0% found this document useful (0 votes)
33 views8 pages

Take Over Checklist

Uploaded by

Huzairi Sulaiman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views8 pages

Take Over Checklist

Uploaded by

Huzairi Sulaiman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

TAKE OVER CHECK LIST

TRAINING WARRANTY DETAILS OF FREE


DATE AND O&M CARDS AND LIST OF SPARE SPARE PARTS AS BUILT SERVICE AND SUPPLIER
SL NO NAME OF EQUIPMENT MANUAL PARTS AT SITE DRAWINGS
TIME DURATION SPARES, IF ANY CONTACT DETAILS

ELECTRICAL
1 VCB (Vacuum Circuit Breakers) N/A
2 Transformer N/A
3 ACB'S (Air Circuit Breakers)
4 MCCB'S (Miniature case circuit
breakers)
5 SFU'S (Switch Fuse Units)
6 MV Panel
7 DG SETS
8 TAP CHANGER
9 CAPACITOR BANK
10 SYNCHRONIZATION PANELS N/A
11 EARTING SYSTEM
12 LIGHTING ARRESTORS
13 RISING MAINS
14 SSB'S (Single Side Band - Switches)
15 GUEST ELEVATORS-3
16 SERVICE ELEVATORS-3
17 STAFF ELEVATOR -1
18 LIGHTS AND BULBS
19 LDB'S (Lighting Distributions boards)
20 PDB'S (Power Distribution boards)
21 STARTER PANELS
22 TELEVISIONS
23 LIGHTING CONTROL SYSTEMS
24 HEALTH CLUB EQUIPMENTS
25 EXTERIOR LIGHTING

HVAC
1 CHILLER PLANTS N/A
2 CONDENSER PUMPS N/A
3 PRIMARY CH W. PUMPS N/A
4 SECONDARY CH W. PUMPS N/A
5 COOLING TOWERS N/A
6 AIR HANDLING UNITS N/A
7 TREATED FRESH AIR UNITS
8 FRESH AIR UNITS
9 EXHAUST SYSTEM
10 SPLIT A/C UNITS
11 PACKAGE UNITS
12 FAN COIL UNITS
13 BUILDING MANAGEMENT SYSTEM
14 BMS-DDC PANELS
15 AIR SEPARATORS
16 VFD'S (Variable frequency Drives)
17 AUTO EXPANSION SYSTEM
18 MODULATING VALVES
19 MECHANICAL AIR PURGING VALVES
20 MOTORIZED DAMPERS
21 OZONISERS
22 DUCTING SYSTEM

WATER AND WASTE WATER


1 HOT WATER BOILERS
2 CALORIFIER
3 R.O.PLANT (Reverse Osmosis)
4 SEWAGE TREATMENT
5 SOFTENERS
6 PRESSURE SAND FILTERS
7 ACTIVATED CARBON FILTERS
8 DOSING PUMPS
9 HYDRO PNEUMATIC SYSTEM
10 ELECTRIC WATER HEATERS
11 WATER FEATURES
12 WATER TANKS
13 SUMP PUMPS
14 ALL UNDER GROUND TANKS
15 RAIN WATER HARVESTING SYSTEM
16 CORPORATION WATER CONNECTION
17 OVER HEAD TANKS
18 HOT WATER SYSTEM
19 COLD WATER SYSTEM
20 WATER TRANSFER PUMPS
21 BORE WELL N/A
22 IRRIGATION SYSTEM N/A
23 DRAINAGE SYSTEM
24 SUBMERSIBLE PUMPS
IT & COMMUNICATION
1 EPABX
MATV SYSTEM
2 DECT SYSTEM
3 SERVERS & COMPUTERS
4 BACK UP UPS
5 CONSOLES
6 TELEPHONE INSTRUMENTS

KITCHEN EQUIPMENTS
1 DISH WASHERS
2 OVENS/COMBI OVENS
3 GAS BANK
4 ICE CUBE MACHINES
5 COOKING RANGES
6 WALK IN COLD ROOMS/FREEZERS
7 REACH IN REFRIGERATORS
8 DEEP FAT FRYERS
9 PIZZA OVEN
10 WATER COOLERS
11 BOILERS
12 BAIN MARIES
13 DOUGH SHEETER
14 DOVE MACHINE
15 STEAMERS
16 TILTING PANS
17 GRINDERS

FIRE & SAFETY


1 FIRE DETECTION SYSTEM
2 SPRINKLER PUMP
3 HYDRANT PUMP
4 JOCKEY PUMPS
5 BOOSTER PUMP
6 SMOKE EXTRACT FANS
7 P.A SYSTEM (Public Address)
8 CCTV
9 FIRE EXIT PRESSURIZATION FANS
10 GAS LEAKAGE DETECTION SYSTEM
11 EMERGENCY LIGHTS
12 EXIT AND SAFETY SIGN AGES
13 FIRE EXTINGUISHERS
14 DOOR ALARMS
15 GAS CONTROL SOLENOIDS
16 SPRINKLER SYSTEM
17 HYDRANT POINTS
18 ELEVATOR EMERGENCY
COMMUNICATION SYSTEM
19 EXIT DOOR ALARM SYSTEM
20 FUEL TANKS

Chief Engineer/Dir of Engineering David Scally - General Manager


ACKNOWLEDGE APPROVED
SERVICE PROVIDERS DEFICIENCY LIST HANDOVER DATE
CONTACT DETAILS AND SIGN OFF AND SIGNATURE