     ARE YOU EXPLORING
01   POSSIBILITIES WITH
     PRE ENGINEERED BUILDINGS?
                                                             01-16
     What is a Pre Engineered Building?
02   DO YOU WISH TO KNOW ABOUT
     PRE ENGINEERED BUILDINGS?
                                                             17-26
     What are the grey areas in a typical PEB transaction?
                       Index
03   WOULD YOU LIKE TO KNOW
     MORE ABOUT US?
                               27-35
     The Brand Story
04   EXCITED! LET’S TALK!      36-38
01
Are you
Exp l o r i n g
possibilities
with Pre
Engineered
Buildings?
What is a Pre
Engineered Building?
  Element                     Components
  Primary                     Beams, Columns & Rafters.
                              Purlins, Cladding Systems, Mezzanine
  Secondary                   Systems, Crane Systems, Fascias &
                              Canopies.
                              Ridge Vents, Turbo Vents, Skylights,
                              Louvers, Sand Trap Louvers, Sliding
  Accessories                 Doors, Fastners, Self tapping screw,
                              Sheeting Fasteners & Sealants.
The advantages of PEBs over Conventional Buildings are:
  Controlled Quality
                                                                              SCAN TO
                                                                             KNOW MORE
Page - 02 | Are you exploring possibilities with Pre Engineered Buildings?
                                                                                                                              SCAN TO
                                                                                                                             KNOW MORE
               Land
               The location must be strategic,
               you must check the level of the
               land in reference to nearest road
               level, Soil & Strata, Ground water
               level and road network available.
                                               Layout
                                               The layout must be professionally planned,
                                               considering factors such as vehicle
                                               movement, parking area, utility space and
                                               drainage system must be mapped out.
                                                                                                           The project schedule must be
                                                                                                           translated into a GANTT chart,
                   Building                                                                                material inspection must be
 Identify the wind corridor, Size                                                                          done prior to dispatch, place of
    must be optimised, Finalise                                                                            unloading loading materials
           machine layout, Load                                                                            must be pre planned and make
  calculations must be done at                                                                             sure your PEB vendor follows
     design stage. You must be                                                                             best erection practices.
cautious of the factors such as
  No. of air exchanges per hour,
  heat, light requirement, no. of
openings, expansion plan, etc.
                                     Civil Foundation
                                     Drainage work must be done prior
                                     to the civil foundation work. Don’t
                                     an old civil foundation. Be cautious
                                     of the Soil Bearing Capacity. The
                                     centre line & anchor the bolt plan
                                     shoul be as per GA drawing.
                                                                 Handover
                                                                customer to the PEB vendor at the time of handover.
Page - 03 | Are you exploring possibilities with Pre Engineered Buildings?
What can you do
Buildings?
                      Structural Steel
                                                Industrial
  Steel Plants                             Metal Smelters                    Cement Plants
Page - 04 | Are you exploring possibilities with Pre Engineered Buildings?
                                                Industrial
     Chemical                            Fertilizers                           Oil & Gas
      Plants                      & Petrochemicals Plants                      Structures
  Power Plants                            Airport Terminal
                                              Buildings
                                          Railway Bridges                    Metro Stations
Page - 05 | Are you exploring possibilities with Pre Engineered Buildings?
                      Light Gauge Steel Framed Structures
   Health care                        Community Centers                        Schools
     centers
                                            Mass Housing                     Relief Camps
                                                                                            labo
 Labour Camp                             Defence helters                      Auditorium
Page - 06 | Are you exploring possibilities with Pre Engineered Buildings?
            High Rise                               Commercial
            Buildings                               & Residential
                                                 Shopping Malls                     Multiplexes
camp
                        Storage Solutions
                                                     Warehouse
       Page - 07 | Are you exploring possibilities with Pre Engineered Buildings?
Pre Engineered Buildings
                    Rigid Frame
                                                      Lean To
                                                 Single Slope                Multi Gable
                                                   Multi Span
Page - 08 | Are you exploring possibilities with Pre Engineered Buildings?
      Ridge                                      Skylights                   Turbo Vents
    Ventilators
     Insulation                                   Louvers                    Sand Trap
                                                                              Louvers
    Primary &                          Sheeting Fastners                      Sealants
   Secondary
       Bolts
Page - 09 | Are you exploring possibilities with Pre Engineered Buildings?
Page - 10/11 | Are you exploring possibilities with Pre Engineered Buildings?
                                        Primary Framing
                                        Members
                                        Primary members are the main steel frames of PEB. The main frames
                                        include columns, rafters, crane beams, mezzanine beams and other
                                        supporting members. The sections are fabricated with High strength steel
                                        plates using the state-of-the-art manufacturing technology.
                                        The application and requirement determines the shape and size of these
                                        members.
                                        Members
                                        Secondary Framing Members are the structural members which carry
                                        loads to the primary framing members. Secondary structural framing
                                        refers to C sections and Z sections, Grits, Eave struts, Wind bracing,
                                        Flange bracing, Base angles, Clips and other miscellaneous structural
                                        parts.
            Standing Seam
                                        Systems
                                        Screw Down Sheeting Method:
                                        Roof and wall cladding are formed by cold rolling metal sheet ranging
             Screw down
                                        between 0.5 to 0.7mm thick in bending press machine. They are used to
                                        provide shelter and support from wind pressure and live load.
                                        Standing Seam Sheeting method:
                                        It is connected indirectly by forming clips into the seam. Steel roof is
                                        coated with zinc-aluminuim alloy, it is available in two grades with
                                        tensile strength of 345 MPA & 550 MPA.
Page - 12 | Are you exploring possibilities with Pre Engineered Buildings?
                                        Mezzanine Systems
                                        It consists of a steel deck with a varying thickness between 0.5 to 1mm
                                        supported by steel joists, Steel joists acts as a secondary members,
                                        connected to main primary beams. Main beams are connected to the
                                        mainframe columns or intermediate column, based on the load & span,
                                        which transfer the load to the foundation.
                                        Crane Systems
                                        Crane systems are required in manufacturing buildings that require
                                        running crane, underhung crane, Monorail Crane and jib Crane. The most
                                        commonly adopted is the top running crane system.
                                        Facias are used for aesthetic appearance. A variety of fascias either
                                        straight or inclined can be provided. They are cantilivered from the main
                                        frame coloumns in the sidewall & from the wind columns on the end wall.
                                        Canopies
                                        Canopies are narrow roof systems that provide various functions such as
                                        a shade to block direct sunlight on the building walls, an extended cover
                                        to protect the buildings against the rain, and a cover at entrances of the
                                        buildings or adjacent to the walls for car parking.
Page - 13 | Are you exploring possibilities with Pre Engineered Buildings?
the estimated cost
                                                                             ???
  Bay Spacing
  Transportation Cost
  Installation Cost
                                                                                    SCAN TO
                                                                                   KNOW MORE
Page - 14 | Are you exploring possibilities with Pre Engineered Buildings?
Excellent PEB customer?
              Regular PEB
               Customer                                                      Customer
                                                                  Selects a vendor who understands PEB as a
     Selects a vendor who provides the cheapest
                                                                    solution, and provides the best quality
                       price.
                                                                         without being too expensive.
                                                                  Understands land selection, overall layout,
      Only shares the dimensions of the Building
                                                                  and ground water drainage & then asks for
           while sharing the requirements.
                                                                                an estimate.
    Demands low weight structure without being
                                                                  Demands an optimum structure with seismic
       concerned about the stability of the
                                                                     load & wind pressure calculations.
                   structure.
     Directly convert steel prices to arrive at the
                       estimate.                                                 make of steel.
        Not too much bothered about the GA                         Involving himself in understanding the GA
                    Drawings.                                             Drawings with the Engineer.
       Demands fast erection and doesn't care                      Demands fast erection with Best Erection
          about Best Erection Practices.                                         Practices.
                                                                    Ensures to complete formalities & issues
       Ignorant towards handing over facilities.
      Does not maintain a relationship with the                    Facilitates strategic relationship with the
                      vendor.                                                        vendor.
                                                       SCAN TO
                                                      KNOW MORE
Page - 15 | Are you exploring possibilities with Pre Engineered Buildings?
a good PEB Vendor?
         Observe their Promise Quotient
Page - 16 | Are you exploring possibilities with Pre Engineered Buildings?
17
Do you
about Pre
Engineered
Buildings?
What will ensure that
PEB roofs do not leak?
Leaking roof is the most common problem faced in metal buildings. You must understand the root cause of this
annoying problem. We have learned about these problems through our years of experience in the PEB industry.
The first and foremost factor responsible is not fixing the screws properly, the screws sould not be out driven,
under driven, and should not be misaligned.
Another area very prone to leakes in the roof is the
area around the flashings. The rubbarised material
gets disturbed due to the movement around the
metal roofing,
the sun also affects it and thus results in
leakages. So it is a wise decision
to consider replacing worn or
rotten stack flashings in order to
keep your building dry.
                                                                                                      SCAN TO
Use good quality sealants that                                                                       KNOW MORE
lasts longer period of time.
We always recommend using
a standing seam roofing
system as it is screw less so there is no chance of
leakage.
The base plate profile used between the polycar-
bonate sheets & turbo ventilators should be
matching with the original roof sheet properly.
The use of 1,000 hours of salt spray tested
fasteners is recommended as after the chamber
exposure, the fastener head cannot exhibit any
red rust and thus there is no leakage due to
rusting of the fasteners.
Page - 18 | Do you know about Pre Engineered Buildings?
What are the grey
areas in a typical
PEB transaction?
                                                               SCAN TO
                                                              KNOW MORE
Page - 19 | Do you know about Pre Engineered Buildings?
More Rupee Per Rupee
on PEB?
                                                           SCAN TO
                                                          KNOW MORE
Page - 20 | Do you know about Pre Engineered Buildings?
                              Is your PEB
         Paintworthy?
The quality of the paint used in PEB is perhaps the most ignored factor which results in a lot
of damage. Inorder to avoid being in trap of your PEB vendor,                                     SCAN TO
                                                                                                 KNOW MORE
 Do they use the right quality of paint?
 What micron of paint do they use on your PEB structure?
 Is there a heat oven to cure the paint applied?
Page - 21 | Do you know about Pre Engineered Buildings?
              The most common
   erecting PEB structures
                                                                                       SCAN TO
                                                                                      KNOW MORE
       Skipping the                  Not Creating a                Choosing the
                                       Base Plan                  Wrong Insulation
     Building Permits
       and Codes
                                                          Neglecting the
                                                            Necessary
                                                          Materials and
                        Operating                          Equipment           Hiring a Wrong
                        Without an                                                    or
                        Instruction                                            inexperienced
                          Manual                                                    Builder
                                             MISTAKE METER
Page - 22 | Do you know about Pre Engineered Buildings?
What are the green
building practices of
your PEB vendor?
Pre Engineered Building Teachnique evolving steel as a primary material
has emerged into green & sustainable alternative to conventional
building practices. The key features that makes PEBs Green Buildings are:-
              1. Use of steel is optimised as per the structural analysis as a
              result steel is used in efficient manner. So make sure your PEB
              vendor ensures you an optimum use of steel to prevent wastage
              of universal resource.
              2. There is comparatively less pollution & waste produced while
              construction of a PEB. As all the members are manufactured
              in controlled environment as per engineering standards in a
              facility. Make sure your vendor implements this.
              3. Structural Steel used in Pre Engineered Buildings can be
              recycled as well as reusable. You must ask for virgin grade of
              steel to your vendor.
              4. The use of electricity is reduced by innovation and
              engineering. Your vendor must provide proper ventilation to save
              cooling costs and at the same time they must give opening for
              entrance of the sunlight in the building. Additionally insulation is
              a prime factor they must consider, make sure use of reflective
              roof & wall systems with galvalume steel coat to provide thermal
              insulation & minimise heat transfer.
Page - 23 | Do you know about Pre Engineered Buildings?
Page - 23 | Do you know about Pre Engineered Buildings?
Is your PEB designed
   Type of Building
   Warehouse
   Light manufacturing
   Heavy manufacturing
                               3 to 5
                               5 to 10
                               10 to 20
                                                                      C
                                                           SCAN TO
                                                          KNOW MORE
Page - 24 | Do you know about Pre Engineered Buildings?
 Why should PEB vendor’s
                                                                                                      SCAN TO
                                                                                                     KNOW MORE
 oous
    ustotomme
CC Bigger stockyard reduce
                                Material Handling                 Cutting
                                                            Cutting must be done              Shearing
                                                                                           Shearing must be
           o
   the turnaround cycle of                                  with the cold process
                               Interdependence of any                                    facilitated for proper
          YY
        each batch of                                         that ensures the
                                    process on the
                                                           molecular stability of the
     aatt
         production.            availability of material
                                                                    steel.
                                    Automated                  Shot Blasting                 Paint Shop
       There must be a
                                                           Shot blasting as per SA        DTM Paint should be
    provision of 2 separate
                                 Due to automation         2.5 standards is a must      used in a booth, an oven
     automated splicing
                                welding is far superior.     for smooth surface           and a conveyor roller
        machines that
                                The process becomes                                     system must be there for
   guarantees strong joints
        with no faults.
 Page - 25 | Do you know about Pre Engineered Buildings?
 er
  e rCC en
         e t
           n r
             t i
               r
m                     n t r i c Tea m
              i
               r  C e
            v v
            m e
          r r
   “Coust o
         ee
                              e”
       SS
                    er v i c
    r r
            o u r S
  u u
       a t Y
o
Y o
  27
ircicTe
      Teaamm
vic e
    ce
   2023
             Became one of India's leading PEB companies.
Page - 28 | Would you like to know more about us?
The Brand Story
Philosophy
Personality
Promise
Purpose
Page - 29 | Would you like to know more about us?
                                                                     TQM* compliance Project
                                                                     Management standards
   Optimized PEB designs to             Installed capacity of 4000    that allow us to deliver
     save on your cost of                 MT to never say "No" to     "right product" to "right
          structure.                           your demand.            person" at "right time".
                                                                       (*TQM = Total Quality
                                                                           Management)
                                                                        Our experience in PEB
                                                                     structures ensures that we
   Our economy of scale will                                          never play with structural
      always give you the                engineers do not learn at     strength for short term
   cutting-edge advantage.                   customer's cost.        gains leading to long term
                                                                        disadvantage to our
                                                                               clients.
Page - 30 | Would you like to know more about us?
We cherish these Values
Rage
Page - 31 | Would you like to know more about us?
From the
Director’s
Desk
“We see a huge potential in
                                                    - Sanjay Singh
Page - 32 | Would you like to know more about us?
Our Machinery:
Cutting
                         Drilling
                                          Welding
                                                    Bending   Painting
Cutting:
Page - 33 | Would you like to know more about us?
Drilling:
•
Welding:
•
Page - 34 | Would you like to know more about us?
Bending:
•
Painting: (Special Highlight)
•
• Curing Oven Dries up the paint at 75 degrees instantly to make
  sure that the surface does not catch dust or other atmospheric
  particles, thus the paint sticks to the surface so that the surface
  remains smooth to avoid vulnerability to rust in the future.
•
•
•
Page - 35 | Would you like to know more about us?
                     Welcome letter
Page - 37 | Would you like to know more about us?
  Lloyds Infinite Foundation
Page - 38 | Would you like to know more about us?
        DESCRIPTION         DETAILS
5.
6.
7.
8.
9.
ADDITIONS/
ACCESSORIES
              ACCESSORIES
NOTES
Contact Us:
   H.O: PEB 360 Solutions, M-1, Saraf Court, Dhantoli, Nagpur- 440012                 SCAN ME
   Mumbai: 57, 2nd Floor, Asiatic Arcade, Vartak Nagar, Thane - 400606
   Plant: R.R. Industrial Area, Gumthala, Bhandara Road, Nagpur- 441104
   www.peb360.com         getintouch@peb360.com        +919373107780, +919307489608
Follow us on: