0% found this document useful (0 votes)
38 views8 pages

Thumboormozhi Estimate

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views8 pages

Thumboormozhi Estimate

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

PRICE EST NO:2017/93631

Office of the Chief Engineer LSGD

Detailed estimate for the construction of Aerobic bin (2 Nos.) compost unit (Model
Estimate)
Detailed Estimate

(Cost Index Applied for this estimate is 35.59%)

Sl No Description No L B D CF Quantity Remark

1 Appendix. A. Construction of Sheet roofing shed ( plinth area 16.64 sq.m or 179.11 sq.feet

1 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of
soil

A. allround 1 16.200 0.400 0.300 1.944

Total Quantity 1.944 cum

Total Deducted Quantity 0.000 cum

Net Total Quantity 1.944 cum

Say1.944 cum @ Rs 214.03 / cum Rs 416.07

2 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40
nominal size)

A. allround 1 16.200 0.400 0.100 0.649

Flooring hall 1 4.7500 2.7500 0.075 0.980

Total Quantity 1.629 cum

Total Deducted Quantity 0.000 cum

Net Total Quantity 1.629 cum

Say1.629 cum @ Rs 6814.89 / cum Rs 11101.46

3 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)

for fixing the GI pipe (


2*3 0.300 0.300 0.500 0.270
foun.portion )

Deduction

GI pipe portion -
2x3x3.14/4x0.05x0.05 4.7 0.050 0.050 0.500 -0.005
x0.50

printed on 23-06-2023 11:55:36 page 1


PRICE EST NO:2017/93631

Total Quantity 0.270 cum

Total Deducted Quantity -0.005 cum

Net Total Quantity 0.265 cum

Say0.265 cum @ Rs 7990.86 / cum Rs 2117.58

4 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of
columns, etc for mass concrete

Foundation 2*3 1.200 0.500 3.600

Total Quantity 3.600 sqm

Total Deducted Quantity 0.000 sqm

Net Total Quantity 3.600 sqm

Say3.600 sqm @ Rs 335.31 / sqm Rs 1207.12

5 50.6.2.1
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available
size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1
cement :6 coarse sand) etc complete

A. all round wall


( F o u n d a t i o n 1 16.200 0.300 0.500 2.430
& B a s e m e n t )

A. super structure 1 16.200 0.150 0.450 1.094

step 1 1.200 0.300 0.150 0.054

Deductions

GI post foundation
2*3 0.300 0.300 0.500 -0.270
basement

- do - super structure
(2x3x3.14/4x.05x.05x 4.71 0.050 0.050 0.450 -0.005
0.45)

Total Quantity 3.578 cum

Total Deducted Quantity -0.275 cum

Net Total Quantity 3.303 cum

Say3.303 cum @ Rs 6237.61 / cum Rs 20602.83

6 13.1.1
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

Outer basement
2 5.350 0.300 3.210
length wise

- do - width wide 2 3.350 0.300 2.010

printed on 23-06-2023 11:55:36 page 2


PRICE EST NO:2017/93631

- do - super structore 2 5.200 0.450 4.681

- do - - do - 2 3.200 0.450 2.881

hall inner 1 15.600 0.450 7.020

super struct or - top 2 5.200 0.200 2.080

- do - -do- 2 2.900 0.200 1.160

step 1 1.200 0.450 0.540

- do - sides 2 0.300 0.150 0.090

Deductin

door 1 1.200 0.450 -0.540

Total Quantity 23.672 sqm

Total Deducted Quantity -0.540 sqm

Net Total Quantity 23.132 sqm

Say23.132 sqm @ Rs 314.09 / sqm Rs 7265.53

7 10.16.1
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including
cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding
and bolted with special shaped washers etc. complete.Hot finished welded type tubes

65 mm dia GI pipe for


2*3 3.500 5.03 105.631
supporting post (2x3 )

80x40x2.60 mm
Rect.hollow section for 2 6.000 4.55 54.600
wall plate

- do - - do - 2 3.100 4.55 28.210

60x40x2.60 mm - do -
2*3 2.600 3.73 58.188
Commen rafter

50x25x2 mm - do -
3 1.200 2.15 7.740
Collar

25x25x2.60 mm - do -
2*3 6.100 1.36 49.776
square - do - purlin

Total Quantity 304.145 kg

Total Deducted Quantity 0.000 kg

Net Total Quantity 304.145 kg

Say304.145 kg @ Rs 168.81 / kg Rs 51342.72

8
12.50
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as
approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams

printed on 23-06-2023 11:55:36 page 3


PRICE EST NO:2017/93631

per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and
polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to
avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired
by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm)
with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of
purlins, rafters and trusses and including cutting to size and shape wherever required.

Roof 2 6.300 2.700 34.020

Total Quantity 34.020 sqm

Total Deducted Quantity 0.000 sqm

Net Total Quantity 34.020 sqm

Say34.020 sqm @ Rs 738.69 / sqm Rs 25130.23

9 12.51.1
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05%) total
coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc
coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both
side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws
complete:Ridges plain (500-600 mm)

Ridge 1 6.500 6.500

Total Quantity 6.500 metre

Total Deducted Quantity 0.000 metre

Net Total Quantity 6.500 metre

Say6.500 metre @ Rs 490.02 / metre Rs 3185.13

10 11.37
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the
manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory,
Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including
pointing the joints with white cement and matching pigment etc., complete.

Flooring

Hall 1 5.100 3.100 15.810

step 1 1.200 0.450 0.540

- do - 2 0.300 0.150 0.090

Deduction

bin pillar portion 2*4 0.200 0.200 -0.320

Total Quantity 16.440 sqm

Total Deducted Quantity -0.320 sqm

Net Total Quantity 16.120 sqm

Say16.120 sqm @ Rs 1091.02 / sqm Rs 17587.24

printed on 23-06-2023 11:55:36 page 4


PRICE EST NO:2017/93631

11 10.25.2
Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including
cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural
steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

Supplying and laying MS angles and rods for fencing on the bricks walls

20x20x3 mm angle
iron & 5 mm dia 2 5.200 2.550 8.400 222.768
MS rods for nets

- do - - do - width wise
2 3.100 2.550 8.400 132.804
including door portion

Door addl. portion of


1 1.200 0.450 8.400 4.537
wall

Total Quantity 360.109 kg

Total Deducted Quantity 0.000 kg

Net Total Quantity 360.109 kg

Say360.109 kg @ Rs 154.17 / kg Rs 55518.00

12 13.44.1
Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied
@ 3.84 kg/10 sqm)

Outer basement
2 5.350 0.300 3.210
length wise

- do - width wide 2 3.350 0.300 2.010

- do - super structore 2 5.200 0.450 4.681

- do - - do - 2 3.200 0.450 2.881

hall inner 1 15.600 0.450 7.020

super struct or - top 2 5.200 0.200 2.080

- do - -do- 2 2.900 0.200 1.160

Total Quantity 23.042 sqm

Total Deducted Quantity 0.000 sqm

Net Total Quantity 23.042 sqm

Say23.042 sqm @ Rs 107.39 / sqm Rs 2474.48

13 13.50.3
Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and
manufacture on steel galvanised iron /steel works

Grill area length wise 2 5.200 2.550 26.520

- do - width wise 2 3.100 2.550 15.810

printed on 23-06-2023 11:55:36 page 5


PRICE EST NO:2017/93631

Door addl. portion 1 1.200 0.450 0.540

Total Quantity 42.870 sqm

Total Deducted Quantity 0.000 sqm

Net Total Quantity 42.870 sqm

Say42.870 sqm @ Rs 59.66 / sqm Rs 2557.62


Sl No Description No L B D CF Quantity Remark

2 Appendix. B. Construction of aerobic bins (2 Nos)

1 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of
soil

pillar 2*4 0.400 0.400 0.600 0.769

Total Quantity 0.769 cum

Total Deducted Quantity 0.000 cum

Net Total Quantity 0.769 cum

Say0.769 cum @ Rs 214.03 / cum Rs 164.59

2 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40
nominal size)

pillar 2*4 0.400 0.400 0.100 0.129

Total Quantity 0.129 cum

Total Deducted Quantity 0.000 cum

Net Total Quantity 0.129 cum

Say0.129 cum @ Rs 6814.89 / cum Rs 879.12

3 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)

For pillar fixing 2*4 0.400 0.400 0.500 0.641

deduction

pillar portion 2*4 0.200 0.200 0.500 -0.160

Total Quantity 0.641 cum

Total Deducted Quantity -0.160 cum

Net Total Quantity 0.481 cum

printed on 23-06-2023 11:55:36 page 6


PRICE EST NO:2017/93631

Say0.481 cum @ Rs 7990.86 / cum Rs 3843.60

4 5.16
Providing, hoisting and fixing up to floor five level precast reinforced cement concrete in shelves including
setting in cement mortar 1:3 ( 1 cement : 3 coarse sand), cost of required centering, shuttering and
finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)

Pillar for bins 2*4 0.200 0.200 1.700 0.544

Slab / concrete reeper 2*10*4 0.075 0.030 1.090 0.197

block for slab gape 2*18*4 0.100 0.030 0.050 0.022

Deduction

Grooves portion of
2*8 0.035 0.035 1.200 -0.023
pillar

Total Quantity 0.763 cum

Total Deducted Quantity -0.023 cum

Net Total Quantity 0.740 cum

Say0.740 cum @ Rs 20239.72 / cum Rs 14977.39

5 5.22.1
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and
binding all complete upto plinth levelMild steel and Medium Tensile steel bars

Pillar size 1x0.20x0.20x1.70

6 mm dia main bar for


5*8 1.650 0.22 14.520
Pillars

5 mm dia distribution
12*8 0.650 0.15 9.610
bars for Pillars

5 mm dia main bars


2*2*40 1.070 0.15 26.365
for reepers

Total Quantity 50.495 kg

Total Deducted Quantity 0.000 kg

Net Total Quantity 50.495 kg

Say50.495 kg @ Rs 96.68 / kg Rs 4881.86

6 5.21
Extra for providing and fixing expanded metal mesh of size 20x60 mm and strands 3.25 mm wide 1.6 mm
thick weighing 3.64 kg per sqm for encasing or rolled steel sections in beams, columns and grillages
excluding cost of hangers.

bin face 2*4 1.200 1.200 11.520

Total Quantity 11.520 sqm

Total Deducted Quantity 0.000 sqm

printed on 23-06-2023 11:55:36 page 7


PRICE EST NO:2017/93631

Net Total Quantity 11.520 sqm

Say11.520 sqm @ Rs 522.56 / sqm Rs 6019.89

7 13.39.1
Colour washing such as green, blue or buff to give an even shade:New work ( two or more coats) with a
base coat of white washing with lime

pillar face (2x4) 8 0.800 1.200 7.680

Grooves 16*2 0.030 1.200 1.152

pillar top 2*4 0.200 0.200 0.321

slab or reeper all


80 1.090 0.210 18.312
round

Total Quantity 27.465 sqm

Total Deducted Quantity 0.000 sqm

Net Total Quantity 27.465 sqm

Say27.465 sqm @ Rs 45.83 / sqm Rs 1258.72


Sl No Description No L B D CF Quantity Remark

3 Engaging man madzoor for arranging the pre-cast items

Lump-Sum Total Rs 500.00


Sl No Description No L B D CF Quantity

Remark 4 Providing Drainage facility,Soak pitt and necessary fitting etc.complete

Lump-Sum Total Rs 2500.00


Sl No Description No L B D CF Quantity

Remark 5 Providing Name board and locking arrengment

Lump-Sum Total Rs 2500.00

Amount reserved for GST payments Rs 42845.61

Total Rs 280876.80

Lumpsum for round off 123.20

TOTAL Rs 280999.99864380003

Rounded Total Rs 281000.00

Rupees Two Lakh Eighty One Thousand Only

(Cost Index Applied for this estimate is 35.59%)

printed on 23-06-2023 11:55:36 page 8