Software crisis started in the mid of late 1960s and the early 1970s. The fields of computing
have become complex and diverse in the modern information society. The main focus of practitioners
from the computing outset was to provide solutions to the complexity barriers of producing software,
escalating software industry and the number of software users. Thus, software came into existence.
Nowadays, every small and large scale software development company is following the engineering
disciplines for developing software.
The importance of software is developed due to several reasons:
1. The dependency of business organizations on software and technology has
increased. Small and large scale organizations have automated their business processes
for increased ease and effectiveness.
2. The varying nature and skills of users and customers have widely increased on
information society. It is observed that most of the projects were unsuccessful due to
unclear requirements provided from the customer.
3. The dynamic nature of software technology forces software companies to move
towards component-based development, where components are assembled rather than
developed from scratch.
4. Software allows changes in requirements at any stage in the development process
but at maintenance stage it becomes tedious.
The ultimate goal of Software practitioners is to produce faster, better and cost-effective products.
Hence, systematic approaches are needed for the development, management, retirement, and
improvement.
Software:
Definition:
It is a collection of computer programs that when executed together with data provide
desired outcomes.
IEEE Definition:
It is a collection of computer programs, together with data, procedure, rules, and associated
documentation, which operate in a specified environment with certain constraints to provide the
desired outcomes.
Software View
• Data are the collection of facts, measurements, and statistics. Usually data are static
in nature and can exist in any form, usable or not.
• Procedures allow automating process steps, ensuring compliance, governance, and
repeatability.
• Rules are the guidelines for development, maintenance, and retirement of software.
1
• Documentation is important in understanding the software code, design, constraints,
customer needs, and specification for further maintenance.
Characteristics of Software:
2
S/W Classifications:
S/W Classification
1. System S/W:
It is a computer S/W which executes programs, transfers data between devices and
controls, and operates the computer H/W.
Ex: Device Drivers, boot program, operating systems, servers, utilities, and so on. System
S/W reduces the burden of Application programmers.
2. Application S/W:
It is designed to accomplish certain specific needs of the end user, by using the
capabilities of the system S/W.
Ex: Enterprise s/w, sale transaction s/w, Educational s/w, video editing s/w, word processing,
spreadsheet etc.
These may be available in different forms such as licensed, sold, freeware, shareware, open
source, need to be installed, run online etc.
3. Programming S/W:
Is a class of system s/w which helps programmers in writing computer programs
using different programming languages in a convenient manner.
Ex: Text Editors, Compilers, Interpreters, debuggers, linkers, and loaders etc, all in the form
of a single application called IDE-Integrated Development Environment.
4. AI S/W:
It is made to think like human beings and therefore it is useful in solving complex
problems automatically. It uses techniques or algorithms for working programs to
represent and manipulate knowledge.
Ex: Game Playing, Speech recognition, understanding natural language, robotics etc are some
AI applications.
3
5. Embedded S/W:
Type of s/w that is built in h/w systems. It is used to control, monitor or assist the
operation of equipment, machinery, or plant.
Ex: 1. Applications or Daily Life Examples- Washing M/C’s, cars, mobiles etc.
6. Engineering/Scientific S/W:
Engineering problems and quantitative analysis are carried out using automated tools.
Scientific S/W is typically used to solve mathematical functions and calculations. Computer-
Aided Design and Computer Aided Manufacturing S/W (CAD/CAM), civil engineering etc.
7. Web S/W:
These have been evolved from a simple website to search engines to web computing,
which are spread over the N/W.
Web applications are based on client-server architecture, where the client requests
information and the server stores and retrieves information from the web. Ex: Web 2.0,
HTML, PHP, search engines
8. Product-Line S/W:
It is a set of S/W systems that a common, managed set of features to satisfy the
specific needs of a particular market segment or mission. These are developed from a
common set of core asserts in a prescribed way. Product line s/w improves time to market,
productivity, quality and other business drivers. Applications: Multimedia, database s/w,
word processing etc.
Engineering Discipline:
S/W Crisis:
Software crisis, the symptoms of the problem of engineering the s/w, began to enforce the
practitioners to look into more disciplined s/w engineering approaches for s/w development.
4
The modern software crisis has some notable symptoms, which are complexity, h/w versus
s/w cost, lateness, costliness, poor quality, unmanageable nature, immaturity, lack of planning
and management practices etc.,
An important cause of s/w crisis is the complexity of s/w development process.
As programs became more complex, earlier methodologies of s/w development were no
longer useful for larger and complex projects.
Designing s/w is a labour-intensive task; hence, with a growing economy, more wages are to
be paid. Development, maintenance, change and reengineering processes require logical
thinking and labour work. Ultimately the cost of s/w is higher than the h/w cost.
The time required to develop s/w and its cost began to exceed all estimates. It is common for
the system to cost more than what had been estimated at the time of project planning
(lateness, costness).
S/W must be of high quality with respect to product operation, product transition and product
migration.
The programmers productivity must be increased.(quality)
In early days of development, change in s/w is a major problem for s/w practitioners and it
makes around 40% of the total development cost.
After changing a code, the entire s/w or subsystem needs to be tested for reliable functioning
of the system. Therefore, some systematic engineering approaches are needed for
maintenance and changes.
In the modern heterogeneous development of s/w, different people are involved in the project.
The project must be planned with the expected requirement of resources (h/w, s/w, people
etc.), cost, time and effort.
S/W crisis has inspired people to improve the processes. IT practitioners always try to follow
some formal process that can help them to produce quality products, reduce cost, and improve
team communication & morale.
There are several such problems in the s/w industry. S/w products become costly, are
delivered late, are unmanaged, have poor quality, decrease the productivity of programmers,
increase the maintenance cost and rework, and lack of nature s/w processes in a complex
project.
The solution to these s/w crises is to introduce systematic s/w engineering practices for
systematic s/w development, maintenance, operation, retirement, planning and management
of s/w.
Engineering provides a step-by-step procedure for s/w engineering i.e., project planning,
problem analysis, architecture and design, programming, testing & integration,
deployment and maintenance and project management.
These activities are performed with the help of technological tools that ease the execution
of above activities.
Management skills are necessary in a project manager to communicate and coordinate the
information and management of these activities.
5
IEEE Definition:
It
It is a set of procedures followed from the beginning to the completion of the development process.
S/W Engineering Methodologies have evolved with increasing complexities in programming and
advancements in programming technologies. Those are:
1. Exploratory Methodology:
This style of methodology is applied whenever the requirements are initially unclear.
Involves experimentation and exploring the programs through step-by-step
programming
The process of each step depends on the previous ones.
Errors are detected only during the final product testing.
2. Structure-Oriented Methodology:
Focuses on procedural approach, which concentrates on developing functions or
procedures, i.e., the programmer writes out the instructions that are followed by
computer from start to finish.
• Three basic elements are Sequence, selection and iteration.
• It uses variety of notations such as Data Flow Diagrams(DFD), CFG,ER etc.,
This approach is preferred in scripts and embedded systems with small memory
requirements with high speed.
6
• Jackson Structured Design (JSD) methodology developed by Michael Jackson in
1970 is a famous data-structure oriented methodology which explains functionality in
the real world.
4. Object-Oriented Methodology:
• Emphasizes the use of data rather than functions. Real world entities are
treated as objects.
• Data & Procedures are built around these objects.
Object involves properties & methods where
i) Properties are nothing but characteristics which define how an object
behaves.
ii) Methods are blocks of instructions that can be executed by an object itself,
and each object has its own set of methods.
5. Component-Based Methodology:
When the programming is of small context, then flow of control and data
structures are the concerns which focuses on its algorithm & data structures.
When it is of large programming context, then the major concern is about
components and their integration.
It became a significant methodology for communication among different
stakeholders and for large-scale reuse.
CBD was introduced in 21st century which is a system analysis and design
methodology that has evolved from the object-oriented Methodology.
It is largely based on its focus of reuse.
It emphasizes reuse in which components represent coherent parts of a system
that can be independently stored and assembled into S/W systems.
7
S/W Engineering Challenges:
S/W Engineering is facing a number of s/w problems since s/w crisis. The primary focus of s/w
companies is to produce quality s/w within budget and small cycle time. These s/w challenges
reflect the development and maintenance of s/w is an important issue or practitioners.
1. Problem Understanding:
Customers are from different backgrounds and they do not have a clear understanding
of their problems and requirements. Also, the customers don’t have technical
knowledge, especially those who are living in remote areas.
Similarly s/w engineers do not have the knowledge of all application domains and
detailed requirements of the problems and the expectations of the customer. The lack
of communication among s/w engineers and customers causes problems for the s/w
engineers in clearly understanding the customer needs. There are many people
involved in an organization. Therefore, it becomes difficult to find requirements from
different perspectives and customers. Sometimes the customers do not have sufficient
time to explain their problems to the development organization.
8
4. Reliability:
It is the most important quality attribute.
It is the successful operation of s/w within the specified environment and duration
under certain constraints.
Verification and Validation techniques are used to ensure the reliability ratio in the
product.
Defect detection and prevention is the prerequisite to high reliability in the product
where several automated testing tools are available for its removal.
S/W becomes unreliable due to logical errors present in the programs of the
S/W. Project complexity is the major cause of s/w unreliability.
5. Change and Maintenance:
Change and maintenance in s/w come when the s/w is delivered and deployed at the
customer site.
They occur if there is any change in the business operation, errors in the s/w, or
addition of new features.
Change in one part of the s/w requires change in other parts also. After any change
and maintenance operation, s/w is rigorously tested to keep it reliable.
As change and maintenance in S/W are flexible but very expensive, sometimes the
maintenance and rework cost becomes more than the development cost.
The challenge is to accommodate changes under controlled cost and reliability as due
to repeated maintenance and change, s/w deteriorates its operational life and quality.
Thus, to accommodate increasing requirements and streamline the modern
technology, s/w is needed to be reengineered onto a modern platform.
6. Usability and Reusability:
Usability means the ease of use of a product in terms of efficiency, effectiveness and
customer satisfaction.
S/W Engineering has always concentrated on providing a usable product by
incorporating customer suggestions and technological issues.
There are many products which came into existence but became unsuccessful due to
certain s/w design and usability issues.
Reuse of existing s/w components and their development has become institutional
business in the modern s/w business scenario.
The analysis of domain knowledge, development of reusable library, and integration
of reusable components in s/w development are some important issues in reuse-based
development.
Reusability increases reliability because reusable components are well tested before
integrating them into s/w development.
7. Repeatability and Process Maturity:
S/W development processes are procedural rules to adhere to when developing s/w.
A S/W engineering process can be repeated in similar projects, which improves
productivity and quality.
Repeatability can help to plan project schedule, fix deadlines for product delivery,
manage configuration, and identify locations of bug occurrences.
Repeatability promotes process maturity.
A Mature S/W process produces quality products and improves S/W productivity.
9
There are several standards, such as CMM, ISO and six sigma, which emphasize
process maturity and its guidelines.
8. Estimation and Planning:
Present estimation methods, such as Lines of Code (LOC), Function Point (FP), and
Object Point (OP), are sometimes unable to accurately estimate project efforts.
Most of the projects fail due to underestimation of budget and time to complete the
project.
The effectiveness of the project plan depends on the accuracy of the estimation and
understanding of the problem.
The use of an effective project planning and estimation technique is an important
challenge for the practitioners.
The rest of the project’s activities depend on estimation and planning.
Software Process:
B) Software Project: It is an entity. With defined start and, in which a S/W process is being
used. Type of the process and its execution depend on the nature of project.
C) Software Product: It is the outcome of the s/w project produced through processes. A
project can have more than one product called work products. A work product is the intermediate
outcome of the processes. But the final work product is referred to as a product or S/W.
10
ii) S/W Process Model:
It is a generic representation of a s/w process instantiated for each specific project. A
process model is a set of activities that have to be accomplished to achieve the
process objectives.
It reduces chaos of s/w development even though it is difficult to execute in
the real world as it is the idealization of the S/W process model.
A particular process model can be useful in one context and may be less
useful in another context. Thus, different process models are generally
needed o develop and understand the various aspects of projects.
These models may be related to development, management, improvement,
and maintenance.
Examples are: Data flow model, life cycle model, quality model etc.,
The generic process model has three phases that are coordinated and
supported by umbrella activities. The phases in a process model are:
1. Definition Phase:
It concentrates on understanding the problem and planning for the
process model. The activities may include problem formulation, Problem
analysis, system engineering, and project planning for the process.
2. Development Phase:
i) It focuses on determining the solution of the problem with the help of
the umbrella activities.
ii) The main activities of this phase are designing the architecture and
algorithms of the system, writing codes, and testing the S/W.
3. Implementation Phase:
Deployment, change management, defect removal, and maintenance
activities are performed in this phase.
Reengineering may take over due to the changes in the technology and
business.
The umbrella activities are responsible for ensuring the proper execution of
definition, development, and implementation phases.
The umbrella activities are project management, quality assurance,
configuration management, risk management, work products preparation &
deployment, and process improvement.
Various reviews and rigorous testing must be carried out through quality
assurance procedures.
11
iii) Elements of S/W Process:
It comprises of various essential elements. These elements are used together to produce a
product. Those are:
1. Artifacts: These are tangible work products produced during the development of s/w.
These are specified in advance in the development process so that the activity could be
performed accordingly and it can be used as raw artifacts to generate other artifacts.
Ex: S/W Architecture, Project plan etc.,
2. Activity: Specifies the tasks to be carried out implicitly or explicitly. Each activity
receives some i/p, executes the task on the laid constraints, and produces certain work
products that can be used as input for some other activity. Each activity uses some
procedures, rules, policies and guidelines to produce the required artifacts.
Ex: Analysis, Design, Tracking and Monitoring etc.,
3. Constraint: Refers to the criteria or condition that must be met or possessed by a s/w
product.
Ex: A M/C allows five users to login at a time, permits seven transaction per nanosecond
etc.
4. People: People or persons or stakeholders who are directly or indirectly involved in the
process. Stakeholders play important roles in achieving project goals.
Ex: S/W tester, quality checker etc.,
5. Tools and Technology: It provides technical support to the methods or techniques to be
used for performing the activities.
Ex: FORTRAN – Scientific problems, CASE tools – S/W development, BASIC –
business
6. Methods or Techniques: It specifies the way to perform an activity using tools and
technology to accomplish the activity. It provides detailed mechanism to carry out an
activity.
Ex: Object Oriented Analysis (OOA), binary search etc.,
7. Relationship: It specifies the link among various activities or entities. It assists in the
execution sequence of activities where the outcome of an activity can be used as an i/p to
the subsequent activity.
Ex: Maintenance followed by implementation, debugging is required after error detection
etc.,
8. Organizational structure: It specifies the team of people that should be coordinated and
managed during s/w development. All organizations have a structure with defined roles
and responsibilities of individuals. Organizational structure reflects the success of s/w
projects and processes.
Ex: the project leader monitors the work flow of various activities which are assigned to
the s/w engineers.
It is very difficult to identify a s/w process for the process of development without
understanding the attributes and scope of the specified s/w process. For example, chat server, real
time operating system, large payroll system etc. Need a different kind of process. However some
characteristics will be common, those are:
12
1. Understandability: The process specification should be easy to understand, easy to learn and
easy to apply. Thus, the process should be specified with its adaptation procedure, execution
mechanism, supporting tools and technology.
2. Effectiveness: The produced product should adhere to the schedule and quality constraints.
Effectiveness of a process depends on certain performance indicators, such as programmer’s
skills, fund availability, quality of work products, etc.
3. Predictability: It is about forecasting the outcomes before the completion of a process. It is the
basis through which the cost, quality, and resource requirements are specified in a project.
The quality of a product and its deliverables can be expected according to the success rate of
the process. Sometimes a predictable process is referred to as being under statistical control
process. Under statistical control, a process can produce outcomes as per the expected input
values.
4. Maintainability: It is the flexibility to maintain s/w through change requirements, defect
detection and correction, adopting it in new operating environments, which is a life-long
process and sometimes its cost exceeds the actual s/w development cost. It is one of the
primary objectives of a process to reduce a maintenance task in s/w which in-turn reduces
project cost.
5. Reliability: It refers to the capability of performing intended tasks. Rigorous testing
procedures are carried out by applying a process in any production process. Unreliability of a
process causes failures and unreliable processes waste time and money.
6. Changeability: It is the acceptability of changes done in s/w. It is classified into robustness,
modifiability, and scalability.
i) Robustness: Process that does not change the product quality due to its internal and
external changes.
ii) Scalability: Ability to change the attributes so that the process can be used in smaller
to larger s/w development.
iii) Modifiability: Ability of adoptability of change occurrence.
7. Improvement: It is a process which helps to enhance quality of the delivered products for
providing more satisfactory services to the users. There are various process improvement
standards, such as quality improvement Paradigm (QIP), Capability Maturity Model
Integration (CMMI) etc.
8. Monitoring and Tracking: It is a process in a project can help to determine predictability and
productivity. Helps to monitor and track the progress of the project based upon past
experiences of the process. The feedback from the earlier projects and products is considered
during the assessment and improvement in the process.
9. Rapidity: It is the speed of a process to produce the products under specifications for its
timely completion. Understandability and tracking of the process can accelerate the
production process.
10. Repeatability: It measures the consistency of a process so that it can be used in various similar
projects. A process is said to be repeatable if it is able to produce an artefact no. Of times
without the loss of quality attributes. There may be variations in the operation, cost, and time
but the quality of artifacts will be the same.
13
Process Classification:
14
Configuration Management includes various activities for performing changes, such as
identification of configuration items, devising mechanisms for performing changes,
controlling changes, and tracking the status to those changes.
Successful configuration management can reduce the overall development cost and
enhance product quality and integrity.
5. Quality Management Process:
The ultimate goal of all the above processes is to develop a quality s/w product.
A quality management process provides metrics, feedback, and guidelines for the
assurance of product quality.
The main activities of s/w quality groups are verification & validation, acceptance testing,
measurement and metrics, process consulting, and so on.
ISO 9000 is a framework that provides certain guidelines for quality system.
Product development is a complex and long-running process whose aim is to produce quality
S/W products.
Each activity in the process is also referred to as a phase. Each phase in the process again acts
as a process for performing the specified activity. General activities include feasibility study,
analysis, design, coding, testing, implementation, and maintenance.
The above activities are collectively called as Software Development Life Cycle(SDLC) or
software life cycle and each of these activities is called Life Cycle Phase.
Each phase has some defined initiating and completion criterion which produces some kind of
intermediate outcomes (work products) for product development.
Examples of these models are waterfall, prototyping, spiral, incremental, agile process, RUP
process model, and so on.
Each model begins with customer needs, performs life cycle activities, and ends with some
work products.
Each process model has a workflow in which these activities are interrelated to one another.
These activities are undertaken in sequence whereas in other models, activities may be in
repeated in a closed loop.
In large and complex projects, activities may be carried out implicitly.
The general development process activities which are covered in software development life cycle
models are feasibility study, requirements analysis, design, code, testing, deployment, operation, and
maintenance.
The developed s/w is used in the environment and faults may be observed during its
operation.
It is observed that the maintenance cost sometimes exceeds with the development cost due to
repeated maintenance, increased user needs, and rapid growth of technology.
1.Project Inititation:
It involves preliminary investigation, feasibility study, and a project plan. Preliminary
Investigation (PI) is the initial step that gives a clear picture of what actually the physical
15
system is. PI goes through problem identification, background of the physical system, and the
system proposal for a candidate system. On the basis of this feasibility study is performed.
SDLC Activities
The purpose of feasibility study is to determine whether the implementation of the proposed
system will support the mission and objectives of the organization. It ensures that the candidate
system is able to satisfy the user needs; promotes operational, effective use of resources; and is cost
effective.
2. Requirements Analysis:
Process of collecting factual data, understanding the process involved, defining the problem,
and providing a document for further software development.
3. Software Design: The goal of the design phase is to transform the collected requirements into a
structure that is suitable for implementation in programming languages. The S/W designers begin with
making architectures, outlining the hierarchical structure, and writing algorithms for each component
in the system. The two aspects are physical design and logical design
4. Coding: It is concerned with the development of source code that will implement the design. Good
coding efforts can reduce testing and maintenance tasks. Programs must be modular so that they can
help in rapid development, maintenance, and enhancements of the system. Rules must be followed for
the declaration of data structures, variables, header files, function call and so on.
16
5. Testing: Testing is performed to remove the defects in the developed system. Test plan of the
system is developed and run on the specified test data. Testing covers various errors at the
requirements, design, and coding phases. Testing is performed at different levels: unit testing,
integration testing, system testing and acceptance testing.
Unit testing is carried out for individual modules at the code level.
After testing each module, interfaces among various models are checked with
integration testing.
System test ensures that the system satisfies the requirements specified by the
customer.
Acceptance test is done for customer satisfaction.
6. Deployment: After acceptance by the customer during the testing phase, deployment of the
software begins. The purpose of the software deployment is to make the software available for
operational use. The release of the software starts. Required resources are procured to operate at the
customer site and important programs files are loaded onto user’s computer. After installation of all
modules of the system, training of the user starts.
7. Maintenance: It comes after the software product is released and put into operation through the
deployment process. Is performed to adapt to changes in a new environment, correct bugs, and
enhance the performance by adding new features. Its activities can be classified as adaptive,
perfective, corrective, and preventive.
Various S/w process models have been proposed due to the varying nature of software
applications. The process models which we will discuss are:
The Waterfall Model was first Process Model to be introduced. It is also referred to as a
linear-sequential life cycle model. It is very simple to understand and use. In a waterfall model, each
phase must be completed fully before the next phase can begin. This type of software development
model is basically used for the project which is small and there are no uncertain requirements. At the
end of each phase, a review takes place to determine if the project is on the right path and whether or
not to continue or discard the project. In this model software testing starts only after the development
is complete. In waterfall model phases do not overlap.
17
Advantages of waterfall model:
• Once an application is in the testing stage, it is very difficult to go back and change
something that was not well-thought out in the concept stage.
• No working software is produced until late during the life cycle.
• High amounts of risk and uncertainty.
• Not a good model for complex and object-oriented projects. Poor model for long and ongoing
projects.
• Not suitable for the projects where requirements are at a moderate to high risk of changing.
• This model is used only when the requirements are very well known, clear
and fixed. Product definition is stable.
• Technology is understood.
• There are no ambiguous requirements
• Ample resources with required expertise are
available freely the project is short.
Very less customer interaction is involved during the development of the product. Once the product is
ready then only it can be demoted to the end users. Once the product is developed and if any failure
occurs then the cost of fixing such issues are very high, because we need to update everywhere from
document till the logic.
18
2. Iterative Waterfall Model
To overcome the major shortcomings of the classical waterfall model, we come up with
the iterative waterfall model.
Here, we provide feedback paths for error correction as & when detected later in a phase.
Though errors are inevitable, but it is desirable to detect them in the same phase in which they
occur. If so, this can reduce the effort to correct the bug.
The advantage of this model is that there is a working model of the system at a very early
stage of development which makes it easier to find functional or design flaws. Finding issues at
an early stage of development enables to take corrective measures in a limited budget.
The disadvantage with this SDLC model is that it is applicable only to large and bulky
software development projects. This is because it is hard to break a small software system into
further small serviceable increments/modules.
3. Incremental Model:
In this model, each module passes through the requirements, design, implementation and
testing phases. A working version of software is produced during the first module, so you have
working software early on during the software life cycle. Each subsequent release of the module adds
function to the previous release. The process continues till the complete system is achieved.
For example:
In the diagram above when we work incrementally we are adding piece by piece but expect
that each piece is fully finished. Thus keep on adding the pieces until it’s complete. As in the image
above a person has thought of the application. Then he started building it and in the first iteration the
first module of the application or product is totally ready and can be demoted to the customers.
Likewise in the second iteration the other module is ready and integrated with the first module.
Similarly, in the third iteration the whole product is ready and integrated. Hence, the product got
ready step by step.
19
Diagram of Incremental model:
• Generates working software quickly and early during the software life cycle.
• This model is more flexible – less costly to change scope and requirements. It is
easier to test and debug during a smaller iteration.
• In this model customer can respond to each built. Lowers initial delivery cost.
• Easier to manage risk because risky pieces are identified and handled during it’d
iteration.
• This model can be used when the requirements of the complete system are clearly defined and
understood.
• Major requirements must be defined; however, some details can evolve with
time. There is a need to get a product to the market early.
• A new technology is being used
• Resources with needed skill set are not available. There are some high risk features and
goals.
4. Prototype Model:
The basic idea in Prototype model is that instead of freezing the requirements before a
design or coding can proceed, a throwaway prototype is built to understand the requirements. This
prototype is developed based on the currently known requirements. Prototype model is a software
development model. By using this prototype, the client can get an “actual feel” of the system, since
the interactions with prototype can enable the client to better understand the requirements of the
20
desired system. Prototyping is an attractive idea for complicated and large systems for which there is
no manual process or existing system to help determining the requirements.
The prototypes are usually not complete systems and many of the details are not built in the
prototype. The goal is to provide a system with overall functionality.
• Prototype model should be used when the desired system needs to have a lot of interaction
with the end users.
• Typically, online systems, web interfaces have a very high amount of interaction with end
users, are best suited for Prototype model. It might take a while for a system to be built that
allows ease of use and needs minimal training for the end user.
• Prototyping ensures that the end users constantly work with the system and provide a
feedback which is incorporated in the prototype to result in a useable system. They are
excellent for designing good human computer interface systems.
21
5. Spiral Model:
The Spiral model of software development is shown in the figure given below. The
diagrammatic representation of this model appears like a spiral with many loops. The exact
number of loops in the spiral is not fixed. Each loop of the spiral represents a phase of the
software process. For example, the innermost loop might be concerned with feasibility study, the
next loop with requirements specification, the next one with design, and so on. Each phase in this
model is split into four sectors (or quadrants) as shown in the below figure. The following
activities are carried out during each phase of a spiral model.
• During the first quadrant, it is needed to identify the objectives of the phase.
• Examine the risks associated with these objectives.
• Steps are taken to reduce the risks. For example, if there is a risk that the requirements
are inappropriate, a prototype system may be developed.
• Develop and validate the next level of the product after resolving the identified risks.
• Review the results achieved so far with the customer and plan the next iteration
around the spiral.
• Progressively more complete version of the software gets built with each
iteration around the spiral.
22
Circumstances to use spiral model
The spiral model is called a Meta model since it encompasses all other life cycle
models. Risk handling is inherently built into this model. The spiral model is suitable for
development of technically challenging software products that are prone to several kinds of
risks. However, this model is much more complex than the other models – this is probably a
factor deterring its use in ordinary projects.
Extreme Programming:
• Writing unit tests before programming and keeping all of the tests running at all times.
The unit tests are automated and eliminate defects early, thus reducing the costs.
• Starting with a simple design just enough to code the features at hand and redesigning
when required.
• Programming in pairs (called pair programming), with two programmers at one screen,
taking turns to use the keyboard. While one of them is at the keyboard, the other constantly
reviews and provides inputs.
• Integrating and testing the whole system several times a day.
23
• Putting a minimal working system into the production quickly and upgrading it
whenever required.
• Keeping the customer involved all the time and obtaining constant feedback. Iterating
facilitates the accommodating changes as the software evolves with the changing
requirements.
Advantages:
• Slipped schedules: Short and achievable development cycles ensure timely deliveries.
• Cancelled projects: Focus on continuous customer involvement ensures transparency
with the customer and immediate resolution of any issues.
• Costs incurred in changes: Extensive and ongoing testing makes sure the changes do
not break the existing functionality. A running working system always ensures sufficient time
for accommodating changes such that the current operations are not affected.
• Production and post-delivery defects: Emphasis is on the unit tests to detect and fix
the defects early.
• Misunderstanding the business and/or domain: Making the customer a part of the
team ensures constant communication and clarifications.
• Business changes: Changes are considered to be inevitable and are accommodated at
any point of time.
• Staff turnover: Intensive team collaboration ensures enthusiasm and good will.
Cohesion of multi-disciplines fosters the team spirit.
Scrum Programming:
24
Scrum Overview - Introduction to Scrum Terms
An introduction to Scrum would not be complete without knowing the Scrum terms you'll be
using. This section in the Scrum overview will discuss common concepts in Scrum.
Scrum team: A typical scrum team has between five and nine people, but Scrum projects can easily
scale into the hundreds. However, Scrum can easily be used by one-person teams and often is. This
team does not include any of the traditional software engineering roles such as programmer, designer,
tester or architect. Everyone on the project works together to complete the set of work they have
collectively committed to complete within a sprint. Scrum teams develop a deep form of camaraderie
and a feeling that “we’re all in this together.”
Product owner: The product owner is the project’s key stakeholder and represents users, customers
and others in the process. The product owner is often someone from product management or
marketing, a key stakeholder or a key user.
Scrum Master: The Scrum Master is responsible for making sure the team is as productive as
possible. The Scrum Master does this by helping the team use the Scrum process, by removing
impediments to progress, by protecting the team from outside, and so on.
Product backlog: The product backlog is a prioritized features list containing every desired feature or
change to the product. Note: The term “backlog” can get confusing because it’s used for two different
things. To clarify, the product backlog is a list of desired features for the product. The sprint backlog
is a list of tasks to be completed in a sprint.
Sprint planning meeting: At the start of each sprint, a sprint planning meeting is held, during which
the product owner presents the top items on the product backlog to the team. The Scrum team selects
the work they can complete during the coming sprint. That work is then moved from the product
backlog to a sprint backlog, which is the list of tasks needed to complete the product backlog items the
team has committed to complete in the sprint.
Daily Scrum: Each day during the sprint, a brief meeting called the daily scrum is conducted. This
meeting helps set the context for each day’s work and helps the team stay on track. All team members
are required to attend the daily scrum.
Sprint review meeting: At the end of each sprint, the team demonstrates the completed functionality
at a sprint review meeting, during which, the team shows what they accomplished during the sprint.
Typically, this takes the form of a demonstration of the new features, but in an informal way; for
example, PowerPoint slides are not allowed. The meeting must not become a task in itself nor a
distraction from the process.
Sprint retrospective: Also at the end of each sprint, the team conducts a sprint retrospective, which
is a meeting during which the team (including its Scrum Master and product owner) reflect on how
well Scrum is working for them and what changes they may wish to make for it to work even better.
Scrum is an iterative framework to help teams manage and progress through a complex
project. It is most commonly used in Software Development by teams that implement the Agile
Software Development methodology. However it is not limited to those groups. Even if your team
does not implement Agile Software Development, you can still benefit from holding regular scrums
with your teams.
25
Scrum participants fall into the same two categories. They are either Pigs or they are chickens.
Participants at scrum are either fully committed to the project or simply participants. Let’s look at who
these various roles really are.
Pig Roles
▪
Actual Team Members: These would be the developers, artists or product managers that
the projectthe
comprise core of the team. These are the people who are actually doingthe daily work to bring
to fruition. These members are fully committed to the project.
▪
Scrum Master: The scrum master might be one of the team members — or might not be. It is
important to call this person out separately here though because the Scrum master has the primary
role of ensuring that the scrum moves forward without problems and is effective for the team.
▪
Project Owner: This may be a Product Manager who is also comprised of the team or it may
not. Again it is important to call this persons role out here as this person represents the voice of
the end customer. This person needs to ensure that the product achieves it’s product goals and
provides the necessary end product to the customers.
Chicken Roles
▪
Managers: At first glance you might think that managers are pigs — naturally. However in
the scrum context managers are generally more concerned about the people involved in a project
and their respective health. They are not as focused on the product and it’s particular
customer
oriented goals. For this reason they are considered a chicken in the scrum context.
▪
Stakeholders: Stakeholders are individuals who will benefit or have a vested interest in the
project, however do not necessarily have authority to dictate direction or to be held accountable
for the product. They can be consulted for opinions and insight however the product owner needs
to maintain final rights for the decision making process.
The chicken and pig roles are vital to scrum because it dictates who in the scrum should be an
active participant Chickens should not be active participants in a scrum meeting. They may attend,
however they should be there as guests only and not required to share their current statuses. Pigs on
the other hand need to share their current progress and share any blockers that they are encountering.
The reason that Chickens should not be active participants is that they too easily will take
over the direction of the scrum and lead it away from the goals of the entire team. It is the scrum
masters job to ensure that the scrum stays on target and covers the topics that need to be covered. if
someone goes off topic (chicken or pig) it is the scrum masters job to bring the group back to the topic
at hand.
26
Disadvantages of Agile model:
• When new changes are needed to be implemented. The freedom agile gives to change is very
important. New changes can be implemented at very little cost because of the frequency of
new increments that are produced.
• To implement a new feature the developers need to lose only the work of a few days, or even
only hours, to roll back and implement it.
• Unlike the waterfall model in agile model very limited planning is required to get started
with the project. Agile assumes that the end users’ needs are ever changing in a dynamic
business and IT world. Changes can be discussed and features can be newly effected or
removed based on feedback. This effectively gives the customer the finished system they
want or need.
• Both system developers and stakeholders alike, find they also get more freedom of time and
options than if the software was developed in a more rigid sequential way. Having options
gives them the ability to leave important decisions until more or better data or even entire
hosting programs are available; meaning the project can continue to move forward without
fear of reaching a sudden standstill.
Stands for "Rational Unified Process." RUP is a software development process from Rational, a
division of IBM. It divides the development process into four distinct phases that each involve
business modeling, analysis and design, implementation, testing, and deployment. The four phases
are:
1. Inception - The idea for the project is stated. The development team determines if the
project is worth pursuing and what resources will be needed.
2. Elaboration - The project's architecture and required resources are further evaluated.
Developers consider possible applications of the software and costs associated with the
development.
3. Construction - The project is developed and completed. The software is designed,
written, and tested.
4. Transition - The software is released to the public. Final adjustments or updates are made
based on feedback from end users.
The RUP development methodology provides a structured way for companies to envision create
software programs. Since it provides a specific plan for each step of the development process, it helps
prevent resources from being wasted and reduces unexpected development costs.
27
Advantages of RUP Software Development
1. This is a complete methodology in itself with an emphasis on accurate documentation
2. It is proactively able to resolve the project risks associated with the client's evolving
requirements requiring careful change request management
3. Less time is required for integration as the process of integration goes on throughout the
software development life cycle.
4. The development time required is less due to reuse of components.
5. There is online training and tutorial available for this process.
As seen, RUP methodology has a highly flexible development path. It uses the some of the
industries’ best practices. These are known as six best practices of RUP methodology.
28
The 6 RUP Best Practices
1. Develop Iteratively
The software requirements specification (SRS) keeps on evolving throughout the
development process and loops are created to add them without affecting the cost of development.
2. Manage Requirements
The business requirements documentation and project management requirements need to be
gathered properly from the user in order to reach the targeted goal.
3. Use Components
The components of large project which are already tested and are in use can be conveniently
used in other projects. This reuse of components reduces the production time.
4. Model Visually
Use of Unified modeling language (UML) facilitates the analysis and design of various
components. Diagrams and models are used to represent various components and their interactions.
5. Verify Quality
Testing and implementing effective project quality management should be a major part of
each and every phase of the project from initiation to delivery (aka the project management life cycle).
6. Control Changes
Synchronization of various parts of the system becomes all the more challenging when the
parts are being developed by various teams working from different geographic locations on different
development platforms. Hence special care should be taken in this direction so that the changes can be
controlled.