Hut Working Drawings
Hut Working Drawings
0
+3050 +3050
40
5,991
Ceiling Height Ceiling Height
R 3,500 +2.800 +2.800
1,463
8,817
540
6,786 Ground Floor F.F level Ground Floor F.F level
7,000
1,660
1,676
1,660
±0.000 ±0.000
NGL NGL
400
649
12,700
29
76
9
7
3,
1,462
1500
1,500 1,500
00
,0
10
750 750
00
,0
10
ROOF: Pitch 260
3,883
3900
1,100
2,100
Roof Apex Level Roof Apex Level
+5990 +5990
Roof Apex Level Roof Apex Level Roof Apex Level Roof Apex Level
+5990 +5990 +5990 +5990
Wall Plate Level Wall Plate Level Wall Plate Level Wall Plate Level
+3050 +3050 +3050 +3050
Ground Floor Window Ground Floor Window Ground Floor Window Ground Floor Window
level level level level
+2.100 +2.100 +2.100 +2.100
Ground Floor F.F level Ground Floor F.F level Ground Floor F.F level Ground Floor F.F level
±0.000 ±0.000 ±0.000 ±0.000
NGL NGL NGL NGL
CLIENT
MR. CHIONDEGWA
PROJECT
PROPOSED
MASVINGO RURAL
HOUSE RENOVATION
AND EXPANSION
Drawing
Ground Floor (3), Elevation
0001 2320/A/A.04
GSPublisherVersion 0.0.100.100