Building Permit Card Sample

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Building Permit Card Sample

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CITY OF BRAMPTON - BUILDING DIVISION - MANDATORY INSPECTIONS

PERMIT No. : PROJECT ADDRESS :


The Building Code Act, Section 10.2(1) Notice of Readiness for Inspection requires that notification be provided when construction is ready to be inspected and OBC
Division C Article 1.2.2.1 requires the submission of reports arising from general review be submitted by an Architect, Professional Engineer or both.
PLEASE NOTE: Construction covered before the required inspection is completed will be required to be uncovered to be inspected. General review reports must be
provided to the Inspector throughout the construction progress.
BUILDING DIVISION To book an inspection, visit: https://www.brampton.ca/EN/residents/Building-Permits/Inspections/Pages/Request-an-Inspection.aspx
Please email any inspection reports (ie engineered fill inspection reports) to inspection.services@brampton.ca in .pdf format only.
THE FOLLOWING PRESCRIBED INSPECTIONS, INDICATED WITH A CHECK REPORTS ARISING FROM GENERAL REVIEW:

MARK ( ), MUST BE REQUESTED FOR THIS PROJECT. * THE ARCHITECT, ENGINEER(S) OR SITE SUPERINTENDENT MUST CONTACT THE
BUILDING INSPECTIONS INSPECTORS AT THE START OF CONSTRUCTION TO DETERMINE THE REPORTS
REQUIRED TO BE PROVIDED FOR THIS PROJECT.
Perimeter Insulation (Slab-on-grade)
NOTE: THE FAILURE TO PROVIDE REPORTS ON AN ONGOING BASIS WILL RESULT
 Start of Construction (Call for inspection prior to commencement of construction) IN THE ISSUANCE OF ORDERS TO COMPLY AND STOP WORK ORDERS AS
Footings (Prior to Concrete Pour) REQUIRED.
Backfill (Foundations)
 Structural Framing (Per Floor) The Architect and/or Professional Engineer shall undertake general review and provide
 Fire Separations, Closures and Fire Stopping reports to the Inspector in accordance with the Performance Standards of OAA && PEO.
 Interior Finishes
Fire Alarm Systems The Soils Engineer shall provide written verification of the required bearing capacity of the
soils prior to placement of footing
Sprinkler and Standpipe Systems
 Emergency Lighting and Power Structural framing (steel) - A CSA W-47 Certified Inspection agency shall provide to the

Sample Only
Fire Access Routes Inspector all reports including reports certifying compliance of structural steel erection
PUBLIC POOLS - Pool Deck, Dressing Rooms and Emergency Stop Systems with CAN/CSA - S16, CAN/ CSA S136 and CSA A660
 Occupancy - Partial and/or Complete (48 hrs. written notice of completion required) Structural framing (concrete) - Concrete strength reports and reinforcing steel inspection
 Final reports shall be provided for all concrete structural framing elements including footings,
foundations, walls, columns, structural slabs
PLUMBING INSPECTIONS
 Start of Construction (Call for inspection prior to commencement of construction) Compaction reports shall be provided for concrete slabs on grade
Fire Service Mains Roof construction - detailed inspection reports shall be provided by an independent
Outside Sewers testing agency
 Water Service The Architect/Engineer or an independent inspection agency shall provide verification of
 Underground Plumbing compliance with the applicable standard for any "tested" assembly
 Drains, Waste and Vents Sprinkler, Standpipe and Hose Systems
 Water Distribution System - Verification of installation testing and the required supervision by the Mechanical
 Plumbing Fixtures and Appliances Engineer and Contractor
PUBLIC POOLS - Suction, Gravity Outlets and Covers - (Submit Above Ground and Below Ground Contractor's Material & Test Certificates
PUBLIC POOLS - Circulation/Re-circulation Systems in conformance with NFPA-13 and NFPA-14 as applicable)
 Occupancy Partial and/or Complete (48 hrs. written notice of completion required) Verification by the Architect/Engineer responsible for general review that the energy
 Final efficient design elements have been completed and are in compliance with OBC Division
HVAC INSPECTIONS C Article 1.2.1.1.
 Start of Construction (Call for inspection prior to commencement of construction) Fire Alarm System
 Insulation, Vapour Barrier & Air Barrier - verification of testing for conformance with CAN/ULC S537-04
 HVAC Rough-in - verification of installation for conformance with CAN/ULC S524 -01
 Substantial Completion of HVAC Systems
Kitchen Exhaust Systems and Smoke Test Fire Protection and Life Safety Systems Integrated Testing
Fire Suppression Systems - Verification of Testing for conformance with CAN/ULC - S1001
 Occupancy - Partial and/or Complete (48 hrs. written notice of completion required) (Submit Integrated Systems Testing Plan/Report and Testing Certificate)
 Final Any additional reports that may be required by the Inspector during construction (eg.
* ADDITIONAL INSPECTIONS MAY BE REQUIRED emergency lighting, emergency power.)