Concrete Steel Qty

Uploaded by

bejay bermudez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views9 pages

Concrete Steel Qty

Uploaded by

bejay bermudez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Bored Piles

Ø Qty Length Tot. Length Shift Time/shift Prop. Rigs Piles/day Drill/day Duration Duration
% Eff.
mm nos. m m nos hrs nos. nos. m days Working days month
1200 190 18 3420 2 20 2 12 216 15.833 80% 26 0.761

with materials without materials


Bored Piles 1200mm 1211.47 Dhs/m 1200mm 255.40 Dhs/m
Duration Unit Rate Amount Duration Unit Rate Amount
Items Unit Qty Unit Qty
monthly monthly AED days monthly AED
Drilling Rig 1.242 nos 1 50,000.00 62,099.36 1.242 nos 1 50,000.00 62,099.36
Crawler Crane (50 ton 1.242 nos 2 30,000.00 74,519.23 1.242 nos 2 30,000.00 74,519.23
Mobile Crane 1.242 nos - 1.242 nos -
Machineries and Equipments (owned)

Abi Machine 1.242 nos - 1.242 nos -


Vibro hammer 1.242 nos - 1.242 nos -
Shovel 1.242 nos - 1.242 nos -
JCB 1.242 nos - 1.242 nos -
Bobcat 1.242 nos - 1.242 nos -
Excavator 1.242 nos - 1.242 nos -
Generator 1.242 nos - 1.242 nos -
Air Compressor 1.242 nos - 1.242 nos -
Desander 1.242 nos - 1.242 nos -
Bentonite Mixer 1.242 nos - 1.242 nos -
Welding machine 1.242 nos - 1.242 nos -
Tower Light 1.242 nos - 1.242 nos -
Pumps 1.242 nos - 1.242 nos -
Water Tanks 1.242 nos - 1.242 nos -
Drilling Rig (1 shift) 0.761 nos 1 120,000.00 91,346.15 0.761 nos 1 120,000.00 91,346.15
Crawler Crane (50 ton 0.761 nos 50,000.00 - 0.761 nos 50,000.00 -
Mobile Crane 0.761 nos 35,000.00 - 0.761 nos 35,000.00 -
Machineries and Equipments (Rental)

Abi Machine 0.761 nos 120,000.00 - 0.761 nos 120,000.00 -


Vibro hammer 0.761 nos 1 140,000.00 106,570.51 0.761 nos 1 140,000.00 106,570.51
Shovel 0.761 nos 25,000.00 - 0.761 nos 25,000.00 -
JCB 0.761 nos - 0.761 nos - -
Bobcat 0.761 nos - 0.761 nos - -
Excavator 0.761 nos - 0.761 nos - -
Generator 0.761 nos 5,000.00 - 0.761 nos 5,000.00 -
Air Compressor 0.761 nos 5,000.00 - 1.000 nos 5,000.00 -
Desander 0.761 nos 12,500.00 - 1.000 nos 12,500.00 -
Bentonite Mixer 0.761 nos 12,500.00 - 1.000 nos 12,500.00 -
Welding machine 0.761 nos 1 1,500.00 1,141.83 0.761 nos 1 1,500.00 1,141.83
Tower Light 0.761 nos 3 1,500.00 3,425.48 0.761 nos 3 1,500.00 3,425.48
Pumps 0.761 nos 3 1,500.00 3,425.48 0.761 nos 3 1,500.00 3,425.48
Water Tanks 0.761 nos 3 1,500.00 3,425.48 0.761 nos 3 1,500.00 3,425.48
Project Manager 1.761 nos 1 15,000.00 26,418.27 1.761 nos 1 15,000.00 26,418.27
Safety Manager 1.761 nos 12,000.00 - 1.761 nos 12,000.00 -
Site Engineer / QA/Q 1.761 nos 2 8,000.00 28,179.49 1.761 nos 2 8,000.00 28,179.49
Safety Engineer 1.761 nos 2 6,500.00 22,895.83 1.761 nos 2 6,500.00 22,895.83
Document Controller 1.761 nos 1 5,000.00 8,806.09 1.761 nos 1 5,000.00 8,806.09
Surveyor 1.761 nos 1 5,000.00 8,806.09 1.761 nos 1 5,000.00 8,806.09
Personnel

Foreman 1.761 nos 2 5,500.00 19,373.40 1.761 nos 2 5,500.00 19,373.40


Operator 1.761 nos 8 4,000.00 56,358.97 1.761 nos 8 4,000.00 56,358.97
Rigger (1) 1.761 nos 4 3,900.00 27,475.00 1.761 nos 4 3,900.00 27,475.00
Labour (3) 1.761 nos 12 2,600.00 54,950.00 1.761 nos 12 2,600.00 54,950.00
Electrician 1.761 nos 1 4,500.00 7,925.48 1.761 nos 1 4,500.00 7,925.48
Mechanic 1.761 nos 1 4,500.00 7,925.48 1.761 nos 1 4,500.00 7,925.48
Materials/Consumables

Welder 1.761 nos 2 3,500.00 12,328.53 1.761 nos 2 3,500.00 12,328.53


CNIA Pass nos 300.00 - nos 300.00 -
Visa Expense nos 2,500.00 - nos 2,500.00 -
Concrete 0.761 m3 4544.93709 285.00 1,295,307.07 0.761 m3 4544.93709435 -
Steel bar 0.761 tons 727.189935 2,160.00 1,570,730.26 0.761 tons 727.189935096 -
Transportation charg 0.761 trips 26 1,500.00 39,000.00 0.761 trips 26 1,500.00
Diesel 0.761 gal 181 8.20 29,374.79 0.761 gal 181 8.20 29,374.79
Polymer 0.761 bags 375.00 - 0.761 bags 375.00 -
Bentonite 0.761 bags 0 15.00 - 0.761 bags 15.00 -
Sweet Water (5000) 0.761 trips 0 490.00 - 0.761 trips 490.00 -
Bullet Teeth 0.761 nos 1 500.00 500.00 0.761 nos 1 500.00 500.00
Electrode 0.761 kg 1 1,000.00 1,000.00 0.761 kg 1 1,000.00 1,000.00
Binding wire 0.761 ton 9.45346916 3,700.00 34,977.84 0.761 kg 9.45346915625 3,700.00
Pile Spacers 0.761 nos 4560 0.55 2,508.00 0.761 nos 4560 0.55
D clamps 0.761 nos 5.00 - 0.761 nos 55.00 -
Oxygen 0.761 nos 3 200.00 600.00 0.761 nos 3 200.00 600.00
Acetylene 0.761 nos 3 300.00 900.00 0.761 nos 3 300.00 900.00
Oil 0.761 liters 1 2,000.00 1,522.44 0.761 liters 1 2,000.00 1,522.44
Main Rope 0.761 m 60 200.00 9,134.62 0.761 m 60 200.00 9,134.62
Service Rope 0.761 m 30 200.00 4,567.31 0.761 nos 30 200.00 4,567.31
Casing L= (13 | 13) 0.761 nos 8 1,800.00 87,457.50 0.761 nos 8 1,800.00 87,457.50
Auger 0.761 nos 2 5,500.00 8,373.40 0.761 nos 2 5,500.00 8,373.40
Bucket 0.761 nos 2 4,500.00 6,850.96 0.761 nos 2 4,500.00 6,850.96
Tremie Pipe 0.761 m 25 365.00 9,125.00 0.761 m 25 365.00 9,125.00
Sling Belts 0.761 nos 2 100.00 152.24 0.761 nos 2 100.00 152.24
cessories
Accessories
2 legged chains 0.761 nos 2 100.00 152.24 0.761 nos 2 100.00 152.24
Tremie holder 0.761 nos 1 500.00 380.61 0.761 nos 1 500.00 380.61
PPE 0.761 nos 37 100.00 2,816.51 0.761 nos 37 100.00 2,816.51
Steel Cage hooks 0.761 nos 48 50.00 1,826.92 0.761 nos 48 50.00 1,826.92
Grease gun 0.761 nos 1 150.00 114.18 0.761 nos 1 150.00 114.18
Tremie wire ropes 0.761 nos 5 100.00 380.61 0.761 nos 5 100.00 380.61
Wire rope slings 0.761 nos 1 500.00 380.61 0.761 nos 1 500.00 380.61
others 0.761 nos 1,000.00 - 0.761 nos 1,000.00 -
Pile Head Breaking m 266 300.00 nos 266 300.00
Steel Fixing tons 727.189935 450.00 327,235.47 nos 727.189935096 450.00
Subcontractors

Signboard nos - nos -


Fencing/Hoarding nos/m 190.00 - nos 190.00 -
Excavation m3 25.00 - nos 25.00 -
Guidewall m 175.00 - nos 150.00 -
Capping Beam m 200.00 - nos 175.00 -
Staff Accomodation 0.761 rooms 4 5,000.00 15,224.36 0.761 rooms 4 5,000.00 15,224.36
Staff transpo 0.761 nos 5 1,000.00 3,806.09 0.761 nos 5 1,000.00 3,806.09
Office Facility 0.761 nos 1 5,000.00 3,806.09 0.761 nos 1 5,000.00 3,806.09
Telephone 0.761 nos 9 500.00 3,425.48 0.761 nos 9 500.00 3,425.48
Allowances 0.761 nos 5 500.00 1,903.04 0.761 nos 5 500.00 1,903.04
Miscellaneous

Site Office 0.761 nos 1 5,000.00 3,806.09 0.761 nos 1 5,000.00 3,806.09
Food (staff) 0.761 nos 6 1,300.00 5,937.50 0.761 nos 6 1,300.00 5,937.50
Food (labour) 0.761 nos 30 780.00 17,812.50 0.761 nos 30 780.00 17,812.50
Labor Accomodation 0.761 rooms 8 3,000.00 18,269.23 0.761 rooms 8 3,000.00 18,269.23
Labor Transpo 0.761 nos 1 6,500.00 4,947.92 0.761 nos 1 6,500.00 4,947.92
Certificates 0.761 nos 1 1,000.00 761.22 0.761 nos 1 1,000.00 761.22
Safety requirements 0.761 nos 1 1,000.00 761.22 0.761 nos 1 1,000.00 761.22
AD registration for e 0.761 nos 20,000.00 - 0.761 nos 20,000.00 -
Lowbed 0.761 trips 10 - 0.761 nos 2 2,500.00 5,000.00
Demob
Mob/

Flat bed 0.761 trips 20 - 0.761 nos 4 700.00 2,800.00


Rentals 2.000 nos 21,000.00 - 2.000 nos 21,000.00 -
SLT - NWP Ser. Load = 680.0 t (2.0 x S.L.) 21,806.45 Ser. Load = 680.0 t (2.0 x S.L.) 4,597.19
- Kentledge test test
- Crown + Anchor test 1 54,400.00 54,400.00 test 1 54,400.00 54,400.00
- Reaction Pile test test -
- Instrumentation test 1 11,000.00 11,000.00 test 1 11,000.00 11,000.00
- Monitoring/Report test 1 2,500.00 2,500.00 test 1 2,500.00 2,500.00
- Integrity Test test 1 10.00 10.00 test 1 10.00 10.00
- Caliper Logging test 1 700.00 700.00 test 1 700.00 700.00
- CSL test 1 883.00 883.00 test 1 883.00 883.00
- Dynamic test 4,200.00 - test 4,200.00 -
- Lateral test test
- Tension test test
Hydraulic jack test 3,500.00 - test 3,500.00 -
Main Beam nos 18,000.00 - test 18,000.00 -
Pile Testing Works

Secondary Beam nos - - test - -


SLT - WP Ser. Load = 680.0 t (1.5 x S.L.) Ser. Load = 680.0 t (1.5 x S.L.)
- Kentledge nos nos
- Crown + Anchor nos 1 35,700.00 35,700.00 nos 35,700.00 -
- Reaction Pile nos nos -
- Instrumentation nos 1 11,000.00 11,000.00 nos 11,000.00 -
- Monitoring/Report nos 1 2,500.00 2,500.00 nos 2,500.00 -
- Integrity Test nos 1 10.00 10.00 nos 10.00 -
- Caliper Logging nos 700.00 - nos - -
- CSL nos 1 883.00 883.00 nos 883.00 -
- Dynamic nos 1 4,200.00 4,200.00 nos 4,200.00 -
Hydraulic jack test 3,500.00 - test - -
Main Beam nos 18,000.00 - nos 18,000.00 -
Secondary Beam nos - - nos - -
Dynamic Load Test
- Monitoring/Report test 1 700.00 700.00 test 1 700.00 700.00
- Hammer + transpo test 1 3,500.00 3,500.00 nos 1 4,500.00 4,500.00
Caliper Logging test test 700.00 - test 700.00 -
Integrity Test test 190 10.00 1,900.00 test 190 10.00 1,900.00
Crosshole Sonic test 200.00 - test 200.00 -
-Sonic pipes nos 55.00 - nos 0 55.00 -
Rotary Coring test 5,000.00 - nos 5,000.00 -

DRILLING COST AED 4,143,225.47 DRILLING COST AED 873,466.83


TESTING COST AED 151,692.45 TESTING COST AED 81,190.19

Cost per meter AED 1,211.47 Cost per meter AED 255.40
Quotation cost/m AED 1,650.00 Quotation cost/m AED 320.00
Quotation Amount AED 5,643,000.00 Quotation Amount AED 1,094,400.00
Profit 26.58% Profit 20.2%
Materials / Type Qty Current Price
Suppliers Supplier 1 Supplier 2
Concrete C40 4544.94m³
Steel Ø16mm 147 tons
Ø40mm 581 tons
Pile Spacer Ø80mm 4560 nos.
Binding Wire 16 gauge 9.45 tons
t Price
Supplier 3
600 ø
= 600 mm 66 PILES Qty Bar Wt. Factor
Main bar : 10 T 20 dia
Spiral : T 10 @100 mm c/c 8
Pile length : 12.00 m development bar .00 m 10
Main bar consider L = 12.00 m overlap .00 m 12
no. of overlap 1 16
W = 2.47kg/m x 12 m x 10 nos. x 66 piles 20
22
W= 19.562 tons 20.54052 25
32
Spiral (T10@100 mm c/c) 40

ø = 450 mm inner rings dia 390 mm


PERIMETER (πd) = 1.40 m Ring length 1.23 m
Spacing 4.00 m
CONCRETE AND STEEL QUANTITY

NO. OF RINGS = 120 nos. QTY 198 nos.


TOT. WT 0.6015438 0.631621
Ring length = 120nos. x 1.4m

= 168.00 m

No. of bars = 14.00 bars

Overlap = 14bars x 0.5

= 7.00 m

Tot Ring length = 175.00 m

No. of bars = 15.00 bars per pile

Wt. in tons = 0.617kg/m x 12 m x 15 nos. x 66 piles

Wt. in tons = 7.33 tons 7.696458 29.00 tons

TOTAL CONCRETE: C40/20 :


C40 224 m³ 258 310.65263
CONCRETE VOLUME:
C20 224 m³ 258 257.52263
guide wall 23 m³ 27
capping beam 23 m³ 27

STEEL QUANTITY 27.49 tons 29 30.932076


guide wall .77 tons 1
capping beam 1.19 tons 2

20
16
10
Bar Wt. Factor CAPPING BEAM 1 (500mm x 600mm)
wt/m no. Fac.
0.395 210 1.00 P : 77.00 m
0.617 135 1.00
0.888 92 1.02 Concrete Cover : 50 mm
1.58 52 1.01
2.47 33 1.02 Stirrup length : 1.0 m
2.98 27 1.04
3.85 21 1.03 Main Bar length : 12 m
6.31 13 1.02
9.86 8 1.06 Main Bar : 6 T 16 mm

Length of MB : 462 m

12m 3 36 Splicing length : 5.13 m


7.6m 1 7.6
Total Length of MB : 469.00 m
CAPPING BEAM

Wt. of MB : 1.58kg/m x 469 m


GUIDEWALL

Wt. of MB : .74 tons

Stirrups : T 10 @200 mm c/c

Stirrup length : 1.9 m

No. of stirrups : 385 nos.

Wt. of Stirrups : 0.617kg/m x 1.9 m x 385 nos.

Wt. of Stirrups : .45 tons

CONCRETE VOLUME + 10% WASTAGE : 23.10 m³

STEEL QUANTITY + 5% WASTAGE : 1.19 tons

1.03
1.77

20.54052 47243.2
0.778071 1789.563
8.1703603 18791.83
67,824.59
Bar Wt. Factor
dia wt/m no. Fac.
8 0.395 210 1.00
10 0.617 135 1.00
12 0.888 92 1.02
16 1.58 52 1.01
20 2.47 33 1.02
22 2.98 27 1.04
25 3.85 21 1.03
32 6 13 1.02
40 9.86 8 1.06

L W
Capping Beam Dimension 500 600
stirrup 400 500

main bar 41 nos. at every 12m span


0.778071 6 nos. of steel bar on each span

0.473902
Pile Dia 800 mm
Main Bar
1st cage 18 T 25 mm
2nd Cage 9 T 25 mm
3rd cage 9 T 25 mm
Stirrups
1st cage T18 @100 mm c/c
Total Length
31 m

800