0% found this document useful (0 votes)
15 views4 pages

Power ICR Et

Uploaded by

hailay20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views4 pages

Power ICR Et

Uploaded by

hailay20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SCC Acceptance Criteria ICR

Hybrid Power System for 156 NR Power


layering

ethio telecom: Huawei:

Signature: Signature:

Date: Date:

Page 1 of 4
Installation Completion Report

Contract Information
For ethio telecom: ETHIO TELECOM 156 NR POWER LAYERING For Huawei: 00023123001125
Specific Commercial Contract No.: Specific Commercial Contract Name:ETHIO TELECOM 156 NR POWER LAYERING
Offshore Order No.: 121848 Onshore Order No.: 121846 Offshore Order No.: Onshore Order No.:
Site Information
Region City Name
SiteName: Site ID:
Site Address Product Type:
Inspection Date: D / M / Y Installation Commencement Date: D / M / Y
Date of submitting: D / M / Y
Checking Result

The installation is completed and accepted by ethio telecom subject to the agreed checklist and quality standard.

Huawei ethio telecom


Name: Name:
Signature: Signature:
Date: Date:

Page 2 of 4
Site Power System Installation Complete Checklist
I. Power System
No. Item Pass Fail Involved (Yes/No) Level Comment
1 SHPA00A Major
2 SHPA01A Major
3 SHPA02A Major
4 SHPA03A Major
5 SHPA04A Major
6 SHPA05A Minor
7 SHPA06A Minor
8 SHPA07A Major
9 SHPA08A Major
10 SHPA09A Major
II. Battery Cabinet
No. Item Pass Fail Involved (Yes/No) Level Comment
1 SHPB00A Major
2 SHPB01A Major
3 SHPB02A Major
4 SHPB03A Major
5 SHPB04A Minor
III. Battery
No. Item Pass Fail Involved (Yes/No) Level Comment
1 SHPC00A Major
2 SHPC01A Major
3 SHPC02A Minor
4 SHPC03A Major
5 SHPC04A Minor
6 SHPC05A Major
IV. ACMB AND SCC800-C1
No. Item Pass Fail Involved (Yes/No) Level Comment
1 SHPA00A Major
2 SHPA01A Major
3 SHPA02A Minor
4 SHPA03A Major
Remark:
1. Definition:
"Major" and "Minor" express different problem levels violating the clauses in the Quality Standard. The detailed definitions are as follows:
Major problems means that the violation of this clause will severely influence the safe running of the equipment, or will affect the personal safety strictly.
Minor problems means the violation of this clause will not influence the normal running of the equipment but may have an impact on the convenience of maintenance operations, etc. It will not influence the
personal safety.
2.Conditions of Issuing ICR
1) The Installation Completion Report (ICR) shall be signed by ethio telecom without any delay when all the items for inspection are passed.
2) Any Minor problem found during the inspection will be recorded as "Pass" in the checklist and shall not affect ethio telecom to accept the installation and sign the ICR, however, such problem shall be
rectified by Huawei within an agreed period.
3) Any Major problem found during the inspection shall be recorded as "fail" in the checklist and shall be rectified by Huawei within an agreed period. The ICR shall not be signed by ethio telecom until
such rectification completed by Huawei and accepted by ethio telecom.

Page 3 of 4
The Hardware installation standards of Site Power System
I. Power System(Power Cabinet)
Item Quality Standard Measure Level
The placement position of the Rectifier Cabinet should comply with the stipulation in the design drawing and should proprly installed according to the
SHPA00A Visual check Major
standard

SHPA01A The DC Power System AIU (AC Input Unit ) inside the cabinet must be firm after installed, consistent with design Visual check Major

SHPA02A Polarity and location of connection cables are according with project design documents, correct, solid Visual check Major

SHPA03A All power cables, grounding cables must be used by copper core cable Visual check Major

SHPA04A Grounding cables and power cables of equipment are connected properly and reliable Visual check Major

SHPA05A The labels of power cable are filled in and stuck correctly and reliably. Visual check Minor

SHPA06A When connecting two or more cables to a wire pole, the cross or back-to-back installation method is generally adopted. Visual check Minor

SHPA07A SMU controller is working: Blinking green light Visual check Major

SHPA08A Rectifier Module and are working: green light is steady Visual check Major

SHPA09A Signal SPD is inside the cabinet is firm after installed and consistent with design Visual check Major

II. Battery Cabinet

SHPB00A The placement position of the (Battery Cabinet) should comply with the stipulation in the design drawing. Visual check Major

SHPB01A The appearance should be intact without abrasion.No damaged or scratched; labels on the rack are correct, clear and complete. Visual check Major

The fitting parts should be installed completely and firmly, and should not be shaky.The rack should be installed steadily, without phenomenon of shaking,
SHPB02A Visual check Major
and the door panels and side panels should be fixed tight.

SHPB03A The equipments inside are installed orderly and in specification, and the cabinet is clean and all the signs should be correct ,clear and complete Visual check Major

SHPB04A The labels of power cable are filled in and stuck correctly and reliably. Visual check Minor

III. Battery
SHPC00A No oil, no dust, no bulging, no leaking Visual check Major

SHPC01A Check the bolts of battery terminal with wrench one by one and make sure they are tighten Visual check Major

SHPC02A Batteries monitoring cables are properly conneted Visual check Minor

SHPC03A Polarity and location of connection cables are according with project design documents, correct, solid and reliable Visual check Major

SHPC04A The labels of power cable are filled in and stuck correctly and reliably. Visual check Minor

SHPC05A Check battery parameters like charging coeffiecnt, battery type and rated battery capacity are setted correctly. Visual check Major

IV. ACMB AND SCC800-C1

SHPA00A Chek whether the SCC800 Power cables are connected Proprly and the Power module are working: green light is steady. Visual check Major

SHPA01A Outdoor ACMB voltage and curent sensors are connected firmly on both sides [ ATS & ACMB sensor] Visual check Major

SHPA02A Outdoor ACMB is installed firmly installed on Pole or on the wall and is stable after installation. Visual check Minor

SHPA03A Outdoor ACMB voltage sensor and curent sensors are connected firmly & the cross or back-to-back installation method is generally adopted. Visual check Major

Remark:

Definition:

Page 4 of 4