Rapp Sukaraja

silahkan di download

Uploaded by

iiikbalsandi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views75 pages

Rapp Sukaraja

silahkan di download

Uploaded by

iiikbalsandi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 75

BESI BETON ( P = 12 m ) BESI SIKU

UKURAN JENIS BERAT/m' BERAT/6m


UKURAN
DIAMETER kg kg
f 6 mm polos 0.2217 20.20.3 mm 5.31
f 8 mm polos 0.3950 25.25.3 mm 6.72
f 10 mm polos 0.6167 25.25.5 mm 10.60
f 12 mm polos 0.8917 30.30.3 mm 8.16
f 13 mm ulir 1.0417 40.40.3 mm 11.00
f 14 mm polos 1.2083 40.40.4 mm 14.50
f 16 mm polos 1.5833 40.40.5 mm 18.00
f 16 mm ulir 1.5833 45.45.4 mm 16.44
f 19 mm ulir 2.2300 45.45.5 mm 20.50
f 22 mm ulir 2.9800 50.50.4 mm 18.40
f 25 mm ulir 3.8500 50.50.5 mm 22.50
f 32 mm ulir 6.3125 50.50.6 mm 27.58
60.60.5 mm 27.30
BESI PLAT HITAM 60.60.6 mm 32.52
65.65.6 mm 35.46
BERAT/lbr 70.70.6 mm 38.28
UKURAN
kg 70.70.7 mm 44.28
1,2 X 1200 X 2400 mm 28.00 75.75.6 mm 41.22
1,4 X 1200 X 2400 mm 33.00 75.75.7 mm 45.00
1,5 X 1200 X 2400 mm 35.00 75.75.8 mm 54.18
1,8 X 1200 X 2400 mm 42.00 75.75.9 mm 59.80
1,9 X 1200 X 2400 mm 44.50 80.80.8 mm 57.96
2 X 1200 X 2400 mm 46.70 16.22 90.90.7 mm 57.54
2,3 X 1200 X 2400 mm 54.00 90.90.9 mm 73.20
2,6 X 1200 X 2400 mm 60.70 90.90.10 mm 79.80
2,8 X 1200 X 2400 mm 65.30 100.100.7 mm 64.25
2,9 X 1200 X 2400 mm 67.60 100.100.10 mm 90.60
3 X 1200 X 2400 mm 70.00 120.120.11 mm 119.40
3,2 X 1200 X 2400 mm 74.70 120.120.12 mm 130.00
4 X 1200 X 2400 mm 93.30 125.125.12 mm 140.00
4,5 X 1200 X 2400 mm 105.00 130.130.9 mm 107.10
5 X 1200 X 2400 mm 117.00 2.88 130.130.12 mm 140.10
6 X 1200 X 2400 mm 140.00 150.150.10 mm 140.00
8 X 1200 X 2400 mm 187.00 150.150.12 mm 164.00
9 X 1200 X 2400 mm 210.00 150.150.15 mm 202.00
10 X 1200 X 2400 mm 233.00 200.200.15 mm 272.00
12 X 1200 X 2400 mm 280.00 200.200.20 mm 358.00
13 X 1200 X 2400 mm 303.00 200.200.25 mm 442.00
15 X 1200 X 2400 mm 350.00 250.250.25 mm 562.00
16 X 1200 X 2400 mm 373.00
18 X 1200 X 2400 mm 420.00
19 X 1200 X 2400 mm 443.00
20 X 1200 X 2400 mm 467.00
21 X 1200 X 2400 mm 490.00
22 X 1200 X 2400 mm 513.00
25 X 1200 X 2400 mm 583.00
28 X 1200 X 2400 mm 653.00
30 X 1200 X 2400 mm 700.00
32 X 1200 X 2400 mm 747.00
38 X 1200 X 2400 mm 887.00
42 X 1200 X 2400 mm 980.00
45 X 1200 X 2400 mm 1,050.00
50 X 1200 X 2400 mm 1,167.00
65 X 1200 X 2400 mm 1,516.00
75 X 1200 X 2400 mm 1,750.00
85 X 1200 X 2400 mm 1,983.00
100 X 1200 X 2400 mm 2,333.00

BESI KANAL UNP BESI KANAL "C" LIP

BERAT/6m BERAT/6m
UKURAN UKURAN
kg kg
50.36.5 mm 33.50 60.30.10.1,2 7.44
65.42.5,5 mm 42.50 60.30.10.2,3
75.40.5 mm 41.50 75.35.10.1,6 13.90
80.45.5 mm 47.00 75.45.15.2,3 19.50
100.50.5 mm 56.20 100.50.20.2,3 24.40
120.55.6 mm 75.00 100.50.20.3,2 33.00
125.55.6 mm 80.40 125.50.20.2,3 27.10
140.60.7 mm 96.00 125.50.20.3,2 36.80
150.75.6,5 mm 112.00 150.50.20.2,3 30.00
160.66.7 mm 115.50 150.50.20.3,2 40.60
180.75.7 mm 132.00 150.65.20.2,3 33.00
200.80.7,5 mm 152.00 150.65.20.3,2 45.10
220.80.9 mm 187.50 200.75.20.3,2 56.00
240.85.9,5 mm 205.00
250.80.7,1 mm 182.50
250.90.9 mm 208.00
260.90.10 mm 114.00
300.90.9 mm 229.00
300.100.10 mm 278.00
380.100.10,5 mm 337.50
PIPA PERSEGI

BERAT/6m
UKURAN ( mm ) TEBAL ( mm )
kg
12,5 X 12,5 0.90 0.3320
15 X 15 0.90 0.4030
20 X 20 0.90 0.5440
25 X 25 1.00 0.7590
30 X 30 1.00 0.9150
40 X 40 1.20 1.4680
10 X 20 0.90 0.4030
12,5 X 27,5 0.90 0.5440
15 X 30 0.90 0.6150
20 X 40 1.00 0.9150
25 X 50 1.40 1.5970
20 X 60 1.40 1.9260
LEBAR PANJANG BERAT/lbr
mm mm kg
16 6000 2.3
19 6000 2.7
25 6000 3.53
32 6000 4.52
38 6000 5.37
19 6000 4.03
25 6000 5.4
32 6000 6.8
38 6000 8.3
50 6000 10.6
19 6000 5.4
25 6000 7.1
32 6000 9.2
38 6000 10.7
50 6000 14.5
65 6000 18.5
75 6000 21.5
85 6000 25.5
100 6000 28.5
150 6000 44.5
25 6000 10.6
32 6000 14
38 6000 16.1
50 6000 21.2
65 6000 27.5
75 6000 32
85 6000 38.3
100 6000 42.5
150 6000 64
25 6000 14.2
38 6000 21.5
50 6000 28.5
65 6000 37
75 6000 42.5
100 6000 56.5
150 6000 85
38 6000 29
50 6000 38
100 6000 76
150 6000 113
38 6000 34
50 6000 45
65 6000 58.5
75 6000 67.5
100 6000 89.5
125 6000 112
150 6000 134
BESI W.F

UKURAN TEBAL PANJANG BERAT/Btg


cm mm M' kg
100 X 50 X 5 7 12 112 9.3333333
125X 60 X 6 8 12 158.4
148X 100 X 6 9 12 253.2
150X 75 X 5 7 12 168
175X 90 X 5 8 12 217.2
198X 99 X 4.5 7 12 218.4
200X 100 X 3.2 4.5 12 143
200X 100 X 5.5 8 12 256
248 X 124 X 5 8 12 308.4
250 X 125 X 6 9 12 355.2
298 X 149 X 6 8 12 384
300 X 150 X 6.5 9 12 440.4
346 X 174 X 6 9 12 497
350 X 175 X 7 11 12 595.2
396 X 199 X 7 11 12 679.5
400 X 200 X 8 13 12 792
446 X 1990 X 8 12 12 794.4
450 X 200 X 98 14 12 912
496 X 199 X 9 14 12 954
500 X 200 X 10 16 12 1075
588 X 300 X 10 16 12 1812
596 X 199 X 9 14 12 1135
600 X 200 X 11 17 12 1272
600 X 300 X 13 20 12 1992
700 X 300 X 13 24 12 2290
800 X 300 X 14 26 12 2520

BESI I.N.P

UKURAN TEBAL PANJANG BERAT/Btg


cm mm M' kg
80 x 42 x 3.9 x 5.9 2.3 6 38.5
100 x 50 x 4.5 x 6.8 2.7 6 50.6
120 x 58 x 5.1 x 7.7 3.1 6 67.5
120 x 58 x 5.1 x 8.6 3.4 6 87.5
160 x 74 x 6.5 x 9.5 3.8 6 108.5
180 x 82 x 6.9 x 10.4 4.1 6 270
200 x 90 x 7.5 x 11.3 4.5 6 315
220 x 98 x 8.1 x 12.2 4.9 6 373
240 x 106 x 8.7 x 13.1 5.2 6 435
250 x 125 x 7.5 x 12.5 6 460
260 x 113 x 9.4 x 14.1 5.6 6 503
280 x 119 x 10.1 x 15.2 6.1 6 580
300 x 125 x 10.8 x 16.2 6.5 6 661
320 x 131 x 11.3x 17.3 6.9 6 760
340 x 137 x 12.2x 18.3 7.3 6 833
360 x 143 x 13 x 19.5 7.8 6 926
380 x 149 x 13.7x 20.5 7.8 6 1026
400 x 155 x 14.4 x 21.6 8.6 6 1136.5
450 x 170 x 16.2 x 24.3 9.7 6 1400
500 x 185 x 18 x 27 10.8 6 1707
RENCANA ANGGARAN BIAYA

PEKERJAAN PEMBANGUNAN POS JAGA DI AREA BUNDARAN SUKARAJA

DAFTAR HARGA UPAH 2020


No. URAIAN SATUAN

1 Tukang Gali O/h


2 Tukang Batu O/h
3 Tukang Kayu O/h
4 Tukang Besi O/h
5 Tukang Listrik O/h
6 Tukang Plumbing O/h
7 Tukang Cat O/h
8 Laden Batu O/h
9 Laden Kayu O/h
10 Laden Besi O/h
11 Kepala Tukang O/h
12 Mandor O/h

DAFTAR HARGA BAHAN


NO JENIS BAHAN BANGUNAN SATUAN

1 Batu Belah M3
2 Bata Congklak Bh
3 Semen 50kg Sak
4 Besi Beton Kg
5 Kawat Beton Kg
6 Pasir Beton M3
7 Pasir Pasang M3
8 Pasir Urug M3
9 Split M3
10 Papan Alba M3
11 Papan Borneo 2/20 M3
12 Triplek 9mm Lbr
13 Kaso Borneo 4x6 M3
14 Kayu Balok Borneo 6/15 M3
15 Paku (5,7,10) Kg
16 Seng Gelombang BJLS 20 Lbr
17 Gravel U 20 Bh
18 Dolken Batang
19 Tanah Urug M3
20 Pasir Urug M3
21 Wwter Proofing Coating Panthene M2
22 Batu Tempel Grooved Loose 40x20x15 cm M2
23 Kusen Meranti uk. 6/12 cm M3
24 Daun Pintu Panel unit
25 Daun Jendela t=2 mtr ,,,PJ1 unit
26 Daun Jendela t=1,25 mtr,,,J1 unit
J2 bh
J3 bh
27 Kaca Polos 5mm EX MULIA m2
28 Daun Pintu Double Teakwood unit
Daun Pintu Double Teakwood+NAT+MELAMINTO unit
29 Rangka Atap Baja Ringan M2
30 Genteng Multiroof bh
31 Nok Multiroof bh
32 GRC 4 mm m'
33 Keramik Lantai 40x40 (1 dus=6 bh) M2
34 Keramik Alfa Grey ex. Milan 20x20 km/wc (1 dus = 25 buah) M2
35 Keramik Lantai Teras uk.30x30 cm (1 dus=11 pcs) M2
36 Keramik Dinding 20x25 (1 dus=11 buah) M2
36 Keramik Mulia Glossy uk 20x20 cm dus/m2
37 Paving Block ex. Abadi Block (1 m2=50 bh) M2
38 Gypsum Board 9mm Eks. Knauff (1,2x2,4m) Lbr
39 Tripleks 4 mm Lbr
40 Box Panel Hager 3 Grup, Presto unit
41 MCB 4A ex Hagger bh
42 Kabel NYM 2x1,5mm m'
43 Saklar Tunggal EX PANASONIC bh
44 Saklar Ganda PANASONIC bh
45 Fitting Lampu SL bh
46 Stop Kontak PANASONIC bh
47 PVC Maspion 3/4" AW Pth btg
48 Knie 3/4" bh
49 Socket 3/4" bh
50 Lem PVC Kg
51 PVC Maspion 1/2" AW Pth btg
52 Knie 1/2" bh
53 Socket 1/2" bh
54 Stop Kran Kitz 3/4" bh
55 Stop Kran Kitz 1/2" bh
56 Seal Tape bh
57 Pompa Shimitzu 125 w unit
58 Tangki Tanam Kapasitas 500 l unit
59 Pelampung San Ei 3/4",,,EX ONDA bh
60 PVC Maspion 3" AW Abu btg
61 Knie 3" bh
62 Socket 3" bh
63 PVC Maspion 2.5" AW Abu btg
64 Knie 2.5" bh
65 Socket 2.5" bh
66 PVC Maspion 2" AW Abu btg
67 Knie 2" bh
68 Socket 2" bh
69 Handle + Body + Sylinder Bertolli PU,KMR TIDUR unit
70 Engsel Valle 4" psg
71 Engsel Valle 3" psg
72 Ramskar Belleza unit
73 Closet Duduk toto unit
73 Closet Jongkok ex INA warna Ivory unit
Closet Jongkok ex INA warna Putih unit
73 Bak Mandi Fiber uk. 55X55X65 cm ex King unit
74 Floor Drain Isano bh
76 Head Shower 3301 ex. Ellite blum kepala shower unit
77 Kran BCP Elite 3202 bh
78 Zinc Cuci 1 lubang type 57 tanpa sayap ex Royal unit
79 Rool Cat bh
80 Plamur Tembok kg
81 Cat Famitex untuk Interior dan untuk plafond warna putih Kg
82 Cat Vinilex Kg
83 Amples bh
84 Kwas 2,5" bh
85 Politur Woodstain Kg
86 Cat ex Seiv Kg
87 Thinner Kg
88 Rumput Gajah Mini m2
89 Tanah Lembang m3
90 ijuk ikat
100 PVC Maspion Maspion 3" D Putih btg
101 PVC Maspion Maspion 2.5" D Putih btg
102 PVC Maspion 2" Maspion D Putih btg
103 kusen alumunium 4' EX BROWN/ALCOMEXINDO m'
104 Angker bh
105 Silikon kaca Rp.65.000/botol m'
106 berangkal m3
107 Handle + Body + Sylinder Bertolli ut KM/WC bh
108 Kran dinding standar ex.FIO bh
109 Semen Warna bh
110 Cat seive kg
111 Cat Pinoguard kg
112 Wastafel
113 Paku Rivet bh
114 Siku Alumunium 1 cm m'
115 "U" Alumunium 1 cm m'
116 "U" Alumunium 2 cmx1 cm m'
117 Keramik Mulia Glossy uk 20x20 cm dus/m2
118 linggis
Sekop
Pahat 10"
Ember
Pacul+doran
Benang rami
Gagang+mata gergaji
Balincong
Jirigen
Buis beton Ø1 m bh
LED WORM WHITE DAN COOL DELIGHT 3 WATT ex Philip bh
LED WORM WHITE DAN COOL DELIGHT 4 WATT bh
LED WORM WHITE DAN COOL DELIGHT 5 WATT
fitting LED 3 watt bh
Cat Interior Famitex
Cat Plafond Famitex putih
SHOWER KAMAR MANDI
- MBT S 010 EX B.C.P (KRAN)
- SHS 535 EX B.C.P (SHOWER)
- SHS 536 EX. B.C.P (SHOWER)
- SHS

SHOWER TYPE 3301 BAKIP ELITE SET


Tusen 3/4 " ex Onda bh
Jet Washer ex wasser bh
Kraan bebek ut bak zinc type 3211 N ex Ellite bh
keramik 30x30 cm ex Roman (1 dus =11 pcs) m2
2020
HARGA SATUAN BARU

Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 160,000.00
Rp 170,000.00

AN 0.0072

HARGA SATUAN 22/1/14 HARGA SATUAN BARU


Rp 1.00
Rp 230,000.00 Rp 110,000 ex. Swakarya
Rp 800.00 Rp 660 ex. Prima Usaha
Rp 61,500.00 Rp 61,500 ex. Tb. Halim
Rp 12,000.00 Rp 8,400 ex. Baja Utara (non ppn)
Rp 13,000.00 Rp 13,000 ex. Sumber rejeki
Rp 230,000.00 Rp 130,000 ex. Swakarya
Rp 225,000.00 Rp 110,000 ex. Swakarya
Rp 225,000.00 -
Rp 230,000.00 Rp 165,000 ex. Swakarya
Rp 425,000.00 Rp 425,000 ex. Hojaya
Rp 3,200,000.00 -
Rp 115,000.00 Rp 115,000 ex. Hojaya
Rp 1,600,000.00 Rp 1,600,000 ex. Hojaya
Rp 3,750,000.00 -
Rp 10,250.00 Rp 10,250 ex. Sumber rejeki
Rp 37,000.00 Rp 37,000
Rp 36,200.00 -
Rp 9,000.00 Rp 9,000 ex. Hojaya
Rp 35,000.00 Rp 35,000 ex. Ronald
Rp 80,000.00 -
Rp 55,000.00 Rp 170,000 Aquaproof g1 galon = 2,5 kg
Rp 108,281.25 Rp 220,000 hrga inc p material=110.000,- /m2
Rp 9,000,000.00 Rp 9,000,000 ex. Tobindo
Rp 1,415,000 ex. Tobindo
Rp 420,000 ex. Tobindo
Rp 311,000 ex. Tobindo

Rp 100,000.00 Rp 100,000 Kaca polos 5mm merk Asahi


Rp 845,000 ex. Tobindo
Rp 905,000 ex. Tobindo
Rp 100,000.00 Rp 97,000 ex. Tritunggal
Rp 5,885.00 Rp 5,885 ex. Cisangkan
Rp 7,500.00 Rp 9,405 ex. Cisangkan
Rp 50,000.00 Rp 56,000 GRC 4mm ex Jayaboard
Rp 52,083.33 Rp 50,000 Granit Natur1 dus 0.96
Rp 52,000.00 Rp 52,000 Asia Tile 1 dus 1
Rp 47,979.80 Rp 47,500 Mulia 1 dus 0.99
Rp 52,500.00 Rp 52,500 Mulia 1 dus 1
53500 53500 Mulia 1 dus 1
Rp 93,000.00 sdh inc b.pemasangan exuk 20x20 true pave
Rp 59,000.00 Rp 59,000 ex. Tunggal Indah Gyps uk.10x20
Rp 56,000.00 Rp 56,000 ex. Muara Biru
Rp 22,500.00 Rp 22,500 Box MCB 4grup merk Presto
Rp 32,500.00 Rp 32,500 MCB 6A merk Hagger
Rp 6,000.00 Rp 5,300 ex. Kim Hin (Eterna) 265.000/roll
Rp 14,500.00 Rp 14,500
#REF! Rp 17,000 19
Rp 15,000.00 Rp 10,500
Rp 20,000.00 Rp 12,000
Rp 16,500.00 Rp 16,500 17679.2
Rp 1,250.00 Rp 1,250
Rp 1,100.00 -
Rp 27,500.00 Rp 27,500
Rp 12,500.00 Rp 12,500
Rp 925.00 Rp 925
Rp 700.00 -
Rp 75,000.00 -
Rp 60,000.00 -
Rp 2,000.00 Rp 2,000
Rp 345,000.00 Rp 345,000 ex. Tb. Jati
Rp 1,025,000.00 Rp 1,025,000 ex. Sumber rejeki (Pinguin)
Rp 65,000.00 Rp 65,000 EX ONDA
Rp 90,000.00 -
Rp 7,000.00 Rp 7,000
Rp 6,000.00 -
Rp 70,000.00 -
Rp 4,770.00 Rp 4,770
Rp 5,000.00 -
Rp 60,000.00 -
Rp 2,060.00 Rp 2,060 10
Rp 4,000.00 -
Rp 130,000.00 Rp 178,740
Rp 23,500.00 Rp 23,500 Rp196,560 UT KM/WC
Rp 17,500.00 Rp 17,500
Rp 40,000.00 Rp 40,000
Rp 1,100,000.00 Rp 650,000
Rp 160,000.00
Rp 165,000.00
Rp 160,000.00 Rp 650,000
Rp 50,000.00 Rp 55,000
Rp 156,000.00 Rp 152,282
Rp 107,250.00 Rp 132,335
Rp 180,000.00 Rp 180,000
Rp 21,000.00 Rp 21,000
Rp 8,000.00 Rp 200,000 / GALON Rp 8,000
Rp 13,478.26 Rp 210,000 / GALON Rp 8,400 harga Maxilite
Rp 19,600.00 Rp 490,000 / GALON Rp 19,600 harga Vinilex
Rp 7,500.00 Rp 7,500 / METER L=0,95 M
Rp 12,500.00 Rp 10,000
Rp 45,000.00 Rp 45,000
Rp 48,000.00 Rp 48,000
Rp 11,000.00 Rp 7,000 / BOTOL
Rp 17,000.00 Rp 17,000
Rp 40.00 Rp 400,000 1 TTRUK = 1,5 RUMAH
Rp 7,000.00 -
Rp 56,000.00 Rp 56,000 3.75 5.625
Rp 44,500.00 Rp 44,500 Rp 71,111 11.25
Rp 32,000.00 Rp 32,000 Rp 35,556
Rp 75,000 Rp 70,000
Rp 3,500.00 -
Rp 5,000 Rp 5,000 berdasarkan penawaran
Rp 45,000 Rp 35,000 1 colt berapa m3
Rp 196,560.00 -
Rp 45,000 Rp 42,500
Rp 12,500 Rp 12,500
Rp 60,000.00
Rp 45,000.00
Rp 800,000.00
Rp 500.00

2500
5333.33333333333
52500 1
47500
50000
27500
7500
47500
6000
26000
60000
17500

63100
74000
86500
20000

712500
25000
60000
Rp 156,000
69000
1.0008 130 12000 1560000

68000
110000
1

1.08

Rp 52,083 / m2
Rp 52,000 /m2
Rp 47,980 / m2
Rp 52,500 / m2
53500
k 20x20 true pave 2800
1400
arga Maxilite

Rp 266,667

11.25
JUMLAH MATERIAL PER KOMPONEN PEKERJAAN

No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL


I PEKERJAAN PERSIAPAN
1 PAGAR SENG GELOMBANG TINGGI : 2 M M2
a Tiang Kayu Borneo Super / Meranti 4/6 0.050 m3 1,600,000.00 80,000.00
b Semen PC (abu-abu) 0.050 sak 61,500.00 3,075.00
c Seng gelombang 1.200 lbr 37,000.00 44,400.00
d Pasir beton 0.005 m3 130,000.00 650.00
e Splitz (batu pecah) 0.009 m3 165,000.00 1,485.00
f Balok Kayu Borneo Super / Meranti 4/6 0.050 m3 1,600,000.00 80,000.00
g Paku 5 - 10 cm 0.060 kg 10,250.00 615.00
h Meni Besi 0.450 kg 55,000.00 24,750.00
i Tukang Kayu 0.200 org 150,000.00 30,000.00
j Pembantu Tukang 0.100 org 120,000.00 12,000.00
276,975.00
2 PAGAR KAWAT BERDURI TINGGI : 1,8 M M1
a Tiang dari Kayu Borneo Super / Meranti 4/6 0.050 m3 1,600,000.00 80,000.00
b Semen PC (abu-abu) 0.040 sak 61,500.00 2,460.00
c Kawat Duri 2.500 kg 4,000.00 10,000.00
d Pasir beton 0.005 m3 130,000.00 650.00
e Splitz (batu pecah) 0.009 m3 165,000.00 1,485.00
f Paku 5 - 10 cm 0.060 kg 10,250.00 615.00
g Tukang Kayu 0.200 org 150,000.00 30,000.00
h Pembantu Tukang 0.300 org 120,000.00 36,000.00
161,210.00
3 PENGUKURAN & PEMASANGAN BOWPLANK M1
a Balok Kayu Borneo Super / Meranti 5/7 0.005 m3 1,600,000.00 8,000.00
b Paku 5 - 10 cm 0.030 kg 10,250.00 307.50
c Papan Papan kayu terentang 2/20 0.004 m3 425,000.00 1,700.00
d Tukang Kayu 0.025 org 150,000.00 3,750.00
e Pembantu Tukang 0.050 org 120,000.00 6,000.00
19,757.50
4 PEMBUATAN KANTOR DIREKSI M2
a Balok Kayu Borneo Super / Meranti 5/7 0.020 m3 1,600,000.00 32,000.00
b Papan kayu terentang 0.180 m3 425,000.00 76,500.00
c Paku semua ukuran 0.850 kg 10,250.00 8,712.50
d Besi Strip 1.100 kg 9,000.00 9,900.00
e Semen PC (abu-abu) 35.000 kg 61,500.00 2,152,500.00
f Pasir Pasang 0.150 m3 110,000.00 16,500.00
g Pasir beton 0.100 m3 130,000.00 13,000.00
h Splitz (batu pecah) 0.150 m3 165,000.00 24,750.00
i Bata Merah 30.000 bh 660.00 19,800.00
j Seng Gelombang 180 x 90 x 0,05 cm 1.200 lbr 37,000.00 44,400.00
k Seng Plat BJLS 32 1.000 m2 37,000.00 37,000.00
l Kawat harmonika 2.000 m2 15,000.00 30,000.00
m Kaca polos 3 mm 0.080 m2 100,000.00 8,000.00
n Kunci Tanam standart 0.150 bh 169,000.00 25,350.00
o Triplek 120 x 240 x 0,4 cm 0.060 lbr 56,000.00 3,360.00
p Tukang Kayu 2.000 org 150,000.00 300,000.00
q Tukang Batu 1.000 org 150,000.00 150,000.00
r Pembantu Tukang 2.000 org 120,000.00 240,000.00
3,191,772.50
5 PEMBUATAN GUDANG PROYEK M2
a Balok Kayu Borneo Super / Meranti 5/7 0.014 m3 1,600,000.00 22,400.00
b Papan kayu terentang 0.180 m3 425,000.00 76,500.00
c Paku 0.250 kg 10,250.00 2,562.50
d Semen PC (abu-abu) - sak 61,500.00 -
e Pasir Beton - m3 230,000.00 -
f Splitz (batu pecah) - m3 230,000.00 -
g Seng Gelombang 180 x 90 x 0,05 cm 1.000 lbr 37,000.00 37,000.00
h Tukang Kayu 0.370 org 150,000.00 55,500.00
i Pembantu Tukang 0.370 org 120,000.00 44,400.00
238,362.50
6 MEMBERSIHKAN LOKASI ROYEK M2
a Pembantu Tukang 0.100 org 120,000.00 12,000.00
12,000.00
7 MEMBERSIHKAN PUING-PUING M2
a Pembantu Tukang 0.200 org 120,000.00 24,000.00
24,000.00
8 MEMBERSIHKAN TUNGGUL TANAMAN BH
a Pembantu Tukang 2.000 org 120,000.00 240,000.00
240,000.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
9 PEMBUATAN JALAN MASUK PROYEK M2
a Batu Belah 15/20 0.100 m3 110,000.00 11,000.00
b Koral 5/7 ( sirtu ) 0.050 m3 230,000.00 11,500.00
c Pasir urug 0.010 m3 230,000.00 2,300.00
d Pembantu Tukang 1.000 org 120,000.00 120,000.00
144,800.00
10 PEMBONGKARAN BETON M3
a Pembantu Tukang 6.200 org 120,000.00 744,000.00
744,000.00
11 PEMBONGKARAN DINDING BATA M3
a Pembantu Tukang 4.600 org 120,000.00 552,000.00
552,000.00
12 PEKERJAAN PAGAR PAPAN RANGKA BALOK M2
a Papan kayu Borneo 0.020 m3 3,200,000.00 64,000.00
b Balok Kayu Borneo Super / Meranti 5/7 0.020 m3 1,600,000.00 32,000.00
c Pasir Beton 0.080 m3 130,000.00 10,400.00
d Splitz (batu pecah) 0.150 m3 165,000.00 24,750.00
e Semen abu - abu 0.500 sak 61,500.00 30,750.00
f Tukang Kayu 0.130 org 150,000.00 19,500.00
g Pembantu Tukang 0.380 org 120,000.00 45,600.00
227,000.00

II PEKERJAAN TANAH
1 GALIAN TANAH SEDALAM 1 M M3
a Pembantu Tukang 0.420 org 120,000.00 50,400.00
b Tukang Gali 0.240 org 150,000.00 36,000.00
86,400.00
2 GALIAN TANAH SEDALAM 2 M M3
a Pembantu Tukang 0.530 org 120,000.00 63,600.00
b Tukang Gali 0.526 org 150,000.00 78,900.00
142,500.00
3 GALIAN TANAH SEDALAM 3 M M3
a Pembantu Tukang 0.740 org 120,000.00 88,800.00
b Tukang Gali 0.020 org 150,000.00 3,000.00
91,800.00
4 GALIAN TANAH KERAS SEDALAM 1 M M3
a Pembantu Tukang 0.450 org 120,000.00 54,000.00
b Tukang Gali 0.020 org 150,000.00 3,000.00
57,000.00
5 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM M2
a Pembantu Tukang 0.050 org 120,000.00 3,000.00
b Tukang Gali 0.020 org 150,000.00 2,250.00
5,250.00
6 PEMBUANGAN TANAH SEJAUH 150 M M3
a Pembantu Tukang 0.420 org 120,000.00 50,400.00
b Tukang Gali 0.020 org 150,000.00 3,000.00
53,400.00
7 URUGAN TANAH KEMBALI M3
a Pembantu Tukang 0.190 org 120,000.00 22,800.00
b Tukang Gali 0.150 org 150,000.00 22,500.00
45,300.00
8 1 m' PEKERJAAN CERUCUK DOLKEN M3
a Dolken 0.500 btg 9,000.00 4,500.00
b Tukang Batu 0.010 hr 150,000.00 1,500.00
c Laden Batu 0.020 hr 120,000.00 2,400.00
d Mandor 0.010 hr 170,000.00 1,700.00
e Alat Bantu 10,100.00
9 1 m3 URUGAN PASIR M3
a Pasir urug 1.100 m3 165,000.00 181,500.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
b Pembantu Tukang 0.300 org 120,000.00 36,000.00
c Tukang Gali 0.020 org 150,000.00 3,000.00
220,500.00
10 1 m3 URUGAN BERANGKAL M3
a Berangkal 1.100 m3 50,000.00 55,000.00
b Tukang gali 0.300 org 150,000.00 45,000.00
c Kepala tukang 0.020 org 120,000.00 2,400.00
102,400.00
11 1 m3 URUGAN SIRTU M3
a Sirtu ( koral ) 1.200 m3 100,000.00 120,000.00
b Pembantu Tukang 0.250 org 120,000.00 30,000.00
c Tukang Gali 0.020 org 150,000.00 3,000.00
153,000.00

III PEKERJAAN PONDASI


1 1 m3 PEKERJAAN LANTAI KERJA 1 PC:3PS:5KRL M2
a Batu Belah - m3 - -
b Semen PC (abu-abu) 4.000 sak 61,500.00 246,000.00
c Pasir Pasang 1.350 m3 110,000.00 148,500.00
Pembantu Tukang 1.250 org 120,000.00 150,000.00
Tukang Batu 0.650 org 150,000.00 97,500.00
Mandor 0.020 org 170,000.00 3,400.00
645,400.00
2 1 m3 PASANG BETON TUMBUK M3 ###
a Semen PC (abu-abu) 4.360 m3 61,500.00 268,140.00
b Split 0.870 sak 165,000.00 143,550.00
c Pasir Beton 0.520 m3 130,000.00 67,600.00
d Pembantu Tukang 1.500 org 120,000.00 180,000.00
e Tukang Batu 0.250 org 150,000.00 37,500.00
696,790.00
3 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps M3
a Batu Belah 1.350 m3 110,000.00 148,500.00
b Semen PC (abu-abu) 2.000 sak 61,500.00 123,000.00
c Pasir Pasang 0.600 m3 110,000.00 66,000.00
d Pembantu Tukang 1.000 org 120,000.00 120,000.00
e Tukang Batu 0.500 org 150,000.00 75,000.00
f Mandor 0.020 org 170,000.00 3,400.00
535,900.00
4 1 m3 PASANG PONDASI BATU KOSONG ( AANSTAMPING ) M3
a Batu Belah 1.200 m3 110,000.00 132,000.00
b Pasir urug 0.300 m3 225,000.00 67,500.00
c Pembantu Tukang 0.780 org 120,000.00 93,600.00
d Tukang Batu 0.390 org 150,000.00 58,500.00
351,600.00
5 1 m3 MEMBUAT BETON FOOT PLATE 1 Pc : 2 Ps : 3 Kr M3
a Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
b Pasir Beton 0.540 m3 130,000.00 70,200.00
c Splitz (batu pecah) 0.810 m3 165,000.00 133,650.00
d Pembantu Tukang 1.500 org 120,000.00 180,000.00
e Tukang Batu 0.500 org 150,000.00 75,000.00
F Mandor 0.500 org 170,000.00 85,000.00
912,850.00
6 PENULANGAN BETON FOOT PLATE 1 KG
a Besi Beton Polos 1.020 kg 8,400.00 8,568.00
b Kawat Beton 0.015 kg 13,000.00 195.00
c Pembantu Tukang - org -
d Tukang Besi 0.017 org 70,000.00 1,190.00
e Kepala Tukang 0.017 org 80,000.00 1,360.00
11,313.00
7 PEKERJAAN BEKISTING FOOT PLATE 1 M2
a Papan kayu terentang, asumsi 3x pakai 0.054 m3 425,000.00 22,950.00
b Paku 5 - 12 cm 0.400 kg 10,250.00 4,100.00
c Pelumas begisting (oli/minyak) - Ltr -
d Pembantu Tukang 0.120 org 120,000.00 14,400.00
e Tukang Kayu 0.150 org 150,000.00 22,500.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
f Kaso 5/7, asumsi 3x pakai 0.008 Ltr 1,600,000.00 12,800.00
g Mandor 0.050 org 80,000.00 4,000.00
80,750.00
8 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI) 0.054 M3 / m3
a Besi Beton Polos 50.000 kg 8,400.00 420,000.00
b Semen PC (abu-abu) 4.040 sak 61,500.00 248,460.00
c Pasir Beton 0.320 m3 130,000.00 41,600.00
d Splitz (batu pecah) 0.490 m3 165,000.00 80,850.00
e Kawat Beton 0.800 kg 13,000.00 10,400.00
f Batu Belah 0.400 m3 110,000.00 44,000.00
g Pembantu Tukang 2.000 org 120,000.00 240,000.00
h Tukang Batu 0.850 org 150,000.00 127,500.00
1,212,810.00
9 PASANG PONDASI SUMURAN DIAMETER 100 cm M3
a Batu Belah 0.450 m3 110,000.00 49,500.00
b Semen PC (abu-abu) 5.600 sak 61,500.00 344,400.00
c Pasir Beton 0.450 m3 130,000.00 58,500.00
d Splitz (batu pecah) 0.670 m3 165,000.00 110,550.00
e Pembantu Tukang 2.380 org 120,000.00 285,600.00
f Tukang Batu 0.300 org 150,000.00 45,000.00
893,550.00
10 PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm
a Pasir Beton 0.100 m3 130,000.00 13,000.00
b Splitz (batu pecah) 0.150 m3 165,000.00 24,750.00
c Semen PC (abu-abu) 1.210 sak 61,500.00 74,415.00
d Besi Beton Polos 45.000 kg 8,400.00 378,000.00
e Kawat Beton 0.900 kg 13,000.00 11,700.00
f Balok Kayu Borneo Super / Meranti 5/7 0.032 m3 1,600,000.00 51,200.00
g Papan kayu terentang 0.010 m3 425,000.00 4,250.00
h Paku 5 - 12 cm 0.120 kg 10,250.00 1,230.00
i Pelumas begisting (oli/minyak) 0.090 Ltr 6,000.00 540.00
j Plamir tembok 0.240 kg 13,000.00 3,120.00
k Pembantu Tukang 1.000 org 120,000.00 120,000.00
l Tukang Batu 0.670 org 150,000.00 100,500.00
782,705.00
11 PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 Cm
a Pasir Beton 0.080 m3 130,000.00 10,400.00
b Splitz (batu pecah) 0.130 m3 165,000.00 21,450.00
c Semen PC (abu-abu) 0.980 sak 61,500.00 60,270.00
d Besi Beton Polos 34.500 kg 8,400.00 289,800.00
e Kawat Beton 0.700 kg 13,000.00 9,100.00
f Balok Kayu Borneo Super / Meranti 5/7 0.030 m3 1,600,000.00 48,000.00
g Papan kayu terentang 0.010 m3 425,000.00 4,250.00
h Paku 5 - 12 cm 0.120 kg 10,250.00 1,230.00
i Pelumas begisting (oli/minyak) 0.090 Ltr 6,000.00 540.00
j Plamir tembok 0.200 kg 13,000.00 2,600.00
k Pembantu Tukang 0.800 org 120,000.00 96,000.00
l Tukang Batu 0.500 org 150,000.00 75,000.00
618,640.00
12 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25 M3
a Pasir Beton 0.060 m3 130,000.00 7,800.00
b Splitz (batu pecah) 0.110 m3 165,000.00 18,150.00
c Semen PC (abu-abu) 0.820 sak 61,500.00 50,430.00
d Besi Beton Polos 34.500 kg 8,400.00 289,800.00
e Kawat Beton 0.600 kg 13,000.00 7,800.00
f Balok Kayu Borneo Super / Meranti 5/7 0.030 m3 1,600,000.00 48,000.00
g Papan kayu terentang 0.010 m3 425,000.00 4,250.00
h Paku 5 - 12 cm 0.110 kg 10,250.00 1,127.50
i Pelumas begisting (oli/minyak) 0.080 Ltr 6,000.00 480.00
j Plamir tembok 0.200 kg 13,000.00 2,600.00
k Pembantu Tukang 0.800 org 120,000.00 96,000.00
l Tukang Batu 0.500 org 150,000.00 75,000.00
601,437.50
13 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING ) M3
a Papan kayu terentang 0.200 m3 425,000.00 85,000.00
b Paku 5 - 12 cm 1.500 kg 10,250.00 15,375.00
c Pelumas begisting (oli/minyak) 0.400 Ltr 6,000.00 2,400.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
d Besi Beton Polos 125.000 kg 8,400.00 1,050,000.00
e 2.250 kg - -
f Semen PC (abu-abu) 6.460 sak 61,500.00 397,290.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Pembantu Tukang 3.900 org 120,000.00 468,000.00
j Tukang Batu 0.350 org 150,000.00 52,500.00
k Tukang Kayu 1.040 org 150,000.00 156,000.00
l Tukang Besi 1.050 org 150,000.00 157,500.00
2,580,365.00
14 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING ) M3
a Papan kayu terentang 0.200 m3 425,000.00 85,000.00
b Paku 5 - 12 cm 1.500 kg 10,250.00 15,375.00
c Pelumas begisting (oli/minyak) 0.400 ltr 6,000.00 2,400.00
d Besi Beton Polos Polos 150.000 kg 8,400.00 1,260,000.00
e Kawat Beton 2.250 kg 13,000.00 29,250.00
f Semen PC (abu-abu) 6.460 sak 61,500.00 397,290.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Pembantu Tukang 4.000 org 120,000.00 480,000.00
j Tukang Batu 0.400 org 150,000.00 60,000.00
k Tukang Kayu 1.000 org 150,000.00 150,000.00
l Tukang Besi 1.000 org 150,000.00 150,000.00
2,825,615.00
15 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING ) M3
a Papan kayu terentang 0.200 m3 425,000.00 85,000.00
b Paku 5 - 12 cm 1.500 kg 10,250.00 15,375.00
c Pelumas begisting (oli/minyak) 0.400 ltr 6,000.00 2,400.00
d Besi Beton Polos Polos 125.000 kg 8,400.00 1,050,000.00
e Kawat Beton 2.100 kg 13,000.00 27,300.00
f Semen PC (abu-abu) 6.460 sak 61,500.00 397,290.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Pembantu Tukang 3.900 org 120,000.00 468,000.00
j Tukang Batu 0.400 org 150,000.00 60,000.00
k Tukang Kayu 1.000 org 150,000.00 150,000.00
l Tukang Besi 1.000 org 150,000.00 150,000.00
2,601,665.00
16 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING ) M3
a Papan kayu terentang 0.200 m3 425,000.00 85,000.00
b Paku 5 - 12 cm 1.500 kg 10,250.00 15,375.00
c Pelumas begisting (oli/minyak) 0.400 ltr 6,000.00 2,400.00
d Besi Beton Polos 150.000 kg 8,400.00 1,260,000.00
e Kawat Beton 2.250 kg 13,000.00 29,250.00
f Semen PC (abu-abu) 6.460 sak 61,500.00 397,290.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Pembantu Tukang 4.000 org 120,000.00 480,000.00
j Tukang Batu 0.400 org 150,000.00 60,000.00
k Tukang Kayu 1.000 org 150,000.00 150,000.00
l Tukang Besi 1.000 org 150,000.00 150,000.00
2,825,615.00

IV PEKERJAAN BETON NON STRUKTUR DAN BETON STRUKTUR


A PEKERJAAN BETON
1 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt M3
a Semen PC (abu-abu) 4.360 sak 61,500.00 268,140.00
b Pasir Beton 0.520 m3 130,000.00 67,600.00
c Splitz (batu pecah) 0.870 m3 165,000.00 143,550.00
d Pembantu Tukang 2.000 org 120,000.00 240,000.00
e Tukang Batu 0.350 org 150,000.00 52,500.00
771,790.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
2 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt M3
a Semen PC (abu-abu) 4.640 sak 61,500.00 285,360.00
b Pasir Beton 0.520 m3 130,000.00 67,600.00
c Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
d Pembantu Tukang 2.000 org 120,000.00 240,000.00
e Tukang Batu 0.350 org 150,000.00 52,500.00
774,160.00
3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt M3
a Semen PC (abu-abu) 6.720 sak 61,500.00 413,280.00
b Pasir Beton 0.540 m3 130,000.00 70,200.00
c Splitz (batu pecah) 0.810 m3 165,000.00 133,650.00
d Pembantu Tukang 2.000 org 120,000.00 240,000.00
e Tukang Batu 0.350 org 150,000.00 52,500.00
909,630.00
4 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225 M3
a Semen PC (abu-abu) 7.760 sak 61,500.00 477,240.00
b Pasir Beton 0.650 m3 130,000.00 84,500.00
c Splitz (batu pecah) 0.650 m3 165,000.00 107,250.00
d Pembantu Tukang 2.000 org 120,000.00 240,000.00
e Tukang Batu 0.350 org 150,000.00 52,500.00
961,490.00
5 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275 M3
a Semen PC (abu-abu) 8.000 sak 61,500.00 492,000.00
b Pasir Beton 0.550 m3 130,000.00 71,500.00
c Splitz (batu pecah) 0.700 m3 165,000.00 115,500.00
d Pembantu Tukang 2.020 org 120,000.00 242,400.00
e Tukang Batu 0.400 org 150,000.00 60,000.00
981,400.00
B PEKERJAAN PEMBESIAN
1 PENULANGAN BETON/BESI BETON POLOS KG
a Besi Beton Polos 1.050 kg 8,400.00 8,820.00
b Kawat Beton 0.020 kg 13,000.00 260.00
c Pembantu Tukang 0.010 org 120,000.00 1,200.00
d Tukang Besi 0.010 org 150,000.00 1,500.00
11,780.00
2 PENULANGAN BETON/BESI BETON ULIR KG
a Besi Beton Ulir 1.100 kg 10,000.00 11,000.00
b Kawat Beton 0.015 kg 13,000.00 195.00
c Pembantu Tukang 0.010 org 120,000.00 1,200.00
d Tukang Besi 0.020 org 150,000.00 3,000.00
15,395.00
C PEKERJAAN BEGISTING
1 PASANG BEKISTING UNTUK SLOOF M3
a Papan kayu terentang 0.045 m3 425,000.00 19,125.00
b Paku 5 - 12 cm 0.300 kg 10,250.00 3,075.00
c Pelumas begisting (oli/minyak) 0.100 Ltr 6,000.00 600.00
d Pembantu Tukang 0.300 org 120,000.00 36,000.00
e Tukang Kayu 0.260 org 150,000.00 39,000.00
97,800.00
2 PASANG BEKISTING UNTUK KOLOM M3
a Papan kayu terentang 0.040 m3 425,000.00 17,000.00
b Paku 5 - 12 cm 0.400 kg 10,250.00 4,100.00
c Pelumas begisting (oli/minyak) 0.200 Ltr 6,000.00 1,200.00
d Balok Kayu Borneo 0.040 m3 1,600,000.00 64,000.00
e Multiplex 120 x 240 x 9 mm 0.350 lbr 180,000.00 63,000.00
f Pembantu Tukang 0.300 org 120,000.00 36,000.00
g Tukang Kayu 0.330 org 150,000.00 49,500.00
234,800.00
3 PASANG BEKISTING UNTUK BALOK M3
a Papan kayu terentang 0.040 m3 425,000.00 17,000.00
b Paku 5 - 12 cm 0.400 kg 10,250.00 4,100.00
c Pelumas begisting (oli/minyak) 0.200 Ltr 6,000.00 1,200.00
d Balok Kayu Borneo 0.040 m3 1,600,000.00 64,000.00
e Multiplex 120 x 240 x 9 mm 0.350 lbr 180,000.00 63,000.00
f Pembantu Tukang 0.320 org 120,000.00 38,400.00
g Tukang Kayu 0.330 org 150,000.00 49,500.00
237,200.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
4 PASANG BEKISTING UNTUK PLAT LANTAI M3
a Papan kayu terentang 0.040 m3 425,000.00 17,000.00
b Paku 5 - 12 cm 0.400 kg 10,250.00 4,100.00
c Pelumas begisting (oli/minyak) 0.200 Ltr 6,000.00 1,200.00
d Balok Kayu Borneo 0.040 m3 1,600,000.00 64,000.00
e Multiplex 120 x 240 x 9 mm 0.350 lbr 180,000.00 63,000.00
f Pembantu Tukang 0.320 org 120,000.00 38,400.00
g Tukang Kayu 0.330 org 150,000.00 49,500.00
237,200.00
5 PASANG BEKISTING UNTUK TANGGA M3
a Papan kayu terentang 0.030 m3 425,000.00 12,750.00
b Paku 5 - 12 cm 0.400 kg 10,250.00 4,100.00
c Pelumas begisting (oli/minyak) 0.150 Ltr 6,000.00 900.00
d Balok Kayu Borneo 0.020 m3 1,600,000.00 32,000.00
e Multiplex 120 x 240 x 9 mm 0.350 lbr 180,000.00 63,000.00
f Pembantu Tukang 0.320 org 120,000.00 38,400.00
g Tukang Kayu 0.330 org 150,000.00 49,500.00
200,650.00
D PEKERJAAN BETON BERTULANG
1 MEMBUAT SLOOF S1 BETON BERTULANG ( 112 kg BESI + BEKISTING ) K225 M3
a Papan kayu terentang 0.827 m3 425,000.00 351,475.00
b Paku 5 - 12 cm 5.330 kg 10,250.00 54,632.50
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 111.574 kg 8,400.00 937,224.96
e Kawat Beton 2.256 kg 13,000.00 29,328.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Pembantu Tukang 2.767 org 120,000.00 332,040.00
j Tukang Batu 0.500 org 150,000.00 75,000.00
k Tukang Kayu 2.267 org 150,000.00 340,050.00
l Tukang Besi 1.862 org 150,000.00 279,300.00
j Mandor 0.090 org 170,000.00 15,300.00
2,979,650.46
2 MEMBUAT SLOOF S2 BETON BERTULANG ( 70 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.827 m3 425,000.00 351,475.00
b Paku 5 - 12 cm 5.330 kg 10,250.00 54,632.50
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 87.676 kg 8,400.00 736,477.06
e Kawat Beton 2.256 kg 13,000.00 29,328.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti , asumsi 3X pakai 0.064 m3 1,600,000.00 102,400.00
j Multiplex 120 x 240 x 9 mm - lbr 180,000.00 -
k Pembantu Tukang 2.767 org 120,000.00 332,040.00
l Tukang Batu 0.500 org 150,000.00 75,000.00
m Tukang Kayu 2.267 org 150,000.00 340,050.00
n Tukang Besi 1.862 org 150,000.00 279,300.00
o Mandor 0.210 org 170,000.00 35,700.00
2,901,702.56
3 MEMBUAT KOLOM K1 15/20 BETON BERTULANG ( 140 kg BESI + BEKISTING ) M3
a Papan kayu terentang spek alba 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 8.000 kg 10,250.00 82,000.00
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 182.658 kg 8,400.00 1,534,327.20
e Kawat Beton 2.700 kg 13,000.00 35,100.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.500 m3 130,000.00 65,000.00
h Splitz (batu pecah) 0.700 m3 165,000.00 115,500.00
i Balok Kayu Borneo Super / Meranti, asumsi 3 x pakai - m3 1,600,000.00 -
j Multiplex 120 x 240 x 9 mm....hapus - lbr 180,000.00 -
k Pembantu Tukang 6.000 org 120,000.00 720,000.00
l Tukang Batu 0.500 org 150,000.00 75,000.00
m Tukang Kayu 2.000 org 150,000.00 300,000.00
n Tukang Besi 2.100 org 150,000.00 315,000.00
o Mandor 0.467 org 170,000.00 79,390.00
3,860,317.20
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
4 MEMBUAT KOLOM K2 BETON BERTULANG ( 95 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 8.000 kg 10,250.00 82,000.00
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 130.620 kg 8,400.00 1,097,208.00
e Kawat Beton 1.882 kg 13,000.00 24,466.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.500 m3 130,000.00 65,000.00
h Splitz (batu pecah) 0.700 m3 165,000.00 115,500.00
i Balok Kayu Borneo Super / Meranti, asumsi 3 x pakai - m3 1,600,000.00 -
j Multiplex 120 x 240 x 9 mm - lbr 180,000.00 -
k Pembantu Tukang 6.000 org 120,000.00 720,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 2.000 org 150,000.00 300,000.00
n Tukang Besi 1.553 org 150,000.00 232,950.00
o Mandor 0.517 org 170,000.00 87,890.00
3,316,514.00
5 MEMBUAT KOLOM KP 15/12 BETON BERTULANG ( 99,459 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.333 m3 425,000.00 141,525.00
b Paku 5 - 12 cm 8.000 kg 10,250.00 82,000.00
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 199.267 kg 8,400.00 1,673,840.00
e Kawat Beton 1.800 kg 13,000.00 23,400.00
f Semen PC (abu-abu) 4.500 sak 61,500.00 276,750.00
g Pasir Beton 0.500 m3 130,000.00 65,000.00
h Splitz (batu pecah) 0.700 m3 165,000.00 115,500.00
i Balok Kayu Borneo Super / Meranti, asumsi 3 x pakai - m3 1,600,000.00 -
j Multiplex 120 x 240 x 9 mm - lbr 180,000.00 -
k Pembantu Tukang 6.000 org 120,000.00 720,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 2.000 org 150,000.00 300,000.00
n Tukang Besi 1.640 org 150,000.00 246,000.00
3,696,515.00
6 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 4.000 kg 10,250.00 41,000.00
c Pelumas begisting (oli/minyak) 2.000 Ltr 6,000.00 12,000.00
d Besi Beton Polos 200.000 kg 8,400.00 1,680,000.00
e Kawat Beton 4.500 kg 13,000.00 58,500.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 1,600,000.00 480,000.00
j Multiplex 120 x 240 x 9 mm 3.500 lbr 180,000.00 630,000.00
k Pembantu Tukang 7.300 org 120,000.00 876,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 3.300 org 150,000.00 495,000.00
n Tukang Besi 2.100 org 150,000.00 315,000.00
5,402,975.00
7 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 4.000 kg 10,250.00 41,000.00
c Pelumas begisting (oli/minyak) 2.000 Ltr 6,000.00 12,000.00
d Besi Beton Polos 250.000 kg 8,400.00 2,100,000.00
e Kawat Beton 4.500 kg 13,000.00 58,500.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 1,600,000.00 480,000.00
j Multiplex 120 x 240 x 9 mm 3.500 lbr 180,000.00 630,000.00
k Pembantu Tukang 7.300 org 120,000.00 876,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 3.300 org 150,000.00 495,000.00
n Tukang Besi 2.100 org 150,000.00 315,000.00
5,822,975.00
8 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 4.000 kg 10,250.00 41,000.00
c Pelumas begisting (oli/minyak) 2.000 Ltr 6,000.00 12,000.00
d Besi Beton Polos 300.000 kg 8,400.00 2,520,000.00
e Kawat Beton 4.500 kg 13,000.00 58,500.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 1,600,000.00 480,000.00
j Multiplex 120 x 240 x 9 mm 3.500 lbr 180,000.00 630,000.00
k Pembantu Tukang 7.300 org 120,000.00 876,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 3.300 org 150,000.00 495,000.00
n Tukang Besi 2.100 org 150,000.00 315,000.00
6,242,975.00
9 MEMBUAT BALOK B1 15/25 BETON BERTULANG ( 144,7 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 6.930 kg 10,250.00 71,032.50
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 127.055 kg 8,400.00 1,067,262.34
e Kawat Beton 2.250 kg 13,000.00 29,250.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti, asumsi 3x pakai - m3 1,600,000.00 -
j Multiplex 120 x 240 x 9 mm - lbr 180,000.00 -
k Balok Dolken dia 8 cm atau kayu 4 x 6 cm / 4m 32.000 btg 9,000.00 288,000.00
l Pembantu Tukang 5.800 org 120,000.00 696,000.00
m Tukang Batu 0.350 org 150,000.00 52,500.00
n Tukang Kayu 2.800 org 150,000.00 420,000.00
o Tukang Besi 1.050 org 150,000.00 157,500.00
3,516,844.84
10 MEMBUAT BALOK BL BETON BERTULANG ( 118,59 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 3.200 kg 10,250.00 32,800.00
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 143.160 kg 8,400.00 1,202,544.00
e Kawat Beton 2.250 kg 13,000.00 29,250.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti, asumsi 3x pakai - m3 1,600,000.00 -
j Multiplex 120 x 240 x 9 mm - lbr 180,000.00 -
k Balok Dolken dia 8 cm atau kayu 4 x 6 cm / 4m 32.000 btg 9,000.00 288,000.00
l Pembantu Tukang 5.800 org 120,000.00 696,000.00
m Tukang Batu 0.350 org 150,000.00 52,500.00
n Tukang Kayu 2.800 org 150,000.00 420,000.00
o Tukang Besi 1.050 org 150,000.00 157,500.00
3,613,894.00
11 MEMBUAT RING BALOK12/15 BETON BERTULANG ( 99,459 kg BESI + BEKISTING M3
a Papan kayu terentang 0.400 m3 425,000.00 170,000.00
b Paku 5 - 12 cm 3.200 kg 10,250.00 32,800.00
c Besi Beton Polos 144.833 kg 8,400.00 1,216,600.00
d Kawat Beton 1.989 kg 13,000.00 25,857.00
e Semen PC (abu-abu) 4.500 sak 61,500.00 276,750.00
f Pasir Beton 0.520 m3 130,000.00 67,600.00
g Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
h Balok Kayu Borneo Super / Meranti, asumsi 3x pakai - m3 1,600,000.00 -
i Balok Dolken dia 8 cm kayu 4 x 6 cm / 4m 16.000 btg 9,000.00 144,000.00
j Pembantu Tukang 5.960 org 120,000.00 715,200.00
k Tukang Batu 0.350 org 150,000.00 52,500.00
l Tukang Kayu 2.800 org 150,000.00 420,000.00
m Tukang Besi 1.400 org 150,000.00 210,000.00
3,460,007.00
12 MEMBUAT BALOK BETON BERTULANG B2( 225 kg BESI + BEKISTING ) M3 RB
a Papan kayu terentang 0.320 m3 425,000.00 136,000.00
b Paku 5 - 12 cm 3.200 kg 10,250.00 32,800.00
c Pelumas begisting (oli/minyak) 1.600 Ltr 6,000.00 9,600.00
d Besi Beton Polos 117.980 kg 8,400.00 991,032.00
e Kawat Beton 4.000 kg 13,000.00 52,000.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.140 m3 425,000.00 59,500.00
j Multiplex 120 x 240 x 9 mm - lbr 180,000.00 -
k Balok Dolken dia 8 cm atau kayu 4 x 6 cm / 4m 16.000 btg 9,000.00 144,000.00
l Pembantu Tukang 5.960 org 120,000.00 715,200.00
m Tukang Batu 0.350 org 150,000.00 52,500.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
n Tukang Kayu 2.800 org 150,000.00 420,000.00
o Tukang Besi 1.400 org 150,000.00 210,000.00
3,415,607.00
13 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.320 m3 425,000.00 136,000.00
b Paku 5 - 12 cm 3.200 kg 10,250.00 32,800.00
c Pelumas begisting (oli/minyak) 1.600 Ltr 6,000.00 9,600.00
d Besi Beton Polos 250.000 kg 8,400.00 2,100,000.00
e Kawat Beton 6.000 kg 13,000.00 78,000.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.140 m3 425,000.00 59,500.00
j Multiplex 120 x 240 x 9 mm 2.800 lbr 180,000.00 504,000.00
k Balok Dolken dia 8 cm kayu 4 x 6 cm / 4m 16.000 btg 9,000.00 144,000.00
l Pembantu Tukang 5.960 org 120,000.00 715,200.00
m Tukang Batu 0.350 org 150,000.00 52,500.00
n Tukang Kayu 2.800 org 150,000.00 420,000.00
o Tukang Besi 1.400 org 150,000.00 210,000.00
5,054,575.00
14 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING ) M3
a Papan kayu terentang 0.250 m3 425,000.00 106,250.00
b Paku 5 - 12 cm 3.000 kg 10,250.00 30,750.00
c Pelumas begisting (oli/minyak) 1.200 Ltr 6,000.00 7,200.00
d Besi Beton Polos 200.000 kg 8,400.00 1,680,000.00
e Kawat Beton 3.000 kg 13,000.00 39,000.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 425,000.00 127,500.00
j Multiplex 120 x 240 x 9 mm 2.500 lbr 180,000.00 450,000.00
k Pembantu Tukang 5.600 org 120,000.00 672,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 2.300 org 150,000.00 345,000.00
n Tukang Besi 1.400 org 150,000.00 210,000.00
4,313,175.00
15 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Papan kayu terentang - m3 425,000.00 -
b Paku 5 - 12 cm 0.150 kg 10,250.00 1,537.50
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 100.000 kg 8,400.00 840,000.00
e Kawat Beton 0.050 kg 13,000.00 650.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.300 m3 130,000.00 39,000.00
h Splitz (batu pecah) 0.550 m3 165,000.00 90,750.00
i Balok Kayu Borneo Super / Meranti, asumsi 3x pakai 0.004 m3 425,000.00 1,700.00
j Multiplex 120 x 240 x 9 mm 0.201 lbr 180,000.00 36,180.00
k Pembantu Tukang 1.500 org 120,000.00 180,000.00
l Tukang Batu 0.300 org 150,000.00 45,000.00
m Tukang Kayu 0.100 org 150,000.00 15,000.00
n Tukang Besi 0.040 org 150,000.00 6,000.00
1,624,817.50
16 MEMBUAT CANOPY Tb. 10 Cm BETON BERTULANG ( 112,62 kg BESI + BEKISTING )
a Papan kayu terentang - m3 425,000.00 -
b Paku 5 - 12 cm 2.800 kg 10,250.00 28,700.00
c Pelumas begisting (oli/minyak) - Ltr 6,000.00 -
d Besi Beton Polos 115.000 kg 8,400.00 966,000.00
e Kawat Beton 2.252 kg 13,000.00 29,276.00
f Semen PC (abu-abu) 6.000 sak 61,500.00 369,000.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti, asumsi 3x pakai 0.100 m3 425,000.00 42,500.00
j Multiplex 120 x 240 x 9 mm 1.157 lbr 180,000.00 208,260.00
k Pembantu Tukang 5.600 org 120,000.00 672,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 0.200 org 150,000.00 30,000.00
n Tukang Besi 0.900 org 150,000.00 135,000.00
2,729,536.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
17 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Papan kayu terentang 0.250 m3 425,000.00 106,250.00
b Paku 5 - 12 cm 3.000 kg 10,250.00 30,750.00
c Pelumas begisting (oli/minyak) 1.200 Ltr 6,000.00 7,200.00
d Besi Beton Polos 125.000 kg 8,400.00 1,050,000.00
e Kawat Beton 3.000 kg 13,000.00 39,000.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 425,000.00 127,500.00
j Multiplex 120 x 240 x 9 mm 2.500 lbr 180,000.00 450,000.00
k Pembantu Tukang 5.600 org 120,000.00 672,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 2.300 org 150,000.00 345,000.00
n Tukang Besi 1.400 org 150,000.00 210,000.00
3,683,175.00
18 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Papan kayu terentang 0.230 m3 425,000.00 97,750.00
b Paku 5 - 12 cm 3.000 kg 10,250.00 30,750.00
c Pelumas begisting (oli/minyak) 1.200 Ltr 6,000.00 7,200.00
d Besi Beton Polos 100.000 kg 8,400.00 840,000.00
e Kawat Beton 3.000 kg 13,000.00 39,000.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 425,000.00 127,500.00
j Multiplex 120 x 240 x 9 mm 2.500 lbr 180,000.00 450,000.00
k Pembantu Tukang 5.600 org 120,000.00 672,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 2.300 org 150,000.00 345,000.00
n Tukang Besi 1.400 org 150,000.00 210,000.00
3,464,675.00
19 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )
a Papan kayu terentang 0.150 m3 425,000.00 63,750.00
b Paku 5 - 12 cm 3.000 kg 10,250.00 30,750.00
c Pelumas begisting (oli/minyak) 1.200 Ltr 6,000.00 7,200.00
d Besi Beton Polos 115.000 kg 8,400.00 966,000.00
e Kawat Beton 3.000 kg 13,000.00 39,000.00
f Semen PC (abu-abu) 6.450 sak 61,500.00 396,675.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Balok Kayu Borneo Super / Meranti 0.300 m3 425,000.00 127,500.00
j Multiplex 120 x 240 x 9 mm 2.000 lbr 180,000.00 360,000.00
k Pembantu Tukang 5.600 org 120,000.00 672,000.00
l Tukang Batu 0.350 org 150,000.00 52,500.00
m Tukang Kayu 2.300 org 150,000.00 345,000.00
n Tukang Besi 1.400 org 150,000.00 210,000.00
3,466,675.00
20 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225
a Papan kayu terentang 0.270 m3 425,000.00 114,750.00
b Paku 5 - 12 cm 2.000 kg 10,250.00 20,500.00
c Pelumas begisting (oli/minyak) 0.600 Ltr 6,000.00 3,600.00
d Besi Beton Polos 175.000 kg 8,400.00 1,470,000.00
e Kawat Beton 3.000 kg 13,000.00 39,000.00
f Semen PC (abu-abu) 8.000 sak 61,500.00 492,000.00
g Pasir Beton 0.520 m3 130,000.00 67,600.00
h Splitz (batu pecah) 0.780 m3 165,000.00 128,700.00
i Pembantu Tukang 4.850 org 120,000.00 582,000.00
j Tukang Batu 0.400 org 150,000.00 60,000.00
k Tukang Kayu 1.750 org 150,000.00 262,500.00
l Tukang Besi 1.450 org 150,000.00 217,500.00
3,458,150.00

V PEKERJAAN DINDING
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
1 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps M2
a Bata Merah 140.000 bh 660.00 92,400.00
b Semen PC (abu-abu) 0.650 sak 61,500.00 39,975.00
c Pasir Pasang 0.090 m3 110,000.00 9,900.00
d Pembantu Tukang 0.650 org 120,000.00 78,000.00
e Tukang Batu 0.200 org 150,000.00 30,000.00
250,275.00
2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps M2
a Bata Merah 140.000 bh 660.00 92,400.00
b Semen PC (abu-abu) 0.550 sak 61,500.00 33,825.00
c Pasir Pasang 0.090 m3 110,000.00 9,900.00
d Pembantu Tukang 0.650 org 120,000.00 78,000.00
e Tukang Batu 0.200 org 150,000.00 30,000.00
244,125.00
3 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps M2
a Bata Merah 140.000 bh 660.00 92,400.00
b Semen PC (abu-abu) 0.450 sak 61,500.00 27,675.00
c Pasir Pasang 0.100 m3 110,000.00 11,000.00
d Pembantu Tukang 0.650 org 120,000.00 78,000.00
e Tukang Batu 0.200 org 150,000.00 30,000.00
239,075.00
4 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Ps M2
a Bata Merah 70.000 bh 660.00 46,200.00
b Semen PC (abu-abu) 0.290 sak 61,500.00 17,835.00
c Pasir Pasang 0.040 m3 110,000.00 4,400.00
d Pembantu Tukang 0.320 org 120,000.00 38,400.00
e Tukang Batu 0.100 org 150,000.00 15,000.00
121,835.00
5 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Ps M2
a Bata Merah 70.000 bh 660.00 46,200.00
b Semen PC (abu-abu) 0.250 sak 61,500.00 15,375.00
c Pasir Pasang 0.050 m3 110,000.00 5,500.00
d Pembantu Tukang 0.320 org 120,000.00 38,400.00
e Tukang Batu 0.100 org 150,000.00 15,000.00
120,475.00
6 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps M2
a Bata Press 70.000 bh 660.00 46,200.00
b Semen PC (abu-abu) 0.200 sak 61,500.00 12,300.00
c Pasir Pasang 0.070 m3 110,000.00 7,700.00
d Pembantu Tukang 0.240 org 120,000.00 28,800.00
e Tukang Batu 0.120 org 150,000.00 18,000.00
113,000.00
7 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG M2
a Rooster / Terawang ukuran 12 x 11 x 24 37.000 bh 2,500.00 92,500.00
b Semen PC (abu-abu) 0.270 sak 61,500.00 16,605.00
c Pasir Pasang 0.040 m3 110,000.00 4,400.00
d Pembantu Tukang 0.300 org 120,000.00 36,000.00
e Tukang Batu 0.100 org 150,000.00 15,000.00
164,505.00

VI PEKERJAAN PLESTERAN/ACCI
1 PEKERJAAN PASANGAN SCREEDING 1:3 TEBAL 3 CM M2
a Semen PC (abu-abu) 0.300 sak 61,500.00 18,450.00
b Pasir Pasang 0.065 m3 110,000.00 7,150.00
c Pembantu Tukang 0.130 org 120,000.00 15,600.00
d Tukang Batu 0.130 org 150,000.00 19,500.00
e Mandor 0.050 org 60,700.00
2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.130 sak 61,500.00 7,995.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.150 org 150,000.00 22,500.00
56,695.00
3 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.100 sak 61,500.00 6,150.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.150 org 150,000.00 22,500.00
54,850.00
4 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.150 sak 61,500.00 9,225.00
b Pasir Pasang 0.035 m3 110,000.00 3,850.00
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.150 org 150,000.00 22,500.00
59,575.00
5 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm M2
a Semen PC (abu-abu) 0.170 sak 61,500.00 10,455.00
b Pasir Pasang 0.030 m3 110,000.00 3,300.00
c Pembantu Tukang 0.220 org 120,000.00 26,400.00
d Tukang Batu 0.160 org 150,000.00 24,000.00
64,155.00
6 PEKERJAAN KAMPROT HALUS 1 Pc : 3 Ps TEBAL 2 cm M2 ###
a Semen PC (abu-abu) 0.300 sak 61,500.00 18,450.00
b Pasir Pasang 0.030 m3 110,000.00 3,300.00
c Pembantu Tukang 0.200 org 120,000.00 24,000.00
d Tukang Batu 0.250 org 150,000.00 37,500.00
83,250.00
7 PEKERJAAN KAMPROT KASAR 1 Pc : 6 Ps TEBAL 2 cm M2 0.00 ###
a Semen PC (abu-abu) 0.110 sak 61,500.00 6,765.00
b Pasir Pasang 0.025 m3 110,000.00 2,750.00
c Pembantu Tukang 0.150 org 120,000.00 18,000.00
d Tukang Batu 0.200 org 150,000.00 30,000.00
Jumlah 57,515.00
Dibulatkan 57,500.00
8 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.190 sak 61,500.00 11,685.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
c Pembantu Tukang 0.260 org 120,000.00 31,200.00
d Tukang Batu 0.200 org 150,000.00 30,000.00
75,085.00
9 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm M2
a Semen PC (abu-abu) 0.150 sak 61,500.00 9,225.00
b Pasir Pasang 0.020 m3 110,000.00 2,200.00
c Pembantu Tukang 0.260 org 120,000.00 31,200.00
d Tukang Batu 0.200 org 150,000.00 30,000.00
72,625.00
10 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps M2
a Semen PC (abu-abu) 0.010 sak 61,500.00 615.00
b Pasir Pasang 0.010 m3 110,000.00 1,100.00
c Pembantu Tukang 0.057 org 120,000.00 6,840.00
d Tukang Batu 0.040 org 150,000.00 6,000.00
14,555.00
11 ACCIAN PLESTERAN M2
a Semen PC (abu-abu) 0.110 sak 61,500.00 6,765.00
b Pembantu Tukang 0.080 org 110,000.00 8,800.00
c Tukang Batu 0.040 org 150,000.00 6,000.00
21,565.00
12 ACIAN SKONENG 1:2 M2
a Semen PC (abu-abu) 0.010 sak 61,500.00 615.00
b Pasir Pasang - m3 110,000.00 -
c Pembantu Tukang 0.057 org 120,000.00 6,840.00
d Tukang Batu 0.038 org 150,000.00 5,700.00
13,155.00

VII PEKERJAAN PELAPIS LANTAI


PASANG LANTAI KERAMIK POLOS 30 x 30 cm area teras depan dan ruang servis M2
a Keramik rocky gray 30 x 30 cm 1.010 m2 53,000.00 53,530.00
b Semen PC (abu-abu) 0.160 sak 61,500.00 9,840.00
c Pasir pasang 0.030 m3 110,000.00 3,300.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
d Semen warna 0.013 kg 3,000.00 39.00
e Pembantu Tukang 0.200 org 120,000.00 24,000.00
f Tukang Batu 0.375 org 150,000.00 56,250.00
146,959.00
2 PASANG LANTAI KERAMIK MOTIF 20x20 cm (KM/WC) M2
a Keramik motif 20 x 20 cm 1.020 m2 55,000.00 56,100.00
b Semen PC (abu-abu) 0.160 sak 61,500.00 9,840.00
c Pasir pasang 0.020 m3 110,000.00 2,200.00
d Semen warna 0.020 kg 3,000.00 60.00
e Pembantu Tukang 0.250 org 120,000.00 30,000.00
f Tukang Batu 0.120 org 150,000.00 18,000.00
116,200.00
12 PASANG LANTAI GRANIT M2
a Granit uk.60x60 1.020 m2 129,600.00 132,192.00
b Semen PC (abu-abu) 0.190 sak 61,500.00 11,685.00
c Pasir pasang 0.050 m3 110,000.00 5,500.00
d Semen warna 0.020 kg 3,000.00 60.00
e Pembantu Tukang 0.400 org 120,000.00 48,000.00
f Tukang Batu 0.200 org 150,000.00 30,000.00
227,437.00

VIII PEKERJAAN PELAPIS DINDING


1 PASANG DINDING KERAMIK MOTIF 25 x 50 cm M2
a Keramik motif 25 x 50 cm 1.000 m2 75,000.00 75,000.00
b Semen PC (abu-abu) 0.180 sak 61,500.00 11,070.00
c Pasir pasang 0.020 m3 110,000.00 2,200.00
d Semen warna 0.020 kg 3,000.00 60.00
e Pembantu Tukang 0.220 org 65,000.00 14,300.00
f Tukang Batu 0.400 org 85,000.00 34,000.00
136,630.00
2 PASANG DINDING KERAMIK POLOS 10 x 50 cm M2
a Keramik 10 x 50 cm 1.000 m2 - -
b Semen PC (abu-abu) 0.180 sak - -
c Pasir pasang 0.020 m3 - -
d Semen warna 0.020 kg - -
e Pembantu Tukang 0.220 org - -
f Tukang Batu 0.400 org - -

10 PASANG DINDING TERRACOTA M2


a Bata Tempel Terracota 70.000 bh 2,500.00 175,000.00
b Semen PC (abu-abu) 0.240 sak 61,500.00 14,760.00
c Pasir pasang 0.035 m3 110,000.00 3,850.00
d Pembantu Tukang 0.300 org 65,000.00 19,500.00
e Tukang Batu 0.250 org 85,000.00 21,250.00
234,360.00
12 PASANG PLINT KERAMIK UKURAN 10 x 60 cm M1
a Plint Keramik ukuran 10 x 60 cm 0.060 bh 129,600.00 7,776.00
b Semen PC (abu-abu) 0.040 sak 61,500.00 2,460.00
c Pasir pasang 0.020 m3 110,000.00 2,200.00
d Semen warna 0.100 kg 3,000.00 300.00
e Pembantu Tukang 0.120 org 65,000.00 7,800.00
f Tukang Batu 0.060 org 85,000.00 5,100.00
25,636.00

X PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


A PEKERJAAN LISPLANK GRC
1 PASANG LISPLANG GRC M'
a Papan Listplank 1.100 M' 55,000.00 60,500.00
b Paku 7 - 10 cm - kg 10,500.00 -
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
c Pembantu Tukang 0.100 org 65,000.00 6,500.00
d Tukang Kayu 0.150 org 85,000.00 12,750.00
79,750.00

B PEKERJAAN PENUTUP ATAP


1 PASANG ATAP GENTENG BETON M2
a Genteng Beton 6.775 bh 7,800.00 52,845.53
b Pembantu Tukang 0.150 org 65,000.00 9,750.00
c Tukang Kayu 0.060 org 80,000.00 4,800.00
d Mandor 0.014 org 100,000.00 1,400.00
67,395.53
2 PASANG NOK/BUBUNGAN GENTENG KERAMIK M'
a NoK CISANGKAN 2.914 bh 10,500.00 30,597.00
b Semen PC (abu-abu) 0.180 sak 61,500.00 11,070.00
c Pasir pasang 0.035 m3 110,000.00 3,850.00
d Pembantu Tukang 0.200 org 50,000.00 10,000.00
e Tukang Kayu 0.100 org 70,000.00 7,000.00
F Mandor - org 80,000.00 -
62,517.00

XI PEKERJAAN PENUTUP PLAFOND


1 Plafond Gypsum Board, tebal 9 mm + rangka besi hollow M2
a Hollow 4/4 Zincromate 0.415 btg 45,000.00 18,675.00
b Hollow 2/4 Zincromate 0.150 btg 35,000.00 5,250.00
c Gypsum board ( 120 x 240 x 9 ) mm 0.364 lbr 56,000.00 20,384.00
d Paku sekrup 25.000 bh 1,000.00 25,000.00
e Ramset / dina bolt 4.000 bh 3,500.00 14,000.00
f Cotton plaster 0.072 bh 55,000.00 3,960.00
g Compoun 0.125 kg 5,000.00 625.00
h Pembantu Tukang 0.100 org 120,000.00 12,000.00
i Tukang Kayu 0.050 org 150,000.00 7,500.00
107,394.00

VIII PEKERJAAN SANITAIR


1 Memasang kloset duduk / monoblok BH
a Kloset duduk / monoblok 1.000 bh 2,270,000.00 2,270,000.00
b Perlengkapan ( 10% hrg kloset ) - ls 227,000.00 227,000.00
c Pembantu Tukang 0.700 org 50,000.00 35,000.00
d Tukang Batu 0.700 org 150,000.00 105,000.00
e Kepala Tukang 0.100 org 160,000.00 16,000.00
2,653,000.00
2 Memasang wastafel dinding BH
a Wastafel 1.000 bh 800,000.00 800,000.00
b Perlengkapan ( 12% hrg kloset ) 1.000 ls 96,000.00 96,000.00
c Semen PC (abu-abu) 0.120 sak 61,500.00 7,380.00
d Pasir pasang 0.010 m3 110,000.00 1,100.00
e Pembantu Tukang 1.000 org 120,000.00 120,000.00
f Tukang Batu 1.000 org 150,000.00 150,000.00
1,174,480.00
6 Memasang shower dinding BH
Shower dinding + tiang+kepala shower 1.000 bh 712,500.00 712,500.00
- - -
Instalasi Air Panas Dingin 2.500 m 17,500.00 43,750.00
Pembantu Tukang 0.500 org 120,000.00 60,000.00
Tukang Batu 0.500 org 150,000.00 75,000.00
Kepala tukang 0.050 org 160,000.00 8,000.00
899,250.00
7 Memasang jet washer BH
a jet washer dinding 1.000 bh 135,000.00 135,000.00
b Pembantu Tukang 0.100 org 120,000.00 12,000.00
c Tukang Plumbing 0.100 org 150,000.00 15,000.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
d Kepala tukang 0.010 org 160,000.00 1,600.00
163,600.00
8 Memasang bak kontrol pasangan batu bata ukuran 30 x 30 cm, tinggi 35 cm BH
a Batu bata 0.150 m3 660.00 99.00
b Semen PC (abu-abu) 0.880 sak 61,500.00 54,120.00
c Pasir pasang 0.070 m3 110,000.00 7,700.00
d Batu kerikil 0.070 m3 165,000.00 11,550.00
e Besi beton 1.600 kg 8,400.00 13,440.00
f Pasir Beton 0.060 m3 130,000.00 7,800.00
g Pembantu Tukang 3.200 org 120,000.00 384,000.00
h Tukang Batu 1.020 org 150,000.00 153,000.00
631,709.00
Memasang Bak Zink type sb 1 ex Royal BH
a Bak Zink 1.000 bh 190,000.00 190,000.00
b tukang plumbing 0.700 hr 150,000.00 105,000.00
c Pembantu Tukang 0.700 hr 120,000.00 84,000.00
d kepala tukang 0.100 hr 100,000.00 10,000.00
389,000.00
1 Memasang kran diameter 3/4 " atau 1/2 " BH
a Kran air 1.000 bh 35,000.00 35,000.00
b Perlengkapan ( 2% hrg kran ) 1.000 ls 700.00 700.00
c Pembantu Tukang 0.010 org 120,000.00 1,200.00
d Tukang Batu 0.100 org 150,000.00 15,000.00
51,900.00
11 Memasang kran taman/tembok BH
a Kran air angsa 1.000 bh 17,500.00 17,500.00
b Perlengkapan ( 2% hrg kran ) 1.000 ls 700.00 700.00
c Pembantu Tukang 0.010 org 120,000.00 1,200.00
d Tukang Batu 0.100 org 150,000.00 15,000.00
34,400.00
11 Memasang kran bak Zink BH
a Kran bebek 1.000 bh 155,000.00 155,000.00
b Perlengkapan ( 2% hrg kran ) 1.000 ls 3,100.00 3,100.00
c Pembantu Tukang 0.150 org 120,000.00 18,000.00
d Tukang Batu 0.100 org 150,000.00 15,000.00
e Mandor 0.020 org 170,000.00 3,400.00
191,100.00
12 Memasang Floor drain BH
a Floor drain 1.000 bh 57,500.00 57,500.00
b Pembantu Tukang 0.100 org 120,000.00 12,000.00
c Tukang Batu 0.100 org 150,000.00 15,000.00
d Mandor 0.010 org 170,000.00 1,700.00
86,200.00

IX PEKERJAAN PERPIPAAN SEPTICTANK DAN POMPA


1 Memasang pipa galvanis diameter ½" M1
a Pipa galvanis dia 1/2" 1.100 M¹ 10,500.00 11,550.00
b Perlengkapan ( 30% harga pipa ) 3,150.00 3,150.00
c Pembantu Tukang 0.054 org 120,000.00 6,480.00
d Tukang pipa 0.090 org 150,000.00 13,500.00
34,680.00
2 Memasang pipa galvanis diameter ¾" M1
a Pipa galvanis 1.100 M¹ 17,500.00 19,250.00
b Perlengkapan ( 30% harga pipa ) 5,250.00 5,250.00
c Pembantu Tukang 0.054 org 120,000.00 6,480.00
d Tukang pipa 0.090 org 150,000.00 13,500.00
44,480.00
3 Memasang pipa galvanis diameter 1" M1
a Pipa galvanis 1.100 M¹ 30,000.00 33,000.00
b Perlengkapan ( 30% harga pipa ) 9,000.00 9,000.00
c Pembantu Tukang 0.054 org 120,000.00 6,480.00
d Tukang pipa 0.090 org 150,000.00 13,500.00
61,980.00
4 Memasang pipa PVC type D diameter 4" M1
a Pipa PVC type D 0.263 M¹ 20,500.00 5,391.50
b Perlengkapan ( 30% harga pipa ) 1.000 ls 6,150.00 6,150.00
c Pembantu Tukang 0.080 org 120,000.00 9,600.00
d Tukang pipa 0.080 org 150,000.00 12,000.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
33,141.50
5 Memasang pipa PVC type D diameter 2" M1
a Pipa PVC type D 0.263 M¹ 9,500.00 2,498.50
b Perlengkapan ( 30% harga pipa ) 1.000 ls 2,850.00 2,850.00
c Pembantu Tukang 0.080 org 120,000.00 9,600.00
d Tukang pipa 0.080 org 150,000.00 12,000.00
26,948.50
6 Memasang PVC tipe AW diameter ½" M1
a Pipa PVC 0.263 M¹ 4,500.00 1,183.50
b Perlengkapan ( 30% harga pipa ) 1.000 ls 1,350.00 1,350.00
c Pembantu Tukang 0.080 org 120,000.00 9,600.00
d Tukang pipa 0.080 org 150,000.00 12,000.00
24,133.50
7 Memasang PVC tipe AW diameter ¾" M1
a Pipa PVC 0.263 M¹ 6,000.00 1,578.00
b Perlengkapan ( 30% harga pipa ) 1.000 ls 1,800.00 1,800.00
c Pembantu Tukang 0.080 org 120,000.00 9,600.00
d Tukang pipa 0.080 org 150,000.00 12,000.00
24,978.00
8 Memasang PVC tipe AW diameter 1" M1
a Pipa PVC 1.100 M¹ 7,500.00 8,250.00
b Perlengkapan ( 30% harga pipa ) 2,250.00 2,250.00
c Pembantu Tukang 0.036 org 120,000.00 4,320.00
d Tukang pipa 0.060 org 150,000.00 9,000.00
23,820.00
9 Memasang Stop Kraan 3/4" M1
a Stop Kraan 1.000 bh 75,000.00 75,000.00
b Perlengkapan ( 30% harga pipa ) 1.000 ls 22,500.00 22,500.00
c Pembantu Tukang 0.008 org 120,000.00 960.00
d Tukang pipa 0.100 org 150,000.00 15,000.00
113,460.00
10 Memasang Stop Kraan 1/2" M1
a Stop Kraan 1.000 bh 60,000.00 60,000.00
b Perlengkapan ( 30% harga pipa ) 1.000 ls 18,000.00 18,000.00
c Pembantu Tukang 0.008 org 120,000.00 960.00
d Tukang pipa 0.100 org 150,000.00 15,000.00
93,960.00
11 Membuat Septictank pasangan Batu Bata dan Rembesan BH
Galian tanah Septictank & rembesan 5.544 M3 86,400.00 479,001.60
Lantai kerja 0.252 M3 696,790.00 175,591.08
Pasang bata 1 Pc : 2 Psr 13.992 M2 121,835.00 1,704,715.32
Pelat beton penutup 0.081 M3 696,790.00 56,439.99
Pipa PVC 4" D putih & perlengkapannya 0.500 M! 33,141.50 16,570.75
Plesteran 1 Pc : 3 Psr 1.840 M2 83,250.00 153,180.00
Pasangan ijuk - IKAT - -
Urugan kerikil 3,5 cm - M3 - -
Pipa PVC 3 " D dilobang 1.600 M! 26,948.50 43,117.60
Urugan kembali 1.386 M3 45,300.00 62,785.80
Pembantu Tukang 4.000 org 120,000.00 480,000.00
Tukang Batu 3.000 org 150,000.00 450,000.00
3,621,402.14
12 PEKERJAAN BAK KONTROL BH
a Pas. Bata 0.420 m2 121,835.00 51,170.70
b Plesteran 1 Pc : 3 Psr 1.440 m2 83,250.00 119,880.00
c plur 0.090 m3 21,565.00 1,940.85
172,991.55

XIII PEKERJAAN ALUMINIUM


1 Pasang Pintu Aluminium / PVC pabrikan M2
a Pintu alluminium / PVC 1.000 bh 165,000.00 165,000.00
b Tukang Batu 1.050 org 85,000.00 89,250.00
c Pembantu Tukang 1.050 org 65,000.00 68,250.00
322,500.00

XIV PEKERJAAN KACA & PENGGANTUNG


No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
1 Pasang Kunci bulat putar Kamar Mandi BH
a Kunci bulat putar kamar mandi 1.000 bh 76,000.00 76,000.00
b Pembantu Tukang 0.005 org 120,000.00 600.00
c Tukang Kayu 0.500 org 150,000.00 75,000.00
151,600.00
2 Pasang Engsel Jendela BH
a Engsel jendela 1.000 bh 18,700.00 18,700.00
b Pembantu Tukang 0.025 org 120,000.00 3,000.00
c Tukang Kayu 0.150 org 150,000.00 22,500.00
44,200.00
3 Pasang Engsel Pintu BH
a Engsel Pintu 1.000 bh 25,850.00 25,850.00
b Pembantu Tukang 0.025 org 120,000.00 3,000.00
c Tukang Kayu 0.150 org 150,000.00 22,500.00
51,350.00
4 Pasang handle dan kunci Pintu UTAMA ex. GRADINO BH
a Door holder,handle,etc 1.000 bh 249,150.00 249,150.00
b Pembantu Tukang 0.050 org 120,000.00 6,000.00
c Tukang Kayu 0.320 org 150,000.00 48,000.00
303,150.00
6 Pasang handle dan kunci Pintu ex. Solid BH
a Door holder,handle,etc 1.000 bh 141,750.00 141,750.00
b Pembantu Tukang 0.050 org 120,000.00 6,000.00
c Tukang Kayu 0.320 org 150,000.00 48,000.00
195,750.00
7 Pasang Grendel / Sloot jendela BH
a Grendel / sloot jendela 1.000 bh 19,500.00 19,500.00
b Pembantu Tukang 0.050 org 120,000.00 6,000.00
c Tukang Kayu 0.500 org 150,000.00 75,000.00
100,500.00
8 Ramskar Jendela BH
a Tarikan jendela 1.000 bh 22,000.00 22,000.00
b Pembantu Tukang 0.050 org 120,000.00 6,000.00
c Tukang Kayu 0.140 org 150,000.00 21,000.00
49,000.00
10 Pasang Kaca polos, tebal 5 mm M2
a Kaca polos 1.100 m2 70,000.00 77,000.00
b Pembantu Tukang 0.015 org 120,000.00 1,800.00
c Tukang Kayu 0.100 org 150,000.00 15,000.00
93,800.00

XV PEKERJAAN PENGECATAN
PEKERJAAN WATERPROOF DAK BETON M2
a Waterproof 0.400 kg 65,000.00 26,000.00
b Plamir kg - -
c Ampelas lbr - -
d Cat dasar - kg - -
e Cat kayu kwalitas baik - kg - -
f Mandor 0.010 org 170,000.00 1,700.00
g Tukang cat 0.060 org 150,000.00 9,000.00
36,700.00
Pengecatan Listplank GRC M'
a Cat 0.025 kg 55,000.00 1,375.00
b Dempul halus 0.250 kg 8,000.00 2,000.00
c Ampelas 0.500 lbr 2,500.00 1,250.00
d Pembantu Tukang 0.050 org 120,000.00 6,000.00
e Tukang cat 0.020 org 150,000.00 3,000.00
13,625.00
Pengecatan Tembok/plafond Baru kwalitas sedang M2
a Plamir 0.100 kg 8,000.00 800.00
b Rol cat 0.010 bh 25,000.00 250.00
c Cat tembok kwalitas sedang 0.450 kg 20,000.00 9,000.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
d Steger ( perancah kerja ) 0.010 Ls 18,000.00 180.00
e Ampelas 0.500 lbr 2,500.00 1,250.00
f Pembantu Tukang 0.060 org 120,000.00 7,200.00
g Tukang cat 0.200 org 150,000.00 30,000.00
48,680.00
Pengecatan Interior M2
a Plamir 0.100 kg 8,000.00 800.00
b Rol cat 0.010 bh 25,000.00 250.00
c Cat tembok kwalitas baik 0.360 kg 20,000.00 7,200.00
d cat dasar 0.100 kg 18,000.00 1,800.00
e Ampelas 0.500 lbr 2,500.00 1,250.00
f Pembantu Tukang 0.020 org 120,000.00 2,400.00
g Tukang cat 0.063 org 150,000.00 9,450.00
23,150.00
Pengecatan exterior M2
a Cat tembok exterior 0.260 kg 26,000.00 6,760.00
b Cat dasar 0.150 kg 18,000.00 2,700.00
c Rol cat 0.010 bh 25,000.00 250.00
d Ampelas 0.500 lbr 2,500.00 1,250.00
e Pembantu Tukang 0.020 org 120,000.00 2,400.00
f Tukang cat 0.063 org 150,000.00 9,450.00
22,810.00

XVI PEKERJAAN LISTRIK


Instalasi Penerangan Titik Lampu TTK
a Kabel NYM 2,5 13.000 m' 8,500.00 110,500.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
b Accessories (10% dr harga material) 1.000 ls 850.00 850.00
c Alat Bantu 1.000 ls -
d Tukang listrik 0.058 org 150,000.00 8,710.50
e Laden 0.524 bh 120,000.00 62,910.00
f Kepala tukang 0.005 org 160,000.00 800.00
183,770.50
Pasang Saklar Engkel TTK
a Saklar Engkel 1.000 bh 17,000.00 17,000.00
b Kabel Listrik NYM 3 x 2,5 mm - m' -
c Accecories ( 20 % material ) 1.000 ls 3,400.00 3,400.00
d Pembantu Tukang 0.200 org 120,000.00 24,000.00
e Tukang listrik 0.040 org 150,000.00 6,000.00
50,400.00
Pasang Saklar Double TTK
a Saklar Double 1.000 bh 20,000.00 20,000.00
b Kabel Listrik NYM 3 x 2,5 mm - m' -
c Accecories ( 20 % material ) 1.000 ls 4,000.00 4,000.00
d Pembantu Tukang 0.200 org 120,000.00 24,000.00
e Tukang listrik 0.040 org 150,000.00 6,000.00
54,000.00
Instalasi + outlet tv dan telephone TTK
a Stop Kontak 1.000 bh 44,000.00 44,000.00
b Kabel Listrik NYM 3 x 2,5 mm m' 8,500.00 -
c Accecories ( 20 % material ) 1.000 ls 8,800.00 8,800.00
d Pembantu Tukang 0.200 org 120,000.00 24,000.00
e Tukang listrik 0.045 org 150,000.00 6,750.00
83,550.00
1 Pasang Downlight BH
a Fitting Downlight 1.000 bh 19,000.00 19,000.00
b Accecories ( 1 % alat ) 1.000 ls 190.00 190.00
c Tukang listrik 0.100 org 150,000.00 15,000.00
34,190.00
2 Pasang Stop Kontak BH
a Stop kontak 1.000 bh 20,000.00 20,000.00
b Accecories ( 1 % alat ) 1.000 ls 200.00 200.00
c Tukang listrik 0.100 org 150,000.00 15,000.00
35,200.00
6 Pasang Lampu Fitting BH ###
a Fitting Lampu 1.000 bh 9,000.00 9,000.00
b Accecories ( 1 % alat ) 1.000 ls 90.00 90.00
c Tukang listrik 0.100 org 150,000.00 15,000.00
24,090.00
7 Pasang Lampu Taman BH
a Lampu Taman 1.000 bh 300,000.00 300,000.00
b Accecories ( 1 % alat ) 1.000 ls 3,000.00 3,000.00
c Tukang listrik 0.350 org 150,000.00 52,500.00
355,500.00
8 Pasang Panel UNIT
a Panel Listrik standart untuk Rumah 1.000 bh - -
b Accecories ( 10 % alat ) 1.000 ls - -
c Tukang listrik 1.000 org - -

9 Pekerjaan box mcb UNIT


a box mcb 1.000 bh 25,000.00 25,000.00
b Accecories ( 10 % alat ) 1.000 ls 2,500.00 2,500.00
c Grounding BC dia 6 mm 1.000 ls ###
d Tofur 1.000 ls ###
e Tukang listrik 0.150 org 150,000.00 22,500.00
f mcb 3.000 bh 17,500.00 52,500.00
g Laden 1.500 org 120,000.00 180,000.00
282,500.00

PEKERJAAN RUMPUT DAN TANAH URUG LEMBANG /M2


Lempengan rumput gajah mini 1.200 m2 17000 20,400.00
Laden 0.035 org 50000 1,750.00
mandor 0.002 org 80000 160.00
22,310.00
No. URAIAN KOEFISIEN SAT VOLUME JUMLAH MATERIAL
Urugan Tanah Lembang 0.100 m3 133333.33 13,333.33
36,000.00
BACK-UP DATA PERHITUNGAN VOLUME

PEKERJAAN PEMBANGUNAN POS JAGA DI AREA BUNDARAN SUKARAJA


TAHUN ANGGARAN 2020

PEKERJAAN ARSITEKTUR
I. BACK-UP PERHITUNGAN VOLUME PEKERJAAN DINDING & PLESTERAN
DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit

LANTAI - 1
1 LUAS DINDING BATA 1 : 3 LUAS NETTO : 12.25 M2
LUAS BIDANG LUAR :
Luas Bruto : 7 2 14.00

DIKURANGI LUAS KUSEN/DAUN PINTU :


Type P-02 : 0.7 2 1.00 1.40
Type J-08 : 0.7 0.5 1.00 0.35

LUAS KUSEN : 1.75 m2


2 LUAS DINDING BATA 1 : 5 LUAS NETTO : 13.50 M2
LUAS BIDANG LUAR :
Luas Bruto : 12.5 3.6 32.75
DIKURANGI LUAS KUSEN/DAUN PINTU :
Type PJ1 2.075 2.6 1.00 5.28
Type P1 0.9 2.2 2.00 4.17
Type P3 0.7 2 1.00 1.40
Type J1 1.35 2.5 1.00 3.38
Type J2 1.8 2.5 1.00 4.50
Type J7 0.625 0.4 1.00 0.25
Type J8 0.7 0.4 1.00 0.28

LUAS KUSEN : 19.25 m2

3 PLESTERAN DAN ACIAN DINDING 1 : 3 24.50 M2

4 PLESTERAN DAN ACIAN DINDING 1 : 5 26.99 M2

LANTAI - 2
1 LUAS DINDING BATA 1 : 3 LUAS NETTO : 24.11 M2
LUAS BIDANG LUAR :
Luas Bruto : 7.6 3.45 26.22

DIKURANGI LUAS KUSEN/DAUN PINTU :


Type P2 0.9 2 1.00 1.80
Type J10 0.775 0.4 1.00 0.31

LUAS KUSEN : 2.11 m2

2 LUAS DINDING BATA 1 : 5 LUAS NETTO : 103.70 M2


LUAS BIDANG LUAR :
Luas Bruto : 34.3 3.45 118.34
DIKURANGI LUAS KUSEN/DAUN PINTU :
Type P1 0.9 2.2 2.00 3.96
Type J3 1.725 2.55 1.00 4.40
Type J4 0.5 2.5 1.00 1.25
Type J5 0.7 2.4 1.00 1.68
Type J6 1.35 2 1.00 2.70
Type J7a 0.625 0.4 1.00 0.25
Type J9 0.5 0.4 2.00 0.40

LUAS KUSEN : 14.64 m2

3 PLESTERAN DAN ACIAN DINDING 1 : 3 48.22 M2

4 PLESTERAN DAN ACIAN DINDING 1 : 5 207.39 M2

5 DINDING BATU TERRACOTA TINGGI PJG LUAS NETTO : 17.11 M2


Tampak Depan : 8.31
Tampak Samping Kanan : 4.40
Tampak Samping Kiri : 4.40
Tampak Belakang : 0.00
II. BACK-UP PERHITUNGAN VOLUME PEKERJAAN LANTAI
DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit

LANTAI - 1
1 URUGAN PASIR BWH LANTAI t = 5cm LUAS 1.31 M3
26.20 0.05 1.31

2 LANTAI KERJA T = 5 cm 1.31 M2


BIDANG 1 26.20 0.05 1.31

3 LANTAI keramik 60X60 WARNA M2


LANTAI : 23.835 23.84
BORDER : 0.4 0.40 62

LANTAI - 2
1 URUGAN PASIR BWH LANTAI t = 0.05 cm LUAS 4.69 M3
93.80 0.05 4.69

2 LANTAI KERJA T = 5 cm 4.69 M2


BIDANG 1 93.80 0.05 4.69

3 LANTAI keramik 60X60 WARNA M2


LANTAI GRANITE : 87.00 87.00
BORDER : 0.4 0.40 62

III. BACK-UP PERHITUNGAN VOLUME PEKERJAAN PLAFOND


DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit

LANTAI - 1
1 RANGKA PLAFOND HOLLOW 11.25 M3
LUAS BIDANG : 11.25 11.25
2 PLAFOND GYPSUM T = 9 MM 12.98 M2
BIDANG 1 : 23.35 23.35

3 PLAFONd GRC 10.38 M2


10.38 10.38

M2
0.00
IV. BACK-UP PERHITUNGAN VOLUME PEKERJAAN PENGECATAN
DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit

LANTAI - 1
1 PENGECATAN DINDING INTERIOR #REF! M2
12.5 3.5 43.75
#REF! 3.5 #REF!

2 PENGECATAN DINDING EXTERIOR panjang tinggi 43.75 M2


12.5 3.5 43.75

3 PENGECATAN PLAFOND 0.00 M2

M2
0.00

LANTAI - 2
1 PENGECATAN DINDING INTERIOR 0.00 M3

2 PENGECATAN DINDING EXTERIOR panjang tinggi 212.80 M2


56 3.8 212.80

3 PENGECATAN PLAFOND 0.00 M2

M2

V. BACK-UP PERHITUNGAN VOLUME PEKERJAAN ATAP


DIMENSI JUMLAH
NO NAMA SUB PEKERJAAN PANJANG LEBAR TINGGI/TEBAL BIDANG VOLUME SAT
( Meter) (Meter) (Meter) unit

LANTAI - 1
1 ATAP BAJA RINGAN 251.82 M3
BIDANG 1 13.775 6.11 2 168.33
BIDANG 2 4.34 6.11 2 52.97
BIDANG 3 3.30 3.4 2 22.44
BIDANG 4 2.38 3.4 1 8.08

0.00
REKAP DAFTAR INDEK HARGA SATUAN PEKERJAAN
Harga
NO. KODE Jenis Pekerjaan Satuan
Pekerjaan

A. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PERSIAPAN


1 A1 PAGAR SENG GELOMBANG TINGGI : 2 M Rp 276,975.00
2 A2 PAGAR KAWAT BERDURI TINGGI : 1,8 M Rp 161,210.00
3 A3 PENGUKURAN & PEMASANGAN BOWPLANK Rp 19,757.50
4 A4 PEMBUATAN KANTOR DIREKSI Rp 3,191,772.50
5 A5 PEMBUATAN GUDANG PROYEK Rp 238,362.50
6 A6 MEMBERSIHKAN LOKASI ROYEK Rp 12,000.00
7 A7 PEMBONGKARAN BETON Rp 744,000.00
8 A8 PEMBONGKARAN DINDING BATA Rp 552,000.00

B. PENETAPAN INDEK HARGA SATUAN PEKERJAAN GALIAN & URUGAN


1 B1 GALIAN TANAH SEDALAM 1 M Rp 86,400.00
2 B2 GALIAN TANAH SEDALAM 2 M Rp 142,500.00
3 B3 GALIAN TANAH SEDALAM 3 M Rp 91,800.00
4 B4 GALIAN TANAH KERAS SEDALAM 1 M Rp 57,000.00
5 B5 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM Rp 5,250.00
6 B6 PEMBUANGAN TANAH SEJAUH 150 M Rp 53,400.00
7 B7 URUGAN TANAH KEMBALI Rp 45,300.00
8 B8 1 m' PEKERJAAN CERUCUK DOLKEN Rp 10,100.00
9 B9 1 m3 URUGAN PASIR Rp 220,500.00
10 B10 1 m3 URUGAN BERANGKAL Rp 102,400.00
11 B11 1 m3 URUGAN SIRTU Rp 153,000.00

C. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PONDASI


1 C1 1 m3 PEKERJAAN LANTAI KERJA 1 PC:3PS:5KRL Rp 645,400.00
2 C2 1 m3 PASANG BETON TUMBUK Rp 696,790.00
3 C3 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps Rp 535,900.00
4 C4 1 m3 PASANG PONDASI BATU KOSONG ( AANSTAMPING ) Rp 351,600.00
5 C5 1 m3 MEMBUAT BETON FOOT PLATE 1 Pc : 2 Ps : 3 Kr Rp 912,850.00
6 C6 PENULANGAN BETON FOOT PLATE 1 KG Rp 11,313.00
7 C7 PEKERJAAN BEKISTING FOOT PLATE 1 M2 Rp 80,750.00

D. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BETON


1 D1 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt Rp 909,630.00
2 D2 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225 Rp 961,490.00
3 D3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275 Rp 981,400.00
4 D4 PENULANGAN BETON/BESI BETON POLOS Rp 11,780.00
5 D5 PENULANGAN BETON/BESI BETON ULIR Rp 15,395.00
6 D6 PASANG BEKISTING UNTUK SLOOF Rp 97,800.00
7 D7 PASANG BEKISTING UNTUK KOLOM Rp 234,800.00
8 D8 PASANG BEKISTING UNTUK BALOK Rp 237,200.00
9 D9 PASANG BEKISTING UNTUK PLAT LANTAI Rp 237,200.00
10 D10 PASANG BEKISTING UNTUK TANGGA Rp 200,650.00

E. PENETAPAN INDEK HARGA SATUAN PEKERJAAN DINDING


1 E1 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps Rp 250,275.00
2 E2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps Rp 244,125.00
3 E3 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps Rp 239,075.00
4 E4 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Ps Rp 121,835.00
5 E5 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Ps Rp 120,475.00
6 E6 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps Rp 113,000.00
7 E7 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG Rp 164,505.00
8 E8 PEKERJAAN PASANGAN SCREEDING 1:3 TEBAL 3 CM Rp 60,700.00
9 E9 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm Rp 56,695.00
10 E10 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm Rp 54,850.00
11 E11 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm Rp 59,575.00
12 E12 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm Rp 64,155.00
13 E13 PEKERJAAN KAMPROT HALUS 1 Pc : 3 Ps TEBAL 2 cm Rp 83,250.00
14 E14 PEKERJAAN KAMPROT KASAR 1 Pc : 6 Ps TEBAL 2 cm Rp 57,500.00
15 E15 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm Rp 75,085.00
16 E16 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm Rp 72,625.00
17 E17 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps Rp 14,555.00
18 E18 ACCIAN PLESTERAN Rp 21,565.00
19 E19 ACIAN SKONENG 1:2 Rp 13,155.00

F. PENETAPAN INDEK HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 F1 Plafond Gypsum Board, tebal 9 mm + rangka besi hollow Rp 107,394.00

G. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENGECATAN/LABURAN


1 G1 PEKERJAAN WATERPROOF DAK BETON Rp 36,700.00
2 G2 Pengecatan Listplank GRC Rp 13,625.00
3 G3 Pengecatan Tembok/plafond Baru kwalitas sedang Rp 48,680.00
4 G4 Pengecatan Interior Rp 23,150.00
5 G5 Pengecatan exterior Rp 22,810.00

H. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING


1 H1 PASANG LANTAI KERAMIK POLOS 30 x 30 cm area teras depan dan ruang servis belakang Rp 146,959.00
2 H2 PASANG LANTAI KERAMIK MOTIF 20x20 cm (KM/WC) Rp 116,200.00
3 H4 PASANG LANTAI GRANIT Rp 227,437.00
4 H5 PASANG DINDING KERAMIK MOTIF 25 x 50 cm Rp 136,630.00
5 H6 PASANG DINDING TERRACOTA Rp 234,360.00
6 H7 PASANG PLINT KERAMIK UKURAN 10 x 60 cm Rp 25,636.00

I. PENETAPAN INDEK HARGA SATUAN PEKERJAAN SANITARY


1 I1 Memasang kloset duduk / monoblok Rp 2,653,000.00
2 I2 Memasang wastafel dinding Rp 1,174,480.00
3 I3 Memasang shower dinding Rp 899,250.00
4 I4 Memasang jet washer Rp 163,600.00
5 I5 Memasang bak kontrol pasangan batu bata ukuran 30 x 30 cm, tinggi 35 cm Rp 631,709.00
Harga
NO. KODE Jenis Pekerjaan Satuan
Pekerjaan
6 I6 Memasang Bak Zink type sb 1 ex Royal Rp 389,000.00
7 I7 Memasang kran diameter 3/4 " atau 1/2 " Rp 51,900.00
8 I8 Memasang kran taman/tembok Rp 34,400.00
9 I9 Memasang kran bak Zink Rp 191,100.00
10 I10 Memasang Floor drain Rp 86,200.00

J. PENETAPAN INDEK HARGA SATUAN PEKERJAAN MEKANIKAL


1 J1 Memasang pipa galvanis diameter ½" Rp 34,680.00
2 J2 Memasang pipa galvanis diameter ¾" Rp 44,480.00
3 J3 Memasang pipa galvanis diameter 1" Rp 61,980.00
4 J4 Memasang pipa PVC type D diameter 4" Rp 33,141.50
5 J5 Memasang pipa PVC type D diameter 2" Rp 26,948.50
6 J6 Memasang PVC tipe AW diameter ½" Rp 24,133.50
7 J7 Memasang PVC tipe AW diameter ¾" Rp 24,978.00
8 J8 Memasang PVC tipe AW diameter 1" Rp 23,820.00
9 J9 Memasang Stop Kraan 3/4" Rp 113,460.00
10 J10 Memasang Stop Kraan 1/2" Rp 93,960.00
11 J11 Membuat Septictank pasangan Batu Bata dan Rembesan Rp 3,621,402.14
12 J12 PEKERJAAN BAK KONTROL Rp 172,991.55

K. PENETAPAN INDEK HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 K1 Instalasi Penerangan Titik Lampu Rp 183,770.50
2 K2 Pasang Saklar Engkel Rp 50,400.00
3 K3 Pasang Saklar Double Rp 54,000.00
4 K4 Instalasi + outlet tv dan telephone Rp 83,550.00
5 K5 Pasang Downlight Rp 34,190.00
6 K6 Pasang Stop Kontak Rp 35,200.00
7 K7 Pasang Lampu Fitting Rp 24,090.00
8 K8 Pasang Lampu Taman Rp 355,500.00
9 K9 Pekerjaan box mcb Rp 282,500.00

L. PENETAPAN INDEK HARGA SATUAN PEKERJAAN ATAP


1 L1 PASANG ATAP GENTENG BETON Rp 67,395.53
2 L2 PASANG NOK/BUBUNGAN GENTENG KERAMIK Rp 62,517.00
3 L3 PASANG LISPLANG GRC Rp 79,750.00

M. PENETAPAN INDEK HARGA SATUAN PEKERJAAN ALUMUNIUM, KACA & ACC


1 M1 Pasang Pintu Aluminium / PVC pabrikan Rp 322,500.00
2 M2 Pasang Kunci bulat putar Kamar Mandi Rp 151,600.00
3 M3 Pasang Engsel Jendela Rp 44,200.00
4 M4 Pasang Engsel Pintu Rp 51,350.00
5 M5 Pasang handle dan kunci Pintu UTAMA ex. GRADINO Rp 303,150.00
6 M6 Pasang handle dan kunci Pintu ex. Solid Rp 195,750.00
7 M7 Pasang Grendel / Sloot jendela Rp 100,500.00
8 M8 Ramskar Jendela Rp 49,000.00
9 M9 Pasang Kaca polos, tebal 5 mm Rp 93,800.00
BACK UP PERHITUNGAN VOLUME
PEKERJAAN PEMBANGUNAN POS JAGA DI AREA BUNDARAN SU
TAHUN ANGGARAN 2020

BETON (M3) BESI ( KG ) BEGISTING (M2)


TYPE POSISI
LEBAR TINGGI PANJANG UNIT JUML.PNJG VOL ( M3 ) TULANGAN DIA JUMLAH PJNG UNIT BERAT / M` BRT TOTAL PANJANG LBR BIDANG UNIT LUAS ( M2 )

MELINTANG BADAN BANGUNAN

GALIAN TANAH BATU KALI 0.6 0.6 12.5 1 12.5 4.5


PONDASI TELAPAK 0.8 0.25 0.8 8 1.28
SLOOF 0.2 0.35 12.5 1 12.5 0.875

Jumlah Total 6.655

LANTAI KERJA BATU KALI 0.6 0.05 12.5 1 0.375


BWH PONDASI TELAPAK 0.8 0.05 0.8 8 0.2560

Jumlah Total 0.631

URUGAN PASIR BATU KALI 0.6 0.05 12.5 1 0.375


BWH PONDASI TELAPAK 0.8 0.05 0.8 8 0.2560

Jumlah Total 0.631

BATU KALI 0.6 0.3 12.5 1 3.375


AANSTAMPING

Jumlah Total 3.375


LUAS
PONDASI 0.6 0.6 12.5 1 4.5
BATU KALI
Jumlah Total 4.500

0.15 0.2 12.5 1 0.375 POKOK 6Ø12 6 12.66 1 0.8917 67.731 12.5 0.4 1 5.00
SLOOF - 1
TUMPUAN
15 / 20 LAPANGAN
TENGAH 2Ø10 2 12.66 1 0.6167 15.614
PENGIKAT TNGH
SENGKANG Ø8 -150 83.33 0.7 1 0.3950 23.042
Jumlah Total 0.375 Jumlah Total 106.387 Jumlah Total 5.000

PONDASI TYPE - 1 0.8 0.8 0.25 0 0 POKOK 1 Ø12 -150 2.3 5.33 0 0.8917 0.000 0.8 0.2 0 0
FOOT PLAT POKOK 2 Ø10 -150 2.3 5.33 0 0.6167 0.000
80 X 80 X 20
#DIV/0!
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

PONDASI TYPE - 2 1.2 1.2 0.3 0 0 POKOK 1 Ø12 -150 3.2 6.00 0 0.8917 0.000 1.44 0.36 0 0
FOOT PLAT POKOK 2 Ø10 -150 3.2 6.00 0 0.6167 0.000
80 X 80 X 20
#DIV/0!
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

KOLOM 0.25 0.25 1.1 0 0 POKOK 1 8-Ø12 8 1.26 0 0.8917 0.000 1.1 1 0 0
STUMP POKOK 2
15 / 25
#DIV/0! SENGKANG Ø10 -150 7 0.5 0 0.6167 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.25 3.8 0 0 POKOK 1 6-Ø12 6 3.96 0 0.8917 0.000 3.8 0.8 0 0
KOLOM K1
POKOK 2 2-Ø10 2 3.96 0 0.6167 0.000
15 / 20
#DIV/0! SENGKANG Ø8 -150 25 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.3 3.8 0 0 POKOK 1 6-Ø12 6 3.96 0 0.8917 0.000 3.8 0.9 0 0
KOLOM K2
POKOK 2
15 / 30
#DIV/0! SENGKANG Ø8 -150 25 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.4 3.8 0 0 POKOK 1 8-Ø12 8 3.96 0 0.8917 0.000 3.8 1.1 0 0
KOLOM K3
POKOK 2
15 / 40
#DIV/0! SENGKANG Ø8 -150 25 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.15 2.7 10 0.6075 POKOK 1 4-Ø8 4 2.86 10 0.3950 45.188 2.7 0.3 10 8.1
KOLOM K4
POKOK 2
15 / 15
SENGKANG Ø6 -150 18 0.5 10 0.2217 19.950
Jumlah Total 0.607 Jumlah Total 65.138 Jumlah Total 8.100

0.15 0.35 3.4 0 0 POKOK 1 6-Ø12 6 3.56 0 0.8917 0.000 3.4 1 0 0


KOLOM K5
POKOK 2
15 / 35
#DIV/0! SENGKANG Ø8 -150 23 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.65 3.8 0 0 POKOK 1 10-Ø12 10 3.96 0 0.8917 0.000 3.8 1.3 0 0
KOLOM K6
POKOK 2
15 / 65
#DIV/0! SENGKANG Ø8 -150 25 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

BALOK 0.1 0.1 4.015 0 0.000 POKOK 4-Ø8 4 4.175 0 0.3950 0.000 4.015 0.3 0 0.00
LINTEL TUMPUAN
LAPANGAN
SENGKANG Ø6 -150 26.76666667 0.5 0 0.2217 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

PLAT CANOPY Bidang : 3.75 0.1 1 1 0.375 LAPIS ATAS Ø8 -150 25 1.1 1 0.395 10.863 1 3.75 1 3.75
+2.75 3.75 x 2.00 7 3.85 1 0.395 10.138
T = 10 cm
LAPIS BAWAH Ø8 -150 25 1.1 1 0.395 10.863
7 3.85 1 0.395 10.138
Sub Jumlah 0.375 Sub Jumlah 42.002 Sub Jumlah 3.75
Bidang : 1.04 0.1 0.3 1 0.031 LAPIS ATAS Ø8 -150 7 0.4 1 0.395 1.095 0.3 1.04 1 0.31
1.35 x 0.3 2 1.14 1 0.395 0.901

LAPIS BAWAH Ø8 -150 7 0.4 1 0.395 1.095


2 1.14 1 0.395 0.901
Sub Jumlah 0.031 Sub Jumlah 3.992 Sub Jumlah 0.31
Jumlah Total 0.406 Jumlah Total 45.994 Jumlah Total 4.062

PLAT CANOPY Bidang : 3 0.08 1.25 0 0.000 LAPIS ATAS Ø8 -150 20 1.35 0 0.395 0.000 1.25 3 0 0.00
+2.85 3.00 x 1.25 8 3.1 0 0.395 0.000
T = 8 Cm
LAPIS BAWAH Ø8 -150 20 1.35 0 0.395 0.000
8 3.1 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

BALOK TYPE - 1 0.2 0.3 7.5 0 0 POKOK 6-Ø12 6 7.66 0 0.8917 0.000 9 2.25 0 0
TANGGA TUMPUAN
20 x 30 LAPANGAN
#DIV/0! SENGKANG Ø8 -150 50 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

PLAT STEP 0.3 0.08 0.9 0 0.000 TUL. POKOK 1-Ø12 1 0.4 0 0.891 0.000 0.3 0.08 0 0.00
TANGGA TANGGA SENGKANG Ø8 -200 1.5 0.85 0 0.395 0.000

#DIV/0! Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
PLAT 0.15 0.15 7.5 0 0.000 LAPIS ATAS Ø12 -150 1 7.6 0 0.891 0.000 7.5 0.45 0 0.00
TANGGA 50 0.25 0 0.891 0.000

LAPIS BAWAH Ø12 -150 1 7.6 0 0.891 0.000


50 0.25 0 0.891 0.000

Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00


PLAT 1.15 0.1 2.45 0 0.000 LAPIS ATAS Ø12 -150 8 2.55 0 0.891 0.000 2.45 1.45 0 0.00
BORDES 16 1.25 0 0.891 0.000

LAPIS BAWAH Ø12 -150 8 2.55 0 0.891 0.000


16 1.25 0 0.891 0.000

Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00


Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

DAPUR 0.6 0.1 3 1 0.180 MEMANJANG 4 3.1 1 0.395 4.898 0.6 3 1 1.80
MEJA BETON Ø8 -150
MELINTANG 20 0.7 1 0.395 5.530
T = 10 Cm

Jumlah Total 0.180 Jumlah Total 10.428 Jumlah Total 1.800

LANTAI 2
0.15 0.25 12.5 1 0.469 POKOK 5-Ø12 5 12.66 1 0.8917 56.442 12.5 0.65 1 8.13
BALOK B1
TUMPUAN
15 x 20 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 83 0.9 1 0.3950 29.625
Jumlah Total 0.469 86.068 8.125

0.15 0.25 17.1 0 0.000 POKOK 5-Ø12 5 17.26 0 0.8917 0.000 17.1 0.65 0 0.00
BALOK B2
TUMPUAN
15 x 25 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 114 0.9 0 0.3950 0.000
Jumlah Total 0.000 0.000 0.000

0.15 0.25 2.3 0 0.000 POKOK 7-Ø12 7 2.46 0 0.8917 0.000 2.3 0.65 0 0.00
BALOK B3
TUMPUAN
15 x 25 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 23 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

BALOK 0.1 0.1 5.05 0 0.000 POKOK 4-Ø8 4 5.21 0 0.3950 0.000 5.05 0.3 0 0.00
LINTEL TUMPUAN
10 x 10 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø6 -150 33.66666667 0.5 0 0.2217 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.25 3.6 0 0 POKOK 1 4-Ø12 4 3.76 0 0.8917 0.000 3.6 0.8 0 0
KOLOM K1
POKOK 2
15 / 25
SENGKANG Ø8 -150 24 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.3 3.6 0 0 POKOK 1 6-Ø12 6 3.76 0 0.8917 0.000 3.6 0.9 0 0
KOLOM K2
POKOK 2
15 / 30
SENGKANG Ø8 -150 24 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.4 4.2 0 0 POKOK 1 8-Ø12 8 4.36 0 0.8917 0.000 4.2 1.1 0 0
KOLOM K3

15 / 40
SENGKANG Ø8 -150 28 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.15 3.6 0 0 POKOK 1 4-Ø10 4 3.76 0 0.6167 0.000 3.6 0.3 0 0
KOLOM K4 POKOK 2
15 / 15
SENGKANG Ø8 -150 24 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

Bidang : 2.5 0.1 2.5 1 0.250 LAPIS ATAS Ø8 -150 17 2.6 1 0.395 17.117 2.5 2.5 1 6.25
PLAT LANTAI
2,5 x 2,5 17 2.6 1 0.395 17.117
T = 10 Cm
LAPIS BAWAH Ø8 -150 17 2.6 0 0.395 0.000
17 2.6 0 0.395 0.000
Sub Jumlah 0.250 Sub Jumlah 34.233 Sub Jumlah 6.25
Bidang : 2.6 0.1 1.8 1 0.468 LAPIS ATAS Ø8 -150 17 1.9 1 0.395 13.009 1.8 2.6 1 4.68
3.00 x 3.00 12 2.7 1 0.395 12.798

LAPIS BAWAH Ø8 -150 17 1.9 1 0.395 13.009


12 2.7 1 0.395 12.798
Sub Jumlah 0.468 Sub Jumlah 51.613 Sub Jumlah 4.68
Bidang : 3.65 0.1 1.05 0 0.000 LAPIS ATAS Ø8 -150 24 1.15 0 0.395 0.000 1.05 3.65 0 0.00
3,65 x 1,05 7 3.75 0 0.395 0.000

LAPIS BAWAH Ø8 -150 24 1.15 0 0.395 0.000


7 3.75 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
Bidang : 1 0.1 1.3 0 0.000 LAPIS ATAS Ø8 -150 7 1.4 0 0.395 0.000 1.3 1 0 0.00
1,00 x 1.30 9 1.1 0 0.395 0.000

LAPIS BAWAH Ø8 -150 7 1.4 0 0.395 0.000


9 1.1 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
Jumlah Total 0.718 Jumlah Total 85.847 Jumlah Total 10.930

PLAT CANOPY Bidang : 5 0.08 0.95 0 0.000 LAPIS ATAS Ø8 -150 33 1.05 0 0.395 0.000 0.95 5 0 0.00
+5.95 5 x 0.95 6 5.1 0 0.395 0.000
T = 8 Cm
LAPIS BAWAH Ø8 -150 33 1.05 0 0.395 0.000
6 5.1 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00

Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

LANTAI ATAP
0.15 0.3 19.5 0 0.000 POKOK 5-Ø12 5 19.66 0 0.8917 0.000 19.5 0.75 0 0.00
BALOK B1
TUMPUAN
15 x 30 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 130 0.9 0 0.3950 0.000
Jumlah Total 0.000 0.000 0.000

0.15 0.25 6.9 0 0.000 POKOK 5-Ø12 5 7.06 0 0.8917 0.000 6.9 0.65 0 0.00
BALOK B2
TUMPUAN
15 x 25 LAPANGAN
TENGAH
PEMINGGANG
SENGKANG Ø8 -150 46 0.9 0 0.3950 0.000
Jumlah Total 0.000 0.000 0.000

0.15 0.15 40 0 0.000 POKOK 4-Ø10 4 40.16 0 0.6167 0.000 40 0.45 0 0.00
BALOK RB
TUMPUAN
15/15 LAPANGAN
TENGAH
#DIV/0! PEMINGGANG
SENGKANG Ø8 -150 267 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15
0.15 0.15 1.35 0 0 POKOK 1 4-Ø12 4 1.51 0 0.8917 0.000 1.35 0.6 0 0
KOLOM KP POKOK 2
15 / 25
SENGKANG Ø8 -150 9 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

Bidang : 3.5 0.12 4.5 0 0.000 LAPIS ATAS Ø8 -150 23 4.6 0 0.395 0.000 4.5 3.5 0 0.00
PLAT LANTAI
3,5 x 4,5 30 3.6 0 0.395 0.000
T = 12 Cm
FFL +6.45 LAPIS BAWAH Ø8 -150 23 4.6 0 0.395 0.000
30 3.6 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
T = 8 cm Bidang : 1.2 0.8 3.65 0 0.000 LAPIS ATAS Ø8 -150 8 3.75 0 0.395 0.000 3.65 1.2 0 0.00
FFL +6.60 1,2 x 3,65 24 1.3 0 0.395 0.000

LAPIS BAWAH Ø8 -150 8 3.75 0 0.395 0.000


24 1.3 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
T = 8 cm Bidang : 1.35 0.8 3 0 0.000 LAPIS ATAS Ø8 -150 9 3.1 0 0.395 0.000 3 1.35 0 0.00
FFL +7.65 1,35 x 3,00 20 1.45 0 0.395 0.000

LAPIS BAWAH Ø8 -150 9 3.1 0 0.395 0.000


20 1.45 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
T = 8 cm Bidang : 0.6 0.8 3 0 0.000 LAPIS ATAS Ø8 -150 4 3.1 0 0.395 0.000 3 0.6 0 0.00
FFL +6.55 0,6 x 3 20 0.7 0 0.395 0.000

LAPIS BAWAH Ø8 -150 4 3.1 0 0.395 0.000


20 0.7 0 0.395 0.000
Sub Jumlah 0.000 Sub Jumlah 0.000 Sub Jumlah 0.00
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

BENTENG BELAKANG
GALIAN TANAH BATU KALI 0.6 0.6 20 0 0 0
PONDASI

Jumlah Total 0.000


LANTAI KERJA BATU KALI 0.8 0.05 20 0 0
BWH PONDASI

Jumlah Total 0.000

URUGAN PASIR BATU KALI 0.6 0.05 20 0 0


BWH PONDASI

Jumlah Total 0.000


LUAS
PONDASI 0.3 0.6 20 0 5.4
BATU KALI
Jumlah Total 5.400

0.2 0.3 20 0 0.000 POKOK 4Ø10 4 20.16 0 0.6167 0.000 20 0.6 0 0.00
SLOOF - 1
TUMPUAN
20 / 30 LAPANGAN
SENGKANG Ø8 -150 133.33 0.7 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
0.15 0.15 2.4 0 0 POKOK 1 4-Ø10 4 2.56 0 0.6167 0.000 2.4 0.3 0 0
KOLOM K4 POKOK 2
15 / 15
SENGKANG Ø8 -150 16 0.5 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000

0.15 0.15 20 0 0.000 POKOK 4-Ø10 4 20.16 0 0.6167 0.000 20 0.45 0 0.00
BALOK RB
TUMPUAN
15/15 LAPANGAN
SENGKANG Ø8 -150 133 0.9 0 0.3950 0.000
Jumlah Total 0.000 Jumlah Total 0.000 Jumlah Total 0.000
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEKERJAAN PEMBANGUNAN POS JAGA DI AREA BUNDARAN SUKARAJA
LOKASI : SUKARAJA
TAHUN ANGGARAN : 2020

JUMLAH
NO URAIAN PEKERJAAN TOTAL
(RP.)

I. PEKERJAAN PERSIAPAN Rp 1,081,090.00

II. PEKERJAAN TANAH & PONDASI Rp 3,162,372.40 6.25

III. PEKERJAAN STRUKTUR BETON Rp 13,828,318.24

IV. PEK. PASANGAN DINDING & PLESTERAN Rp 2,804,584.63

V. PEKERJAAN KUSEN Rp 1,725,000.00

VI. PEKERJAAN PENUTUP LANTAI Rp 3,174,815.97

VII. PEKERJAAN PLAFOND Rp 534,059.62

VIII. PEKERJAAN PENGECATAN Rp 1,058,846.15

IX. PEKERJAAN ATAP Rp 511,206.29

X. PEKERJAAN ELETRIKAL Rp 1,145,822.50

XI. PEKERJAAN MEKANIKAL Rp 3,101,791.55

XII. PEKERJAAN LAIN-LAIN Rp 5,967,675.11

JUMLAH Rp 38,095,582.46 HARGA PEMBANGUNAN RUMAH Rp 32,127,907.35

PPN (10%) Rp 3,809,558.25 Rp 32,127,000.00

JUMLAH + PPN Rp 41,905,140.71 SIPILNYA SAJA Rp 27,152,972.79

DIBULATKAN Rp 41,905,000.00

JUMLAH TOTAL Rp 41,905,000.00 HARGA /M2 RUMAH Rp 5,140,320.00

HARGA /M2 Rp 5,140,320.00


Terbilang :

bogor, november 2020


Dibuat Oleh :
Perencana
RINCIAN
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEKERJAAN PEMBANGUNAN POS JAGA DI AREA BUNDARAN SUKARAJA
LOKASI : SUKARAJA
TAHUN ANGGARAN : 2020

JUMLAH
HARGA SATUAN
N0 URAIAN PEKERJAAN VOLUME SAT HARGA
(RP.) (RP.)
1 2 3 4 5 6=5x3

I. PEKERJAAN PERSIAPAN
1 Pas. Bowplank dan Pengukuran Site 12.00 m1 19,757.50 237,090.00
2 Pembuatan Direksi Keet & Bedeng Kerja - ls 3,191,772.50 -
3 Pengadaan Listrik & Air Bersih 1.00 Ls 700,000.00 700,000.00
5 Pembersihan lahan 12.00 m2 12,000.00 144,000.00
Jumlah - I 1,081,090.00
II. PEKERJAAN TANAH & PONDASI
1 Pek. Galian Tanah Pondasi Batu Kali dan Sloof 5.38 m3 86,400.00 464,400.00
2 Pek. Cerucuk Dolken 12.00 m' 10,100.00 121,200.00
3 Pek. Lantai Kerja Pondasi Telapak 0.26 m3 645,400.00 165,222.40
4 Pek. Pondasi Batu Kali 1:5 4.50 m3 535,900.00 2,411,550.00
Jumlah - II 3,162,372.40
III. PEKERJAAN STRUKTUR BETON
1 Pekerjaan Sloof Beton ( SL-1 ) 15/20
- Cor Beton K-225 0.38 M³ 961,490.00 360,558.75
- Tulangan 106.39 Kg 11,780.00 1,253,234.93
- Bekisting 5.00 M² 97,800.00 489,000.00
2 Pekerjaan Kolom Beton K4 15/15
- Cor Beton K-225 0.61 M³ 961,490.00 584,105.17
- Tulangan 65.14 Kg 11,780.00 767,325.64
- Bekisting 8.10 M² 97,800.00 792,180.00
3 Pekerjaan Balok Lintel Atas Kusen 10/10
- Cor Beton K-175 - M³ -
- Tulangan - Kg -
- Bekisting - M² -
4 Pekerjaan Topian / Canopy Plat Beton ( Atas Kusen FFL +2.75)
- Cor Beton K-225 0.41 M³ 961,490.00 390,557.24
- Tulangan 45.99 Kg 11,780.00 541,806.96
- Bekisting 4.06 M² 237,200.00 963,506.40
5 Pekerjaan Balok Beton B1 15/20
- Cor Beton K-225 0.47 M³ 961,490.00 450,698.44
- Tulangan 86.07 Kg 11,780.00 1,013,875.15
- Bekisting 8.13 M² 237,200.00 1,927,250.00
6 Pekerjaan Plat Lantai t=12cm
- Cor Beton K-225 0.72 M³ 961,490.00 690,349.82
- Tulangan 85.85 Kg 11,780.00 1,011,273.73
- Bekisting 10.93 M² 237,200.00 2,592,596.00
Sub Jumlah Pek. Beton 13,828,318.24
IV. PEK. PASANGAN DINDING & PLESTERAN
1 Pasangan Bata Merah Campuran 1: 3 12.25 M² 121,835.00 1,492,478.75
2 Plesteran dan Acian Dinding Acian 1 : 3 18.38 M² 56,695.00 1,041,770.63
3 Plesteran Finishing Opening / Sudut Kusen 20.55 M' 13,155.00 270,335.25
Sub Jumlah Pek. Dinding 2,804,584.63
V. PEKERJAAN KUSEN
1 Jendela Kaca Mati Clear Uk. 2230 x 1200 1.00 unit 700,000.00 700,000.00
2 Jendela Kaca Kecil Uk. 300 x 1200 2.00 unit 250,000.00 500,000.00
3 Bouven Splite Uk. 600 x 400 1.00 350,000.00 350,000.00
4 Pintu PVC 1.00 175,000.00 175,000.00
Sub Jumlah Pek. Kusen 1,725,000.00
VI. PEKERJAAN PENUTUP LANTAI
LANTAI 1
1 Urugan Pasir Bawah Lantai t=5 cm 6.93 m3 220,500.00 1,526,962.50
2 Pekerjaan Lantai Keramik 30x30 ex. Mulia 6.93 m2 146,959.00 1,017,691.08
3 Pekerjaan Lantai Keramik 25x25 Warna / Motif ( KM/WC ) 2.35 m2 136,630.00 321,080.50
LANTAI ATAP
1 Waterproofing Plat Dak Atap, Canopy 8.42 m2 36,700.00 309,081.89
Sub Jumlah Pek. Lantai 3,174,815.97
VII. PEKERJAAN PLAFOND

1 Pekerjaan Pasang Plafond Gypsum ex. A Plus + Rangka Langit Langit Hollow 4.97 m2 107,394.00 534,059.62

Sub Jumlah Pek. Plafond 534,059.62


VIII. PEKERJAAN PENGECATAN
1 Pengecatan Dinding Interior 14.15 m 2
23,150.00 327,665.10
2 Pengecatan Dinding Exterior 12.69 m2 48,680.00 617,749.20
3 Pengecatan Plafond 4.97 m2 22,810.00 113,431.85
Sub Jumlah Pek. Pengecatan 1,058,846.15
IX. PEKERJAAN ATAP
1 Screeding Plat Beton (Plat Canopy & Dak Atap) 8.42 m2 60,700.00 511,206.29
Sub Jumlah Pek. Atap 511,206.29
X. PEKERJAAN ELEKTRIKAL
LANTAI 1
1 Instalasi Titik Lampu 3.00 titik 183,770.50 551,311.50
2 Instalasi Stop Kontak 2.00 titik 183,770.50 367,541.00
5 Pasang Stop Kontak ex. Broco 2.00 bh 35,200.00 70,400.00
7 Pasang Saklar Ganda ex. Broco 1.00 bh 54,000.00 54,000.00
8 Pasang Downlight 3.00 bh 34,190.00 102,570.00
SUB TOTAL PEKERJAAN ELEKTRIKAL 1,145,822.50
XI. PEKERJAAN MEKANIKAL
LANTAI 1
1 pasang closet jongkok 1.00 Ls 180,000.00 180,000.00
2 Instalasi Air Bersih Pipa PVC AW 1/2" + Accesoris 1.00 m' 150,000.00 150,000.00
3 Instalasi Pipa Air Hujan Pipa PVC D 2" + Accesoris 1.00 m' 180,000.00 180,000.00
4 Instalasi Pipa Air Kotor Pipa PVC D 3" + Accesoris 1.00 m' 200,000.00 200,000.00
5 Pasang Kran Tembok 2.00 bh 34,400.00 68,800.00
6 Pasang Septiktank + struktur 1.00 unit 1,000,000.00 1,000,000.00
7 jet bouster 1.00 unit 172,991.55 172,991.55
8 pengadaan torn 300 ltr + pasang 1.00 bh 1,150,000.00 1,150,000.00
SUB TOTAL PEKERJAAN MEKANIKAL 3,101,791.55
XII. PEKERJAAN LAIN-LAIN
1 Pemasangan Paving Block Eksisting T =8 cm (material paving by owner) 25.25 m2 105,000.00 2,651,250.00
include abu batu & base course
2 Rolaag 1/2 Bata + plester aci
- Pas. Bata campuran 1 : 5 26.5 m2 22,600.00 598,900.00 5.30 598900
- plester aci 26.5 m2 21,565.00 571,472.50 5.30 454316
3 Cor + Aci Anak Tangga Uk. 0.8 x 3, Tebal = 7 cm (4 trap) 2.50 m2 298,421.04 746,052.61
- Cor 0.67 m3 909,630.00 611271.36
- aci 2.50 m2 21,565.00 53912.50
4 Kansten Jepit 11.20 m1 125,000.00 1,400,000.00
JUMLAH
HARGA SATUAN
N0 URAIAN PEKERJAAN VOLUME SAT HARGA
(RP.) (RP.)
1 2 3 4 5 6=5x3

SUB TOTAL PEKERJAAN LAIN-LAIN 5,967,675.11

JUMLAH TOTAL PEKERJAAN 38,095,582.46


Harga Satuan
di tik manual
BILL OF QUANTITY

PEKERJAAN PEMBANGUNAN POS JAGA DI


AREA BUNDARAN SUKARAJA

No Nama Pekerjaan Vol Sat H. Sat Total Harga


A Persiapan
¨ Mobilisasi & Demobilisasi 1.00 ls 41,675 Rp 41,675
¨ Keamanan 1.00 ls 150,000 Rp 150,000
¨ Pengukuran dan Bouwplank 1.00 ls 150,000 Rp 150,000
¨ Air & Listrik Kerja 1.00 ls 200,000 Rp 200,000
¨ Bedeng Pekerja 1.00 ls 350,000 Rp 350,000

Subtotal Rp 891,675

B Pekerjaan Tanah dan Pondasi


¨ Galian Tanah Dasar & Pondasi 6.25 m3 86,400 Rp 540,000
¨ Pasir Urug 1.22 m3 220,500 Rp 268,734
¨ Pondasi Batu Kali 4.47 m3 535,900 Rp 2,396,478
1 batu belah 1 engkel
2 pasir beton 1 engkel
3 semen 10 zak

C Pekerjaan Bangunan Pos Jaga


I Struktur
¨ Kolom 15 x 15, Tinggi 2.7 mtr 10 bh 115,000 Rp 1,150,000
1 besi 8 10 batang
2 cincin jadi u/15x15 150 bh
3 kawat benrat 2 kg
4 papan alba 3x20 25 lbr
5 paku 7 ,5,10 5 kg
6 split 1 engkel
¨ Sloof 15 x 20 12.50 m1 85,000 Rp 1,062,500
1 besi 8 13 btg
2 cincin jadi u/15x20 65 bh
3 kawat benrat 1 kg
4 papan alba 3x20 8 lbr
5 paku 7 ,5,10 2 kg
6 split

¨ Ring Balok 15 x 20 12.50 m1 90,000 Rp 1,125,000


1 besi 8 13 btg
2 cincin jadi u/15x20 65 bh
3 kawat benrat 1 kg
4 papan alba 3x20 8 lbr
5 paku 7 ,5,10 2 kg
6 split

¨ Plat Lantai, tebal 10 cm, Wiremesh M8 (1 lapis) 6.25 m2 785,000 Rp 4,906,250


1 bondex
2 wiremesh
3 pasir
4 semen
5 seplit
6
¨ Plat Lantai Dak, tebal 10 cm, Wiremesh M8 (2 lapis) 4.67 m2 1,150,000 Rp 5,372,628
¨ Plat Canopy , tebal 10 cm 3.75 m2 350,000 Rp 1,312,500
¨ Plat Canopy , tebal 10 cm 1.04 m2 650,000 Rp 674,018

Subtotal Rp 15,602,895

II Arsitektur
¨ Keramik Lantai 30 x 30, Ex. Mulia 3.90 m2 110,000 Rp 429,000
¨ Keramik Lantai 20 x 20 (WC), Ex. Mulia 1.00 m2 115,000 Rp 114,425
¨ Dinding Bata 13.42 m2 120,475 Rp 1,617,015
¨ Plester + Aci 26.84 m2 78,260 Rp 2,100,811
¨ Cat Dalam Ex. Propan 14.15 m2 21,000 Rp 297,234
¨ Cat Luar Ex. Propan 12.69 m2 44,000 Rp 558,360
¨ Screeding Dak + Canopy 8.42 m2 80,000 Rp 673,748
¨ Waterproofing Dak + Canopy 8.42 m2 80,000 Rp 673,748
¨ Plafond Gypsum 4.97 m2 93,000 Rp 462,480
¨ Cat Plafond 4.97 m2 21,950 Rp 109,155

Subtotal Rp 7,035,977

III Kusen Alumunium Pintu & Jendela


1 Jendela Kaca Mati Clear Uk. 2230 x 1200 1.00 bh 1,200,000 Rp 1,200,000
2 Jendela Kaca Kecil Uk. 300 x 1200 2.00 bh 700,000 Rp 1,400,000
3 Bouven Splite Uk. 600 x 400 1.00 bh 300,000 Rp 300,000
4 Pintu PVC 1.00 bh 215,000 Rp 215,000

Subtotal Rp 3,115,000

IV Sanitair, Instalasi Air & Plumbing


1 Closet Jongkok, Ex. Lokal 1.00 bh 230,000 Rp 230,000
2 Floor Drain Stainless 1.00 bh 60,000 Rp 60,000
3 Kran 2.00 bh 37,500 Rp 75,000
4 Dak Torn Penguin Kap. 300 Ltr 1.00 bh 700,000 Rp 700,000
5 Septic Tank 1.00 bh 850,000 Rp 850,000
6 Instalasi Pipa Air Bersih 1.00 ls 450,000 Rp 450,000
7 Instalasi Pipa Air Kotor 1.00 ls 458,000 Rp 458,000
8 Instalasi Pipa Air Hujan + Roof Drain 1.00 ls 320,000 Rp 320,000
9 Struktur GroundTank pasangan bata + tutup 1.00 ls 120,000 Rp 120,000
10 Pompa Booster 1.00 ls 650,000 Rp 650,000

Subtotal Rp 3,913,000

V Instalasi Listrik
1 Instalasi titik lampu Downlight 18W + armatur 3.00 ttk 175,300 Rp 525,900
2 Saklar Ganda 1.00 bh 65,000 Rp 65,000
3 Instalasi stop kontak + stop kontak 2.00 bh 85,000 Rp 170,000
Subtotal Rp 760,900

VI Paving Block di area Pos Jaga


1 Pemasangan Paving Block Eksisting T =8 cm (material pa 25.25 m2 105,000 Rp 2,651,250
include abu batu & base course
2 Kansten Jepit 11.20 m' 125000 Rp 1,400,000
3 Rollag Bata Jepit 1/2 Bata + Plaster Aci 26.50 m' 40000 Rp 1,060,000
4 Cor + Aci Anak Tangga Uk. 0.8 x 3, Tebal = 7 cm (4 trap) 2.50 m2 320000 Rp 800,000

Subtotal Rp 5,911,250

TOTAL Rp 38,833,303
PPN 10% Rp 3,883,330
GRAND TOTAL Rp 42,716,633
LISA HARGA SATUAN PEKERJAAN
SNI EDISI REVISI 2008

Harga Jumlah Harga Jumlah Harga Jumlah Harga


NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )

A. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.1 1 m1 Pek. pengukuran dan pemasangan Bowplank
Kayu Klas II & III M3 0.0120 1,650,000.00 19,800.00
Bahan Paku 5cm- 7cm Kg 0.0200 14,000.00 280.00
Kayu Papan 3/20 cm Klas II/Klas III M3 0.0070 1,650,000.00 11,550.00
Pekerja Oh 0.1000 60,000.00 6,000.00
Tukang Oh 0.1000 85,000.00 8,500.00
Tenaga Kepala Tukang Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 31,630.00 15,950.00 47,580.00
Keuntungan Max 10% 10% 3,163.00 1,595.00 4,758.00
Jumlah+keuntungan 34,793.00 17,545.00 52,338.00
Dibulatkan 34,700.00 17,500.00 52,300.00
2 A2 1 m2 Pekerjaan Membersihkan lapangan dan perataan
Tenaga Kerja Pekerja HOK 0.1000 60,000.00 6,000.00
Mandor HOK 0.0500 100,000.00 5,000.00
Jumlah 11,000.00 - 11,000.00
Keuntungan Max 10% 10% 1,100.00 - 1,100.00
Jumlah+keuntungan 12,100.00 - 12,100.00
Dibulatkan 12,100.00 - 12,100.00
B. PENETAPAN INDEK HARGA SATUAN PEKERJAAN GALIAN & URUGAN
Te
1 B.1 na Menggali 1 m3 tanah biasa sedalam 1 meter
ga Tukang gali OH 0.7500 60,000.00 45,000.00
Ke Mandor OH 0.0250 100,000.00 2,500.00
rja
Jumlah - 47,500.00 47,500.00
Keuntungan Max 10% 10% - 4,750.00 4,750.00
Jumlah+keuntungan - 52,250.00 52,250.00
Dibulatkan - 52,200.00 52,200.00
2 B.2 Membuang 1 m3 tanah sejauh 15 meter
Tenaga Kerja Tukang gali OH 0.3300 85,000.00 28,050.00
Mandor OH 0.0100 100,000.00 1,000.00
Jumlah - 29,050.00 29,050.00
Keuntungan Max 10% 10% - 2,905.00 2,905.00
Jumlah+keuntungan - 31,955.00 31,955.00
Dibulatkan - 31,900.00 31,900.00
3 B.3 Mengurug 1 m3 pasir urug
Bahan Pasir Urug OH 1.2000 115,000.00 138,000.00
Tenaga Kerja Pekerja OH 0.3000 60,000.00 18,000.00
Mandor OH 0.0100 100,000.00 1,000.00
Jumlah 138,000.00 19,000.00 157,000.00
Keuntungan Max 10% 10% 13,800.00 1,900.00 15,700.00
Jumlah+keuntungan 151,800.00 20,900.00 172,700.00
Dibulatkan 151,800.00 20,900.00 172,700.00
4 B.4 Mengurug 1m3 Urugan tanah kembali
Tenaga Pekerja OH 0.1920 60,000.00 11,520.00
Mandor OH 0.0190 100,000.00 1,900.00
Jumlah - 13,420.00 13,420.00
Keuntungan Max 10% 10% - 1,342.00 1,342.00
Jumlah+keuntungan - 14,762.00 14,762.00
Dibulatkan - 14,700.00 14,700.00
C. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PONDASI
1 C.1 Memasang 1m3 pondasi batu belah,campuran 1PC : 3PP
Batu belah 15 cm/20 cm M³ 1.2000 130,000.00 156,000.00
Bahan Portland Cement Kg 202.0000 1,360.00 274,720.00
Pasir Pasang M³ 0.4850 145,000.00 70,325.00
Pekerja OH 1.5000 60,000.00 90,000.00
Tenaga KerjaTukang batu OH 0.7500 85,000.00 63,750.00
Kepala tukang OH 0.0750 95,000.00 7,125.00
Mandor OH 0.0750 100,000.00 7,500.00
Jumlah 501,045.00 168,375.00 669,420.00
Keuntungan Max 10% 10% 50,104.50 16,837.50 66,942.00
Jumlah+keuntungan 551,149.50 185,212.50 736,362.00
Dibulatkan 551,100.00 185,200.00 736,300.00
2 C.2 Memasang 1m3 pondasi batu belah,campuran 1PC : 5PP
Batu belah 15 cm/20 cm M³ 1.2000 130,000.00 156,000.00
Bahan Portland Cement Kg 136.0000 1,360.00 184,960.00
Pasir Pasang M³ 0.5440 145,000.00 78,880.00
Pekerja OH 1.5000 60,000.00 90,000.00
Tenaga Kerja Tukang batu OH 0.7500 85,000.00 63,750.00
Kepala tukang OH 0.0750 95,000.00 7,125.00
Mandor OH 0.0750 100,000.00 7,500.00
Jumlah 419,840.00 168,375.00 588,215.00
Keuntungan Max 10% 10% 41,984.00 16,837.50 58,821.50
Jumlah+keuntungan 461,824.00 185,212.50 647,036.50
Dibulatkan 461,800.00 185,200.00 647,000.00

Page 53 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
3 C.3 Memasang 1m3 batu kosong (anstamping)
Bahan Batu belah 15 cm/20 cm M³ 1.2000 130,000.00 156,000.00
Pasir Urug M³ 0.4320 115,000.00 49,680.00
Pekerja OH 0.7800 60,000.00 46,800.00
Tenaga kerja Tukang batu OH 0.3900 85,000.00 33,150.00
Kepala tukang OH 0.0390 95,000.00 3,705.00
Mandor OH 0.0390 100,000.00 3,900.00
Jumlah 205,680.00 87,555.00 293,235.00
Keuntungan Max 10% 10% 20,568.00 8,755.50 29,323.50
Jumlah+keuntungan 226,248.00 96,310.50 322,558.50
Dibulatkan 226,200.00 96,300.00 322,500.00
D. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KAYU
1 D.1 Membuat dan memasang 1m2 pintu panel kayu kelas l atau ll
papan kayu M3 0.0400 4,950,000.00 198,000.00
Bahan paku 5cm - 7 cm Kg 0.5000 14,000.00 7,000.00
pekerja OH 1.0000 60,000.00 60,000.00
Tukang OH 3.0000 85,000.00 255,000.00
Tenaga kerja kepala tukang OH 0.3000 95,000.00 28,500.00
mandor OH 0.0500 100,000.00 5,000.00
Jumlah 205,000.00 348,500.00 553,500.00
Keuntungan Max 10% 10% 20,500.00 34,850.00 55,350.00
Jumlah+keuntungan 225,500.00 383,350.00 608,850.00
Dibulatkan 225,500.00 383,300.00 608,800.00
2 D.2 Membuat 1m pintu plywood rangkap ,rangka expose kayu kelas l atau ll
Papan kayu M3 0.0256 4,086,700.00 104,619.52
Bahan Paku 1cm - 2.5 cm Kg 0.0300 14,000.00 420.00
Lem kayu kg 0.5000 21,300.00 10,650.00
Plywood tebal 4mm uk. (90x220)cm Lbr 1.0000 50,000.00 50,000.00
Pekerja OH 0.8000 60,000.00 48,000.00
tenaga kerja Tukang OH 2.4000 85,000.00 204,000.00
kepala tukang OH 0.2400 95,000.00 22,800.00
Mandor OH 0.0400 100,000.00 4,000.00
Jumlah 165,689.52 278,800.00 444,489.52
Keuntungan Max 10% 10% 16,568.95 27,880.00 44,448.95
Jumlah+keuntungan 182,258.47 306,680.00 488,938.47
Dibulatkan 182,200.00 306,600.00 488,900.00
3 D.3 Memasang 1 m2 teakwood rangkap lapis formika,rangka expose kayukelas ll
Papan kayu M3 0.0250 4,086,700.00 102,167.50
Bahan Paku 1cm - 2.5 cm Kg 0.0300 14,000.00 420.00
Lem kayu Kg 0.8000 21,300.00 17,040.00
Plywood tebal 4mm uk. (90x220)cm Lebar 1.0000 50,000.00 50,000.00
Formika Lembar 0.5000 107,000.00 53,500.00
Tenaga kerja Pekerja OH 0.8500 60,000.00 51,000.00 51,000.00
Tukang OH 2.5500 85,000.00 216,750.00
kepala tukang OH 0.2550 95,000.00 24,225.00
Mandor OH 0.0430 100,000.00 4,300.00
Jumlah 274,127.50 296,275.00 570,402.50
Keuntungan Max 10% 10% 27,412.75 29,627.50 57,040.25
Jumlah+keuntungan 301,540.25 325,902.50 627,442.75
Dibulatkan 301,500.00 325,900.00 627,400.00
4 D.4 Memasang 1 m1 listplank ukuran (3x20) cm, kayu kelas l atau kelas ll
Papan kayu M3 0.0108 3,232,000.00 34,905.60
Bahan Paku 5 cm dan 7 cm Kg 0.1000 14,000.00 1,400.00
Pekerja OH 0.1000 60,000.00 6,000.00
Tukang OH 0.2000 85,000.00 17,000.00
Tenaga kerja kepala tukang OH 0.0200 95,000.00 1,900.00
Mandor OH 0.0050 100,000.00 500.00
Jumlah 36,305.60 25,400.00 61,705.60
Keuntungan Max 10% 10% 3,630.56 2,540.00 6,170.56
Jumlah+keuntungan 39,936.16 27,940.00 67,876.16
Dibulatkan 39,900.00 27,900.00 67,800.00
5 D.5 Memasang 1 m1 listplank ukuran (3x30) cm, kayu kelas l atau kelas ll
Papan kayu M3 0.0110 4,950,000.00 54,450.00
Bahan Paku 5 cm dan 7 cm Kg 0.0500 14,000.00 700.00
Pekerja OH 0.1000 60,000.00 6,000.00
Tukang OH 0.2000 85,000.00 17,000.00
Tenaga kerja kepala tukang OH 0.0200 95,000.00 1,900.00
Mandor OH 0.0050 100,000.00 500.00
Jumlah 55,150.00 25,400.00 80,550.00
Keuntungan Max 10% 10% 5,515.00 2,540.00 8,055.00
Jumlah+keuntungan 60,665.00 27,940.00 88,605.00
Dibulatkan 60,600.00 27,900.00 88,600.00
E. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BETON
1 E.1 Membuat 1 m3 beton mutu f =7,4 Mpa (K 100), slump (12 ± 2) cm,w/c =0,87
Portland Cement Kg 247.0000 1,360.00 335,920.00
Bahan Pasir Beton m3 0.6685 180,000.00 120,323.08
KR (maksimum 30 mm) m3 0.7685 170,000.00 130,638.46
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 608,381.54 133,335.00 741,716.54
Keuntungan Max 10% 10% 60,838.15 13,333.50 74,171.65
Jumlah+keuntungan 669,219.69 146,668.50 815,888.19
Dibulatkan 669,200.00 146,600.00 815,800.00
2 E.2 Membuat 1 m3 beton mutu f =9,8 Mpa (K 125), slump (12 ± 2) cm,w/c =0,78
Portland Cement Kg 276.0000 1,360.00 375,360.00
Bahan Pasir Beton m3 0.6331 180,000.00 113,953.85
KR (maksimum 30 mm) m3 0.7785 170,000.00 132,338.46
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00 8,300.00
Jumlah 776,487.31 133,335.00 909,822.31
Keuntungan Max 10% 10% 77,648.73 13,333.50 90,982.23

Page 54 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
Jumlah+keuntungan 854,136.04 146,668.50 1,000,804.54
Dibulatkan 854,100.00 146,600.00 1,000,800.00
3 E.3 Membuat 1 m3 beton mutu f =12,2 Mpa (K 150), slump (12 ± 2) cm,w/c =0,72
Portland Cement Kg 299.0000 1,360.00 406,640.00
Bahan Pasir Beton m3 0.6146 180,000.00 110,630.77
KR (maksimum 30 mm) m3 0.7823 170,000.00 132,992.31
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 671,763.08 133,335.00 805,098.08
Keuntungan Max 10% 10% 67,176.31 13,333.50 80,509.81
Jumlah+keuntungan 738,939.38 146,668.50 885,607.88
Dibulatkan 738,900.00 146,600.00 885,600.00
1 E.1 Membuat 1 m3 lantai kerja beton mutu f =7,4 Mpa (K 100), slump (3-6) cm,w/c =0,87
Portland Cement Kg 230.0000 1,360.00 312,800.00
Bahan Pasir Beton m3 0.6869 180,000.00 123,646.15
KR (maksimum 30 mm) m3 0.7900 170,000.00 134,300.00
Air Liter 200.0000 100.00 20,000.00
Pekerja OH 1.2000 60,000.00 72,000.00
Tenaga kerja Tukang OH 0.2000 85,000.00 17,000.00
kepala tukang OH 0.0200 95,000.00 1,900.00
Mandor OH 0.0600 100,000.00 6,000.00
Jumlah 590,746.15 96,900.00 687,646.15
Keuntungan Max 10% 10% 59,074.62 9,690.00 68,764.62
Jumlah+keuntungan 649,820.77 106,590.00 756,410.77
Dibulatkan 649,800.00 106,500.00 756,400.00
2 E.2 Membuat 1 m3 beton mutu f =14,5 Mpa (K 175), slump (12 ± 2) cm,w/c =0,66
Portland Cement Kg 326.0000 1,360.00 443,360.00
Bahan Pasir Beton m3 0.5846 180,000.00 105,230.77
KR (maksimum 30 mm) m3 0.7915 170,000.00 134,561.54
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 704,652.31 133,335.00 837,987.31
Keuntungan Max 10% 10% 70,465.23 13,333.50 83,798.73
Jumlah+keuntungan 775,117.54 146,668.50 921,786.04
Dibulatkan 775,100.00 146,600.00 921,700.00
3 E.3 Membuat 1 m3 beton mutu f =19,3 Mpa (K 225), slump (12 ± 2) cm,w/c =0,58
Portland Cement Kg 371.0000 1,360.00 504,560.00
Bahan Pasir Beton m3 0.5369 180,000.00 96,646.15
KR (maksimum 30 mm) m3 0.8054 170,000.00 136,915.38
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 759,621.54 133,335.00 892,956.54
Keuntungan Max 10% 10% 75,962.15 13,333.50 89,295.65
Jumlah+keuntungan 835,583.69 146,668.50 982,252.19
Dibulatkan 835,500.00 146,600.00 982,200.00
4 E.4 Membuat 1 m3 beton mutu f =21,7 Mpa (K 250), slump (12 ± 2) cm,w/c =0,56
Portland Cement Kg 384.0000 1,360.00 522,240.00
Bahan Pasir Beton m3 0.5323 180,000.00 95,815.38
KR (maksimum 30 mm) m3 0.7992 170,000.00 135,869.23
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 775,424.62 133,335.00 908,759.62
Keuntungan Max 10% 10% 77,542.46 13,333.50 90,875.96
Jumlah+keuntungan 852,967.08 146,668.50 999,635.58
Dibulatkan 852,900.00 146,600.00 999,600.00
5 E.5 Membuat 1 m3 beton mutu f =26,4 Mpa (K 300), slump (12 ± 2) cm,w/c =0,52
Portland Cement Kg 413.0000 1,360.00 561,680.00
Bahan Pasir Beton m3 0.5238 180,000.00 94,292.31
KR (maksimum 30 mm) m3 0.7854 170,000.00 133,515.38
Air Liter 215.0000 100.00 21,500.00
Pekerja OH 1.6500 60,000.00 99,000.00
Tenaga kerja Tukang OH 0.2750 85,000.00 23,375.00
kepala tukang OH 0.0280 95,000.00 2,660.00
Mandor OH 0.0830 100,000.00 8,300.00
Jumlah 810,987.69 133,335.00 944,322.69
Keuntungan Max 10% 10% 81,098.77 13,333.50 94,432.27
Jumlah+keuntungan 892,086.46 146,668.50 1,038,754.96
Dibulatkan 892,000.00 146,600.00 1,038,700.00

Page 55 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
6 E.6 Pembesian 1 kg dengan besi atau besi ulir
Bahan Besi beton( ulir ) Kg 1.0500 7,000.00 7,350.00
kawat beton Kg 0.0100 13,000.00 130.00
Tenaga kerja pekerja OH 0.0700 60,000.00 4,200.00
Tukang OH 0.0070 85,000.00 595.00
Kepala tukang OH 0.0007 95,000.00 66.50
Mandor OH 0.0004 100,000.00 40.00
Jumlah 7,480.00 4,901.50 12,381.50
Keuntungan Max 10% 10% 748.00 490.15 1,238.15
Jumlah+keuntungan 8,228.00 5,391.65 13,619.65
Dibulatkan 8,200.00 5,300.00 13,600.00
F. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BEKISTING/CETAKAN BETON
1 F.1 Memasang 1 m2 Bekisting Pondasi
Bahan Kayu kelas III M3 0.0400 1,100,000.00 44,000.00
Paku 5 cm- 10 cm Kg 0.3000 14,000.00 4,200.00
Minyak bekisting Liter 0.1000 4,500.00 450.00
Pekerja OH 0.5200 60,000.00 31,200.00
Tenaga kerja Tukang OH 0.2600 85,000.00 22,100.00
Kepala tukang OH 0.0260 95,000.00 2,470.00
Mandor OH 0.0260 100,000.00 2,600.00
Jumlah 48,650.00 58,370.00 107,020.00
Keuntungan Max 10% 10% 4,865.00 5,837.00 10,702.00
Jumlah+keuntungan 53,515.00 64,207.00 117,722.00
Dibulatkan 53,500.00 64,200.00 117,700.00
2 F.2 Memasang 1m2 Bekisting untuk sloof
Bahan Kayu kelas III M3 0.0400 1,100,000.00 44,000.00
Paku 5 cm- 10 cm Kg 0.3000 14,000.00 4,200.00
Minyak bekisting Liter 0.1000 4,500.00 450.00
Tenaga kerja Pekerja OH 0.5200 60,000.00 31,200.00
Tukang OH 0.2600 85,000.00 22,100.00
Kepala tukang OH 0.0260 95,000.00 2,470.00
Mandor OH 0.0260 100,000.00 2,600.00
Jumlah 48,650.00 58,370.00 107,020.00
Keuntungan Max 10% 10% 4,865.00 5,837.00 10,702.00
Jumlah+keuntungan 53,515.00 64,207.00 117,722.00
Dibulatkan 53,500.00 64,200.00 117,700.00
3 F.3 Memasang 1m2 Bekisting untuk Kolom 2 x Pakai
Bahan Kayu kelas III m3 0.0200 1,100,000.00 22,000.00
Paku 5 cm-12cm kg 0.2000 14,000.00 2,800.00
Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas II m3 0.0075 3,232,000.00 24,240.00
Plywood Tebal 9mm Lbr 0.1750 104,000.00 18,200.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 1.0000 19,500.00 19,500.00
Tenaga kerja Pekerja OH 0.6600 60,000.00 39,600.00
Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 87,640.00 74,085.00 161,725.00
Keuntungan Max 10% 10% 8,764.00 7,408.50 16,172.50
Jumlah+keuntungan 96,404.00 81,493.50 177,897.50
Dibulatkan 96,400.00 81,400.00 177,800.00
4 F.4 Memasang 1m2 bekisting untuk balok 2x Pakai
Bahan Kayu kelas III m3 0.0200 1,100,000.00 22,000.00
Paku 5 cm-12cm kg 0.2000 14,000.00 2,800.00
Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas II m3 0.0090 3,232,000.00 29,088.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 1.0000 19,500.00 19,500.00
Tenaga kerja Pekerja OH 0.6600 60,000.00 39,600.00
Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 110,688.00 74,085.00 184,773.00
Keuntungan Max 10% 10% 11,068.80 7,408.50 18,477.30
Jumlah+keuntungan 121,756.80 81,493.50 203,250.30
Dibulatkan 121,700.00 81,400.00 203,200.00
5 F.5 Memasang 1m2 bekisting untuk plat lantai
Bahan Kayu kelas III m3 0.0200 1,100,000.00 22,000.00
Paku 5 cm-12cm kg 0.4000 14,000.00 5,600.00
Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas ll m3 0.0075 3,232,000.00 24,240.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 3.0000 19,500.00 58,500.00
Tenaga kerja Pekerja OH 0.6600 60,000.00 39,600.00
Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 147,640.00 74,085.00 221,725.00
Keuntungan Max 10% 10% 14,764.00 7,408.50 22,172.50
Jumlah+keuntungan 162,404.00 81,493.50 243,897.50
Dibulatkan 162,400.00 81,400.00 243,800.00

Page 56 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
6 F.6 Memasang 1m2 bekisting untuk dinding
Kayu kelas lll m3 0.0300 1,100,000.00 33,000.00
Paku 5 cm-12cm kg 0.4000 14,000.00 5,600.00
Bahan Minyak bekisting Liter 0.2000 4,500.00 900.00
Balok kayu kelas ll m3 0.0200 3,232,000.00 64,640.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 3.0000 19,500.00 58,500.00
Formite/penjaga jarak bekisting/spacer Buah 4.0000 2,985.60 11,942.40
Pekerja OH 0.6600 60,000.00 39,600.00
Tenaga kerja Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 210,982.40 74,085.00 285,067.40
Keuntungan Max 10% 10% 21,098.24 7,408.50 28,506.74
Jumlah+keuntungan 232,080.64 81,493.50 313,574.14
Dibulatkan 232,000.00 81,400.00 313,500.00
7 F.7 Memasang 1m2 bekisting untuk tangga
Kayu kelas lll m3 0.0300 1,100,000.00 33,000.00
Paku 5 cm-12cm kg 0.4000 14,000.00 5,600.00
Bahan Minyak bekisting Liter 0.1500 4,500.00 675.00
Balok kayu kelas ll m3 0.0150 3,232,000.00 48,480.00
Plywood Tebal 9mm Lbr 0.3500 104,000.00 36,400.00
Dolken kayu galam,Ø (8-10) cm , Pjng 4 m Batang 2.0000 19,500.00 39,000.00
Pekerja OH 0.6600 60,000.00 39,600.00
Tenaga kerja Tukang OH 0.3300 85,000.00 28,050.00
Kepala tukang OH 0.0330 95,000.00 3,135.00
Mandor OH 0.0330 100,000.00 3,300.00
Jumlah 163,155.00 74,085.00 237,240.00
Keuntungan Max 10% 10% 16,315.50 7,408.50 23,724.00
Jumlah+keuntungan 179,470.50 81,493.50 260,964.00
Dibulatkan 179,400.00 81,400.00 260,900.00
G. PENETAPAN INDEK HARGA SATUAN PEKERJAAN DINDING
1 G.1 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC :3 PP
Bata merah buah 70.0000 700.00 49,000.00
Bahan Portland Cement Kg 14.3700 1,360.00 19,543.20
Pasir Pasang m3 0.0400 145,000.00 5,800.00
Tenaga Kerja Pekerja OH 0.3000 60,000.00 18,000.00
Tukang batu OH 0.1000 85,000.00 8,500.00
Kepala Tukang OH 0.0100 95,000.00 950.00
Mandor OH 0.0150 100,000.00 1,500.00
Jumlah 74,343.20 28,950.00 103,293.20
Keuntungan Max 10% 10% 7,434.32 2,895.00 10,329.32
Jumlah+keuntungan 81,777.52 31,845.00 113,622.52
Dibulatkan 81,700.00 31,800.00 113,600.00
2 G.2 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 5 PP
Bata merah buah 70.0000 700.00 49,000.00
Bahan Portland Cement Kg 9.6800 1,360.00 13,164.80
Pasir Pasang m3 0.0450 145,000.00 6,525.00
Tenaga Kerja Pekerja OH 0.3000 60,000.00 18,000.00
Tukang batu OH 0.1000 85,000.00 8,500.00
Kepala Tukang OH 0.0100 95,000.00 950.00
Mandor OH 0.0150 100,000.00 1,500.00
Jumlah 68,689.80 28,950.00 97,639.80
Keuntungan Max 10% 10% 6,868.98 2,895.00 9,763.98
Jumlah+keuntungan 75,558.78 31,845.00 107,403.78
Dibulatkan 75,500.00 31,800.00 107,400.00
3 G.3 Memasang 1 m2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
Semen Portland Kg 10.8000 1,360.00 14,688.00
Bahan Pasir Pasang M3 0.0260 145,000.00 3,770.00
Pekerja Oh 0.2500 60,000.00 15,000.00
Tenaga Kerja Tukang Batu Oh 0.2000 85,000.00 17,000.00
Kepala Tukang Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0125 100,000.00 1,250.00
Jumlah 18,458.00 35,150.00 53,608.00
Keuntungan Max 10% 10% 1,845.80 3,515.00 5,360.80
Jumlah+keuntungan 20,303.80 38,665.00 58,968.80
Dibulatkan 20,300.00 38,600.00 58,900.00
4 G.4 Memasang 1 m2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Bahan Semen Portland Kg 7.2900 1,360.00 9,914.40
Pasir Pasang M3 0.0280 145,000.00 4,060.00
Pekerja Oh 0.2500 60,000.00 15,000.00
Tenaga Kerja Tukang Batu Oh 0.2000 85,000.00 17,000.00
Kepala Tukang Batu Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0125 100,000.00 1,250.00
Jumlah 13,974.40 35,150.00 49,124.40
Keuntungan Max 10% 10% 1,397.44 3,515.00 4,912.44
Jumlah+keuntungan 15,371.84 38,665.00 54,036.84
Dibulatkan 15,300.00 38,600.00 54,000.00

Page 57 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
5 G.5 Memasang 1 m2 Aferking Beton (acian)
Bahan Semen Portland Kg 4.0000 1,360.00 5,440.00
Pekerja Oh 0.1430 60,000.00 8,580.00
Tenaga Kerja Tukang Batu Oh 0.1070 85,000.00 9,095.00
Kepala Tukang Batu Oh 0.0105 95,000.00 997.50
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 5,440.00 19,672.50 25,112.50
Keuntungan Max 10% 10% 544.00 1,967.25 2,511.25
Jumlah+keuntungan 5,984.00 21,639.75 27,623.75
Dibulatkan 5,900.00 21,600.00 27,600.00
H. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KONTRUKSI BAJA
1 H.1 Mengerjakan 1 cm pengelasan dengan las listrik
Kawat las listrik kg 0.0400 17,800.00 712.00
Bahan Solar Liter 0.0300 4,500.00 135.00
Minyak pelumas Liter 0.0040 30,000.00 120.00
Pekerja OH 0.0040 60,000.00 240.00
Tenaga Kerja Tukang besi OH 0.0020 85,000.00 170.00
Kepala Tukang OH 0.0002 95,000.00 19.00
Mandor OH 0.0002 100,000.00 20.00
Alat Sewa alat Jam 0.0170 33,000.00 561.00
Jumlah 1,528.00 449.00 1,977.00
Keuntungan Max 10% 10% 152.80 44.90 197.70
Jumlah+keuntungan 1,680.80 493.90 2,174.70
Dibulatkan 1,600.00 400.00 2,100.00
2 H.2 Memasang 1 kg besi profil
Bahan Besi profil Kg 1.1500 15,000.00 17,250.00
Pekerja OH 0.0600 60,000.00 3,600.00
Tenaga Kerja Tukang las konstruksi OH 0.0600 85,000.00 5,100.00
Kepala Tukang OH 0.0060 95,000.00 570.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 17,250.00 9,570.00 26,820.00
Keuntungan Max 10% 10% 1,725.00 957.00 2,682.00
Jumlah+keuntungan 18,975.00 10,527.00 29,502.00
Dibulatkan 18,900.00 10,500.00 29,500.00
3 H.3 Memasang 1 kg rangka kuda-kuda baja IWF
Bahan Besi baja IWF Kg 1.1500 10,000.00 11,500.00
Pekerja OH 0.0600 60,000.00 3,600.00
Tenaga Kerja Tukang las konstruksi OH 0.0600 85,000.00 5,100.00
Kepala Tukang OH 0.0060 95,000.00 570.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 11,500.00 9,570.00 21,070.00
Keuntungan Max 10% 10% 1,150.00 957.00 2,107.00
Jumlah+keuntungan 12,650.00 10,527.00 23,177.00
Dibulatkan 12,600.00 10,500.00 23,100.00
4 H.4 Mengerjakan 100 kg pekerjaan perakitan
Solar Liter 1.0000 4,500.00 4,500.00
Bahan
Minyak pelumas Liter 0.1000 30,000.00 3,000.00
Pekerja OH 0.1000 60,000.00 6,000.00
Tukang besi konstruksi OH 0.1000 85,000.00 8,500.00
Tenaga Kerja
Kepala Tukang OH 0.0010 95,000.00 95.00
Mandor OH 0.0050 100,000.00 500.00
Alat Sewa alat Jam 0.8000 - -
Jumlah 7,500.00 15,095.00 22,595.00
Keuntungan Max 10% 10% 750.00 1,509.50 2,259.50
Jumlah+keuntungan 8,250.00 16,604.50 24,854.50
Dibulatkan 8,200.00 16,600.00 24,800.00
5 H.5 Mengerjakan 1 kg pekerjaan perakitan 82.00 166.00 248.00
6 G.6 Memasang 1 m2 talang datar/jurai seng bjls 28 lebar 90 cm
Seng plat m2 1.0500 46,500.00 48,825.00
Bahan Paku skrup 1 cm-2,5 cm Kg 0.0150 21,000.00 315.00
Papan kayu kelas ll atau III m3 0.0190 4,086,700.00 77,647.30
Pekerja OH 0.2000 60,000.00 12,000.00
Tukang OH 0.4000 85,000.00 34,000.00
Tenaga Kerja
Kepala Tukang OH 0.0250 95,000.00 2,375.00
Mandor OH 0.0100 100,000.00 1,000.00
Jumlah 126,787.30 49,375.00 176,162.30
Keuntungan Max 10% 10% 12,678.73 4,937.50 17,616.23
Jumlah+keuntungan 139,466.03 54,312.50 193,778.53
Dibulatkan 139,400.00 54,300.00 193,700.00
7 H.7 Memasang 1 m2 talang ½ lingkaran D-15 cm seng plat bjls 30 lebar 45 cm
Seng plat m2 1.0500 46,500.00 48,825.00
Bahan Paku skrup 1 cm-2,5 cm Kg 0.0100 21,000.00 210.00
Besi strip Kg 0.5000 17,300.00 8,650.00
Pekerja OH 0.1500 60,000.00 9,000.00
Tukang OH 0.3000 85,000.00 25,500.00
Tenaga Kerja
Kepala Tukang OH 0.0300 95,000.00 2,850.00
Mandor OH 0.0080 100,000.00 800.00
Jumlah 57,685.00 38,150.00 95,835.00
Keuntungan Max 10% 10% 5,768.50 3,815.00 9,583.50
Jumlah+keuntungan 63,453.50 41,965.00 105,418.50
Dibulatkan 63,400.00 41,900.00 105,400.00

Page 58 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
I. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KUSEN ALUMUNIUM
1 I.1 MEMASANG KUSEN DAN DAUN PINTU TYPE P-01
Kusen Kayu Merawan Oven m' 5.5500 125,000.00 693,750.00
Daun Pintu Kayu Merawan Oven m2 2.7675 250,000.00 691,875.00
Engsel Pintu Psg 1.5000 42,000.00 63,000.00
Bahan Dan Upah Lever Handel Dekson Solid Unit 1.0000 250,000.00 250,000.00
Body Kunci + Cylinder Bh 1.0000 200,000.00 200,000.00
Upah Pasang ls 1.0000 189,862.50 189,862.50
Alat Bantu ls 1.0000 47,465.63 47,465.63
Pengecatan dengan Cat duco + Upah m2 6.6420 150,000.00 996,300.00
Jumlah 1,898,625.00 237,328.13 2,135,953.13
Keuntungan Max 10% 10% 189,862.50 23,732.81 213,595.31
Jumlah+keuntungan 2,088,487.50 261,060.94 2,349,548.44
Dibulatkan 2,088,400.00 261,000.00 2,349,500.00
2 I.2 MEMASANG KUSEN DAN DAUN PINTU TYPE P-02
Kusen Kayu Merawan Oven m' 6.4000 125,000.00 800,000.00
Daun Pintu Kayu Merawan Oven m2 1.6400 250,000.00 410,000.00
Kaca Bening 5mm m2 0.1200 65,000.00 7,800.00
Engsel Pintu Psg 1.5000 42,000.00 63,000.00
Bahan Dan Upah
Lever Handel Solid Unit 1.0000 250,000.00 250,000.00
Body Kunci + Cylinder Bh 1.0000 200,000.00 200,000.00
Upah Pasang ls 1.0000 173,080.00 173,080.00
Alat Bantu ls 1.0000 43,270.00 43,270.00
Pengecatan dengan Cat duco + Upah m2 3.9360 150,000.00 590,400.00
Jumlah 1,730,800.00 216,350.00 1,947,150.00
Keuntungan Max 10% 10% 173,080.00 21,635.00 194,715.00
Jumlah+keuntungan 1,903,880.00 237,985.00 2,141,865.00
Dibulatkan 1,903,800.00 237,900.00 2,141,800.00
4 I.4 MEMASANG KUSEN DAN DAUN PINTU TYPE PJ-01
Kusen Kayu Merawan Oven m' 8.2000 125,000.00 1,025,000.00
Daun Pintu Kayu Merawan Oven m2 1.6400 250,000.00 410,000.00
Daun Jendela Merawan Oven m2 0.3456 250,000.00 86,400.00
Engsel Pintu Psg 4.5000 42,000.00 189,000.00
Bahan Dan Upah Lever Handel Belleza Unit 1.0000 180,000.00 180,000.00
Body Kunci + Cylinder Bh 1.0000 125,000.00 125,000.00
Kaca Polos 5 mm m2 7.8440 65,000.00 509,860.00
Upah Pasang ls 1.0000 252,526.00 252,526.00
Alat Bantu ls 1.0000 63,131.50 63,131.50
Pengecatan dengan Cat duco + Upah m2 4.7654 150,000.00 714,816.00
Jumlah 2,525,260.00 1,030,473.50 3,555,733.50
Keuntungan Max 10% 10% 252,526.00 103,047.35 355,573.35
Jumlah+keuntungan 2,777,786.00 1,133,520.85 3,911,306.85
Dibulatkan 2,777,700.00 1,133,500.00 3,911,300.00
5 I.5 MEMASANG KUSEN DAN DAUN PINTU TYPE PJ-02
Kusen Aluminium Natural 4" m' 14.6500 95,000.00 1,391,750.00
Daun Pintu Aluminium Natural m' 5.4000 95,000.00 513,000.00
Rel Pintu Geser (Henderson) set 1.0000 350,000.00 350,000.00
Handle Pintu Geser Unit 1.0000 225,000.00 225,000.00
Body Kunci + Cylinder Pintu Geser Bh 1.0000 185,000.00 185,000.00
Kaca Polos 5 mm m2 3.7680 65,000.00 244,920.00
Bahan Dan Upah
Sealent M' 20.0400 5,000.00 100,200.00
List Karet m' 33.7200 6,500.00 219,180.00
Paku Skrup Bh 14.0000 2,000.00 28,000.00
Pisher m2 14.0000 2,000.00 28,000.00
Upah Pasang ls 1.0000 328,505.00 328,505.00
Alat Bantu ls 1.0000 82,126.25 82,126.25
Jumlah 3,285,050.00 410,631.25 3,695,681.25
Keuntungan Max 10% 10% 328,505.00 41,063.13 369,568.13
Jumlah+keuntungan 3,613,555.00 451,694.38 4,065,249.38
Dibulatkan 3,613,500.00 451,600.00 4,065,200.00
8 I.8 MEMASANG KUSEN JENDELA TYPE J-01
Kusen Kayu Merawan Oven m' 9.6000 125,000.00 1,200,000.00
Daun Jendela Merawan Oven m' 0.8640 250,000.00 216,000.00
Kaca Polos 5 mm m2 1.7780 65,000.00 115,570.00
Engsel Jendela Psg 1.0000 75,000.00 75,000.00
Bahan Dan Upah Ramskar Jendela Belleza Psg 1.0000 65,000.00 65,000.00
List Kayu m' 1.7280 9,000.00 15,552.00
Paku 1-2cm bh 28.0000 700.00 19,600.00
Upah Pasang ls 1.0000 170,672.20 170,672.20
Alat Bantu ls 1.0000 42,668.05 42,668.05
Pengecatan dengan Cat duco + Upah m2 2.0736 150,000.00 311,040.00
Jumlah 1,706,722.00 213,340.25 1,920,062.25
Keuntungan Max 10% 10% 170,672.20 21,334.03 192,006.23
Jumlah+keuntungan 1,877,394.20 234,674.28 2,112,068.48
Dibulatkan 1,877,300.00 234,600.00 2,112,000.00

Page 59 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
J. PENETAPAN INDEK HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 J.1 Memasang 1 m2 Pasangan rangka langit - langit (60 X 60) cm kayu Borneo
Bahan Kayu Klas II/ III M3 0.0120 3,232,000.00 38,784.00
Paku Biasa 2" - 5" Kg 0.1000 14,000.00 1,400.00
Pekerja Oh 0.1500 60,000.00 9,000.00
Tenaga Kerja Tukang Oh 0.2500 85,000.00 21,250.00
Kepala Tukang Oh 0.0250 95,000.00 2,375.00
Mandor Oh 0.0750 100,000.00 7,500.00
Jumlah 40,184.00 40,125.00 80,309.00
Keuntungan Max 10% 10% 4,018.40 4,012.50 8,030.90
Jumlah+keuntungan 44,202.40 44,137.50 88,339.90
Dibulatkan 44,200.00 44,100.00 88,300.00
2 J.2 Memasang 1 m2 Pasangan rangka langit - langit hollow
hollow M2 1.0000 22,500.00 22,500.00
Bahan Gantungan Besi dia 6 Kg 0.2750 -
Assesories dan Alat Bantu ls 1.0000 1,125.00 1,125.00
Pekerja Oh 0.1500 60,000.00 9,000.00
Tenaga Kerja Tukang Oh 0.5000 85,000.00 42,500.00
Kepala Tukang Oh 0.0500 95,000.00 4,750.00
Mandor Oh 0.0080 100,000.00 800.00
Jumlah 23,625.00 57,050.00 80,675.00
Keuntungan Max 10% 10% 2,362.50 5,705.00 8,067.50
Jumlah+keuntungan 25,987.50 62,755.00 88,742.50
Dibulatkan 25,900.00 62,700.00 88,700.00
3 J.3 Memasang 1 m2 Langit-langit GRC t = 4 mm
Bahan Pelat GRC tebal 4mm Lbr 0.3470 84,000.00 29,148.00
Paku kg 0.0100 14,000.00 140.00
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang kayu Oh 0.0700 85,000.00 5,950.00
Kepala tukang kayu Oh 0.0070 95,000.00 665.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 29,288.00 8,565.00 37,853.00
Keuntungan Max 10% 10% 2,928.80 856.50 3,785.30
Jumlah+keuntungan 32,216.80 9,421.50 41,638.30
Dibulatkan 32,200.00 9,400.00 41,600.00
4 J.4 Memasang 1 m2 Langit-langit Gypsumboard 9 mm
Pelat Gypsum Board Lbr 0.3470 60,000.00 20,820.00
Bahan Plaster Board Ls 1.0000 1,041.00 1,041.00
Paku Skrup kg 0.0100 14,000.00 140.00
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang kayu Oh 0.0700 85,000.00 5,950.00
Kepala tukang kayu Oh 0.0070 95,000.00 665.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 22,001.00 8,565.00 30,566.00
Keuntungan Max 10% 10% 2,200.10 856.50 3,056.60
Jumlah+keuntungan 24,201.10 9,421.50 33,622.60
Dibulatkan 24,200.00 9,400.00 33,600.00
5 J.5 Memasang 1 m2 Langit-langit Calsiboard 9 mm
Pelat Calsi Board Lbr 0.3470 55,000.00 19,085.00
Bahan Plaster Board Ls 1.0000 1,041.00 1,041.00
Paku Skrup kg 0.0100 14,000.00 140.00
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang kayu Oh 0.0700 85,000.00 5,950.00
Kepala tukang kayu Oh 0.0070 95,000.00 665.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 20,266.00 8,565.00 28,831.00
Keuntungan Max 10% 10% 2,026.60 856.50 2,883.10
Jumlah+keuntungan 22,292.60 9,421.50 31,714.10
Dibulatkan 22,200.00 9,400.00 31,700.00
6 J.6 Memasang 1 m2 list profil plapond bahan kayu profil 4/4 kayu Kamper Banjar
Bahan Kayu Profil Kamper M1 1.0500 33,000.00 34,650.00
Paku Biasa 1/2" - 2" Kg 0.0400 14,000.00 560.00
Pekerja Oh 0.0210 60,000.00 1,260.00
Tenaga Kerja Tukang Kayu Oh 0.0210 85,000.00 1,785.00
Kepala Tukang Kayu Oh 0.0020 95,000.00 190.00
Mandor Oh 0.0010 100,000.00 100.00
Jumlah 35,210.00 3,335.00 38,545.00
Keuntungan Max 10% 10% 3,521.00 333.50 3,854.50
Jumlah+keuntungan 38,731.00 3,668.50 42,399.50
Dibulatkan 38,700.00 3,600.00 42,300.00

Page 60 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
7 J.7 Memasang 1 m2 list plafond gypsum profil
Bahan List gypsum profil m 1.0500 13,000.00 13,650.00
Tepung gypsum Kg 0.1500 3,250.00 487.50
Pekerja OH 0.0600 60,000.00 3,600.00
Tenaga Kerja Tukang kayu OH 0.0600 85,000.00 5,100.00
Kepala Tukang OH 0.0060 95,000.00 570.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 14,137.50 9,570.00 23,707.50
Keuntungan Max 10% 10% 1,413.75 957.00 2,370.75
Jumlah+keuntungan 15,551.25 10,527.00 26,078.25
Dibulatkan 15,500.00 10,500.00 26,000.00
8 J.8 Memasang 1 m2 list langit-langit kayu profil
Bahan List kayu profil m 1.0500 15,180.00 15,939.00
Paku Kg 1.0100 14,000.00 14,140.00
Pekerja OH 0.0500 60,000.00 3,000.00
Tenaga Kerja Tukang kayu OH 0.0500 85,000.00 4,250.00
Kepala Tukang OH 0.0050 95,000.00 475.00
Mandor OH 0.0030 100,000.00 300.00
Jumlah 30,079.00 8,025.00 38,104.00
Keuntungan Max 10% 10% 3,007.90 802.50 3,810.40
Jumlah+keuntungan 33,086.90 8,827.50 41,914.40
Dibulatkan 33,000.00 8,800.00 41,900.00
K. PENETAPAN INDEK HARGA SATUAN PEKERJAAN ATAP
1 K.1 Memasang 1 m2 atap genteng Metal Roof t = 0,35
Bahan Genteng Metal t = 0,3 M2 1.0000 85,000.00 85,000.00
Assesories Ls 1.0000 4,250.00 4,250.00
Pekerja Oh 0.1500 60,000.00 9,000.00
Tenaga Kerja Tukang kayu Oh 0.0750 85,000.00 6,375.00
Kepala tukang kayu Oh 0.0080 95,000.00 760.00
Mandor Oh 0.0080 100,000.00 800.00
Jumlah 89,250.00 16,935.00 106,185.00
Keuntungan Max 10% 10% 8,925.00 1,693.50 10,618.50
Jumlah+keuntungan 98,175.00 18,628.50 116,803.50
Dibulatkan 98,100.00 18,600.00 116,800.00
2 K.2 Memasang 1 m' nok genteng Metal Roof t = 0,35
Bahan Nok genteng Metal t = 0,3 M' 1.0000 45,000.00 45,000.00
Assesories Ls 1.0000 2,250.00 2,250.00
Pekerja Oh 0.4000 60,000.00 24,000.00
Tenaga Kerja Tukang kayu Oh 0.2000 85,000.00 17,000.00
Kepala tukang kayu Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0200 100,000.00 2,000.00
Jumlah 47,250.00 44,900.00 92,150.00
Keuntungan Max 10% 10% 4,725.00 4,490.00 9,215.00
Jumlah+keuntungan 51,975.00 49,390.00 101,365.00
Dibulatkan 51,900.00 49,300.00 101,300.00
3 K.3 Memasang 1 m' Pasang lisplang ukuran 3/28 cm kayu kamper
Bahan Kayu Papan Kamper M3 0.0090 4,950,000.00 44,550.00
Paku Biasa 2" - 5" Kg 0.0500 14,000.00 700.00
Pekerja Oh 0.1100 60,000.00 6,600.00
Tenaga Kerja Tukang Kayu Oh 0.2200 85,000.00 18,700.00
Kepala Tukang Kayu Oh 0.0220 95,000.00 2,090.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 45,250.00 27,890.00 73,140.00
Keuntungan Max 10% 10% 4,525.00 2,789.00 7,314.00
Jumlah+keuntungan 49,775.00 30,679.00 80,454.00
Dibulatkan 49,700.00 30,600.00 80,400.00
L. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENGECATAN/LABURAN
1 L.1 1 M2 Pengecatan bidang Besi / kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni Kg 0.2000 25,300.00 5,060.00
Plamir Kg 0.1500 27,830.00 4,174.50
Bahan Cat dasar Kg 0.1700 25,000.00 4,250.00
Cat penutup Kg 0.2600 62,617.50 16,280.55
Ampelas Lbr 0.0100 3,450.00 34.50
Kwas 3" Bh 0.0500 6,900.00 345.00
Pekerja Oh 0.1400 60,000.00 8,400.00
Tenaga Kerja Tukang cat Oh 0.0180 85,000.00 1,530.00
Kepala tukang cat Oh 0.0120 95,000.00 1,140.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 30,144.55 11,570.00 41,714.55
Keuntungan Max 10% 10% 3,014.46 1,157.00 4,171.46
Jumlah+keuntungan 33,159.01 12,727.00 45,886.01
Dibulatkan 33,100.00 12,700.00 45,800.00
2 L.2 1 M2 Pengecatan Permukaan Baja Dengan Meni Besi / Sinkromat
Cat meni Besi Kg 0.1000 25,300.00 2,530.00
Ampelas Lbr 0.0100 4,000.00 40.00
Kwas 3" Bh 0.0500 6,900.00 345.00
Pekerja Oh 0.2000 60,000.00 12,000.00
Tenaga Kerja Tukang cat Oh 0.1000 85,000.00 8,500.00
Kepala tukang cat Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 2,915.00 23,400.00 26,315.00
Keuntungan Max 10% 10% 291.50 2,340.00 2,631.50
Jumlah+keuntungan 3,206.50 25,740.00 28,946.50
Dibulatkan 3,200.00 25,700.00 28,900.00

Page 61 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
3 L.3 1 M2 Pengecatan tembok baru 1 lapis cat dasar, 2 lapis cat penutup (EXTERIOR)
Cat dasar Kg 0.2000 18,800.00 3,760.00
Bahan Cat penutup 2 x "ICI" Watershield Kg 0.2600 45,000.00 11,700.00
Ampelas Lbr 0.1000 3,450.00 345.00
Roll Cat Bh 0.0250 28,750.00 718.75
Pekerja Oh 0.0400 60,000.00 2,400.00
Tenaga Kerja Tukang cat Oh 0.1260 85,000.00 10,710.00
Kepala tukang cat Oh 0.0126 95,000.00 1,197.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 16,523.75 14,807.00 31,330.75
Keuntungan Max 10% 10% 1,652.38 1,480.70 3,133.08
Jumlah+keuntungan 18,176.13 16,287.70 34,463.83
Dibulatkan 18,100.00 16,200.00 34,400.00
4 L.4 1 M2 Pengecatan tembok baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir Kg 0.1000 18,000.00 1,800.00
Cat dasar Kg 0.1000 18,800.00 1,880.00
Bahan Cat penutup 2 x Kg 0.2600 28,500.00 7,410.00
Ampelas Lbr 0.1000 3,450.00 345.00
Roll Cat Bh 0.0250 28,750.00 718.75
Pekerja Oh 0.0400 60,000.00 2,400.00
Tenaga Kerja Tukang cat Oh 0.1260 85,000.00 10,710.00
Kepala tukang cat Oh 0.0126 95,000.00 1,197.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 12,153.75 14,807.00 26,960.75
Keuntungan Max 10% 10% 1,215.38 1,480.70 2,696.08
Jumlah+keuntungan 13,369.13 16,287.70 29,656.83
Dibulatkan 13,300.00 16,200.00 29,600.00
5 L.5 1 M2 Pengecatan plapond baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir Kg 0.1000 18,000.00 1,800.00
Cat dasar Kg 0.1000 18,800.00 1,880.00
Bahan Cat penutup 2 x Kg 0.2600 28,500.00 7,410.00
Ampelas Lbr 0.1000 3,450.00 345.00
Roll Cat Bh 0.0250 28,750.00 718.75
Pekerja Oh 0.0400 60,000.00 2,400.00
Tenaga Kerja Tukang cat Oh 0.1260 85,000.00 10,710.00
Kepala tukang cat Oh 0.0126 95,000.00 1,197.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah 12,153.75 14,807.00 26,960.75
Keuntungan Max 10% 10% 1,215.38 1,480.70 2,696.08
Jumlah+keuntungan 13,369.13 16,287.70 29,656.83

Page 62 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
Dibulatkan 13,300.00 16,200.00 29,600.00
6 L.6 1 M2 Pelaburan kayu dengan melamic
Wood Filler Kg 0.2800 31,625.00 8,855.00
Wood Stain Kg 0.4000 40,000.00 16,000.00
Melamin Sending Siller MSS 123 Kg 0.2200 40,000.00 8,800.00
Bahan ML 131 Clear Danagloss Kg 0.2200 45,000.00 9,900.00
Tiner Ltr 1.3000 20,125.00 26,162.50
Ampelas Lbr 4.0000 4,000.00 16,000.00
Kwas 3" Bh 0.5000 6,900.00 3,450.00
Alat Bantu dll Ls 1.0000 4,458.38 4,458.38
Pekerja Oh 0.4200 60,000.00 25,200.00
Tenaga Kerja Tukang cat Oh 0.3600 85,000.00 30,600.00
Kepala tukang cat Oh 0.0360 95,000.00 3,420.00
Mandor Oh 0.0210 100,000.00 2,100.00
Jumlah 93,625.88 61,320.00 154,945.88
Keuntungan Max 10% 10% 9,362.59 6,132.00 15,494.59
Jumlah+keuntungan 102,988.46 67,452.00 170,440.46
Dibulatkan 102,900.00 67,400.00 170,400.00
7 L.7 1 M2 Pelaburan kayu dengan residu
Bahan Residu Kg 0.3500 9,200.00 3,220.00
Tenaga Kerja Pekerja Oh 0.1000 60,000.00 6,000.00
Mandor Oh 0.0060 100,000.00 600.00
Jumlah 3,220.00 6,600.00 9,820.00
PPN 10% 322.00 660.00 982.00
Jumlah+PPN 3,542.00 7,260.00 10,802.00
Dibulatkan 3,500.00 7,200.00 10,800.00
8 L.8 1 M2 Laburan Waterproofing Emulsion
Waterproofimg Emulsion Kg 0.5000 50,000.00 25,000.00
Ampelas lbr 0.5000 3,450.00 1,725.00
Bahan Kwas 3" bh 0.0100 6,900.00 69.00
Pekerja Oh 0.0200 60,000.00 1,200.00
Tenaga Kerja Tukang cat Oh 0.2000 85,000.00 17,000.00
Kepala tukang cat Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 26,794.00 21,100.00 47,894.00
Keuntungan Max 10% 10% 2,679.40 2,110.00 4,789.40
Jumlah+keuntungan 29,473.40 23,210.00 52,683.40
Dibulatkan 29,400.00 23,200.00 52,600.00
9 L.9 1 M2 Laburan Waterproofing Membran sheet
Membran sheet M2 1.1000 78,650.00 86,515.00
Ampelas lbr 0.5000 3,450.00 1,725.00
Bahan Kape tembok bh 0.0100 5,750.00 57.50
Pekerja Oh 0.0200 60,000.00 1,200.00
Tenaga Kerja Tukang cat Oh 0.2000 85,000.00 17,000.00
Kepala tukang cat Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0100 100,000.00 1,000.00
Jumlah 88,297.50 21,100.00 109,397.50
Keuntungan Max 10% 10% 8,829.75 2,110.00 10,939.75
Jumlah+keuntungan 97,127.25 23,210.00 120,337.25
Dibulatkan 97,100.00 23,200.00 120,300.00
M. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING
1 M.1 Memasang 1 m2 lantai Keramik ukuran 40x40 (Motif/Corak ), campuran spesi 1 PC : 3 PP
Keramik 40x40 m2 1.0500 55,000.00 57,750.00
Bahan Portland Cement kg 14.1500 1,360.00 19,244.00
Pasir Pasang m3 0.0390 145,000.00 5,655.00
Semen warna kg 2.0000 12,000.00 24,000.00
Pekerja OH 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang Batu OH 0.3500 85,000.00 29,750.00
Kepala Tukang OH 0.0350 95,000.00 3,325.00
Mandor OH 0.0300 100,000.00 3,000.00
Jumlah 106,649.00 73,275.00 179,924.00
Keuntungan Max 10% 10% 10,664.90 7,327.50 17,992.40
Jumlah+keuntungan 117,313.90 80,602.50 197,916.40
Dibulatkan 117,300.00 80,600.00 197,900.00
2 M.2 Memasang 1 m2 lantai kerarnik 20 x 20 cm (CORAK ANTI SLIP)
Ubin keramik 20 x 20 cm M2 1.0000 51,157.75 51,157.75
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 90,724.55 73,275.00 163,999.55
Keuntungan Max 10% 10% 9,072.46 7,327.50 16,399.96
Jumlah+keuntungan 99,797.01 80,602.50 180,399.51
Dibulatkan 99,700.00 80,600.00 180,300.00

Page 63 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
3 M.3 Memasang 1 m2 dinding kerarnik 20 x 25 cm (Motif/Corak )
Ubin keramik 20 x 25 cm M2 1.0000 64,570.00 64,570.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 104,136.80 73,275.00 177,411.80
Keuntungan Max 10% 10% 10,413.68 7,327.50 17,741.18
Jumlah+keuntungan 114,550.48 80,602.50 195,152.98
Dibulatkan 114,500.00 80,600.00 195,100.00
4 M.4 Memasang 1 m2 Granit Alam Hitam
Marmer Alam Citatah Ukuran kecil M2 1.0000 1,012,000.00 1,012,000.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 1,051,566.80 73,275.00 1,124,841.80
Keuntungan Max 10% 10% 105,156.68 7,327.50 112,484.18
Jumlah+keuntungan 1,156,723.48 80,602.50 1,237,325.98
Dibulatkan 1,156,700.00 80,600.00 1,237,300.00
5 M.5 Memasang 1 m2 lantai keramik 60 x 60 cm Warna / Corak
Ubin keramik 60 x 60 cm Warna M2 1.0000 80,000.00 80,000.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 119,566.80 73,275.00 192,841.80
Keuntungan Max 10% 10% 11,956.68 7,327.50 19,284.18
Jumlah+keuntungan 131,523.48 80,602.50 212,125.98
Dibulatkan 131,500.00 80,600.00 212,100.00
6 M.6 Memasang 1 m2 lantai keramik 30 x 30 cm
Ubin keramik 30 x 30 cm M2 1.0000 38,525.00 38,525.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 78,091.80 73,275.00 151,366.80
Keuntungan Max 10% 10% 7,809.18 7,327.50 15,136.68
Jumlah+keuntungan 85,900.98 80,602.50 166,503.48
Dibulatkan 85,900.00 80,600.00 166,500.00
7 M.7 Memasang 1 m1 lantai keramik Plint 10 x 40 cm
Keramik 10 x 40 cm M' 4.0000 8,000.00 32,000.00
Bahan Semen portland Kg 1.1380 1,360.00 1,547.68
Pasir pasang M3 0.0042 145,000.00 609.00
Semen warna Kg 0.1500 12,000.00 1,800.00
Pekerja Oh 0.0620 60,000.00 3,720.00
Tenaga Kerja Tukang batu Oh 0.0350 85,000.00 2,975.00
Kepala tukang batu Oh 0.0035 95,000.00 332.50
Mandor Oh 0.0030 100,000.00 300.00
Jumlah 35,956.68 7,327.50 43,284.18
Keuntungan Max 10% 10% 3,595.67 732.75 4,328.42
Jumlah+keuntungan 39,552.35 8,060.25 47,612.60
Dibulatkan 39,500.00 8,000.00 47,600.00
8 M.8 Memasang 1 m1 lantai keramik List 7 x 30 cm
List Keramik 7 x 20 cm M' 4.0000 4,519.90 18,079.60
Bahan Semen portland Kg 0.7966 1,360.00 1,083.38
Pasir pasang M3 0.0029 145,000.00 426.30
Semen warna Kg 0.1050 12,000.00 1,260.00
Pekerja Oh 0.0434 60,000.00 2,604.00
Tenaga Kerja Tukang batu Oh 0.0245 85,000.00 2,082.50
Kepala tukang batu Oh 0.0025 95,000.00 232.75
Mandor Oh 0.0021 100,000.00 210.00
Jumlah 20,849.28 5,129.25 25,978.53
Keuntungan Max 10% 10% 2,084.93 512.93 2,597.85
Jumlah+keuntungan 22,934.20 5,642.18 28,576.38
Dibulatkan 22,900.00 5,600.00 28,500.00

Page 64 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
9 M.9 Memasang 1 m1 Stair nozing 5 x 40 cm
Stair Nozing 5 x 40 cm Bh 2.5000 10,000.00 25,000.00
Bahan Semen portland Kg 0.5690 1,360.00 773.84
Pasir pasang M3 0.0021 145,000.00 304.50
Semen warna Kg 0.0750 12,000.00 900.00
Pekerja Oh 0.0310 60,000.00 1,860.00
Tenaga Kerja Tukang batu Oh 0.0175 85,000.00 1,487.50
Kepala tukang Oh 0.0018 95,000.00 166.25
Mandor Oh 0.0015 100,000.00 150.00
Jumlah 26,978.34 3,663.75 30,642.09
Keuntungan Max 10% 10% 2,697.83 366.38 3,064.21
Jumlah+keuntungan 29,676.17 4,030.13 33,706.30
Dibulatkan 29,600.00 4,000.00 33,700.00
10 M.10 Memasang 1 m2 Lantai / Dinding Granit China, campuran spesi 1 PC : 3 PP
Granit China m2 1.0500 135,000.00 141,750.00
Bahan Portland Cement kg 12.4400 1,360.00 16,918.40
Pasir Pasang m3 0.0250 145,000.00 3,625.00
Semen warna kg 1.5000 12,000.00 18,000.00
Paku Pancing bh 2.0000 1,500.00 3,000.00
Pekerja OH 0.7200 60,000.00 43,200.00
Tenaga Kerja Tukang Batu OH 0.6500 85,000.00 55,250.00
Kepala Tukang OH 0.0650 95,000.00 6,175.00
Mandor OH 0.0350 100,000.00 3,500.00
Jumlah 183,293.40 108,125.00 291,418.40
Keuntungan Max 10% 10% 18,329.34 10,812.50 29,141.84
Jumlah+keuntungan 201,622.74 118,937.50 320,560.24
Dibulatkan 201,600.00 118,900.00 320,500.00
1 M.11 Memasang 1 m2 dinding Batu Andesit
Batu Candi 20/40 M2 1.0000 131,100.00 131,100.00
Bahan Semen portland Kg 11.3800 1,360.00 15,476.80
Pasir pasang M3 0.0420 145,000.00 6,090.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pekerja Oh 0.6200 60,000.00 37,200.00
Tenaga Kerja Tukang batu Oh 0.3500 85,000.00 29,750.00
Kepala tukang batu Oh 0.0350 95,000.00 3,325.00
Mandor Oh 0.0300 100,000.00 3,000.00
Jumlah 170,666.80 73,275.00 243,941.80
Keuntungan Max 10% 10% 17,066.68 7,327.50 24,394.18
Jumlah+keuntungan 187,733.48 80,602.50 268,335.98
Dibulatkan 187,700.00 80,600.00 268,300.00
N. PENETAPAN INDEK HARGA SATUAN PEKERJAAN SANITARY
1 N.1 Memasang I buah kloset duduk/monoblok sek Toto
Bahan Kloset duduk monoblok Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 3.3000 60,000.00 198,000.00
Tenaga Kerja Tukang batu Oh 1.1000 85,000.00 93,500.00
Kepala tukang batu Oh 0.0010 95,000.00 95.00
Mandor Oh 0.1600 100,000.00 16,000.00
Jumlah - 307,595.00 307,595.00
Keuntungan Max 10% 10% - 30,759.50 30,759.50
Jumlah+keuntungan - 338,354.50 338,354.50
Dibulatkan - 338,300.00 338,300.00
2 N.2 Memasang 1 buah kloset jongkok porselen sek. Toto
Kloset jongkok porselen Bh 1.0000 - -
Bahan Semen portland Kg 6.0000 1,360.00 8,160.00
Pasir pasang M3 0.0100 145,000.00 1,450.00
Pekerja Oh 1.0000 60,000.00 60,000.00
Tenaga Kerja Tukang batu Oh 1.5000 85,000.00 127,500.00
Kepala tukang batu Oh 1.5000 95,000.00 142,500.00
Mandor Oh 0.1600 100,000.00 16,000.00
Jumlah 9,610.00 346,000.00 355,610.00
Keuntungan Max 10% 10% 961.00 34,600.00 35,561.00
Jumlah+keuntungan 10,571.00 380,600.00 391,171.00
Dibulatkan 10,500.00 380,600.00 391,100.00
3 N.3 Memasang I buah Wastafel meja sek. Toto
Bahan Wastafel Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
4 N.4 Memasang I buah wastafel Gantung sek. Toto
Bahan Wastafel Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00

Page 65 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
5 N.5 Memasang I buah Urinoar "U 57 Type Muslim" sek. Toto
Bahan Urinoar Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
6 N.6 Memasang I buah Skat Urinal Porselin sek. Toto
Bahan Skat Urinal Porselin Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.2000 60,000.00 72,000.00
Tenaga Kerja Tukang batu Oh 1.4500 85,000.00 123,250.00
Kepala tukang batu Oh 0.1500 95,000.00 14,250.00
Mandor Oh 0.1000 100,000.00 10,000.00
Jumlah - 219,500.00 219,500.00
Keuntungan Max 10% 10% - 21,950.00 21,950.00
Jumlah+keuntungan - 241,450.00 241,450.00
Dibulatkan - 241,400.00 241,400.00
7 N.7 Memasang I buah bak mandl fibreglass volume 0,30 m3
Bahan Bak fibre glass Bh 1.0000 - -
Perlengkapan 35% dari harga bahan ls 1.0000 - -
Pekerja Oh 1.8000 60,000.00 108,000.00
Tenaga Kerja Tukang batu Oh 2.7000 85,000.00 229,500.00
Kepala tukang batu Oh 0.5400 95,000.00 51,300.00
Mandor Oh 0.1100 100,000.00 11,000.00
Jumlah - 399,800.00 399,800.00
Keuntungan Max 10% 10% - 39,980.00 39,980.00
Jumlah+keuntungan - 439,780.00 439,780.00
Dibulatkan - 439,700.00 439,700.00
8 N.8 Memasang I bh bak cuci piring stainles steel Lokal 1 Lubang
Bahan Bak cuci stainless steel Bh 1.0000 - -
Water drain+ asesories Ls 1.0000 - -
Pekerja Oh 0.0300 60,000.00 1,800.00
Tenaga Kerja Tukang batu Oh 0.3000 85,000.00 25,500.00
Kepala tukang batu Oh 0.0300 95,000.00 2,850.00
Mandor Oh 0.0015 100,000.00 150.00
Jumlah - 30,300.00 30,300.00
Keuntungan Max 10% 10% - 3,030.00 3,030.00
Jumlah+keuntungan - 33,330.00 33,330.00
Dibulatkan - 33,300.00 33,300.00
9 N.9 Memasang I bh kran diameter 3/4" atau 1/2" sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Ls 1.0000 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
10 N.10 Memasang I bh kran leher angsa diameter 3/4" atau 1/2" sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Ls 1.0000 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
11 N.11 Memasang I bh fixed shower spray sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Bh 0.0250 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
12 N.12 Memasang I bh fixed jet washer sek. Toto
Bahan Kran air Bh 1.0000 - -
Seal tape Bh 0.0250 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00

Page 66 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
13 N.13 Memasang I bh Floor drain sek. Toto
Bahan Floor drain Bh 1.0000 - -
Pekerja Oh 0.0100 60,000.00 600.00
Tenaga Kerja Tukang batu Oh 0.1000 85,000.00 8,500.00
Kepala tukang batu Oh 0.0100 95,000.00 950.00
Mandor Oh 0.0050 100,000.00 500.00
Jumlah - 10,550.00 10,550.00
Keuntungan Max 10% 10% - 1,055.00 1,055.00
Jumlah+keuntungan - 11,605.00 11,605.00
Dibulatkan - 11,600.00 11,600.00
O. PENETAPAN INDEK HARGA SATUAN PEKERJAAN INSTALASI PIPA
1 O.1 Memasang I m' pipa PVC tipe AW Ø.1/2"
Bahan Pipa PVC M' 1.2000 6,750.00 8,100.00
Perlengkapan 35% dari harga bahan Ls 1.0000 2,362.50 2,362.50
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 10,462.50 8,010.00 18,472.50
Keuntungan Max 10% 10% 1,046.25 801.00 1,847.25
Jumlah+keuntungan 11,508.75 8,811.00 20,319.75
Dibulatkan 11,500.00 8,800.00 20,300.00
2 O.2 Memasang 1 m' pipa PVC tipe AW Ø3/4"
Bahan Pipa PVC M' 1.2000 7,500.00 9,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 2,625.00 2,625.00
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 11,625.00 8,010.00 19,635.00
Keuntungan Max 10% 10% 1,162.50 801.00 1,963.50
Jumlah+keuntungan 12,787.50 8,811.00 21,598.50
Dibulatkan 12,700.00 8,800.00 21,500.00
3 O.3 Memasang I m' pipa PVC tipe AW Ø I"
Bahan Pipa PVC M' 1.2000 9,250.00 11,100.00
Perlengkapan 35% dari harga bahan Ls 1.0000 3,237.50 3,237.50
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 14,337.50 8,010.00 22,347.50
Keuntungan Max 10% 10% 1,433.75 801.00 2,234.75
Jumlah+keuntungan 15,771.25 8,811.00 24,582.25
Dibulatkan 15,700.00 8,800.00 24,500.00
4 O.4 Memasang I m' pipa PVC tipe AW diameter 1.1/2"
Bahan Pipa PVC M' 1.2000 10,608.75 12,730.50
Perlengkapan 35% dari harga bahan Ls 1.0000 3,713.06 3,713.06
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 16,443.56 8,010.00 24,453.56
Keuntungan Max 10% 10% 1,644.36 801.00 2,445.36
Jumlah+keuntungan 18,087.92 8,811.00 26,898.92
Dibulatkan 18,000.00 8,800.00 26,800.00
5 O.5 Memasang I M' pipa PVC tipe AW diameter 2"
Bahan Pipa PVC M' 1.2000 16,250.00 19,500.00
Perlengkapan 35% dari harga bahan Ls 1.0000 5,687.50 5,687.50
Pekerja Oh 0.0540 60,000.00 3,240.00
Tenaga Kerja Tukang Pipa Oh 0.0900 85,000.00 7,650.00
Kepala tukang pipa Oh 0.0090 95,000.00 855.00
Mandor Oh 0.0027 100,000.00 270.00
Jumlah 25,187.50 12,015.00 37,202.50
Keuntungan Max 10% 10% 2,518.75 1,201.50 3,720.25
Jumlah+keuntungan 27,706.25 13,216.50 40,922.75
Dibulatkan 27,700.00 13,200.00 40,900.00
6 O.6 Memasang I m' pipa PVC tipe AW diameter 2.1/2"
Bahan Pipa PVC M' 1.2000 19,406.25 23,287.50
Perlengkapan 35% dari harga bahan Ls 1.0000 6,792.19 6,792.19
Pekerja Oh 0.0360 60,000.00 2,160.00
Tenaga Kerja Tukang Pipa Oh 0.0600 85,000.00 5,100.00
Kepala tukang pipa Oh 0.0060 95,000.00 570.00
Mandor Oh 0.0018 100,000.00 180.00
Jumlah 30,079.69 8,010.00 38,089.69
Keuntungan Max 10% 10% 3,007.97 801.00 3,808.97
Jumlah+keuntungan 33,087.66 8,811.00 41,898.66
Dibulatkan 33,000.00 8,800.00 41,800.00
7 O.7 Memasang I m' pipa PVC tipe AW diameter 3
Bahan Pipa PVC M' 1.2000 35,000.00 42,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 12,250.00 12,250.00
Pekerja Oh 0.0810 60,000.00 4,860.00
Tenaga Kerja Tukang Pipa Oh 0.1350 85,000.00 11,475.00
Kepala tukang pipa Oh 0.0135 95,000.00 1,282.50
Mandor Oh 0.0041 100,000.00 410.00
Jumlah 54,250.00 18,027.50 72,277.50
Keuntungan Max 10% 10% 5,425.00 1,802.75 7,227.75
Jumlah+keuntungan 59,675.00 19,830.25 79,505.25
Dibulatkan 59,600.00 19,800.00 79,500.00

Page 67 of 75
Harga Jumlah Harga Jumlah Harga Jumlah Harga
NO. KODE Kebutuhan Sat. Indeks Satuan Bahan Upah
( Rp ) ( Rp ) ( Rp ) ( Rp )
8 O.8 Memasang 1 m' pipa PVC tipe AW diameter 4
Bahan Pipa PVC M' 1.2000 70,000.00 84,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 24,500.00 24,500.00
Pekerja Oh 0.0810 60,000.00 4,860.00
Tenaga Kerja Tukang Pipa Oh 0.1350 85,000.00 11,475.00
Kepala tukang pipa Oh 0.0135 95,000.00 1,282.50
Mandor Oh 0.0041 100,000.00 410.00
Jumlah 108,500.00 18,027.50 126,527.50
Keuntungan Max 10% 10% 10,850.00 1,802.75 12,652.75
Jumlah+keuntungan 119,350.00 19,830.25 139,180.25
Dibulatkan 119,300.00 19,800.00 139,100.00
9 O.9 Memasang 1 m' pipa PVC tipe AW diameter 6
Bahan Pipa PVC M' 1.2000 105,000.00 126,000.00
Perlengkapan 35% dari harga bahan Ls 1.0000 36,750.00 36,750.00
Pekerja Oh 0.0810 60,000.00 4,860.00
Tenaga Kerja Tukang Pipa Oh 0.1350 85,000.00 11,475.00
Kepala tukang pipa Oh 0.0135 95,000.00 1,282.50
Mandor Oh 0.0041 100,000.00 410.00
Jumlah 162,750.00 18,027.50 180,777.50
Keuntungan Max 10% 10% 16,275.00 1,802.75 18,077.75
Jumlah+keuntungan 179,025.00 19,830.25 198,855.25
Dibulatkan 179,000.00 19,800.00 198,800.00
P. PENETAPAN INDEK HARGA SATUAN PEKERJAAN SALURAN
1 P.1 Memasang 1 Unit Bak Kontrol uk.45x45 cm,tinggi 50 cm
Bahan Batu bata (0,2500 m3) bh 144.6750 700.00 101,272.50
Semen Portland Kg 77.0000 1,360.00 104,720.00
Pasir Pasang m3 0.1300 145,000.00 18,850.00
Batu kerikil m3 0.0200 170,000.00 3,400.00
Besi beton Kg 2.6000 7,000.00 18,200.00
Pasir beton m3 0.0900 180,000.00 16,200.00
Pekerja Oh 1.4200 60,000.00 85,200.00
Tenaga Kerja Tukang Oh 0.4730 85,000.00 40,205.00
Kepala tukang Oh 0.0470 95,000.00 4,465.00
Mandor Oh 0.0710 100,000.00 7,100.00
Jumlah 262,642.50 136,970.00 399,612.50
Keuntungan Max 10% 10% 26,264.25 13,697.00 39,961.25
Jumlah+keuntungan 288,906.75 150,667.00 439,573.75
Dibulatkan 288,900.00 150,600.00 439,500.00
2 P.2 Memasang 1 Unit Bak Kontrol uk.30x30 cm,tinggi 35 cm
Bahan Batu bata (0,2500 m3) bh 83.9120 700.00 58,738.40
Semen Portland Kg 44.0000 1,360.00 59,840.00
Pasir Pasang m3 0.0700 145,000.00 10,150.00
Batu kerikil m3 0.0700 170,000.00 11,900.00
Besi beton Kg 1.6000 7,000.00 11,200.00
Pasir beton m3 0.0600 180,000.00 10,800.00
Pekerja Oh 3.2000 60,000.00 192,000.00
Tenaga Kerja Tukang Oh 1.0150 85,000.00 86,275.00
Kepala tukang Oh 0.0015 95,000.00 142.50
Mandor Oh 0.0160 100,000.00 1,600.00
Jumlah 162,628.40 280,017.50 442,645.90
Keuntungan Max 10% 10% 16,262.84 28,001.75 44,264.59
Jumlah+keuntungan 178,891.24 308,019.25 486,910.49
Dibulatkan 178,800.00 308,000.00 486,900.00
3 P.3 Memasang 1 m1 Saluran Gravel U 20 cm+Pas bata
Galian Tanah m3 0.3000 52,200.00 15,660.00
Buangan tanah m3 0.1000 31,900.00 3,190.00
Lantai kerja m3 0.1250 815,800.00 101,975.00
Gravel U 30cm m' 1.0000 40,480.00 40,480.00 142,455.00
Pas.1/2 Bata add. 1 : 3 m2 0.7000 113,600.00 79,520.00
Plesteran Acia add. 1 : 3 m2 1.8000 58,900.00 106,020.00
Jumlah 346,845.00 - 346,845.00
Dibulatkan 346,800.00 - 346,800.00

Page 68 of 75
DAFTAR HARGA SATUAN BAHAN

HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m3 115,000.00
2 Pasir Pasang m3 145,000.00
3 Pasir Beton 1 m3 180,000.00
4 Batu Pecah Mesin 1/2 m3 210,000.00
5 Batu Pecah Mesin 2/3 m3 170,000.00
6 Batu Pecah Mesin 3/5 m3 135,000.00
7 Batu Pecah Mesin 5/7 m3 187,500.00
8 Batu Belah Pondasi m3 130,000.00
9 Batu Tempel Hitam m2 138,000.00
10 Batu Pinggir Beton 10 x 20 x 35 bh 11,500.00
11 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) bh 32,000.00
12 Batu Telor m3 50,094.00
9 Bata Merah Bakar Kelas I bh 700.00
10 Paving Blok Natural 8 cm m2 41,917.50
11 Paving Blok Warna 8 cm m2 51,750.00
12 Paving Blok Natural 6 cm m2 37,375.00
13 Paving Blok Warna 6 cm m2 46,000.00
14 Gras Block Natural 8 Cm m2 97,350.00
15 Gras Block Natural 10 Cm m2 110,000.00
16 Gras Block Natural 6 Cm m2 132,000.00
11 Kanstin Paving Blok m1 22,500.00
12 Semen PC Tiga Roda / 50 Kg zak 68,000.00
13 Semen PC Tiga Roda / Kg kg 1,360.00
14 Semen Putih zak 86,250.00
15 Semen Warna kg 12,000.00

B. BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA


1 Plamir Tembok kg 18,000.00
2 Cat Dasar Tembok kg 18,800.00
3 Cat Tembok ICI Exterior kg 45,000.00
4 Cat Tembok ICI Interior kg 45,000.00
5 Cat Tembok Vinilex kg 28,500.00
6 Water Profing Emulsion kg 50,000.00
7 Water Profing Membrance m1 78,650.00
8 Roll Cat Tembok bh 28,750.00
9 Kape Tembok bh 5,750.00
10 Kape Kayu bh 8,500.00
11 Kwas 3" bh 6,900.00
12 Dempul Halus / Imfra ( Wood Filler ) kg 31,625.00
13 Terpentin lt 13,800.00
14 Tiner A lt 16,400.00
15 Tiner B lt 20,125.00
16 Ampelas lbr 3,450.00
17 Ampelas halus/duco lbr 4,000.00
18 Dempul Kayu kg 27,830.00
19 Meni Kayu / Besi kg 25,300.00
20 Lem FOX kg 21,300.00
21 Lem Kuning kg 14,800.00
22 Minyak Bekisting Ltr 4,500.00
23 Air Ltr 100.00

Page 69 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
C. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Kayu Terentang m3 1,650,000.00
2 Kayu Balok Borneo Super ( Kayu kelas II ) m3 3,232,000.00
3 Kayu Papan Borneo Super m3 4,086,700.00
4 Kayu Balok Kamper Banjar m3 4,900,000.00
5 Kayu Papan Kamper Banjar m3 4,950,000.00
6 Kayu Albasia ( kayu Kelas III ) m3 1,100,000.00
7 Dolken 5 s/d 7 bt 19,500.00
8 Dolken 7 s/d 10 bt 27,000.00
9 List Jati Jabar Btg 55,000.00

D. BAHAN PENUTUP PLAFOND


1 Eternit 4 mm m2 7,590.00
2 Hardpleks 5 mm 120 x 240 lbr 84,000.00
3 Gypsum 120 x 240 t = 9 mm ex DN lbr 60,000.00
4 Calsiboard 120 x 240 t = 9 mm lbr 55,000.00
5 Gypsum Panel Motif 60 x 120 t = 9 mm set. "JAYABOARD" lbr 50,000.00
6 Acustik Amstrong 60 x 120 lbr 90,700.00
7 List profil Gypsum 10 cm m1 13,000.00
8 Plester Gybsum Rol 50,000.00
9 GRC 120 x 240 t = 4mm lbr 54,000.00

E. BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr 58,000.00
2 Triplek 4 mm 120 x 240 lbr 62,500.00
3 Triplek 4 mm Ukuran Pintu lbr 50,000.00
4 Multiplek 6 mm 120 x 240 lbr 98,000.00
5 Multiplek 9 mm 120 x 240 lbr 104,000.00
6 Teak Wood 3 mm Ukuran Pintu lbr 80,000.00
7 Teak Wood 4 mm Ukuran Pintu lbr 120,175.00
8 Formika / Melamin Ukuran Pintu lbr 107,000.00

F. BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 20 x 20 KW I DN Putih / Polos m2 43,125.00
2 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m2 51,157.75
2 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m2 52,900.00
3 Stairnosing Keramik 10/20 bh 9,600.00
4 Keramik 20 x 25 Dinding KM KW I DN Corak m2 64,570.00
5 Keramik 30 x 30 KW I DN Putih / Polos m2 38,525.00
6 Keramik 40 x 40 KW I DN Corak m2 55,000.00
7 Keramik 60 x 60 KW I DN Putih / Polos m2 80,000.00
8 Granit CHINA Ex. Eleganza setara m2 135,000.00
9 Batu Candi 20/40 m2 131,100.00
10 Batu Candi 15/30 m2 101,000.00

Page 70 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
G. BAHAN SALURAN AIR KOTOR
1 Grafel U 20 cm m1 27,830.00
2 Grafel U 30 cm m1 40,480.00
3 Buis Beton O 20 cm ( 1m' ) m1 61,750.00
4 Buis Beton O 30 cm ( 1m' ) m1 59,455.00
5 Buis Beton O 60 cm ( 1m' ) m1 75,900.00
5 Injuk kg 12,650.00

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-Rata kg 7,000.00
2 Besi Beton U-39 / U-32 Rata-Rata kg 7,000.00
3 IWF Ex DN SII kg 10,000.00
4 Besi Profil DN SII kg 15,000.00
5 Besi C Lip Chanel kg 15,000.00
6 Besi Plat Baja Tipis 2 mm s/d 5 mm kg 14,000.00
7 Besi Hollow 40x40mm @ 6mtr m1 22,500.00
8 Besi Hollow 20x40mm @ 6mtr m1 17,500.00
9 Plat Floor Deck T=0.75 mm Type A-890 (Cahaya deck) m2 115,000.00
10 Besi Beton Weirmes M-4 Uk. 2,1x5,4 "Cahaya deck" lbr 187,000.00
11 Besi Beton Weirmes M-6 Uk. 2,1x5,4 "Cahaya deck" lbr 245,000.00
12 Besi Beton Weirmes M-8 Uk. 2,1x5,4 "Cahaya deck" lbr 530,000.00
7 Kawat Beton kg 13,000.00
8 Kawat Stailess Btg 35,000.00
9 Kawat Las Listrik kg 17,800.00

Page 71 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
10 Kawat Duri m' 1,150.00
11 Seng Gelombang BJLS 28 ( 80 x 180 cm ) lbr 45,000.00
12 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) m1 32,000.00
13 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) m1 46,500.00
14 Rangka Atap Baja Ringan "Zinkalum" (Terpasang) m2 150,000.00
15 Rangka Atap Baja Ringan "Galvalum" (Terpasang) m2 135,000.00
16 Canal Baja Ringan Ukuran C.75.100 m1 20,900.00
17 Canal Baja Ringan Ukuran C.75.75 m1 17,600.00
18 Profil allumunium ''T'' m1 45,000.00
19 Hollow Alumunium 40x40 MM m1 70,000.00
20 Pasang Talang Jurai Dalam (Terpasang) m1 45,000.00
21 Rangka Pertisi / Plafond Metal Stud "Zingalum" m2 75,000.00
22 Kusen Alumunium Natural 1.3 mm t=1.3 mm ( 3" ) m1 55,000.00
23 Kusen Alumunium Warna 1.3 mm t=1.3 mm ( 3" ) m1 76,000.00
24 Daun Jendela Alumunium Natural ( Tanpa Kaca ) m1 60,000.00
25 Daun Jendela Alumunium Warna ( Tanpa Kaca ) m1 70,000.00
26 Daun Pintu Alumunium Natural ( Tanpa Kaca ) m1 70,000.00
27 Daun Pintu Alumunium Warna ( Tanpa Kaca ) m1 85,000.00
28 Jalusi Alumunium Warna m2 65,000.00
29 Panel Spandrel Aluminium m2 100,000.00
30 Kait Angin Sendok Alumunium ps 60,000.00
31 Sealant @ 200mm m' 5,000.00
32 List Karet Kaca m' 6,500.00
32 Lem Kuning ( aibond ) kg 20,000.00
33 Kunci Silinder Utama untuk pintu Aluminium bh 414,000.00
34 Body Kunci bh 75,000.00
35 Cylinder bh 125,000.00
36 Lever Handle Sek. Dekson Type LHTR - DKS - 84030 - SSS bh 250,000.00
37 Cylinder Sek. Dekson Type CYL - DKS - D 65 mm - DC - SN bh 150,000.00
38 Kunci 2 Slaag Silinder Utama Standard bh 117,000.00
39 Kunci Silinder untuk pintu Aluminium "standard Anchor asli" bh 153,700.00
40 Kunci Pintu Double Slaag bh 201,250.00
41 Kunci KM Bulat ALPHA biasa bh 74,750.00
42 Kunci Pintu besi bh 150,000.00
43 Flush Bolt Sek. Dekson Type FB - MC - 508 - NA / BA Psg 75,000.00
44 Rambucis Sek. Dekson Type CHW - 4 - RYB1C Psg 65,000.00
45 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 388,000.00
46 Engsel Pintu ps 31,625.00
47 Engsel Jendela ps 14,600.00
48 Engsel Pintu Aluminium ps 42,000.00
49 Engsel Jungkit Jendela Aluminium ps 65,000.00
50 Engsel Pintu Tanam (Floor Hinges) sek.Dorma ps 850,000.00
51 Engsel Pintu Besi (Engsel bubut) bh 50,000.00
52 Engsel Pintu Sek. Dekson Type ES - S/S - EL - 4 " X 3 " X 2 m Psg 27,000.00
53 Engsel Casement Sek. Dekson Type FS - DKS - 14" Psg 75,000.00
54 Rel Sleading Pintu Psg 300,000.00
55 Sloot Pintu Tanam/Espanolet aluminium bh 121,000.00
56 Sloot Pintu Tanam/Espanolet bh 85,000.00
57 Sloot Jendela Putar aluminium bh 35,000.00
58 Sloot Jendela bh 15,000.00
59 Kait Angin Sendok Alumunium ps 45,000.00
60 Kait Angin jendela ps 20,000.00
61 Tarikan Jendela Alumunium ps 35,500.00
62 Door Closer ps 350,000.00
63 Bingkai Kaca Frame lest Stainlessteel psg 450,000.00
64 Handle Pintu Stainlessteel Psg 350,000.00

Page 72 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
I. BAHAN KACA
1 Kaca Es 5 mm ( ASAHI ) m2 98,000.00
2 Kaca Polos 5 mm ( ASAHI ) m2 65,000.00
3 Kaca Warna Biru 5 mm ( ASAHI ) m2 260,000.00
4 Kaca Rayben 5 mm ( ASAHI ) m2 86,900.00
5 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,367,200.00
6 Kaca Float Tempered 12 mm Terpasang ( ASAHI ) m2 571,100.00
7 Kaca Polos 8 mm ( ASAHI ) m2 175,000.00
8 Kaca Tempered 8 mm ( ASAHI ) m2 347,500.00
9 Glass Block DN 20 x 20 ( Kedawung ) bh 22,900.00
10 List Karet (Assesoris Kusen/Pintu Alumunium) m1 6,500.00
11 Sticker Sanblass m2 85,000.00

J. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm kg 14,000.00
2 Paku 4 cm s/d 7 cm kg 14,000.00
3 Paku 8 cm s/d 12 cm kg 14,000.00
4 Paku Skrup kg 35,000.00
4 Duk Angker bh 17,400.00
5 Angker Mur Baut dia. 19 / Panjang 60 cm bh 47,200.00
6 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) bh 14,000.00
7 Mur Baut HTB Biasa. 19 s/d 16 ( 5 cm ) bh 8,300.00
8 Ramset/Dinabolt bh 8,300.00
9 Ring Plat t=3mm dia.1" bh 5,000.00
10 Screw Dinabolt P=25mm Bh 1,500.00
11 Pisher dia. 12 s/d 20 cm. bh 3,000.00
12 Paku Skrup. 12 s/d 20 cm. bh 1,500.00
13 Paku Skrup gybsum bh 1,000.00
14 Paku Skrup 1 1/4 dus 18,000.00
15 Paku Skrup 1 1/2 dus 12,400.00
16 Paku Skrup 5/8 dus 10,900.00
17 Paku Skrup 1/4 dus 19,000.00
18 Paku Skrup 1/6 dus 21,000.00
19 Asesories Stainlesstell bh 20,000.00

K. BAHAN MEKANIKAL
1 Besi Pipa Hitam Ø 1" t = 2 mm bt 99,100.00
2 Besi Pipa Hitam Ø 1,1/2" t = 2 mm bt 105,100.00
3 Besi Pipa Hitam Ø 2" t = 2 mm bt 138,900.00
4 Besi Pipa Hitam Ø 3" t = 2 mm bt 173,625.00
5 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt 108,800.00
6 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 153,600.00
7 Pipa GIP Medium A Ø 1" ( 6 m' ) bt 176,640.00
8 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 203,136.00
9 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 313,700.00
10 Pipa Stainlesstell Ø 1/2" ( 6 m1 ) bt 163,200.00
11 Pipa Stainlesstell A Ø 3/4" ( 6 m1 ) bt 230,400.00
12 Pipa Stainlesstell A Ø 1" ( 6 m' ) bt 264,960.00
13 Pipa Stainlesstell A Ø 1 1/4" ( 6 m1 ) bt 304,704.00
14 Pipa Stainlesstell A Ø 1 1/2" ( 6 m1 ) bt 470,550.00
15 Macam-macam Sambungan GIP Ø 1/2" bh 13,205.00
16 Macam-macam Sambungan GIP Ø 3/4" bh 13,900.00
17 Macam-macam Sambungan GIP Ø 1" bh 14,595.00
18 Macam-macam Sambungan GIP Ø 1 1/4" bh 16,054.50
19 Macam-macam Sambungan GIP Ø 1 1/2" bh 17,659.95
20 Macam-macam Sambungan GIP Ø 1 3/4" bh 19,425.95
21 Macam-macam Sambungan Stainlesstel Ø 1/2" bh 26,410.00
22 Macam-macam Sambungan Stainlesstel Ø 3/4" bh 27,800.00

Page 73 of 75
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
23 Macam-macam Sambungan Stainlesstel Ø 1" bh 29,190.00
24 Macam-macam Sambungan Stainlesstel Ø 1 1/4" bh 32,109.00
25 Macam-macam Sambungan Stainlesstel Ø 1 1/2" bh 35,319.90
26 Macam-macam Sambungan Stainlesstel Ø 1 3/4" bh 38,851.89
27 Pipa PVC Type AW. O 1/2" ( Maspion ) bt 27,000.00
28 Pipa PVC Type AW. O 3/4" (Maspion ) bt 30,000.00
29 Pipa PVC Type AW. O 1" (Maspion ) bt 37,000.00
32 Pipa PVC Type AW. O 2" ( Maspion ) bt 65,000.00
34 Pipa PVC Type AW. O 3" ( Maspion ) bt 140,000.00
35 Pipa PVC Type AW. O 4" ( Maspion ) bt 280,000.00
36 Macam-macam Sambungan Rucika O 1/2" bh 4,025.00
37 Macam-macam Sambungan Rucika O 3/4" bh 4,600.00
38 Macam-macam Sambungan Rucika O 1" bh 4,600.00
39 Macam-macam Sambungan Rucika O 1 1/4" bh 5,750.00
40 Macam-macam Sambungan Rucika O 1 1/2" bh 5,750.00
41 Macam-macam Sambungan Rucika O 1 3/4" bh 2,530.00
42 Macam-macam Sambungan Rucika O 2" bh 6,325.00
43 Macam-macam Sambungan Rucika O 2 1/2" bh 6,900.00
44 Sambungan U trap 4" bh 55,000.00
45 Sambungan Elbow 4" bh 35,000.00
46 Sambungan T 4" bh 25,000.00
47 Sambungan Sock 4" bh 20,000.00
48 Sambungan U trap 3" bh 49,500.00
49 Sambungan Elbow 3" bh 31,500.00
50 Sambungan T 3" bh 22,500.00
51 Sambungan Sock 3" bh 18,000.00
52 Lem Paralon tb 8,050.00
53 Isolatip Leideng rol 5,000.00
54 Pipa PVC 4" berlobang jenis AW. m' 39,600.00
55 Gate valve 1" bh 375,000.00
56 Gate valve 3/4" bh 318,750.00
57 Gate valve 1/2" bh 286,875.00
58 Flange socket 1" bh 165,000.00

L. BAHAN PENUTUP ATAP


1 Alumunium Foile m2 5,000.00
2 Atap Genteng Plentong pres Bakar Kw. 1 bh 1,400.00
3 Atap Genteng Plentong pres Molen Oven Kw. 1 bh 1,400.00
4 Atap Genteng Murando Glasur 18bh/m2 bh 6,700.00
5 Atap Genteng Murando Natural 18bh/m2 bh 5,200.00
2 Atap Genteng Cisangkan Type " Victoria " warna standar bh 9,020.00
3 Bubung / Nok Atas Genteng Cisangkan, warna standar bh 12,100.00
4 Listplank GRC 3/20 m' 90,000.00
5 Genteng Metal ( Rainbow Roof ) m2 85,000.00
6 Genteng Metal Hana m2 75,000.00
7 Nok Atas Metal ( Rainbow Roof ) m1 45,000.00
8 Nok Atas Metal Hana m1 55,000.00
9 Polycarbonate 6mm sek Twin lite uk. 11,8x2,5 M' m2 118,644.07

Page 74 of 75
DAFTAR HARGA SATUAN UPAH KERJA
Standard Upah

HARGA SAT
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
Rp.

1 PEKERJA 60,000 1 ORANG/HR/ 8 JAM


2 TUKANG 85,000 1 ORANG/HR/ 8 JAM
3 KEPALA TUKANG 95,000 1 ORANG/HR/ 8 JAM
4 MANDOR 100,000 1 ORANG/HR/ 8 JAM

5 OPERATOR ALAT BESAR 108,891.00 1 ORANG/HR/ 8 JAM


6 PEMBANTU OPERATOR/MEKANIK 62,223.00 1 ORANG/HR/ 8 JAM
7 SOPIR TRUCK 93,395.00 1 ORANG/HR/ 8 JAM
8 KENEK TRUCK 62,223.00 1 ORANG/HR/ 8 JAM
9 PENJAGA MALAM 70,125.00 1 ORANG/HR/ 8 JAM