baja Ringan M2
30 Genteng Multiroof bh
31 Nok Multiroof bh
32 GRC 4 mm m'
33 Keramik Lantai 40x40 (1 dus=6 bh) M2
34 Keramik Alfa Grey ex. Milan 20x20 km/wc (1 dus = 25 buah) M2
35 Keramik Lantai Teras uk.30x30 cm (1 dus=11 pcs) M2
36 Keramik Dinding 20x25 (1 dus=11 buah) M2
36 Keramik Mulia Glossy uk 20x20 cm dus/m2
37 Paving Block ex. Abadi Block (1 m2=50 bh) M2
38 Gypsum Board 9mm Eks. Knauff (1,2x2,4m) Lbr
39 Tripleks 4 mm Lbr
40 Box Panel Hager 3 Grup, Presto unit
41 MCB 4A ex Hagger bh
42 Kabel NYM 2x1,5mm m'
43 Saklar Tunggal EX PANASONIC bh
44 Saklar Ganda PANASONIC bh
45 Fitting Lampu SL bh
46 Stop Kontak PANASONIC bh
47 PVC Maspion 3/4" AW Pth btg
48 Knie 3/4" bh
49 Socket 3/4" bh
50 Lem PVC Kg
51 PVC Maspion 1/2" AW Pth btg
52 Knie 1/2" bh
53 Socket 1/2" bh
54 Stop Kran Kitz 3/4" bh
55 Stop Kran Kitz 1/2" bh
56 Seal Tape bh
57 Pompa Shimitzu 125 w unit
58 Tangki Tanam Kapasitas 500 l unit
59 Pelampung San Ei 3/4",,,EX ONDA bh
60 PVC Maspion 3" AW Abu btg
61 Knie 3" bh
62 Socket 3" bh
63 PVC Maspion 2.5" AW Abu btg
64 Knie 2.5" bh
65 Socket 2.5" bh
66 PVC Maspion 2" AW Abu btg
67 Knie 2" bh
68 Socket 2" bh
69 Handle + Body + Sylinder Bertolli PU,KMR TIDUR unit
70 Engsel Valle 4" psg
71 Engsel Valle 3" psg
72 Ramskar Belleza unit
73 Closet Duduk toto unit
73 Closet Jongkok ex INA warna Ivory unit
Closet Jongkok ex INA warna Putih unit
73 Bak Mandi Fiber uk. 55X55X65 cm ex King unit
74 Floor Drain Isano bh
76 Head Shower 3301 ex. Ellite blum kepala shower unit
77 Kran BCP Elite 3202 bh
78 Zinc Cuci 1 lubang type 57 tanpa sayap ex Royal unit
79 Rool Cat bh
80 Plamur Tembok kg
81 Cat Famitex untuk Interior dan untuk plafond warna putih Kg
82 Cat Vinilex Kg
83 Amples bh
84 Kwas 2,5" bh
85 Politur Woodstain Kg
86 Cat ex Seiv Kg
87 Thinner Kg
88 Rumput Gajah Mini m2
89 Tanah Lembang m3
90 ijuk ikat
100 PVC Maspion Maspion 3" D Putih btg
101 PVC Maspion Maspion 2.5" D Putih btg
102 PVC Maspion 2" Maspion D Putih btg
103 kusen alumunium 4' EX BROWN/ALCOMEXINDO m'
104 Angker bh
105 Silikon kaca Rp.65.000/botol m'
106 berangkal m3
107 Handle + Body + Sylinder Bertolli ut KM/WC bh
108 Kran dinding standar ex.FIO bh
109 Semen Warna bh
110 Cat seive kg
111 Cat Pinoguard kg
112 Wastafel
113 Paku Rivet bh
114 Siku Alumunium 1 cm m'
115 "U" Alumunium 1 cm m'
116 "U" Alumunium 2 cmx1 cm m'
117 Keramik Mulia Glossy uk 20x20 cm dus/m2
118 linggis
Sekop
Pahat 10"
Ember
Pacul+doran
Benang rami
Gagang+mata gergaji
Balincong
Jirigen
Buis beton Ø1 m bh
LED WORM WHITE DAN COOL DELIGHT 3 WATT ex Philip bh
LED WORM WHITE DAN COOL DELIGHT 4 WATT bh
LED WORM WHITE DAN COOL DELIGHT 5 WATT
fitting LED 3 watt bh
Cat Interior Famitex
Cat Plafond Famitex putih
SHOWER KAMAR MANDI
- MBT S 010 EX B.C.P (KRAN)
- SHS 535 EX B.C.P (SHOWER)
- SHS 536 EX. B.C.P (SHOWER)
- SHS
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 160,000.00
Rp 170,000.00
AN 0.0072
2500
5333.33333333333
52500 1
47500
50000
27500
7500
47500
6000
26000
60000
17500
63100
74000
86500
20000
712500
25000
60000
Rp 156,000
69000
1.0008 130 12000 1560000
68000
110000
1
1.08
Rp 52,083 / m2
Rp 52,000 /m2
Rp 47,980 / m2
Rp 52,500 / m2
53500
k 20x20 true pave 2800
1400
arga Maxilite
Rp 266,667
11.25
JUMLAH MATERIAL PER KOMPONEN PEKERJAAN
II PEKERJAAN TANAH
1 GALIAN TANAH SEDALAM 1 M M3
a Pembantu Tukang 0.420 org 120,000.00 50,400.00
b Tukang Gali 0.240 org 150,000.00 36,000.00
86,400.00
2 GALIAN TANAH SEDALAM 2 M M3
a Pembantu Tukang 0.530 org 120,000.00 63,600.00
b Tukang Gali 0.526 org 150,000.00 78,900.00
142,500.00
3 GALIAN TANAH SEDALAM 3 M M3
a Pembantu Tukang 0.740 org 120,000.00 88,800.00
b Tukang Gali 0.020 org 150,000.00 3,000.00
91,800.00
4 GALIAN TANAH KERAS SEDALAM 1 M M3
a Pembantu Tukang 0.450 org 120,000.00 54,000.00
b Tukang Gali 0.020 org 150,000.00 3,000.00
57,000.00
5 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM M2
a Pembantu Tukang 0.050 org 120,000.00 3,000.00
b Tukang Gali 0.020 org 150,000.00 2,250.00
5,250.00
6 PEMBUANGAN TANAH SEJAUH 150 M M3
a Pembantu Tukang 0.420 org 120,000.00 50,400.00
b Tukang Gali 0.020 org 150,000.00 3,000.00
53,400.00
7 URUGAN TANAH KEMBALI M3
a Pembantu Tukang 0.190 org 120,000.00 22,800.00
b Tukang Gali 0.150 org 150,000.00 22,500.00
45,300.00
8 1 m' PEKERJAAN CERUCUK DOLKEN M3
a Dolken 0.500 btg 9,000.00 4,500.00
b Tukang Batu 0.010 hr 150,000.00 1,500.00
c Laden Batu 0.020 hr 120,000.00 2,400.00
d Mandor 0.010 hr 170,000.00 1,700.00
e Alat Bantu 10,100.00
9 1 m3 URUGAN PASIR M3
a Pasir urug 1.100 m3 165,000.00 181,500.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
b Pembantu Tukang 0.300 org 120,000.00 36,000.00
c Tukang Gali 0.020 org 150,000.00 3,000.00
220,500.00
10 1 m3 URUGAN BERANGKAL M3
a Berangkal 1.100 m3 50,000.00 55,000.00
b Tukang gali 0.300 org 150,000.00 45,000.00
c Kepala tukang 0.020 org 120,000.00 2,400.00
102,400.00
11 1 m3 URUGAN SIRTU M3
a Sirtu ( koral ) 1.200 m3 100,000.00 120,000.00
b Pembantu Tukang 0.250 org 120,000.00 30,000.00
c Tukang Gali 0.020 org 150,000.00 3,000.00
153,000.00
V PEKERJAAN DINDING
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
1 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps M2
a Bata Merah 140.000 bh 660.00 92,400.00
b Semen PC (abu-abu) 0.650 sak 61,500.00 39,975.00
c Pasir Pasang 0.090 m3 110,000.00 9,900.00
d Pembantu Tukang 0.650 org 120,000.00 78,000.00
e Tukang Batu 0.200 org 150,000.00 30,000.00
250,275.00
2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps M2
a Bata Merah 140.000 bh 660.00 92,400.00
b Semen PC (abu-abu) 0.550 sak 61,500.00 33,825.00
c Pasir Pasang 0.090 m3 110,000.00 9,900.00
d Pembantu Tukang 0.650 org 120,000.00 78,000.00
e Tukang Batu 0.200 org 150,000.00 30,000.00
244,125.00
3 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps M2
a Bata Merah 140.000 bh 660.00 92,400.00
b Semen PC (abu-abu) 0.450 sak 61,500.00 27,675.00
c Pasir Pasang 0.100 m3 110,000.00 11,000.00
d Pembantu Tukang 0.650 org 120,000.00 78,000.00
e Tukang Batu 0.200 org 150,000.00 30,000.00
239,075.00
4 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Ps M2
a Bata Merah 70.000 bh 660.00 46,200.00
b Semen PC (abu-abu) 0.290 sak 61,500.00 17,835.00
c Pasir Pasang 0.040 m3 110,000.00 4,400.00
d Pembantu Tukang 0.320 org 120,000.00 38,400.00
e Tukang Batu 0.100 org 150,000.00 15,000.00
121,835.00
5 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Ps M2
a Bata Merah 70.000 bh 660.00 46,200.00
b Semen PC (abu-abu) 0.250 sak 61,500.00 15,375.00
c Pasir Pasang 0.050 m3 110,000.00 5,500.00
d Pembantu Tukang 0.320 org 120,000.00 38,400.00
e Tukang Batu 0.100 org 150,000.00 15,000.00
120,475.00
6 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps M2
a Bata Press 70.000 bh 660.00 46,200.00
b Semen PC (abu-abu) 0.200 sak 61,500.00 12,300.00
c Pasir Pasang 0.070 m3 110,000.00 7,700.00
d Pembantu Tukang 0.240 org 120,000.00 28,800.00
e Tukang Batu 0.120 org 150,000.00 18,000.00
113,000.00
7 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG M2
a Rooster / Terawang ukuran 12 x 11 x 24 37.000 bh 2,500.00 92,500.00
b Semen PC (abu-abu) 0.270 sak 61,500.00 16,605.00
c Pasir Pasang 0.040 m3 110,000.00 4,400.00
d Pembantu Tukang 0.300 org 120,000.00 36,000.00
e Tukang Batu 0.100 org 150,000.00 15,000.00
164,505.00
VI PEKERJAAN PLESTERAN/ACCI
1 PEKERJAAN PASANGAN SCREEDING 1:3 TEBAL 3 CM M2
a Semen PC (abu-abu) 0.300 sak 61,500.00 18,450.00
b Pasir Pasang 0.065 m3 110,000.00 7,150.00
c Pembantu Tukang 0.130 org 120,000.00 15,600.00
d Tukang Batu 0.130 org 150,000.00 19,500.00
e Mandor 0.050 org 60,700.00
2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.130 sak 61,500.00 7,995.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.150 org 150,000.00 22,500.00
56,695.00
3 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.100 sak 61,500.00 6,150.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.150 org 150,000.00 22,500.00
54,850.00
4 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.150 sak 61,500.00 9,225.00
b Pasir Pasang 0.035 m3 110,000.00 3,850.00
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.150 org 150,000.00 22,500.00
59,575.00
5 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm M2
a Semen PC (abu-abu) 0.170 sak 61,500.00 10,455.00
b Pasir Pasang 0.030 m3 110,000.00 3,300.00
c Pembantu Tukang 0.220 org 120,000.00 26,400.00
d Tukang Batu 0.160 org 150,000.00 24,000.00
64,155.00
6 PEKERJAAN KAMPROT HALUS 1 Pc : 3 Ps TEBAL 2 cm M2 ###
a Semen PC (abu-abu) 0.300 sak 61,500.00 18,450.00
b Pasir Pasang 0.030 m3 110,000.00 3,300.00
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.250 org 150,000.00 37,500.00
83,250.00
7 PEKERJAAN KAMPROT KASAR 1 Pc : 6 Ps TEBAL 2 cm M2 0.00 ###
a Semen PC (abu-abu) 0.110 sak 61,500.00 6,765.00
b Pasir Pasang 0.025 m3 110,000.00 2,750.00
c Pembantu Tukang 0.150 org 120,000.00 18,000.00
d Tukang Batu 0.200 org 150,000.00 30,000.00
Jumlah 57,515.00
Dibulatkan 57,500.00
8 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.190 sak 61,500.00 11,685.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
c Pembantu Tukang 0.260 org 120,000.00 31,200.00
d Tukang Batu 0.200 org 150,000.00 30,000.00
75,085.00
9 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.150 sak 61,500.00 9,225.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
c Pembantu Tukang 0.260 org 120,000.00 31,200.00
d Tukang Batu 0.200 org 150,000.00 30,000.00
72,625.00
10 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps M2
a Semen PC (abu-abu) 0.010 sak 61,500.00 615.00
b Pasir Pasang 0.010 m3 110,000.00 1,100.00
c Pembantu Tukang 0.057 org 120,000.00 6,840.00
d Tukang Batu 0.040 org 150,000.00 6,000.00
14,555.00
11 ACCIAN PLESTERAN M2
a Semen PC (abu-abu) 0.110 sak 61,500.00 6,765.00
b Pembantu Tukang 0.080 org 110,000.00 8,800.00
c Tukang Batu 0.040 org 150,000.00 6,000.00
21,565.00
12 ACIAN SKONENG 1:2 M2
a Semen PC (abu-abu) 0.010 sak 61,500.00 615.00
b Pasir Pasang - m3 110,000.00 -
c Pembantu Tukang 0.057 org 120,000.00 6,840.00
d Tukang Batu 0.038 org 150,000.00 5,700.00
13,155.00
XV PEKERJAAN PENGECATAN
PEKERJAAN WATERPROOF DAK BETON M2
a Waterproof 0.400 kg 65,000.00 26,000.00
b Plamir kg - -
c Ampelas lbr - -
d Cat dasar - kg - -
e Cat kayu kwalitas baik - kg - -
f Mandor 0.010 org 170,000.00 1,700.00
g Tukang cat 0.060 org 150,000.00 9,000.00
36,700.00
Pengecatan Listplank GRC M'
a Cat 0.025 kg 55,000.00 1,375.00
b Dempul halus 0.250 kg 8,000.00 2,000.00
c Ampelas 0.500 lbr 2,500.00 1,250.00
d Pembantu Tukang 0.050 org 120,000.00 6,000.00
e Tukang cat 0.020 org 150,000.00 3,000.00
13,625.00
Pengecatan Tembok/plafond Baru kwalitas sedang M2
a Plamir 0.100 kg 8,000.00 800.00
b Rol cat 0.010 bh 25,000.00 250.00
c Cat tembok kwalitas sedang 0.450 kg 20,000.00 9,000.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
d Steger ( perancah kerja ) 0.010 Ls 18,000.00 180.00
e Ampelas 0.500 lbr 2,500.00 1,250.00
f Pembantu Tukang 0.060 org 120,000.00 7,200.00
g Tukang cat 0.200 org 150,000.00 30,000.00
48,680.00
Pengecatan Interior M2
a Plamir 0.100 kg 8,000.00 800.00
b Rol cat 0.010 bh 25,000.00 250.00
c Cat tembok kwalitas baik 0.360 kg 20,000.00 7,200.00
d cat dasar 0.100 kg 18,000.00 1,800.00
e Ampelas 0.500 lbr 2,500.00 1,250.00
f Pembantu Tukang 0.020 org 120,000.00 2,400.00
g Tukang cat 0.063 org 150,000.00 9,450.00
23,150.00
Pengecatan exterior M2
a Cat tembok exterior 0.260 kg 26,000.00 6,760.00
b Cat dasar 0.150 kg 18,000.00 2,700.00
c Rol cat 0.010 bh 25,000.00 250.00
d Ampelas 0.500 lbr 2,500.00 1,250.00
e Pembantu Tukang 0.020 org 120,000.00 2,400.00
f Tukang cat 0.063 org 150,000.00 9,450.00
22,810.00
PEKERJAAN ARSITEKTUR
I. BACK-UP PERHITUNGAN VOLUME PEKERJAAN DINDING & PLESTERAN
DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit
LANTAI - 1
1 LUAS DINDING BATA 1 : 3 LUAS NETTO : 12.25 M2
LUAS BIDANG LUAR :
Luas Bruto : 7 2 14.00
LANTAI - 2
1 LUAS DINDING BATA 1 : 3 LUAS NETTO : 24.11 M2
LUAS BIDANG LUAR :
Luas Bruto : 7.6 3.45 26.22
LANTAI - 1
1 URUGAN PASIR BWH LANTAI t = 5cm LUAS 1.31 M3
26.20 0.05 1.31
LANTAI - 2
1 URUGAN PASIR BWH LANTAI t = 0.05 cm LUAS 4.69 M3
93.80 0.05 4.69
LANTAI - 1
1 RANGKA PLAFOND HOLLOW 11.25 M3
LUAS BIDANG : 11.25 11.25
2 PLAFOND GYPSUM T = 9 MM 12.98 M2
BIDANG 1 : 23.35 23.35
M2
0.00
IV. BACK-UP PERHITUNGAN VOLUME PEKERJAAN PENGECATAN
DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit
LANTAI - 1
1 PENGECATAN DINDING INTERIOR #REF! M2
12.5 3.5 43.75
#REF! 3.5 #REF!
M2
0.00
LANTAI - 2
1 PENGECATAN DINDING INTERIOR 0.00 M3
M2
LANTAI - 1
1 ATAP BAJA RINGAN 251.82 M3
BIDANG 1 13.775 6.11 2 168.33
BIDANG 2 4.34 6.11 2 52.97
BIDANG 3 3.30 3.4 2 22.44
BIDANG 4 2.38 3.4 1 8.08
0.00
REKAP DAFTAR INDEK HARGA SATUAN PEKERJAAN
Harga
NO. KODE Jenis Pekerjaan Satuan
Pekerjaan
0.15 0.2 12.5 1 0.375 POKOK 6Ø12 6 12.66 1 0.8917 67.731 12.5 0.4 1 5.00
SLOOF - 1
TUMPUAN
15 / 20 LAPANGAN
TENGAH 2Ø10 2 12.66 1 0.6167 15.614
PENGIKAT TNGH
SENGKANG Ø8 -150 83.33 0.7 1 0.3950 23.042
Jumlah Total 0.375 Jumlah Total 106.387 Jumlah Total 5.000
PONDASI TYPE - 1 0.8 0.8 0.25 0 0 POKOK 1 Ø12 -150 2.3 5.33 0 0.8917 0.000 0.8 0.2 0 0
FOOT PLAT POKOK 2 Ø10 -150 2.3 5.33 0 0.6167 0.000
80 X 80 X 20
#DIV/0!
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
PONDASI TYPE - 2 1.2 1.2 0.3 0 0 POKOK 1 Ø12 -150 3.2 6.00 0 0.8917 0.000 1.44 0.36 0 0
FOOT PLAT POKOK 2 Ø10 -150 3.2 6.00 0 0.6167 0.000
80 X 80 X 20
#DIV/0!
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
KOLOM 0.25 0.25 1.1 0 0 POKOK 1 8-Ø12 8 1.26 0 0.8917 0.000 1.1 1 0 0
STUMP POKOK 2
15 / 25
#DIV/0! SENGKANG Ø10 -150 7 0.5 0 0.6167 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.25 3.8 0 0 POKOK 1 6-Ø12 6 3.96 0 0.8917 0.000 3.8 0.8 0 0
KOLOM K1
POKOK 2 2-Ø10 2 3.96 0 0.6167 0.000
15 / 20
#DIV/0! SENGKANG Ø8 -150 25 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.3 3.8 0 0 POKOK 1 6-Ø12 6 3.96 0 0.8917 0.000 3.8 0.9 0 0
KOLOM K2
POKOK 2
15 / 30
#DIV/0! SENGKANG Ø8 -150 25 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.4 3.8 0 0 POKOK 1 8-Ø12 8 3.96 0 0.8917 0.000 3.8 1.1 0 0
KOLOM K3
POKOK 2
15 / 40
#DIV/0! SENGKANG Ø8 -150 25 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.15 2.7 10 0.6075 POKOK 1 4-Ø8 4 2.86 10 0.3950 45.188 2.7 0.3 10 8.1
KOLOM K4
POKOK 2
15 / 15
SENGKANG Ø6 -150 18 0.5 10 0.2217 19.950
Jumlah Total 0.607 Jumlah Total 65.138 Jumlah Total 8.100
0.15 0.65 3.8 0 0 POKOK 1 10-Ø12 10 3.96 0 0.8917 0.000 3.8 1.3 0 0
KOLOM K6
POKOK 2
15 / 65
#DIV/0! SENGKANG Ø8 -150 25 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
BALOK 0.1 0.1 4.015 0 0.000 POKOK 4-Ø8 4 4.175 0 0.3950 0.000 4.015 0.3 0 0.00
LINTEL TUMPUAN
LAPANGAN
SENGKANG Ø6 -150 26.76666667 0.5 0 0.2217 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
PLAT CANOPY Bidang : 3.75 0.1 1 1 0.375 LAPIS ATAS Ø8 -150 25 1.1 1 0.395 10.863 1 3.75 1 3.75
+2.75 3.75 x 2.00 7 3.85 1 0.395 10.138
T = 10 cm
LAPIS BAWAH Ø8 -150 25 1.1 1 0.395 10.863
7 3.85 1 0.395 10.138
Sub Jumlah 0.375 Sub Jumlah 42.002 Sub Jumlah 3.75
Bidang : 1.04 0.1 0.3 1 0.031 LAPIS ATAS Ø8 -150 7 0.4 1 0.395 1.095 0.3 1.04 1 0.31
1.35 x 0.3 2 1.14 1 0.395 0.901
PLAT CANOPY Bidang : 3 0.08 1.25 0 0.000 LAPIS ATAS Ø8 -150 20 1.35 0 0.395 0.000 1.25 3 0 0.00
+2.85 3.00 x 1.25 8 3.1 0 0.395 0.000
T = 8 Cm
LAPIS BAWAH Ø8 -150 20 1.35 0 0.395 0.000
8 3.1 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
BALOK TYPE - 1 0.2 0.3 7.5 0 0 POKOK 6-Ø12 6 7.66 0 0.8917 0.000 9 2.25 0 0
TANGGA TUMPUAN
20 x 30 LAPANGAN
#DIV/0! SENGKANG Ø8 -150 50 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
PLAT STEP 0.3 0.08 0.9 0 0.000 TUL. POKOK 1-Ø12 1 0.4 0 0.891 0.000 0.3 0.08 0 0.00
TANGGA TANGGA SENGKANG Ø8 -200 1.5 0.85 0 0.395 0.000
#DIV/0! Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
PLAT 0.15 0.15 7.5 0 0.000 LAPIS ATAS Ø12 -150 1 7.6 0 0.891 0.000 7.5 0.45 0 0.00
TANGGA 50 0.25 0 0.891 0.000
DAPUR 0.6 0.1 3 1 0.180 MEMANJANG 4 3.1 1 0.395 4.898 0.6 3 1 1.80
MEJA BETON Ø8 -150
MELINTANG 20 0.7 1 0.395 5.530
T = 10 Cm
LANTAI 2
0.15 0.25 12.5 1 0.469 POKOK 5-Ø12 5 12.66 1 0.8917 56.442 12.5 0.65 1 8.13
BALOK B1
TUMPUAN
15 x 20 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 83 0.9 1 0.3950 29.625
Jumlah Total 0.469 86.068 8.125
0.15 0.25 17.1 0 0.000 POKOK 5-Ø12 5 17.26 0 0.8917 0.000 17.1 0.65 0 0.00
BALOK B2
TUMPUAN
15 x 25 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 114 0.9 0 0.3950 0.000
Jumlah Total 0.000 0.000 0.000
0.15 0.25 2.3 0 0.000 POKOK 7-Ø12 7 2.46 0 0.8917 0.000 2.3 0.65 0 0.00
BALOK B3
TUMPUAN
15 x 25 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 23 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
BALOK 0.1 0.1 5.05 0 0.000 POKOK 4-Ø8 4 5.21 0 0.3950 0.000 5.05 0.3 0 0.00
LINTEL TUMPUAN
10 x 10 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø6 -150 33.66666667 0.5 0 0.2217 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.25 3.6 0 0 POKOK 1 4-Ø12 4 3.76 0 0.8917 0.000 3.6 0.8 0 0
KOLOM K1
POKOK 2
15 / 25
SENGKANG Ø8 -150 24 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.3 3.6 0 0 POKOK 1 6-Ø12 6 3.76 0 0.8917 0.000 3.6 0.9 0 0
KOLOM K2
POKOK 2
15 / 30
SENGKANG Ø8 -150 24 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.4 4.2 0 0 POKOK 1 8-Ø12 8 4.36 0 0.8917 0.000 4.2 1.1 0 0
KOLOM K3
15 / 40
SENGKANG Ø8 -150 28 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.15 3.6 0 0 POKOK 1 4-Ø10 4 3.76 0 0.6167 0.000 3.6 0.3 0 0
KOLOM K4 POKOK 2
15 / 15
SENGKANG Ø8 -150 24 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
Bidang : 2.5 0.1 2.5 1 0.250 LAPIS ATAS Ø8 -150 17 2.6 1 0.395 17.117 2.5 2.5 1 6.25
PLAT LANTAI
2,5 x 2,5 17 2.6 1 0.395 17.117
T = 10 Cm
LAPIS BAWAH Ø8 -150 17 2.6 0 0.395 0.000
17 2.6 0 0.395 0.000
Sub Jumlah 0.250 Sub Jumlah 34.233 Sub Jumlah 6.25
Bidang : 2.6 0.1 1.8 1 0.468 LAPIS ATAS Ø8 -150 17 1.9 1 0.395 13.009 1.8 2.6 1 4.68
3.00 x 3.00 12 2.7 1 0.395 12.798
PLAT CANOPY Bidang : 5 0.08 0.95 0 0.000 LAPIS ATAS Ø8 -150 33 1.05 0 0.395 0.000 0.95 5 0 0.00
+5.95 5 x 0.95 6 5.1 0 0.395 0.000
T = 8 Cm
LAPIS BAWAH Ø8 -150 33 1.05 0 0.395 0.000
6 5.1 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
LANTAI ATAP
0.15 0.3 19.5 0 0.000 POKOK 5-Ø12 5 19.66 0 0.8917 0.000 19.5 0.75 0 0.00
BALOK B1
TUMPUAN
15 x 30 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 130 0.9 0 0.3950 0.000
Jumlah Total 0.000 0.000 0.000
0.15 0.25 6.9 0 0.000 POKOK 5-Ø12 5 7.06 0 0.8917 0.000 6.9 0.65 0 0.00
BALOK B2
TUMPUAN
15 x 25 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 46 0.9 0 0.3950 0.000
Jumlah Total 0.000 0.000 0.000
0.15 0.15 40 0 0.000 POKOK 4-Ø10 4 40.16 0 0.6167 0.000 40 0.45 0 0.00
BALOK RB
TUMPUAN
15/15 LAPANGAN
TENGAH
#DIV/0! PEMINGGANG
SENGKANG Ø8 -150 267 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15
0.15 0.15 1.35 0 0 POKOK 1 4-Ø12 4 1.51 0 0.8917 0.000 1.35 0.6 0 0
KOLOM KP POKOK 2
15 / 25
SENGKANG Ø8 -150 9 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
Bidang : 3.5 0.12 4.5 0 0.000 LAPIS ATAS Ø8 -150 23 4.6 0 0.395 0.000 4.5 3.5 0 0.00
PLAT LANTAI
3,5 x 4,5 30 3.6 0 0.395 0.000
T = 12 Cm
FFL +6.45 LAPIS BAWAH Ø8 -150 23 4.6 0 0.395 0.000
30 3.6 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
T = 8 cm Bidang : 1.2 0.8 3.65 0 0.000 LAPIS ATAS Ø8 -150 8 3.75 0 0.395 0.000 3.65 1.2 0 0.00
FFL +6.60 1,2 x 3,65 24 1.3 0 0.395 0.000
BENTENG BELAKANG
GALIAN TANAH BATU KALI 0.6 0.6 20 0 0 0
PONDASI
0.2 0.3 20 0 0.000 POKOK 4Ø10 4 20.16 0 0.6167 0.000 20 0.6 0 0.00
SLOOF - 1
TUMPUAN
20 / 30 LAPANGAN
SENGKANG Ø8 -150 133.33 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.15 2.4 0 0 POKOK 1 4-Ø10 4 2.56 0 0.6167 0.000 2.4 0.3 0 0
KOLOM K4 POKOK 2
15 / 15
SENGKANG Ø8 -150 16 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.15 20 0 0.000 POKOK 4-Ø10 4 20.16 0 0.6167 0.000 20 0.45 0 0.00
BALOK RB
TUMPUAN
15/15 LAPANGAN
SENGKANG Ø8 -150 133 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEKERJAAN PEMBANGUNAN POS JAGA DI AREA BUNDARAN SUKARAJA
LOKASI : SUKARAJA
TAHUN ANGGARAN : 2020
JUMLAH
NO URAIAN PEKERJAAN TOTAL
(RP.)
DIBULATKAN Rp 41,905,000.00
JUMLAH
HARGA SATUAN
N0 URAIAN PEKERJAAN VOLUME SAT HARGA
(RP.) (RP.)
1 2 3 4 5 6=5x3
I. PEKERJAAN PERSIAPAN
1 Pas. Bowplank dan Pengukuran Site 12.00 m1 19,757.50 237,090.00
2 Pembuatan Direksi Keet & Bedeng Kerja - ls 3,191,772.50 -
3 Pengadaan Listrik & Air Bersih 1.00 Ls 700,000.00 700,000.00
5 Pembersihan lahan 12.00 m2 12,000.00 144,000.00
Jumlah - I 1,081,090.00
II. PEKERJAAN TANAH & PONDASI
1 Pek. Galian Tanah Pondasi Batu Kali dan Sloof 5.38 m3 86,400.00 464,400.00
2 Pek. Cerucuk Dolken 12.00 m' 10,100.00 121,200.00
3 Pek. Lantai Kerja Pondasi Telapak 0.26 m3 645,400.00 165,222.40
4 Pek. Pondasi Batu Kali 1:5 4.50 m3 535,900.00 2,411,550.00
Jumlah - II 3,162,372.40
III. PEKERJAAN STRUKTUR BETON
1 Pekerjaan Sloof Beton ( SL-1 ) 15/20
- Cor Beton K-225 0.38 M³ 961,490.00 360,558.75
- Tulangan 106.39 Kg 11,780.00 1,253,234.93
- Bekisting 5.00 M² 97,800.00 489,000.00
2 Pekerjaan Kolom Beton K4 15/15
- Cor Beton K-225 0.61 M³ 961,490.00 584,105.17
- Tulangan 65.14 Kg 11,780.00 767,325.64
- Bekisting 8.10 M² 97,800.00 792,180.00
3 Pekerjaan Balok Lintel Atas Kusen 10/10
- Cor Beton K-175 - M³ -
- Tulangan - Kg -
- Bekisting - M² -
4 Pekerjaan Topian / Canopy Plat Beton ( Atas Kusen FFL +2.75)
- Cor Beton K-225 0.41 M³ 961,490.00 390,557.24
- Tulangan 45.99 Kg 11,780.00 541,806.96
- Bekisting 4.06 M² 237,200.00 963,506.40
5 Pekerjaan Balok Beton B1 15/20
- Cor Beton K-225 0.47 M³ 961,490.00 450,698.44
- Tulangan 86.07 Kg 11,780.00 1,013,875.15
- Bekisting 8.13 M² 237,200.00 1,927,250.00
6 Pekerjaan Plat Lantai t=12cm
- Cor Beton K-225 0.72 M³ 961,490.00 690,349.82
- Tulangan 85.85 Kg 11,780.00 1,011,273.73
- Bekisting 10.93 M² 237,200.00 2,592,596.00
Sub Jumlah Pek. Beton 13,828,318.24
IV. PEK. PASANGAN DINDING & PLESTERAN
1 Pasangan Bata Merah Campuran 1: 3 12.25 M² 121,835.00 1,492,478.75
2 Plesteran dan Acian Dinding Acian 1 : 3 18.38 M² 56,695.00 1,041,770.63
3 Plesteran Finishing Opening / Sudut Kusen 20.55 M' 13,155.00 270,335.25
Sub Jumlah Pek. Dinding 2,804,584.63
V. PEKERJAAN KUSEN
1 Jendela Kaca Mati Clear Uk. 2230 x 1200 1.00 unit 700,000.00 700,000.00
2 Jendela Kaca Kecil Uk. 300 x 1200 2.00 unit 250,000.00 500,000.00
3 Bouven Splite Uk. 600 x 400 1.00 350,000.00 350,000.00
4 Pintu PVC 1.00 175,000.00 175,000.00
Sub Jumlah Pek. Kusen 1,725,000.00
VI. PEKERJAAN PENUTUP LANTAI
LANTAI 1
1 Urugan Pasir Bawah Lantai t=5 cm 6.93 m3 220,500.00 1,526,962.50
2 Pekerjaan Lantai Keramik 30x30 ex. Mulia 6.93 m2 146,959.00 1,017,691.08
3 Pekerjaan Lantai Keramik 25x25 Warna / Motif ( KM/WC ) 2.35 m2 136,630.00 321,080.50
LANTAI ATAP
1 Waterproofing Plat Dak Atap, Canopy 8.42 m2 36,700.00 309,081.89
Sub Jumlah Pek. Lantai 3,174,815.97
VII. PEKERJAAN PLAFOND
1 Pekerjaan Pasang Plafond Gypsum ex. A Plus + Rangka Langit Langit Hollow 4.97 m2 107,394.00 534,059.62
Subtotal Rp 891,675
Subtotal Rp 15,602,895
II Arsitektur
¨ Keramik Lantai 30 x 30, Ex. Mulia 3.90 m2 110,000 Rp 429,000
¨ Keramik Lantai 20 x 20 (WC), Ex. Mulia 1.00 m2 115,000 Rp 114,425
¨ Dinding Bata 13.42 m2 120,475 Rp 1,617,015
¨ Plester + Aci 26.84 m2 78,260 Rp 2,100,811
¨ Cat Dalam Ex. Propan 14.15 m2 21,000 Rp 297,234
¨ Cat Luar Ex. Propan 12.69 m2 44,000 Rp 558,360
¨ Screeding Dak + Canopy 8.42 m2 80,000 Rp 673,748
¨ Waterproofing Dak + Canopy 8.42 m2 80,000 Rp 673,748
¨ Plafond Gypsum 4.97 m2 93,000 Rp 462,480
¨ Cat Plafond 4.97 m2 21,950 Rp 109,155
Subtotal Rp 7,035,977
Subtotal Rp 3,115,000
Subtotal Rp 3,913,000
V Instalasi Listrik
1 Instalasi titik lampu Downlight 18W + armatur 3.00 ttk 175,300 Rp 525,900
2 Saklar Ganda 1.00 bh 65,000 Rp 65,000
3 Instalasi stop kontak + stop kontak 2.00 bh 85,000 Rp 170,000
Subtotal Rp 760,900
Subtotal Rp 5,911,250
TOTAL Rp 38,833,303
PPN 10% Rp 3,883,330
GRAND TOTAL Rp 42,716,633
LISA HARGA SATUAN PEKERJAAN
SNI EDISI REVISI 2008
Page 53 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
3 C.3 Memasang 1m3 batu kosong (anstamping)
Bahan Batu belah 15 cm/20 cm M³ 1.2000 130,000.00 156,000.00
Pasir Urug M³ 0.4320 115,000.00 49,680.00
Pekerja OH 0.7800 60,000.00 46,800.00
Tenaga kerja Tukang batu OH 0.3900 85,000.00 33,150.00
Kepala tukang OH 0.0390 95,000.00 3,705.00
Mandor OH 0.0390 100,000.00 3,900.00
Jumlah 205,680.00 87,555.00 293,235.00
Keuntungan Max 10% 10% 20,568.00 8,755.50 29,323.50
Jumlah+keuntungan 226,248.00 96,310.50 322,558.50
Dibulatkan 226,200.00 96,300.00 322,500.00
D. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KAYU
1 D.1 Membuat dan memasang 1m2 pintu panel kayu kelas l atau ll
papan kayu M3 0.0400 4,950,000.00 198,000.00
Bahan paku 5cm - 7 cm Kg 0.5000 14,000.00 7,000.00
pekerja OH 1.0000 60,000.00 60,000.00
Tukang OH 3.0000 85,000.00 255,000.00
Tenaga kerja kepala tukang OH 0.3000 95,000.00 28,500.00
mandor OH 0.0500 100,000.00 5,000.00
Jumlah 205,000.00 348,500.00 553,500.00
Keuntungan Max 10% 10% 20,500.00 34,850.00 55,350.00
Jumlah+keuntungan 225,500.00 383,350.00 608,850.00
Dibulatkan 225,500.00 383,300.00 608,800.00
2 D.2 Membuat 1m pintu plywood rangkap ,rangka expose kayu kelas l atau ll
Papan kayu M3 0.0256 4,086,700.00 104,619.52
Bahan Paku 1cm - 2.5 cm Kg 0.0300 14,000.00 420.00
Lem kayu kg 0.5000 21,300.00 10,650.00
Plywood tebal 4mm uk. (90x220)cm Lbr 1.0000 50,000.00 50,000.00
Pekerja OH 0.8000 60,000.00 48,000.00
tenaga kerja Tukang OH 2.4000 85,000.00 204,000.00
kepala tukang OH 0.2400 95,000.00 22,800.00
Mandor OH 0.0400 100,000.00 4,000.00
Jumlah 165,689.52 278,800.00 444,489.52
Keuntungan Max 10% 10% 16,568.95 27,880.00 44,448.95
Jumlah+keuntungan 182,258.47 306,680.00 488,938.47
Dibulatkan 182,200.00 306,600.00 488,900.00
3 D.3 Memasang 1 m2 teakwood rangkap lapis formika,rangka expose kayukelas ll
Papan kayu M3 0.0250 4,086,700.00 102,167.50
Bahan Paku 1cm - 2.5 cm Kg 0.0300 14,000.00 420.00
Lem kayu Kg 0.8000 21,300.00 17,040.00
Plywood tebal 4mm uk. (90x220)cm Lebar 1.0000 50,000.00 50,000.00
Formika Lembar 0.5000 107,000.00 53,500.00
Tenaga kerja Pekerja OH 0.8500 60,000.00 51,000.00 51,000.00
Tukang OH 2.5500 85,000.00 216,750.00
kepala tukang OH 0.2550 95,000.00 24,225.00
Mandor OH 0.0430 100,000.00 4,300.00
Jumlah 274,127.50 296,275.00 570,402.50
Keuntungan Max 10% 10% 27,412.75 29,627.50 57,040.25
Jumlah+keuntungan 301,540.25 325,902.50 627,442.75
Dibulatkan 301,500.00 325,900.00 627,400.00
4 D.4 Memasang 1 m1 listplank ukuran (3x20) cm, kayu kelas l atau kelas ll
Papan kayu M3 0.0108 3,232,000.00 34,905.60
Bahan Paku 5 cm dan 7 cm Kg 0.1000 14,000.00 1,400.00
Pekerja OH 0.1000 60,000.00 6,000.00
Tukang OH 0.2000 85,000.00 17,000.00
Tenaga kerja kepala tukang OH 0.0200 95,000.00 1,900.00
Mandor OH 0.0050 100,000.00 500.00
Jumlah 36,305.60 25,400.00 61,705.60
Keuntungan Max 10% 10% 3,630.56 2,540.00 6,170.56
Jumlah+keuntungan 39,936.16 27,940.00 67,876.16
Dibulatkan 39,900.00 27,900.00 67,800.00
5 D.5 Memasang 1 m1 listplank ukuran (3x30) cm, kayu kelas l atau kelas ll
Papan kayu M3 0.0110 4,950,000.00 54,450.00
Bahan Paku 5 cm dan 7 cm Kg 0.0500 14,000.00 700.00
Pekerja OH 0.1000 60,000.00 6,000.00
Tukang OH 0.2000 85,000.00 17,000.00
Tenaga kerja kepala tukang OH 0.0200 95,000.00 1,900.00
Mandor OH 0.0050 100,000.00 500.00
Jumlah 55,150.00 25,400.00 80,550.00
Keuntungan Max 10% 10% 5,515.00 2,540.00 8,055.00
Jumlah+keuntungan 60,665.00 27,940.00 88,605.00
Dibulatkan 60,600.00 27,900.00 88,600.00
E. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BETON
1 E.1 Membuat 1 m3 beton mutu f =7,4 Mpa (K 100), slump (12 ± 2) cm,w/c =0,87
Portland Cement Kg 247.0000 1,360.00 335,920.00
Bahan Pasir Beton m3 0.6685 180,000.00 120,323.08
KR (maksimum 30 mm) m3 0.7685 170,000.00 130,638.46
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 608,381.54 133,335.00 741,716.54
Keuntungan Max 10% 10% 60,838.15 13,333.50 74,171.65
Jumlah+keuntungan 669,219.69 146,668.50 815,888.19
Dibulatkan 669,200.00 146,600.00 815,800.00
2 E.2 Membuat 1 m3 beton mutu f =9,8 Mpa (K 125), slump (12 ± 2) cm,w/c =0,78
Portland Cement Kg 276.0000 1,360.00 375,360.00
Bahan Pasir Beton m3 0.6331 180,000.00 113,953.85
KR (maksimum 30 mm) m3 0.7785 170,000.00 132,338.46
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00 8,300.00
Jumlah 776,487.31 133,335.00 909,822.31
Keuntungan Max 10% 10% 77,648.73 13,333.50 90,982.23
Page 54 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
Jumlah+keuntungan 854,136.04 146,668.50 1,000,804.54
Dibulatkan 854,100.00 146,600.00 1,000,800.00
3 E.3 Membuat 1 m3 beton mutu f =12,2 Mpa (K 150), slump (12 ± 2) cm,w/c =0,72
Portland Cement Kg 299.0000 1,360.00 406,640.00
Bahan Pasir Beton m3 0.6146 180,000.00 110,630.77
KR (maksimum 30 mm) m3 0.7823 170,000.00 132,992.31
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 671,763.08 133,335.00 805,098.08
Keuntungan Max 10% 10% 67,176.31 13,333.50 80,509.81
Jumlah+keuntungan 738,939.38 146,668.50 885,607.88
Dibulatkan 738,900.00 146,600.00 885,600.00
1 E.1 Membuat 1 m3 lantai kerja beton mutu f =7,4 Mpa (K 100), slump (3-6) cm,w/c =0,87
Portland Cement Kg 230.0000 1,360.00 312,800.00
Bahan Pasir Beton m3 0.6869 180,000.00 123,646.15
KR (maksimum 30 mm) m3 0.7900 170,000.00 134,300.00
Air Liter 200.0000 100.00 20,000.00
Pekerja OH 1.2000 60,000.00 72,000.00
Tenaga kerja Tukang OH 0.2000 85,000.00 17,000.00
kepala tukang OH 0.0200 95,000.00 1,900.00
Mandor OH 0.0600 100,000.00 6,000.00
Jumlah 590,746.15 96,900.00 687,646.15
Keuntungan Max 10% 10% 59,074.62 9,690.00 68,764.62
Jumlah+keuntungan 649,820.77 106,590.00 756,410.77
Dibulatkan 649,800.00 106,500.00 756,400.00
2 E.2 Membuat 1 m3 beton mutu f =14,5 Mpa (K 175), slump (12 ± 2) cm,w/c =0,66
Portland Cement Kg 326.0000 1,360.00 443,360.00
Bahan Pasir Beton m3 0.5846 180,000.00 105,230.77
KR (maksimum 30 mm) m3 0.7915 170,000.00 134,561.54
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 704,652.31 133,335.00 837,987.31
Keuntungan Max 10% 10% 70,465.23 13,333.50 83,798.73
Jumlah+keuntungan 775,117.54 146,668.50 921,786.04
Dibulatkan 775,100.00 146,600.00 921,700.00
3 E.3 Membuat 1 m3 beton mutu f =19,3 Mpa (K 225), slump (12 ± 2) cm,w/c =0,58
Portland Cement Kg 371.0000 1,360.00 504,560.00
Bahan Pasir Beton m3 0.5369 180,000.00 96,646.15
KR (maksimum 30 mm) m3 0.8054 170,000.00 136,915.38
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 759,621.54 133,335.00 892,956.54
Keuntungan Max 10% 10% 75,962.15 13,333.50 89,295.65
Jumlah+keuntungan 835,583.69 146,668.50 982,252.19
Dibulatkan 835,500.00 146,600.00 982,200.00
4 E.4 Membuat 1 m3 beton mutu f =21,7 Mpa (K 250), slump (12 ± 2) cm,w/c =0,56
Portland Cement Kg 384.0000 1,360.00 522,240.00
Bahan Pasir Beton m3 0.5323 180,000.00 95,815.38
KR (maksimum 30 mm) m3 0.7992 170,000.00 135,869.23
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 775,424.62 133,335.00 908,759.62
Keuntungan Max 10% 10% 77,542.46 13,333.50 90,875.96
Jumlah+keuntungan 852,967.08 146,668.50 999,635.58
Dibulatkan 852,900.00 146,600.00 999,600.00
5 E.5 Membuat 1 m3 beton mutu f =26,4 Mpa (K 300), slump (12 ± 2) cm,w/c =0,52
Portland Cement Kg 413.0000 1,360.00 561,680.00
Bahan Pasir Beton m3 0.5238 180,000.00 94,292.31
KR (maksimum 30 mm) m3 0.7854 170,000.00 133,515.38
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 810,987.69 133,335.00 944,322.69
Keuntungan Max 10% 10% 81,098.77 13,333.50 94,432.27
Jumlah+keuntungan 892,086.46 146,668.50 1,038,754.96
Dibulatkan 892,000.00 146,600.00 1,038,700.00
Page 55 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
6 E.6 Pembesian 1 kg dengan besi atau besi ulir
Bahan Besi beton( ulir ) Kg 1.0500 7,000.00 7,350.00
kawat beton Kg 0.0100 13,000.00 130.00
Tenaga kerja pekerja OH 0.0700 60,000.00 4,200.00
Tukang OH 0.0070 85,000.00 595.00
Kepala tukang OH 0.0007 95,000.00 66.50
Mandor OH 0.0004 100,000.00 40.00
Jumlah 7,480.00 4,901.50 12,381.50
Keuntungan Max 10% 10% 748.00 490.15 1,238.15
Jumlah+keuntungan 8,228.00 5,391.65 13,619.65
Dibulatkan 8,200.00 5,300.00 13,600.00
F. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BEKISTING/CETAKAN BETON
1 F.1 Memasang 1 m2 Bekisting Pondasi
Bahan Kayu kelas III M3 0.0400 1,100,000.00 44,000.00
Paku 5 cm- 10 cm Kg 0.3000 14,000.00 4,200.00
Minyak bekisting Liter 0.1000 4,500.00 450.00
Pekerja OH 0.5200 60,000.00 31,200.00
Tenaga kerja Tukang OH 0.2600 85,000.00 22,100.00
Kepala tukang OH 0.0260 95,000.00 2,470.00
Mandor OH 0.0260 100,000.00 2,600.00
Jumlah 48,650.00 58,370.00 107,020.00
Keuntungan Max 10% 10% 4,865.00 5,837.00 10,702.00
Jumlah+keuntungan 53,515.00 64,207.00 117,722.00
Dibulatkan 53,500.00 64,200.00 117,700.00
2 F.2 Memasang 1m2 Bekisting untuk sloof
Bahan Kayu kelas III M3 0.0400 1,100,000.00 44,000.00
Paku 5 cm- 10 cm Kg 0.3000 14,000.00 4,200.00
Minyak bekisting Liter 0.1000 4,500.00 450.00
Tenaga kerja Pekerja OH 0.5200 60,000.00 31,200.00
Tukang OH 0.2600 85,000.00 22,100.00
Kepala tukang OH 0.0260 95,000.00 2,470.00
Mandor OH 0.0260 100,000.00 2,600.00
Jumlah 48,650.00 58,370.00 107,020.00
Keuntungan Max 10% 10% 4,865.00 5,837.00 10,702.00
Jumlah+keuntungan 53,515.00 64,207.00 117,722.00
Dibulatkan 53,500.00 64,200.00 117,700.00
3 F.3 Memasang 1m2 Bekisting untuk Kolom 2 x Pakai
Bahan Kayu kelas III m3 0.0200 1,100,000.00 22,000.00
Paku 5 cm-12cm kg 0.2000 14,000.00 2,800.00
Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas II m3 0.0075 3,232,000.00 24,240.00
Plywood Tebal 9mm Lbr 0.1750 104,000.00 18,200.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 1.0000 19,500.00 19,500.00
Tenaga kerja Pekerja OH 0.6600 60,000.00 39,600.00
Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 87,640.00 74,085.00 161,725.00
Keuntungan Max 10% 10% 8,764.00 7,408.50 16,172.50
Jumlah+keuntungan 96,404.00 81,493.50 177,897.50
Dibulatkan 96,400.00 81,400.00 177,800.00
4 F.4 Memasang 1m2 bekisting untuk balok 2x Pakai
Bahan Kayu kelas III m3 0.0200 1,100,000.00 22,000.00
Paku 5 cm-12cm kg 0.2000 14,000.00 2,800.00
Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas II m3 0.0090 3,232,000.00 29,088.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 1.0000 19,500.00 19,500.00
Tenaga kerja Pekerja OH 0.6600 60,000.00 39,600.00
Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 110,688.00 74,085.00 184,773.00
Keuntungan Max 10% 10% 11,068.80 7,408.50 18,477.30
Jumlah+keuntungan 121,756.80 81,493.50 203,250.30
Dibulatkan 121,700.00 81,400.00 203,200.00
5 F.5 Memasang 1m2 bekisting untuk plat lantai
Bahan Kayu kelas III m3 0.0200 1,100,000.00 22,000.00
Paku 5 cm-12cm kg 0.4000 14,000.00 5,600.00
Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas ll m3 0.0075 3,232,000.00 24,240.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 3.0000 19,500.00 58,500.00
Tenaga kerja Pekerja OH 0.6600 60,000.00 39,600.00
Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 147,640.00 74,085.00 221,725.00
Keuntungan Max 10% 10% 14,764.00 7,408.50 22,172.50
Jumlah+keuntungan 162,404.00 81,493.50 243,897.50
Dibulatkan 162,400.00 81,400.00 243,800.00
Page 56 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
6 F.6 Memasang 1m2 bekisting untuk dinding
Kayu kelas lll m3 0.0300 1,100,000.00 33,000.00
Paku 5 cm-12cm kg 0.4000 14,000.00 5,600.00
Bahan Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas ll m3 0.0200 3,232,000.00 64,640.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 3.0000 19,500.00 58,500.00
Formite/penjaga jarak bekisting/spacer Buah 4.0000 2,985.60 11,942.40
Pekerja OH 0.6600 60,000.00 39,600.00
Tenaga kerja Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 210,982.40 74,085.00 285,067.40
Keuntungan Max 10% 10% 21,098.24 7,408.50 28,506.74
Jumlah+keuntungan 232,080.64 81,493.50 313,574.14
Dibulatkan 232,000.00 81,400.00 313,500.00
7 F.7 Memasang 1m2 bekisting untuk tangga
Kayu kelas lll m3 0.0300 1,100,000.00 33,000.00
Paku 5 cm-12cm kg 0.4000 14,000.00 5,600.00
Bahan Minyak bekisting Liter 0.1500 4,500.00 675.00
Balok kayu kelas ll m3 0.0150 3,232,000.00 48,480.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 2.0000 19,500.00 39,000.00
Pekerja OH 0.6600 60,000.00 39,600.00
Tenaga kerja Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 163,155.00 74,085.00 237,240.00
Keuntungan Max 10% 10% 16,315.50 7,408.50 23,724.00
Jumlah+keuntungan 179,470.50 81,493.50 260,964.00
Dibulatkan 179,400.00 81,400.00 260,900.00
G. PENETAPAN INDEK HARGA SATUAN PEKERJAAN DINDING
1 G.1 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC :3 PP
Bata merah buah 70.0000 700.00 49,000.00
Bahan Portland Cement Kg 14.3700 1,360.00 19,543.20
Pasir Pasang m3 0.0400 145,000.00 5,800.00
Tenaga Kerja Pekerja OH 0.3000 60,000.00 18,000.00
Tukang batu OH 0.1000 85,000.00 8,500.00
Kepala Tukang OH 0.0100 95,000.00 950.00
Mandor OH 0.0150 100,000.00 1,500.00
Jumlah 74,343.20 28,950.00 103,293.20
Keuntungan Max 10% 10% 7,434.32 2,895.00 10,329.32
Jumlah+keuntungan 81,777.52 31,845.00 113,622.52
Dibulatkan 81,700.00 31,800.00 113,600.00
2 G.2 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 5 PP
Bata merah buah 70.0000 700.00 49,000.00
Bahan Portland Cement Kg 9.6800 1,360.00 13,164.80
Pasir Pasang m3 0.0450 145,000.00 6,525.00
Tenaga Kerja Pekerja OH 0.3000 60,000.00 18,000.00
Tukang batu OH 0.1000 85,000.00 8,500.00
Kepala Tukang OH 0.0100 95,000.00 950.00
Mandor OH 0.0150 100,000.00 1,500.00
Jumlah 68,689.80 28,950.00 97,639.80
Keuntungan Max 10% 10% 6,868.98 2,895.00 9,763.98
Jumlah+keuntungan 75,558.78 31,845.00 107,403.78
Dibulatkan 75,500.00 31,800.00 107,400.00
3 G.3 Memasang 1 m2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
Semen Portland Kg 10.8000 1,360.00 14,688.00
Bahan Pasir Pasang M3 0.0260 145,000.00 3,770.00
Pekerja Oh 0.2500 60,000.00 15,000.00
Tenaga Kerja Tukang Batu Oh 0.2000 85,000.00 17,000.00
Kepala Tukang Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0125 100,000.00 1,250.00
Jumlah 18,458.00 35,150.00 53,608.00
Keuntungan Max 10% 10% 1,845.80 3,515.00 5,360.80
Jumlah+keuntungan 20,303.80 38,665.00 58,968.80
Dibulatkan 20,300.00 38,600.00 58,900.00
4 G.4 Memasang 1 m2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Bahan Semen Portland Kg 7.2900 1,360.00 9,914.40
Pasir Pasang M3 0.0280 145,000.00 4,060.00
Pekerja Oh 0.2500 60,000.00 15,000.00
Tenaga Kerja Tukang Batu Oh 0.2000 85,000.00 17,000.00
Kepala Tukang Batu Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0125 100,000.00 1,250.00
Jumlah 13,974.40 35,150.00 49,124.40
Keuntungan Max 10% 10% 1,397.44 3,515.00 4,912.44
Jumlah+keuntungan 15,371.84 38,665.00 54,036.84
Dibulatkan 15,300.00 38,600.00 54,000.00
Page 57 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
5 G.5 Memasang 1 m2 Aferking Beton (acian)
Bahan Semen Portland Kg 4.0000 1,360.00 5,440.00
Pekerja Oh 0.1430 60,000.00 8,580.00
Tenaga Kerja Tukang Batu Oh 0.1070 85,000.00 9,095.00
Kepala Tukang Batu Oh 0.0105 95,000.00 997.50
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 5,440.00 19,672.50 25,112.50
Keuntungan Max 10% 10% 544.00 1,967.25 2,511.25
Jumlah+keuntungan 5,984.00 21,639.75 27,623.75
Dibulatkan 5,900.00 21,600.00 27,600.00
H. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KONTRUKSI BAJA
1 H.1 Mengerjakan 1 cm pengelasan dengan las listrik
Kawat las listrik kg 0.0400 17,800.00 712.00
Bahan Solar Liter 0.0300 4,500.00 135.00
Minyak pelumas Liter 0.0040 30,000.00 120.00
Pekerja OH 0.0040 60,000.00 240.00
Tenaga Kerja Tukang besi OH 0.0020 85,000.00 170.00
Kepala Tukang OH 0.0002 95,000.00 19.00
Mandor OH 0.0002 100,000.00 20.00
Alat Sewa alat Jam 0.0170 33,000.00 561.00
Jumlah 1,528.00 449.00 1,977.00
Keuntungan Max 10% 10% 152.80 44.90 197.70
Jumlah+keuntungan 1,680.80 493.90 2,174.70
Dibulatkan 1,600.00 400.00 2,100.00
2 H.2 Memasang 1 kg besi profil
Bahan Besi profil Kg 1.1500 15,000.00 17,250.00
Pekerja OH 0.0600 60,000.00 3,600.00
Tenaga Kerja Tukang las konstruksi OH 0.0600 85,000.00 5,100.00
Kepala Tukang OH 0.0060 95,000.00 570.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 17,250.00 9,570.00 26,820.00
Keuntungan Max 10% 10% 1,725.00 957.00 2,682.00
Jumlah+keuntungan 18,975.00 10,527.00 29,502.00
Dibulatkan 18,900.00 10,500.00 29,500.00
3 H.3 Memasang 1 kg rangka kuda-kuda baja IWF
Bahan Besi baja IWF Kg 1.1500 10,000.00 11,500.00
Pekerja OH 0.0600 60,000.00 3,600.00
Tenaga Kerja Tukang las konstruksi OH 0.0600 85,000.00 5,100.00
Kepala Tukang OH 0.0060 95,000.00 570.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 11,500.00 9,570.00 21,070.00
Keuntungan Max 10% 10% 1,150.00 957.00 2,107.00
Jumlah+keuntungan 12,650.00 10,527.00 23,177.00
Dibulatkan 12,600.00 10,500.00 23,100.00
4 H.4 Mengerjakan 100 kg pekerjaan perakitan
Solar Liter 1.0000 4,500.00 4,500.00
Bahan
Minyak pelumas Liter 0.1000 30,000.00 3,000.00
Pekerja OH 0.1000 60,000.00 6,000.00
Tukang besi konstruksi OH 0.1000 85,000.00 8,500.00
Tenaga Kerja
Kepala Tukang OH 0.0010 95,000.00 95.00
Mandor OH 0.0050 100,000.00 500.00
Alat Sewa alat Jam 0.8000 - -
Jumlah 7,500.00 15,095.00 22,595.00
Keuntungan Max 10% 10% 750.00 1,509.50 2,259.50
Jumlah+keuntungan 8,250.00 16,604.50 24,854.50
Dibulatkan 8,200.00 16,600.00 24,800.00
5 H.5 Mengerjakan 1 kg pekerjaan perakitan 82.00 166.00 248.00
6 G.6 Memasang 1 m2 talang datar/jurai seng bjls 28 lebar 90 cm
Seng plat m2 1.0500 46,500.00 48,825.00
Bahan Paku skrup 1 cm-2,5 cm Kg 0.0150 21,000.00 315.00
Papan kayu kelas ll atau III m3 0.0190 4,086,700.00 77,647.30
Pekerja OH 0.2000 60,000.00 12,000.00
Tukang OH 0.4000 85,000.00 34,000.00
Tenaga Kerja
Kepala Tukang OH 0.0250 95,000.00 2,375.00
Mandor OH 0.0100 100,000.00 1,000.00
Jumlah 126,787.30 49,375.00 176,162.30
Keuntungan Max 10% 10% 12,678.73 4,937.50 17,616.23
Jumlah+keuntungan 139,466.03 54,312.50 193,778.53
Dibulatkan 139,400.00 54,300.00 193,700.00
7 H.7 Memasang 1 m2 talang ½ lingkaran D-15 cm seng plat bjls 30 lebar 45 cm
Seng plat m2 1.0500 46,500.00 48,825.00
Bahan Paku skrup 1 cm-2,5 cm Kg 0.0100 21,000.00 210.00
Besi strip Kg 0.5000 17,300.00 8,650.00
Pekerja OH 0.1500 60,000.00 9,000.00
Tukang OH 0.3000 85,000.00 25,500.00
Tenaga Kerja
Kepala Tukang OH 0.0300 95,000.00 2,850.00
Mandor OH 0.0080 100,000.00 800.00
Jumlah 57,685.00 38,150.00 95,835.00
Keuntungan Max 10% 10% 5,768.50 3,815.00 9,583.50
Jumlah+keuntungan 63,453.50 41,965.00 105,418.50
Dibulatkan 63,400.00 41,900.00 105,400.00
Page 58 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
I. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KUSEN ALUMUNIUM
1 I.1 MEMASANG KUSEN DAN DAUN PINTU TYPE P-01
Kusen Kayu Merawan Oven m' 5.5500 125,000.00 693,750.00
Daun Pintu Kayu Merawan Oven m2 2.7675 250,000.00 691,875.00
Engsel Pintu Psg 1.5000 42,000.00 63,000.00
Bahan Dan Upah Lever Handel Dekson Solid Unit 1.0000 250,000.00 250,000.00
Body Kunci + Cylinder Bh 1.0000 200,000.00 200,000.00
Upah Pasang ls 1.0000 189,862.50 189,862.50
Alat Bantu ls 1.0000 47,465.63 47,465.63
Pengecatan dengan Cat duco + Upah m2 6.6420 150,000.00 996,300.00
Jumlah 1,898,625.00 237,328.13 2,135,953.13
Keuntungan Max 10% 10% 189,862.50 23,732.81 213,595.31
Jumlah+keuntungan 2,088,487.50 261,060.94 2,349,548.44
Dibulatkan 2,088,400.00 261,000.00 2,349,500.00
2 I.2 MEMASANG KUSEN DAN DAUN PINTU TYPE P-02
Kusen Kayu Merawan Oven m' 6.4000 125,000.00 800,000.00
Daun Pintu Kayu Merawan Oven m2 1.6400 250,000.00 410,000.00
Kaca Bening 5mm m2 0.1200 65,000.00 7,800.00
Engsel Pintu Psg 1.5000 42,000.00 63,000.00
Bahan Dan Upah
Lever Handel Solid Unit 1.0000 250,000.00 250,000.00
Body Kunci + Cylinder Bh 1.0000 200,000.00 200,000.00
Upah Pasang ls 1.0000 173,080.00 173,080.00
Alat Bantu ls 1.0000 43,270.00 43,270.00
Pengecatan dengan Cat duco + Upah m2 3.9360 150,000.00 590,400.00
Jumlah 1,730,800.00 216,350.00 1,947,150.00
Keuntungan Max 10% 10% 173,080.00 21,635.00 194,715.00
Jumlah+keuntungan 1,903,880.00 237,985.00 2,141,865.00
Dibulatkan 1,903,800.00 237,900.00 2,141,800.00
4 I.4 MEMASANG KUSEN DAN DAUN PINTU TYPE PJ-01
Kusen Kayu Merawan Oven m' 8.2000 125,000.00 1,025,000.00
Daun Pintu Kayu Merawan Oven m2 1.6400 250,000.00 410,000.00
Daun Jendela Merawan Oven m2 0.3456 250,000.00 86,400.00
Engsel Pintu Psg 4.5000 42,000.00 189,000.00
Bahan Dan Upah Lever Handel Belleza Unit 1.0000 180,000.00 180,000.00
Body Kunci + Cylinder Bh 1.0000 125,000.00 125,000.00
Kaca Polos 5 mm m2 7.8440 65,000.00 509,860.00
Upah Pasang ls 1.0000 252,526.00 252,526.00
Alat Bantu ls 1.0000 63,131.50 63,131.50
Pengecatan dengan Cat duco + Upah m2 4.7654 150,000.00 714,816.00
Jumlah 2,525,260.00 1,030,473.50 3,555,733.50
Keuntungan Max 10% 10% 252,526.00 103,047.35 355,573.35
Jumlah+keuntungan 2,777,786.00 1,133,520.85 3,911,306.85
Dibulatkan 2,777,700.00 1,133,500.00 3,911,300.00
5 I.5 MEMASANG KUSEN DAN DAUN PINTU TYPE PJ-02
Kusen Aluminium Natural 4" m' 14.6500 95,000.00 1,391,750.00
Daun Pintu Aluminium Natural m' 5.4000 95,000.00 513,000.00
Rel Pintu Geser (Henderson) set 1.0000 350,000.00 350,000.00
Handle Pintu Geser Unit 1.0000 225,000.00 225,000.00
Body Kunci + Cylinder Pintu Geser Bh 1.0000 185,000.00 185,000.00
Kaca Polos 5 mm m2 3.7680 65,000.00 244,920.00
Bahan Dan Upah
Sealent M' 20.0400 5,000.00 100,200.00
List Karet m' 33.7200 6,500.00 219,180.00
Paku Skrup Bh 14.0000 2,000.00 28,000.00
Pisher m2 14.0000 2,000.00 28,000.00
Upah Pasang ls 1.0000 328,505.00 328,505.00
Alat Bantu ls 1.0000 82,126.25 82,126.25
Jumlah 3,285,050.00 410,631.25 3,695,681.25
Keuntungan Max 10% 10% 328,505.00 41,063.13 369,568.13
Jumlah+keuntungan 3,613,555.00 451,694.38 4,065,249.38
Dibulatkan 3,613,500.00 451,600.00 4,065,200.00
8 I.8 MEMASANG KUSEN JENDELA TYPE J-01
Kusen Kayu Merawan Oven m' 9.6000 125,000.00 1,200,000.00
Daun Jendela Merawan Oven m' 0.8640 250,000.00 216,000.00
Kaca Polos 5 mm m2 1.7780 65,000.00 115,570.00
Engsel Jendela Psg 1.0000 75,000.00 75,000.00
Bahan Dan Upah Ramskar Jendela Belleza Psg 1.0000 65,000.00 65,000.00
List Kayu m' 1.7280 9,000.00 15,552.00
Paku 1-2cm bh 28.0000 700.00 19,600.00
Upah Pasang ls 1.0000 170,672.20 170,672.20
Alat Bantu ls 1.0000 42,668.05 42,668.05
Pengecatan dengan Cat duco + Upah m2 2.0736 150,000.00 311,040.00
Jumlah 1,706,722.00 213,340.25 1,920,062.25
Keuntungan Max 10% 10% 170,672.20 21,334.03 192,006.23
Jumlah+keuntungan 1,877,394.20 234,674.28 2,112,068.48
Dibulatkan 1,877,300.00 234,600.00 2,112,000.00
Page 59 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
J. PENETAPAN INDEK HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 J.1 Memasang 1 m2 Pasangan rangka langit - langit (60 X 60) cm kayu Borneo
Bahan Kayu Klas II/ III M3 0.0120 3,232,000.00 38,784.00
Paku Biasa 2" - 5" Kg 0.1000 14,000.00 1,400.00
Pekerja Oh 0.1500 60,000.00 9,000.00
Tenaga Kerja Tukang Oh 0.2500 85,000.00 21,250.00
Kepala Tukang Oh 0.0250 95,000.00 2,375.00
Mandor Oh 0.0750 100,000.00 7,500.00
Jumlah 40,184.00 40,125.00 80,309.00
Keuntungan Max 10% 10% 4,018.40 4,012.50 8,030.90
Jumlah+keuntungan 44,202.40 44,137.50 88,339.90
Dibulatkan 44,200.00 44,100.00 88,300.00
2 J.2 Memasang 1 m2 Pasangan rangka langit - langit hollow
hollow M2 1.0000 22,500.00 22,500.00
Bahan Gantungan Besi dia 6 Kg 0.2750 -
Assesories dan Alat Bantu ls 1.0000 1,125.00 1,125.00
Pekerja Oh 0.1500 60,000.00 9,000.00
Tenaga Kerja Tukang Oh 0.5000 85,000.00 42,500.00
Kepala Tukang Oh 0.0500 95,000.00 4,750.00
Mandor Oh 0.0080 100,000.00 800.00
Jumlah 23,625.00 57,050.00 80,675.00
Keuntungan Max 10% 10% 2,362.50 5,705.00 8,067.50
Jumlah+keuntungan 25,987.50 62,755.00 88,742.50
Dibulatkan 25,900.00 62,700.00 88,700.00
3 J.3 Memasang 1 m2 Langit-langit GRC t = 4 mm
Bahan Pelat GRC tebal 4mm Lbr 0.3470 84,000.00 29,148.00
Paku kg 0.0100 14,000.00 140.00
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang kayu Oh 0.0700 85,000.00 5,950.00
Kepala tukang kayu Oh 0.0070 95,000.00 665.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 29,288.00 8,565.00 37,853.00
Keuntungan Max 10% 10% 2,928.80 856.50 3,785.30
Jumlah+keuntungan 32,216.80 9,421.50 41,638.30
Dibulatkan 32,200.00 9,400.00 41,600.00
4 J.4 Memasang 1 m2 Langit-langit Gypsumboard 9 mm
Pelat Gypsum Board Lbr 0.3470 60,000.00 20,820.00
Bahan Plaster Board Ls 1.0000 1,041.00 1,041.00
Paku Skrup kg 0.0100 14,000.00 140.00
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang kayu Oh 0.0700 85,000.00 5,950.00
Kepala tukang kayu Oh 0.0070 95,000.00 665.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 22,001.00 8,565.00 30,566.00
Keuntungan Max 10% 10% 2,200.10 856.50 3,056.60
Jumlah+keuntungan 24,201.10 9,421.50 33,622.60
Dibulatkan 24,200.00 9,400.00 33,600.00
5 J.5 Memasang 1 m2 Langit-langit Calsiboard 9 mm
Pelat Calsi Board Lbr 0.3470 55,000.00 19,085.00
Bahan Plaster Board Ls 1.0000 1,041.00 1,041.00
Paku Skrup kg 0.0100 14,000.00 140.00
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang kayu Oh 0.0700 85,000.00 5,950.00
Kepala tukang kayu Oh 0.0070 95,000.00 665.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 20,266.00 8,565.00 28,831.00
Keuntungan Max 10% 10% 2,026.60 856.50 2,883.10
Jumlah+keuntungan 22,292.60 9,421.50 31,714.10
Dibulatkan 22,200.00 9,400.00 31,700.00
6 J.6 Memasang 1 m2 list profil plapond bahan kayu profil 4/4 kayu Kamper Banjar
Bahan Kayu Profil Kamper M1 1.0500 33,000.00 34,650.00
Paku Biasa 1/2" - 2" Kg 0.0400 14,000.00 560.00
Pekerja Oh 0.0210 60,000.00 1,260.00
Tenaga Kerja Tukang Kayu Oh 0.0210 85,000.00 1,785.00
Kepala Tukang Kayu Oh 0.0020 95,000.00 190.00
Mandor Oh 0.0010 100,000.00 100.00
Jumlah 35,210.00 3,335.00 38,545.00
Keuntungan Max 10% 10% 3,521.00 333.50 3,854.50
Jumlah+keuntungan 38,731.00 3,668.50 42,399.50
Dibulatkan 38,700.00 3,600.00 42,300.00
Page 60 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
7 J.7 Memasang 1 m2 list plafond gypsum profil
Bahan List gypsum profil m 1.0500 13,000.00 13,650.00
Tepung gypsum Kg 0.1500 3,250.00 487.50
Pekerja OH 0.0600 60,000.00 3,600.00
Tenaga Kerja Tukang kayu OH 0.0600 85,000.00 5,100.00
Kepala Tukang OH 0.0060 95,000.00 570.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 14,137.50 9,570.00 23,707.50
Keuntungan Max 10% 10% 1,413.75 957.00 2,370.75
Jumlah+keuntungan 15,551.25 10,527.00 26,078.25
Dibulatkan 15,500.00 10,500.00 26,000.00
8 J.8 Memasang 1 m2 list langit-langit kayu profil
Bahan List kayu profil m 1.0500 15,180.00 15,939.00
Paku Kg 1.0100 14,000.00 14,140.00
Pekerja OH 0.0500 60,000.00 3,000.00
Tenaga Kerja Tukang kayu OH 0.0500 85,000.00 4,250.00
Kepala Tukang OH 0.0050 95,000.00 475.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 30,079.00 8,025.00 38,104.00
Keuntungan Max 10% 10% 3,007.90 802.50 3,810.40
Jumlah+keuntungan 33,086.90 8,827.50 41,914.40
Dibulatkan 33,000.00 8,800.00 41,900.00
K. PENETAPAN INDEK HARGA SATUAN PEKERJAAN ATAP
1 K.1 Memasang 1 m2 atap genteng Metal Roof t = 0,35
Bahan Genteng Metal t = 0,3 M2 1.0000 85,000.00 85,000.00
Assesories Ls 1.0000 4,250.00 4,250.00
Pekerja Oh 0.1500 60,000.00 9,000.00
Tenaga Kerja Tukang kayu Oh 0.0750 85,000.00 6,375.00
Kepala tukang kayu Oh 0.0080 95,000.00 760.00
Mandor Oh 0.0080 100,000.00 800.00
Jumlah 89,250.00 16,935.00 106,185.00
Keuntungan Max 10% 10% 8,925.00 1,693.50 10,618.50
Jumlah+keuntungan 98,175.00 18,628.50 116,803.50
Dibulatkan 98,100.00 18,600.00 116,800.00
2 K.2 Memasang 1 m' nok genteng Metal Roof t = 0,35
Bahan Nok genteng Metal t = 0,3 M' 1.0000 45,000.00 45,000.00
Assesories Ls 1.0000 2,250.00 2,250.00
Pekerja Oh 0.4000 60,000.00 24,000.00
Tenaga Kerja Tukang kayu Oh 0.2000 85,000.00 17,000.00
Kepala tukang kayu Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0200 100,000.00 2,000.00
Jumlah 47,250.00 44,900.00 92,150.00
Keuntungan Max 10% 10% 4,725.00 4,490.00 9,215.00
Jumlah+keuntungan 51,975.00 49,390.00 101,365.00
Dibulatkan 51,900.00 49,300.00 101,300.00
3 K.3 Memasang 1 m' Pasang lisplang ukuran 3/28 cm kayu kamper
Bahan Kayu Papan Kamper M3 0.0090 4,950,000.00 44,550.00
Paku Biasa 2" - 5" Kg 0.0500 14,000.00 700.00
Pekerja Oh 0.1100 60,000.00 6,600.00
Tenaga Kerja Tukang Kayu Oh 0.2200 85,000.00 18,700.00
Kepala Tukang Kayu Oh 0.0220 95,000.00 2,090.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 45,250.00 27,890.00 73,140.00
Keuntungan Max 10% 10% 4,525.00 2,789.00 7,314.00
Jumlah+keuntungan 49,775.00 30,679.00 80,454.00
Dibulatkan 49,700.00 30,600.00 80,400.00
L. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENGECATAN/LABURAN
1 L.1 1 M2 Pengecatan bidang Besi / kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni Kg 0.2000 25,300.00 5,060.00
Plamir Kg 0.1500 27,830.00 4,174.50
Bahan Cat dasar Kg 0.1700 25,000.00 4,250.00
Cat penutup Kg 0.2600 62,617.50 16,280.55
Ampelas Lbr 0.0100 3,450.00 34.50
Kwas 3" Bh 0.0500 6,900.00 345.00
Pekerja Oh 0.1400 60,000.00 8,400.00
Tenaga Kerja Tukang cat Oh 0.0180 85,000.00 1,530.00
Kepala tukang cat Oh 0.0120 95,000.00 1,140.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 30,144.55 11,570.00 41,714.55
Keuntungan Max 10% 10% 3,014.46 1,157.00 4,171.46
Jumlah+keuntungan 33,159.01 12,727.00 45,886.01
Dibulatkan 33,100.00 12,700.00 45,800.00
2 L.2 1 M2 Pengecatan Permukaan Baja Dengan Meni Besi / Sinkromat
Cat meni Besi Kg 0.1000 25,300.00 2,530.00
Ampelas Lbr 0.0100 4,000.00 40.00
Kwas 3" Bh 0.0500 6,900.00 345.00
Pekerja Oh 0.2000 60,000.00 12,000.00
Tenaga Kerja Tukang cat Oh 0.1000 85,000.00 8,500.00
Kepala tukang cat Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 2,915.00 23,400.00 26,315.00
Keuntungan Max 10% 10% 291.50 2,340.00 2,631.50
Jumlah+keuntungan 3,206.50 25,740.00 28,946.50
Dibulatkan 3,200.00 25,700.00 28,900.00
Page 61 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
3 L.3 1 M2 Pengecatan tembok baru 1 lapis cat dasar, 2 lapis cat penutup (EXTERIOR)
Cat dasar Kg 0.2000 18,800.00 3,760.00
Bahan Cat penutup 2 x "ICI" Watershield Kg 0.2600 45,000.00 11,700.00
Ampelas Lbr 0.1000 3,450.00 345.00
Roll Cat Bh 0.0250 28,750.00 718.75
Pekerja Oh 0.0400 60,000.00 2,400.00
Tenaga Kerja Tukang cat Oh 0.1260 85,000.00 10,710.00
Kepala tukang cat Oh 0.0126 95,000.00 1,197.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 16,523.75 14,807.00 31,330.75
Keuntungan Max 10% 10% 1,652.38 1,480.70 3,133.08
Jumlah+keuntungan 18,176.13 16,287.70 34,463.83
Dibulatkan 18,100.00 16,200.00 34,400.00
4 L.4 1 M2 Pengecatan tembok baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir Kg 0.1000 18,000.00 1,800.00
Cat dasar Kg 0.1000 18,800.00 1,880.00
Bahan Cat penutup 2 x Kg 0.2600 28,500.00 7,410.00
Ampelas Lbr 0.1000 3,450.00 345.00
Roll Cat Bh 0.0250 28,750.00 718.75
Pekerja Oh 0.0400 60,000.00 2,400.00
Tenaga Kerja Tukang cat Oh 0.1260 85,000.00 10,710.00
Kepala tukang cat Oh 0.0126 95,000.00 1,197.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 12,153.75 14,807.00 26,960.75
Keuntungan Max 10% 10% 1,215.38 1,480.70 2,696.08
Jumlah+keuntungan 13,369.13 16,287.70 29,656.83
Dibulatkan 13,300.00 16,200.00 29,600.00
5 L.5 1 M2 Pengecatan plapond baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir Kg 0.1000 18,000.00 1,800.00
Cat dasar Kg 0.1000 18,800.00 1,880.00
Bahan Cat penutup 2 x Kg 0.2600 28,500.00 7,410.00
Ampelas Lbr 0.1000 3,450.00 345.00
Roll Cat Bh 0.0250 28,750.00 718.75
Pekerja Oh 0.0400 60,000.00 2,400.00
Tenaga Kerja Tukang cat Oh 0.1260 85,000.00 10,710.00
Kepala tukang cat Oh 0.0126 95,000.00 1,197.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 12,153.75 14,807.00 26,960.75
Keuntungan Max 10% 10% 1,215.38 1,480.70 2,696.08
Jumlah+keuntungan 13,369.13 16,287.70 29,656.83
Page 62 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
Dibulatkan 13,300.00 16,200.00 29,600.00
6 L.6 1 M2 Pelaburan kayu dengan melamic
Wood Filler Kg 0.2800 31,625.00 8,855.00
Wood Stain Kg 0.4000 40,000.00 16,000.00
Melamin Sending Siller MSS 123 Kg 0.2200 40,000.00 8,800.00
Bahan ML 131 Clear Danagloss Kg 0.2200 45,000.00 9,900.00
Tiner Ltr 1.3000 20,125.00 26,162.50
Ampelas Lbr 4.0000 4,000.00 16,000.00
Kwas 3" Bh 0.5000 6,900.00 3,450.00
Alat Bantu dll Ls 1.0000 4,458.38 4,458.38
Pekerja Oh 0.4200 60,000.00 25,200.00
Tenaga Kerja Tukang cat Oh 0.3600 85,000.00 30,600.00
Kepala tukang cat Oh 0.0360 95,000.00 3,420.00
Mandor Oh 0.0210 100,000.00 2,100.00
Jumlah 93,625.88 61,320.00 154,945.88
Keuntungan Max 10% 10% 9,362.59 6,132.00 15,494.59
Jumlah+keuntungan 102,988.46 67,452.00 170,440.46
Dibulatkan 102,900.00 67,400.00 170,400.00
7 L.7 1 M2 Pelaburan kayu dengan residu
Bahan Residu Kg 0.3500 9,200.00 3,220.00
Tenaga Kerja Pekerja Oh 0.1000 60,000.00 6,000.00
Mandor Oh 0.0060 100,000.00 600.00
Jumlah 3,220.00 6,600.00 9,820.00
PPN 10% 322.00 660.00 982.00
Jumlah+PPN 3,542.00 7,260.00 10,802.00
Dibulatkan 3,500.00 7,200.00 10,800.00
8 L.8 1 M2 Laburan Waterproofing Emulsion
Waterproofimg Emulsion Kg 0.5000 50,000.00 25,000.00
Ampelas lbr 0.5000 3,450.00 1,725.00
Bahan Kwas 3" bh 0.0100 6,900.00 69.00
Pekerja Oh 0.0200 60,000.00 1,200.00
Tenaga Kerja Tukang cat Oh 0.2000 85,000.00 17,000.00
Kepala tukang cat Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 26,794.00 21,100.00 47,894.00
Keuntungan Max 10% 10% 2,679.40 2,110.00 4,789.40
Jumlah+keuntungan 29,473.40 23,210.00 52,683.40
Dibulatkan 29,400.00 23,200.00 52,600.00
9 L.9 1 M2 Laburan Waterproofing Membran sheet
Membran sheet M2 1.1000 78,650.00 86,515.00
Ampelas lbr 0.5000 3,450.00 1,725.00
Bahan Kape tembok bh 0.0100 5,750.00 57.50
Pekerja Oh 0.0200 60,000.00 1,200.00
Tenaga Kerja Tukang cat Oh 0.2000 85,000.00 17,000.00
Kepala tukang cat Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 88,297.50 21,100.00 109,397.50
Keuntungan Max 10% 10% 8,829.75 2,110.00 10,939.75
Jumlah+keuntungan 97,127.25 23,210.00 120,337.25
Dibulatkan 97,100.00 23,200.00 120,300.00
M. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING
1 M.1 Memasang 1 m2 lantai Keramik ukuran 40x40 (Motif/Corak ), campuran spesi 1 PC : 3 PP
Keramik 40x40 m2 1.0500 55,000.00 57,750.00
Bahan Portland Cement kg 14.1500 1,360.00 19,244.00
Pasir Pasang m3 0.0390 145,000.00 5,655.00
Semen warna kg 2.0000 12,000.00 24,000.00
Pekerja OH 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang Batu OH 0.3500 85,000.00 29,750.00
Kepala Tukang OH 0.0350 95,000.00 3,325.00
Mandor OH 0.0300 100,000.00 3,000.00
Jumlah 106,649.00 73,275.00 179,924.00
Keuntungan Max 10% 10% 10,664.90 7,327.50 17,992.40
Jumlah+keuntungan 117,313.90 80,602.50 197,916.40
Dibulatkan 117,300.00 80,600.00 197,900.00
2 M.2 Memasang 1 m2 lantai kerarnik 20 x 20 cm (CORAK ANTI SLIP)
Ubin keramik 20 x 20 cm M2 1.0000 51,157.75 51,157.75
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 90,724.55 73,275.00 163,999.55
Keuntungan Max 10% 10% 9,072.46 7,327.50 16,399.96
Jumlah+keuntungan 99,797.01 80,602.50 180,399.51
Dibulatkan 99,700.00 80,600.00 180,300.00
Page 63 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
3 M.3 Memasang 1 m2 dinding kerarnik 20 x 25 cm (Motif/Corak )
Ubin keramik 20 x 25 cm M2 1.0000 64,570.00 64,570.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 104,136.80 73,275.00 177,411.80
Keuntungan Max 10% 10% 10,413.68 7,327.50 17,741.18
Jumlah+keuntungan 114,550.48 80,602.50 195,152.98
Dibulatkan 114,500.00 80,600.00 195,100.00
4 M.4 Memasang 1 m2 Granit Alam Hitam
Marmer Alam Citatah Ukuran kecil M2 1.0000 1,012,000.00 1,012,000.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 1,051,566.80 73,275.00 1,124,841.80
Keuntungan Max 10% 10% 105,156.68 7,327.50 112,484.18
Jumlah+keuntungan 1,156,723.48 80,602.50 1,237,325.98
Dibulatkan 1,156,700.00 80,600.00 1,237,300.00
5 M.5 Memasang 1 m2 lantai keramik 60 x 60 cm Warna / Corak
Ubin keramik 60 x 60 cm Warna M2 1.0000 80,000.00 80,000.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 119,566.80 73,275.00 192,841.80
Keuntungan Max 10% 10% 11,956.68 7,327.50 19,284.18
Jumlah+keuntungan 131,523.48 80,602.50 212,125.98
Dibulatkan 131,500.00 80,600.00 212,100.00
6 M.6 Memasang 1 m2 lantai keramik 30 x 30 cm
Ubin keramik 30 x 30 cm M2 1.0000 38,525.00 38,525.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 78,091.80 73,275.00 151,366.80
Keuntungan Max 10% 10% 7,809.18 7,327.50 15,136.68
Jumlah+keuntungan 85,900.98 80,602.50 166,503.48
Dibulatkan 85,900.00 80,600.00 166,500.00
7 M.7 Memasang 1 m1 lantai keramik Plint 10 x 40 cm
Keramik 10 x 40 cm M' 4.0000 8,000.00 32,000.00
Bahan Semen portland Kg 1.1380 1,360.00 1,547.68
Pasir pasang M3 0.0042 145,000.00 609.00
Semen warna Kg 0.1500 12,000.00 1,800.00
Pekerja Oh 0.0620 60,000.00 3,720.00
Tenaga Kerja Tukang batu Oh 0.0350 85,000.00 2,975.00
Kepala tukang batu Oh 0.0035 95,000.00 332.50
Mandor Oh 0.0030 100,000.00 300.00
Jumlah 35,956.68 7,327.50 43,284.18
Keuntungan Max 10% 10% 3,595.67 732.75 4,328.42
Jumlah+keuntungan 39,552.35 8,060.25 47,612.60
Dibulatkan 39,500.00 8,000.00 47,600.00
8 M.8 Memasang 1 m1 lantai keramik List 7 x 30 cm
List Keramik 7 x 20 cm M' 4.0000 4,519.90 18,079.60
Bahan Semen portland Kg 0.7966 1,360.00 1,083.38
Pasir pasang M3 0.0029 145,000.00 426.30
Semen warna Kg 0.1050 12,000.00 1,260.00
Pekerja Oh 0.0434 60,000.00 2,604.00
Tenaga Kerja Tukang batu Oh 0.0245 85,000.00 2,082.50
Kepala tukang batu Oh 0.0025 95,000.00 232.75
Mandor Oh 0.0021 100,000.00 210.00
Jumlah 20,849.28 5,129.25 25,978.53
Keuntungan Max 10% 10% 2,084.93 512.93 2,597.85
Jumlah+keuntungan 22,934.20 5,642.18 28,576.38
Dibulatkan 22,900.00 5,600.00 28,500.00
Page 64 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
9 M.9 Memasang 1 m1 Stair nozing 5 x 40 cm
Stair Nozing 5 x 40 cm Bh 2.5000 10,000.00 25,000.00
Bahan Semen portland Kg 0.5690 1,360.00 773.84
Pasir pasang M3 0.0021 145,000.00 304.50
Semen warna Kg 0.0750 12,000.00 900.00
Pekerja Oh 0.0310 60,000.00 1,860.00
Tenaga Kerja Tukang batu Oh 0.0175 85,000.00 1,487.50
Kepala tukang Oh 0.0018 95,000.00 166.25
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 26,978.34 3,663.75 30,642.09
Keuntungan Max 10% 10% 2,697.83 366.38 3,064.21
Jumlah+keuntungan 29,676.17 4,030.13 33,706.30
Dibulatkan 29,600.00 4,000.00 33,700.00
10 M.10 Memasang 1 m2 Lantai / Dinding Granit China, campuran spesi 1 PC : 3 PP
Granit China m2 1.0500 135,000.00 141,750.00
Bahan Portland Cement kg 12.4400 1,360.00 16,918.40
Pasir Pasang m3 0.0250 145,000.00 3,625.00
Semen warna kg 1.5000 12,000.00 18,000.00
Paku Pancing bh 2.0000 1,500.00 3,000.00
Pekerja OH 0.7200 60,000.00 43,200.00
Tenaga Kerja Tukang Batu OH 0.6500 85,000.00 55,250.00
Kepala Tukang OH 0.0650 95,000.00 6,175.00
Mandor OH 0.0350 100,000.00 3,500.00
Jumlah 183,293.40 108,125.00 291,418.40
Keuntungan Max 10% 10% 18,329.34 10,812.50 29,141.84
Jumlah+keuntungan 201,622.74 118,937.50 320,560.24
Dibulatkan 201,600.00 118,900.00 320,500.00
1 M.11 Memasang 1 m2 dinding Batu Andesit
Batu Candi 20/40 M2 1.0000 131,100.00 131,100.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 170,666.80 73,275.00 243,941.80
Keuntungan Max 10% 10% 17,066.68 7,327.50 24,394.18
Jumlah+keuntungan 187,733.48 80,602.50 268,335.98
Dibulatkan 187,700.00 80,600.00 268,300.00
N. PENETAPAN INDEK HARGA SATUAN PEKERJAAN SANITARY
1 N.1 Memasang I buah kloset duduk/monoblok sek Toto
Bahan Kloset duduk monoblok Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 3.3000 60,000.00 198,000.00
Tenaga Kerja Tukang batu Oh 1.1000 85,000.00 93,500.00
Kepala tukang batu Oh 0.0010 95,000.00 95.00
Mandor Oh 0.1600 100,000.00 16,000.00
Jumlah - 307,595.00 307,595.00
Keuntungan Max 10% 10% - 30,759.50 30,759.50
Jumlah+keuntungan - 338,354.50 338,354.50
Dibulatkan - 338,300.00 338,300.00
2 N.2 Memasang 1 buah kloset jongkok porselen sek. Toto
Kloset jongkok porselen Bh 1.0000 - -
Bahan Semen portland Kg 6.0000 1,360.00 8,160.00
Pasir pasang M3 0.0100 145,000.00 1,450.00
Pekerja Oh 1.0000 60,000.00 60,000.00
Tenaga Kerja Tukang batu Oh 1.5000 85,000.00 127,500.00
Kepala tukang batu Oh 1.5000 95,000.00 142,500.00
Mandor Oh 0.1600 100,000.00 16,000.00
Jumlah 9,610.00 346,000.00 355,610.00
Keuntungan Max 10% 10% 961.00 34,600.00 35,561.00
Jumlah+keuntungan 10,571.00 380,600.00 391,171.00
Dibulatkan 10,500.00 380,600.00 391,100.00
3 N.3 Memasang I buah Wastafel meja sek. Toto
Bahan Wastafel Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
4 N.4 Memasang I buah wastafel Gantung sek. Toto
Bahan Wastafel Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
Page 65 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
5 N.5 Memasang I buah Urinoar "U 57 Type Muslim" sek. Toto
Bahan Urinoar Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
6 N.6 Memasang I buah Skat Urinal Porselin sek. Toto
Bahan Skat Urinal Porselin Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
7 N.7 Memasang I buah bak mandl fibreglass volume 0,30 m3
Bahan Bak fibre glass Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.8000 60,000.00 108,000.00
Tenaga Kerja Tukang batu Oh 2.7000 85,000.00 229,500.00
Kepala tukang batu Oh 0.5400 95,000.00 51,300.00
Mandor Oh 0.1100 100,000.00 11,000.00
Jumlah - 399,800.00 399,800.00
Keuntungan Max 10% 10% - 39,980.00 39,980.00
Jumlah+keuntungan - 439,780.00 439,780.00
Dibulatkan - 439,700.00 439,700.00
8 N.8 Memasang I bh bak cuci piring stainles steel Lokal 1 Lubang
Bahan Bak cuci stainless steel Bh 1.0000 - -
Water drain+ asesories Ls 1.0000 - -
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang batu Oh 0.3000 85,000.00 25,500.00
Kepala tukang batu Oh 0.0300 95,000.00 2,850.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah - 30,300.00 30,300.00
Keuntungan Max 10% 10% - 3,030.00 3,030.00
Jumlah+keuntungan - 33,330.00 33,330.00
Dibulatkan - 33,300.00 33,300.00
9 N.9 Memasang I bh kran diameter 3/4" atau 1/2" sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Ls 1.0000 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
10 N.10 Memasang I bh kran leher angsa diameter 3/4" atau 1/2" sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Ls 1.0000 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
11 N.11 Memasang I bh fixed shower spray sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Bh 0.0250 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
12 N.12 Memasang I bh fixed jet washer sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Bh 0.0250 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
Page 66 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
13 N.13 Memasang I bh Floor drain sek. Toto
Bahan Floor drain Bh 1.0000 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
O. PENETAPAN INDEK HARGA SATUAN PEKERJAAN INSTALASI PIPA
1 O.1 Memasang I m' pipa PVC tipe AW Ø.1/2"
Bahan Pipa PVC M' 1.2000 6,750.00 8,100.00
Perlengkapan 35% dari harga bahan Ls 1.0000 2,362.50 2,362.50
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 10,462.50 8,010.00 18,472.50
Keuntungan Max 10% 10% 1,046.25 801.00 1,847.25
Jumlah+keuntungan 11,508.75 8,811.00 20,319.75
Dibulatkan 11,500.00 8,800.00 20,300.00
2 O.2 Memasang 1 m' pipa PVC tipe AW Ø3/4"
Bahan Pipa PVC M' 1.2000 7,500.00 9,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 2,625.00 2,625.00
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 11,625.00 8,010.00 19,635.00
Keuntungan Max 10% 10% 1,162.50 801.00 1,963.50
Jumlah+keuntungan 12,787.50 8,811.00 21,598.50
Dibulatkan 12,700.00 8,800.00 21,500.00
3 O.3 Memasang I m' pipa PVC tipe AW Ø I"
Bahan Pipa PVC M' 1.2000 9,250.00 11,100.00
Perlengkapan 35% dari harga bahan Ls 1.0000 3,237.50 3,237.50
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 14,337.50 8,010.00 22,347.50
Keuntungan Max 10% 10% 1,433.75 801.00 2,234.75
Jumlah+keuntungan 15,771.25 8,811.00 24,582.25
Dibulatkan 15,700.00 8,800.00 24,500.00
4 O.4 Memasang I m' pipa PVC tipe AW diameter 1.1/2"
Bahan Pipa PVC M' 1.2000 10,608.75 12,730.50
Perlengkapan 35% dari harga bahan Ls 1.0000 3,713.06 3,713.06
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 16,443.56 8,010.00 24,453.56
Keuntungan Max 10% 10% 1,644.36 801.00 2,445.36
Jumlah+keuntungan 18,087.92 8,811.00 26,898.92
Dibulatkan 18,000.00 8,800.00 26,800.00
5 O.5 Memasang I M' pipa PVC tipe AW diameter 2"
Bahan Pipa PVC M' 1.2000 16,250.00 19,500.00
Perlengkapan 35% dari harga bahan Ls 1.0000 5,687.50 5,687.50
Pekerja Oh 0.0540 60,000.00 3,240.00
Tenaga Kerja Tukang Pipa Oh 0.0900 85,000.00 7,650.00
Kepala tukang pipa Oh 0.0090 95,000.00 855.00
Mandor Oh 0.0027 100,000.00 270.00
Jumlah 25,187.50 12,015.00 37,202.50
Keuntungan Max 10% 10% 2,518.75 1,201.50 3,720.25
Jumlah+keuntungan 27,706.25 13,216.50 40,922.75
Dibulatkan 27,700.00 13,200.00 40,900.00
6 O.6 Memasang I m' pipa PVC tipe AW diameter 2.1/2"
Bahan Pipa PVC M' 1.2000 19,406.25 23,287.50
Perlengkapan 35% dari harga bahan Ls 1.0000 6,792.19 6,792.19
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 30,079.69 8,010.00 38,089.69
Keuntungan Max 10% 10% 3,007.97 801.00 3,808.97
Jumlah+keuntungan 33,087.66 8,811.00 41,898.66
Dibulatkan 33,000.00 8,800.00 41,800.00
7 O.7 Memasang I m' pipa PVC tipe AW diameter 3
Bahan Pipa PVC M' 1.2000 35,000.00 42,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 12,250.00 12,250.00
Pekerja Oh 0.0810 60,000.00 4,860.00
Tenaga Kerja Tukang Pipa Oh 0.1350 85,000.00 11,475.00
Kepala tukang pipa Oh 0.0135 95,000.00 1,282.50
Mandor Oh 0.0041 100,000.00 410.00
Jumlah 54,250.00 18,027.50 72,277.50
Keuntungan Max 10% 10% 5,425.00 1,802.75 7,227.75
Jumlah+keuntungan 59,675.00 19,830.25 79,505.25
Dibulatkan 59,600.00 19,800.00 79,500.00
Page 67 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
8 O.8 Memasang 1 m' pipa PVC tipe AW diameter 4
Bahan Pipa PVC M' 1.2000 70,000.00 84,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 24,500.00 24,500.00
Pekerja Oh 0.0810 60,000.00 4,860.00
Tenaga Kerja Tukang Pipa Oh 0.1350 85,000.00 11,475.00
Kepala tukang pipa Oh 0.0135 95,000.00 1,282.50
Mandor Oh 0.0041 100,000.00 410.00
Jumlah 108,500.00 18,027.50 126,527.50
Keuntungan Max 10% 10% 10,850.00 1,802.75 12,652.75
Jumlah+keuntungan 119,350.00 19,830.25 139,180.25
Dibulatkan 119,300.00 19,800.00 139,100.00
9 O.9 Memasang 1 m' pipa PVC tipe AW diameter 6
Bahan Pipa PVC M' 1.2000 105,000.00 126,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 36,750.00 36,750.00
Pekerja Oh 0.0810 60,000.00 4,860.00
Tenaga Kerja Tukang Pipa Oh 0.1350 85,000.00 11,475.00
Kepala tukang pipa Oh 0.0135 95,000.00 1,282.50
Mandor Oh 0.0041 100,000.00 410.00
Jumlah 162,750.00 18,027.50 180,777.50
Keuntungan Max 10% 10% 16,275.00 1,802.75 18,077.75
Jumlah+keuntungan 179,025.00 19,830.25 198,855.25
Dibulatkan 179,000.00 19,800.00 198,800.00
P. PENETAPAN INDEK HARGA SATUAN PEKERJAAN SALURAN
1 P.1 Memasang 1 Unit Bak Kontrol uk.45x45 cm,tinggi 50 cm
Bahan Batu bata (0,2500 m3) bh 144.6750 700.00 101,272.50
Semen Portland Kg 77.0000 1,360.00 104,720.00
Pasir Pasang m3 0.1300 145,000.00 18,850.00
Batu kerikil m3 0.0200 170,000.00 3,400.00
Besi beton Kg 2.6000 7,000.00 18,200.00
Pasir beton m3 0.0900 180,000.00 16,200.00
Pekerja Oh 1.4200 60,000.00 85,200.00
Tenaga Kerja Tukang Oh 0.4730 85,000.00 40,205.00
Kepala tukang Oh 0.0470 95,000.00 4,465.00
Mandor Oh 0.0710 100,000.00 7,100.00
Jumlah 262,642.50 136,970.00 399,612.50
Keuntungan Max 10% 10% 26,264.25 13,697.00 39,961.25
Jumlah+keuntungan 288,906.75 150,667.00 439,573.75
Dibulatkan 288,900.00 150,600.00 439,500.00
2 P.2 Memasang 1 Unit Bak Kontrol uk.30x30 cm,tinggi 35 cm
Bahan Batu bata (0,2500 m3) bh 83.9120 700.00 58,738.40
Semen Portland Kg 44.0000 1,360.00 59,840.00
Pasir Pasang m3 0.0700 145,000.00 10,150.00
Batu kerikil m3 0.0700 170,000.00 11,900.00
Besi beton Kg 1.6000 7,000.00 11,200.00
Pasir beton m3 0.0600 180,000.00 10,800.00
Pekerja Oh 3.2000 60,000.00 192,000.00
Tenaga Kerja Tukang Oh 1.0150 85,000.00 86,275.00
Kepala tukang Oh 0.0015 95,000.00 142.50
Mandor Oh 0.0160 100,000.00 1,600.00
Jumlah 162,628.40 280,017.50 442,645.90
Keuntungan Max 10% 10% 16,262.84 28,001.75 44,264.59
Jumlah+keuntungan 178,891.24 308,019.25 486,910.49
Dibulatkan 178,800.00 308,000.00 486,900.00
3 P.3 Memasang 1 m1 Saluran Gravel U 20 cm+Pas bata
Galian Tanah m3 0.3000 52,200.00 15,660.00
Buangan tanah m3 0.1000 31,900.00 3,190.00
Lantai kerja m3 0.1250 815,800.00 101,975.00
Gravel U 30cm m' 1.0000 40,480.00 40,480.00 142,455.00
Pas.1/2 Bata add. 1 : 3 m2 0.7000 113,600.00 79,520.00
Plesteran Acia add. 1 : 3 m2 1.8000 58,900.00 106,020.00
Jumlah 346,845.00 - 346,845.00
Dibulatkan 346,800.00 - 346,800.00
Page 68 of 75
DAFTAR HARGA SATUAN BAHAN
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
Page 69 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
C. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Kayu Terentang m3 1,650,000.00
2 Kayu Balok Borneo Super ( Kayu kelas II ) m3 3,232,000.00
3 Kayu Papan Borneo Super m3 4,086,700.00
4 Kayu Balok Kamper Banjar m3 4,900,000.00
5 Kayu Papan Kamper Banjar m3 4,950,000.00
6 Kayu Albasia ( kayu Kelas III ) m3 1,100,000.00
7 Dolken 5 s/d 7 bt 19,500.00
8 Dolken 7 s/d 10 bt 27,000.00
9 List Jati Jabar Btg 55,000.00
Page 70 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
G. BAHAN SALURAN AIR KOTOR
1 Grafel U 20 cm m1 27,830.00
2 Grafel U 30 cm m1 40,480.00
3 Buis Beton O 20 cm ( 1m' ) m1 61,750.00
4 Buis Beton O 30 cm ( 1m' ) m1 59,455.00
5 Buis Beton O 60 cm ( 1m' ) m1 75,900.00
5 Injuk kg 12,650.00
Page 71 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
10 Kawat Duri m' 1,150.00
11 Seng Gelombang BJLS 28 ( 80 x 180 cm ) lbr 45,000.00
12 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) m1 32,000.00
13 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) m1 46,500.00
14 Rangka Atap Baja Ringan "Zinkalum" (Terpasang) m2 150,000.00
15 Rangka Atap Baja Ringan "Galvalum" (Terpasang) m2 135,000.00
16 Canal Baja Ringan Ukuran C.75.100 m1 20,900.00
17 Canal Baja Ringan Ukuran C.75.75 m1 17,600.00
18 Profil allumunium ''T'' m1 45,000.00
19 Hollow Alumunium 40x40 MM m1 70,000.00
20 Pasang Talang Jurai Dalam (Terpasang) m1 45,000.00
21 Rangka Pertisi / Plafond Metal Stud "Zingalum" m2 75,000.00
22 Kusen Alumunium Natural 1.3 mm t=1.3 mm ( 3" ) m1 55,000.00
23 Kusen Alumunium Warna 1.3 mm t=1.3 mm ( 3" ) m1 76,000.00
24 Daun Jendela Alumunium Natural ( Tanpa Kaca ) m1 60,000.00
25 Daun Jendela Alumunium Warna ( Tanpa Kaca ) m1 70,000.00
26 Daun Pintu Alumunium Natural ( Tanpa Kaca ) m1 70,000.00
27 Daun Pintu Alumunium Warna ( Tanpa Kaca ) m1 85,000.00
28 Jalusi Alumunium Warna m2 65,000.00
29 Panel Spandrel Aluminium m2 100,000.00
30 Kait Angin Sendok Alumunium ps 60,000.00
31 Sealant @ 200mm m' 5,000.00
32 List Karet Kaca m' 6,500.00
32 Lem Kuning ( aibond ) kg 20,000.00
33 Kunci Silinder Utama untuk pintu Aluminium bh 414,000.00
34 Body Kunci bh 75,000.00
35 Cylinder bh 125,000.00
36 Lever Handle Sek. Dekson Type LHTR - DKS - 84030 - SSS bh 250,000.00
37 Cylinder Sek. Dekson Type CYL - DKS - D 65 mm - DC - SN bh 150,000.00
38 Kunci 2 Slaag Silinder Utama Standard bh 117,000.00
39 Kunci Silinder untuk pintu Aluminium "standard Anchor asli" bh 153,700.00
40 Kunci Pintu Double Slaag bh 201,250.00
41 Kunci KM Bulat ALPHA biasa bh 74,750.00
42 Kunci Pintu besi bh 150,000.00
43 Flush Bolt Sek. Dekson Type FB - MC - 508 - NA / BA Psg 75,000.00
44 Rambucis Sek. Dekson Type CHW - 4 - RYB1C Psg 65,000.00
45 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 388,000.00
46 Engsel Pintu ps 31,625.00
47 Engsel Jendela ps 14,600.00
48 Engsel Pintu Aluminium ps 42,000.00
49 Engsel Jungkit Jendela Aluminium ps 65,000.00
50 Engsel Pintu Tanam (Floor Hinges) sek.Dorma ps 850,000.00
51 Engsel Pintu Besi (Engsel bubut) bh 50,000.00
52 Engsel Pintu Sek. Dekson Type ES - S/S - EL - 4 " X 3 " X 2 m Psg 27,000.00
53 Engsel Casement Sek. Dekson Type FS - DKS - 14" Psg 75,000.00
54 Rel Sleading Pintu Psg 300,000.00
55 Sloot Pintu Tanam/Espanolet aluminium bh 121,000.00
56 Sloot Pintu Tanam/Espanolet bh 85,000.00
57 Sloot Jendela Putar aluminium bh 35,000.00
58 Sloot Jendela bh 15,000.00
59 Kait Angin Sendok Alumunium ps 45,000.00
60 Kait Angin jendela ps 20,000.00
61 Tarikan Jendela Alumunium ps 35,500.00
62 Door Closer ps 350,000.00
63 Bingkai Kaca Frame lest Stainlessteel psg 450,000.00
64 Handle Pintu Stainlessteel Psg 350,000.00
Page 72 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
I. BAHAN KACA
1 Kaca Es 5 mm ( ASAHI ) m2 98,000.00
2 Kaca Polos 5 mm ( ASAHI ) m2 65,000.00
3 Kaca Warna Biru 5 mm ( ASAHI ) m2 260,000.00
4 Kaca Rayben 5 mm ( ASAHI ) m2 86,900.00
5 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,367,200.00
6 Kaca Float Tempered 12 mm Terpasang ( ASAHI ) m2 571,100.00
7 Kaca Polos 8 mm ( ASAHI ) m2 175,000.00
8 Kaca Tempered 8 mm ( ASAHI ) m2 347,500.00
9 Glass Block DN 20 x 20 ( Kedawung ) bh 22,900.00
10 List Karet (Assesoris Kusen/Pintu Alumunium) m1 6,500.00
11 Sticker Sanblass m2 85,000.00
K. BAHAN MEKANIKAL
1 Besi Pipa Hitam Ø 1" t = 2 mm bt 99,100.00
2 Besi Pipa Hitam Ø 1,1/2" t = 2 mm bt 105,100.00
3 Besi Pipa Hitam Ø 2" t = 2 mm bt 138,900.00
4 Besi Pipa Hitam Ø 3" t = 2 mm bt 173,625.00
5 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt 108,800.00
6 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 153,600.00
7 Pipa GIP Medium A Ø 1" ( 6 m' ) bt 176,640.00
8 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 203,136.00
9 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 313,700.00
10 Pipa Stainlesstell Ø 1/2" ( 6 m1 ) bt 163,200.00
11 Pipa Stainlesstell A Ø 3/4" ( 6 m1 ) bt 230,400.00
12 Pipa Stainlesstell A Ø 1" ( 6 m' ) bt 264,960.00
13 Pipa Stainlesstell A Ø 1 1/4" ( 6 m1 ) bt 304,704.00
14 Pipa Stainlesstell A Ø 1 1/2" ( 6 m1 ) bt 470,550.00
15 Macam-macam Sambungan GIP Ø 1/2" bh 13,205.00
16 Macam-macam Sambungan GIP Ø 3/4" bh 13,900.00
17 Macam-macam Sambungan GIP Ø 1" bh 14,595.00
18 Macam-macam Sambungan GIP Ø 1 1/4" bh 16,054.50
19 Macam-macam Sambungan GIP Ø 1 1/2" bh 17,659.95
20 Macam-macam Sambungan GIP Ø 1 3/4" bh 19,425.95
21 Macam-macam Sambungan Stainlesstel Ø 1/2" bh 26,410.00
22 Macam-macam Sambungan Stainlesstel Ø 3/4" bh 27,800.00
Page 73 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
23 Macam-macam Sambungan Stainlesstel Ø 1" bh 29,190.00
24 Macam-macam Sambungan Stainlesstel Ø 1 1/4" bh 32,109.00
25 Macam-macam Sambungan Stainlesstel Ø 1 1/2" bh 35,319.90
26 Macam-macam Sambungan Stainlesstel Ø 1 3/4" bh 38,851.89
27 Pipa PVC Type AW. O 1/2" ( Maspion ) bt 27,000.00
28 Pipa PVC Type AW. O 3/4" (Maspion ) bt 30,000.00
29 Pipa PVC Type AW. O 1" (Maspion ) bt 37,000.00
32 Pipa PVC Type AW. O 2" ( Maspion ) bt 65,000.00
34 Pipa PVC Type AW. O 3" ( Maspion ) bt 140,000.00
35 Pipa PVC Type AW. O 4" ( Maspion ) bt 280,000.00
36 Macam-macam Sambungan Rucika O 1/2" bh 4,025.00
37 Macam-macam Sambungan Rucika O 3/4" bh 4,600.00
38 Macam-macam Sambungan Rucika O 1" bh 4,600.00
39 Macam-macam Sambungan Rucika O 1 1/4" bh 5,750.00
40 Macam-macam Sambungan Rucika O 1 1/2" bh 5,750.00
41 Macam-macam Sambungan Rucika O 1 3/4" bh 2,530.00
42 Macam-macam Sambungan Rucika O 2" bh 6,325.00
43 Macam-macam Sambungan Rucika O 2 1/2" bh 6,900.00
44 Sambungan U trap 4" bh 55,000.00
45 Sambungan Elbow 4" bh 35,000.00
46 Sambungan T 4" bh 25,000.00
47 Sambungan Sock 4" bh 20,000.00
48 Sambungan U trap 3" bh 49,500.00
49 Sambungan Elbow 3" bh 31,500.00
50 Sambungan T 3" bh 22,500.00
51 Sambungan Sock 3" bh 18,000.00
52 Lem Paralon tb 8,050.00
53 Isolatip Leideng rol 5,000.00
54 Pipa PVC 4" berlobang jenis AW. m' 39,600.00
55 Gate valve 1" bh 375,000.00
56 Gate valve 3/4" bh 318,750.00
57 Gate valve 1/2" bh 286,875.00
58 Flange socket 1" bh 165,000.00
Page 74 of 75
DAFTAR HARGA SATUAN UPAH KERJA
Standard Upah
HARGA SAT
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
Rp.