0% found this document useful (0 votes)
36 views4 pages

Clab I

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views4 pages

Clab I

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

iHFG Standard Components

Room Layout Sheet

RLS Room Code clab-i


Room Name Catheter Laboratory Procedure Room RDS Room Code clab-i

ANMM ANAESTHETIC - MACHINE WITH ANAESTHETIC MONITOR O2 OXYGEN


SERVICES IN 2 x COM/2
AS ADJUSTABLE SHELF OPS/R OBSERVATION PANEL WITH SLIDING PANEL - RADIATION SHIELDING
PENDANT (SUP/S) 2 x O2
BH/PB BULKHEAD - PLASTERBOARD, PAINT FINISH OWIN OBSERVATION WINDOW 1 x N2O
BNL BENCH - LAMINATE PC2 PLASTERBOARD CORNICE, FLUSHED COVED 1 x MA
BRCCM BRACKET - CARDIAC MONITOR PO/1E POWER OUTLET - EMERGENCY, SINGLE 2x S
BRCS BRACKET - SHARPS PO/1I ISOLATED POWER SUPPLY - SINGLE 1 x SC
C CLOCK PO/2E POWER OUTLET - EMERGENCY, DOUBLE 1 x EC
1 x SAC
CARP CARDIAC PROTECTED PO/2U UNINTERRUPTED POWER SUPPLY - DOUBLE
6 x PO/1E
CBD/C CUPBOARD - CATHETER HANGING PO/C POWER OUTLET - CLEANER'S
6 x PO/1I
CBD/D CUPBOARD - DRAWER UNIT PU/IN1 PUMP - INFUSION, SINGLE 1 x DCE
CBD/FG CUPBOARD - FULL HEIGHT, GLASS DOORS PU/S PUMP - SYRINGE 1 x TA/DC (FOR SUPPLY UNIT BRAKES)
CBD/UB CUPBOARD - UNDER BENCH R/LA RACK - LEAD APRON
COM/1 COMMUNICATION OUTLET - SINGLE RAG RETURN AIR GRILLE
COM/2 COMMUNICATION OUTLET - DOUBLE S SUCTION SERVICES IN 1 x DCU/1
LIGHT 1 X COM/DC
CR CRASH RAIL SAC STAFF ASSIST CALL
DFP DOOR AND DOOR FRAME PROTECTION SB SUCTION BOTTLE
DFR DEFIBRILLATOR SBIN SHARPS BIN
EC EMERGENCY CALL SC SCAVENGE OUTLET
FR/DR FRIDGE - DRUG SK4 FLOOR VINYL COVED SKIRTING
IM/ACU IMAGING - ANGIOGRAPHY, CARDIAC IMAGING UNIT STAM STOOL - ADJUSTABLE, MOBILE
NOTE:
IM/CT IMAGING - CATHETERISATION TABLE SUP/S SUPPLY UNIT - SURGICAL RADIATION SHIELDING REQUIREMENTS TO BE PROVIDED
INJ/CMS INJECTOR - CONTRAST MEDIA, SINGLE T/A TROLLEY - ANAESTHETIC BY A QUALIFIED RADIATION SHIELDING CONSULTANT
INT INTERCOM T/I TROLLEY - INSTRUMENT
IVS IV STAND - MOBILE T/R TROLLEY - RESUSCITATION, ADULT
L/CC LIGHT - COLOUR CORRECTED TB/MY TABLE - MAYO
L/CCD LIGHT - COLOUR CORRECTED, DIMMABLE V1 VINYL FLOORING, STANDARD SLIP RESISTANT
L/OC LIGHT - OPERATING, WITH CAMERA WBC/120 WASTE BIN - CLINICAL, 120 LITRE
LIND/S LINEN CARRIER - DIRTY, SINGLE WBG/20 WASTE BIN - GENERAL, 20 LITRE
LS/DD LIGHT SWITCH - DOWNLIGHT DIMMER WPF WALL PAINT FINISH
LS/R2 LIGHT SWITCH - ROOM, 2 WAY XR-L X-RAY IN USE' LIGHT
MON/C MONITOR - CARDIAC

CL OF WALL CL OF WALL CL OF WALL CL OF WALL


2800 5600 2800

COMPUTER ROOM EQUIPMENT ROOM ALTERNATIVE LOCATION


(OPTIONAL) (OPTIONAL) FOR COMPUTER ROOM
(OPTIONAL)
CL OF WALL

CL OF IM/CT 1000 CLEAR


OPENING

CR

CBD/FG DOOR TO
EQUIPMENT ROOM
(OPTIONAL)
1800

CBD/C
WITH
GLASS SUPPLY DISPENSING
SLIDING SYSTEM: AUTOMATED,
DOORS CATHETER, AUXILIARY
UNIT (OPTIONAL)
FR/DR

ALTERNATIVE
CATHETER LAB SUPPLY DISPENSING
OWIN (LEAD GLASS)

SYSTEM: AUTOMATED, LOCATION FOR


CONTROL/
WBG/20

CATHETER, MAIN UNIT CATHETER LAB


REPORTING ROOM
SUP/S

(OPTIONAL)
MON/C

T/R CONTROL/
BRCCM

DFR
REPORTING ROOM
IM/ACU
3100

CEILING RAIL FOR C-


STAM
7500

SBIN ARM UNIT


BRCS (INSTALLATION TO
IM/CT MANUFACTURER'S
DETAILS)
STAM
ANMM
920MM CLEAR
L/OC

CR
BNL

OPENING

INT
INJ/CMS

DOOR TO SCRUB
920 CLEAR
OPENING

T/A
(ALTERNATIVE
SCRUB LOCATION)

42 m² 1 T/I
CARP FLOOR=V1
4 2 ALTERNATIVE LOCATION
3
IVS FOR SCRUB
2x PU/S
2x PU/IN1
R/LA

LIND/S WBC/120 TB/MY


1600 CLEAR
920MM CLEAR CR
OPENING
OPENING
XR-L
PATIENT ENTRY / EXIT
PLAN
REV DESCRIPTION DATE BY REV DESCRIPTION DATE BY COMPATIBILITY
1 FIRST ISSUE 24.10.10 CT 4 GENERAL REVISION 24.11.22 BV
2 GENERAL REVISION 30.08.11 MT iHFG
3 GENERAL REVISION 31.10.12 KC
International Health Facility Guidelines at: DESIGNED APPROVED DATE SCALE(S) SHEET
International Health www.healthdesign.com.au/ihfg
Editable version of Standard Components on BV RH 24.11.22 1 : 50 1 OF 4
Health Facility Briefing System (HFBS) at: REVIT FILE NAME PAPER DRAWING ID ISSUE
Facility Guidelines www.healthdesign.com.au ©TAHPI
clab-i clab-i-1 4
This document is for advisory purpose only
iHFG Standard Components
Room Layout Sheet

RLS Room Code clab-i


Room Name Catheter Laboratory Procedure Room RDS Room Code clab-i

ANMM ANAESTHETIC - MACHINE WITH ANAESTHETIC MONITOR CL OF IM/CT


AS ADJUSTABLE SHELF 3000
BH/PB BULKHEAD - PLASTERBOARD, PAINT FINISH PC2 PC2
BNL BENCH - LAMINATE WPF WPF
BRCCM BRACKET - CARDIAC MONITOR SUP/S IM/ACU
BRCS BRACKET - SHARPS
C CLOCK 2200
CARP CARDIAC PROTECTED CBD/C OPTIONAL DOOR TO
CBD/C CUPBOARD - CATHETER HANGING EQUIPMENT ROOM
CBD/D CUPBOARD - DRAWER UNIT
CBD/FG CUPBOARD - FULL HEIGHT, GLASS DOORS
CBD/UB CUPBOARD - UNDER BENCH
COM/1 COMMUNICATION OUTLET - SINGLE
COM/2 COMMUNICATION OUTLET - DOUBLE
900
CR CRASH RAIL
CR CR
DFP DOOR AND DOOR FRAME PROTECTION 600
DFR DEFIBRILLATOR PO/2E
EC EMERGENCY CALL
FR/DR FRIDGE - DRUG 150
IM/ACU IMAGING - ANGIOGRAPHY, CARDIAC IMAGING UNIT 0 SK4 SK4
IM/CT IMAGING - CATHETERISATION TABLE
INJ/CMS INJECTOR - CONTRAST MEDIA, SINGLE
INT INTERCOM ELEVATION 1
IVS IV STAND - MOBILE
L/CC LIGHT - COLOUR CORRECTED
3000
L/CCD LIGHT - COLOUR CORRECTED, DIMMABLE
L/OC LIGHT - OPERATING, WITH CAMERA PC2 PC2
WPF WPF
LIND/S LINEN CARRIER - DIRTY, SINGLE
LS/DD LIGHT SWITCH - DOWNLIGHT DIMMER AUTOMATED AUTOMATED
SUPPLY SUPPLY
LS/R2 LIGHT SWITCH - ROOM, 2 WAY
STATION - STATION -
MON/C MONITOR - CARDIAC
AUX UNIT MAIN UNIT DOOR TO SCRUB
O2 OXYGEN (ALTERNATIVE
OPS/R OBSERVATION PANEL WITH SLIDING PANEL - RADIATION SHIELDING LOCATION)
1700
OWIN OBSERVATION WINDOW
PC2 PLASTERBOARD CORNICE, FLUSHED COVED T/R
PO/1E POWER OUTLET - EMERGENCY, SINGLE
ANMM INJ/CMS
PO/1I ISOLATED POWER SUPPLY - SINGLE
T/I
PO/2E POWER OUTLET - EMERGENCY, DOUBLE 900 DFR T/A TB/MY
PO/2U UNINTERRUPTED POWER SUPPLY - DOUBLE CR
PO/C POWER OUTLET - CLEANER'S 600

RAG
PO/2U

PO/2U
COM/1

COM/1

PU/IN1 PUMP - INFUSION, SINGLE

COM/2
PO/2E
PU/S PUMP - SYRINGE PO/2E BRCS
150 SBIN
R/LA RACK - LEAD APRON
0 SK4 SK4 SK4
RAG RETURN AIR GRILLE
S SUCTION FOR SUPPLY DISPENSING
SYSTEMS (OPTIONAL)
SAC STAFF ASSIST CALL
SB
SBIN
SUCTION BOTTLE
SHARPS BIN
ELEVATION 2
SC SCAVENGE OUTLET
SK4 FLOOR VINYL COVED SKIRTING CL OF ROOM
STAM STOOL - ADJUSTABLE, MOBILE 3000
SUP/S SUPPLY UNIT - SURGICAL PC2 PC2
WPF WPF
T/A TROLLEY - ANAESTHETIC
T/I TROLLEY - INSTRUMENT
2400
T/R TROLLEY - RESUSCITATION, ADULT C
TB/MY TABLE - MAYO 2200
V1 VINYL FLOORING, STANDARD SLIP RESISTANT IVS DOOR TO CORRIDOR
WBC/120 WASTE BIN - CLINICAL, 120 LITRE R/LA
WBG/20 WASTE BIN - GENERAL, 20 LITRE
WPF WALL PAINT FINISH 2x PU/IN1 100
XR-L X-RAY IN USE' LIGHT
2x PU/S
TB/MY WBC/120 LIND/S
900
SERVICES IN 2 x COM/2 CR DFP DFP
600
PENDANT (SUP/S) 2 x O2
PO/2E

1 x N2O
PO/C

1 x MA
2x S 150
0 SK4 SK4 SK4
1 x SC
1 x EC
1 x SAC
6 x PO/1E
6 x PO/1I
ELEVATION 3
1 x DCE
1 x TA/DC (FOR SUPPLY UNIT BRAKES)
3000
PC2 PC2 PC2
SERVICES IN 1 x DCU/1 WPF WPF BH/PB BH/PB
LIGHT 1 X COM/DC

2200 DOOR TO SCRUB


OWIN (LEAD GLASS) CBD/C CBD/FG
OPS/R

AS
100 100
INT WITH
HANDSFREE MIC
AS

1100
AS
LS/DD
LS/R2

900 2xPO/2E COM/2 BNL


DFP WPF
600 AS
AS AS WBG/20
PO/2E
COM/1
RAG

NOTE: 150 CBD/UB CBD/D FR/DR


RADIATION SHIELDING REQUIREMENTS TO BE PROVIDED 0 SK4 SK4 SK4
BY A QUALIFIED RADIATION SHIELDING CONSULTANT 4 x EQ 1000
SK4 SK4
ELEVATION 4
REV DESCRIPTION DATE BY REV DESCRIPTION DATE BY COMPATIBILITY
1 FIRST ISSUE 24.10.10 CT 4 GENERAL REVISION 24.11.22 BV
2 GENERAL REVISION 30.08.11 MT iHFG
3 GENERAL REVISION 31.10.12 KC
International Health Facility Guidelines at: DESIGNED APPROVED DATE SCALE(S) SHEET
International Health www.healthdesign.com.au/ihfg
Editable version of Standard Components on BV RH 24.11.22 1 : 50 2 OF 4
Health Facility Briefing System (HFBS) at: REVIT FILE NAME PAPER DRAWING ID ISSUE
Facility Guidelines www.healthdesign.com.au ©TAHPI
clab-i clab-i-2 4
This document is for advisory purpose only
iHFG Standard Components
Room Layout Sheet

RLS Room Code clab-i


Room Name Catheter Laboratory Procedure Room RDS Room Code clab-i

GENERAL NOTES:
THIS DRAWING TO BE READ IN CONJUNCTION WITH R.D.S.
(ROOM DATA SHEETS) WHICH TAKES PRECEDENCE.

ALL SERVICES INDICATED ARE INDICATIVE AND SUBJECTED TO


DETAILED PROJECT SPECIFIC ENGINEERING DESIGN.

CEILING LEGEND:
CEILING TYPE
CORNICE TYPE
BP-PC2
2700 HEIGHT ABOVE F.F.L.

BH/PB PLASTERBOARD BULKHEAD, PAINT FINISH


PB-PC2 PLASTERBOARD FLUSH SET CEILING, PAINT FINISH WITH
FLUSHED COVE CORNICE
GRID LINE

ELECTRICAL LEGEND:

L/CC LIGHT - COLOUR CORRECTED

L/CCD LIGHT - COLOUR CORRECTED, DIMMABLE

MECHANICAL LEGEND:

CL CL OF ROOM
SUPPLY AIR GRILLE CL
1550 1550

RETURN AIR GRILLE OR L/CCD


TRANSFER AIR GRILLE L/CCD L/CCD
BH/PB
2200

L/CC L/CC
2700

FIRE SERVICES LEGEND:


SMOKE DETECTOR

SPRINKLER CT SCANNING -
CONTROL ROOM
(REF. ROOM CTCR FOR DETAILS) L/CC L/CC

L/CCD L/CCD
CL

PB-PC2
3000

SETTING OUT
POINT FOR SUP/S
2000

L/CC L/CC

SETTING OUT
POINT FOR L/OC

L/CCD L/CCD
CL

L/CC L/CC L/CC

PB-PC2
3000

L/CCD L/CCD L/CCD

XR-L

REFLECTED CEILING PLAN

REV DESCRIPTION DATE BY REV DESCRIPTION DATE BY COMPATIBILITY


1 FIRST ISSUE 24.10.10 CT 4 GENERAL REVISION 24.11.22 BV
2 GENERAL REVISION 30.08.11 MT iHFG
3 GENERAL REVISION 31.10.12 KC
International Health Facility Guidelines at: DESIGNED APPROVED DATE SCALE(S) SHEET
International Health www.healthdesign.com.au/ihfg
Editable version of Standard Components on BV RH 24.11.22 1 : 50 3 OF 4
Health Facility Briefing System (HFBS) at: REVIT FILE NAME PAPER DRAWING ID ISSUE
Facility Guidelines www.healthdesign.com.au ©TAHPI
clab-i clab-i-3 4
This document is for advisory purpose only
iHFG Standard Components
Room Layout Sheet

RLS Room Code clab-i


Room Name Catheter Laboratory Procedure Room RDS Room Code clab-i

ISOMETRIC VIEW 1

ISOMETRIC VIEW 2

REV DESCRIPTION DATE BY REV DESCRIPTION DATE BY COMPATIBILITY


1 FIRST ISSUE 24.10.10 CT 4 GENERAL REVISION 24.11.22 BV
2 GENERAL REVISION 30.08.11 MT iHFG
3 GENERAL REVISION 31.10.12 KC
International Health Facility Guidelines at: DESIGNED APPROVED DATE SCALE(S) SHEET
International Health www.healthdesign.com.au/ihfg
Editable version of Standard Components on BV RH 24.11.22 4 OF 4
Health Facility Briefing System (HFBS) at: REVIT FILE NAME PAPER DRAWING ID ISSUE
Facility Guidelines www.healthdesign.com.au ©TAHPI
clab-i clab-i-4 4
This document is for advisory purpose only

You might also like