0% found this document useful (0 votes)
559 views7 pages

Rescue Boat Davit

Viking Norsafe Rescue boat davit Year 2007 NDSC-25

Uploaded by

Pratham Kamboj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
559 views7 pages

Rescue Boat Davit

Viking Norsafe Rescue boat davit Year 2007 NDSC-25

Uploaded by

Pratham Kamboj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 7
VIKIN Enterprise No.: NO940411696 p NORSAFE www. VIKING-Hfe.com Boats and davits NDSC-25 — Rescue Boat Davit TECHNICAL SPECIFICATION ‘Tybakken 90, N-4818 Faervik P.O, Box 115, N-4852 Faervik ‘Arendal, Norway Tel: +47 37 05 85 00 Fax: +47 37 05 85 01 i ae a ce ce E-mail: VIKING-Norsafe@VIKING-life.com VIKING ProjectNo. Standard VIKING Doe. No: 150-0046, 1, REGULATION AND CERTIFICATION Applicable rules and regulations —_In accordance with IMO/ SOLAS requirements, LSA Code and European Council Directive 2014/90/EU on Marine Equipment (MED) Certificate MED Other certificate Class certificate or flag acceptance on request 2. DAVIT SPECIFICATION 2.1. GENERAL DAVIT Type Rescue Boat Davit Mode! Nosc-25 Application Rescue boat & Life raft handling Drawing reference {©-500202, G-500203, G-500204 Execution Hydraulic slewing arm davit Boarding position Inboard / Outboard on deck level Operating position From deck side and from inside the boat (Gravity lowering) Davit system weight (Approx.) 2000 ka, davit incl. winch (dry weight) ‘Safe Working Load (SWL) 2500 kg (max. 4 m slewing radius) Trim / list conditions 40" /20° Max. lowering height 40 m (including 10°/20° trimilst condition) Operation temperature 20°C till +45°C (other range on request) Min. hoisting speed Hydraulically 18 m/min Not less than that obtained from the formula S=0.4+(0.02H), pease ‘and not exceed 1.3 mis. oom) Manual hoisting By manual hand-cranking Pivot bearing type Slewing bearing Wire sheaves Galvanized, equipped with ball bearings installation 1 (one) deck welding point (reduced installation time) Deck reinforcement requirements See general arrangement drawing Davit system H/ W/D ‘See general arrangement drawing Deck space required ‘See general arrangement drawing The VIKING Norsafe NDSC slewing davit system is especially designed for safe and efficient launching and retrieval of VIKING Norsafe Rescue Boats and life rafts. The davit system is designed for long time operation in a tough and corrosive marine/offshore environment and to futfl all requirements as given in latest SOLAS/IMO requirements. The system will allow: = Hoisting and lowering of the fully loaded rescue boat up to 20° list and 10° trim. ~ Gravity lowering of the fully loaded boat up to 20° list and 10° trim, completely independent of any power supply. - Hoisting of the loaded rescue boat by electric motor. & VIKING “VIKING Project No.: Standard ‘VIKING Doc. No TSD-0046, NORSAFE to bam (98.03.2022 Rev. No: 7 = Dead ship slewing of the rescue boat by the nitrogen accumulator installed on the davit arm. - Retrieval of the rescue boat by manual hoisting, - Manual slewing by hand pump. The davit system has a hydraulically driven, mechanical slewing jib and an electric driven winch with single wire fall. Slewing and dead ship slewing functions are driven by a small hydraulic power pack. The hydraulic system is equipped with a stored power unit - which allows full operation of the davit in “dead ship” conditions. The davit is designed to achieve optimum performance in terms of safety and reliability, and minimal maintenance levels. All selected equipment is chosen and installed to ensure the lowest possible ‘emission of sound and for good access for service and repair. A HPU is included, and is located inside of the davit pedestal. All internal hydraulic piping is properly done and completed on the entire davit system, A remote control for start/stop of el motor on HPU as well as hoisting and slewing control is also included. When the button is released, davit operation will cease immediately. A thermal overload relay in the starter cabinet protects the electrical motor against overheating in case of excessive loads. A safety valve is installed in the hydraulic power unit. This safety valve prevents the davit from slewing loads in excess of the Safe Working Load and protects the system and motor from being overloaded, The winch is fitted with a one-way clutch. In the event of power loss during hoisting, the brake will automatically activate and davit motion will stop. A centrifugal brake is located on the winch. The brake controls the speed of descent for the lifeboat. The brake is enclosed, and provides reliable operation in all climate conditions. Electrical limit switches are used to cut power to the winch, if the boat is hoisted above stowage height, Electrical limit switches will prevent the boat from being hoisted above its upmost position / stowed position. Electrical limit switches on the winch provide failsafe operation of the hand crank. For launching in dead ship conditions, stored power from accumulator and gravity lowering system in winch provides safe launching, Starter cabinet is mounted on HPU as standard. All electrical cables for davit control, included 42V AC to rescue boat when that is needed is installed and terminated by VIKING Norsafe. Only main power supply is required 2.2 WINCH AND WIRE Type DW-25 winch Drawing reference Ds-00712 Electrical hoisting and lowering / Gravity lowering / Execution Manually hoisting / Manually fast hoisting Brakes type Centrifugal brakes Wire rope type Galvanized, rotation resistant (certified item) VIKING VIKING PojetNa:Standats ——-VKING Dos. No TSO-4048, NORSAFE Rev. ate: 06.05.2022 Rev. No: Wire rope diameter, MBL and spec. Inner / outer wire end Connection shackle in thimble 2.3. ELECTRICAL Electric power supply Electrical cabinet Remote control imit switch Power consumption Starting method Duty rating Motor space heating Wiring Cables type Transformer Emergency stop 2.4. HYDRAULIC Type Oil flow Max. working pressure Oil amount Motor type Hydraulic accumulators ‘System fittings Fittings and hose fittings Tubes 2.5. PAINTING SYSTEM Blasting Specification System Coating Two (2) layers (other on request) Total dry film thickness 2.6. DOCUMENTATION Technical specification davit General arrangement drawing Hydraulic flow diagram & VIKING NORSAFE © 16 mm, MBL 150 kN, 1960N/mm2 Secured to drum / Swaged eye Included (cerifed item) 440Vi3ph/60Hz (other on request) P56 IP56 P56 11.6 kW (HPU); 11.6 kW (Winch) DOL - Direct on line S2-10 min Included, 40w Included, (only power supply cable required) Marine type, flame retardant halogen free Included, 440/42VAC (other on request) Yes, mushroom type Independent integrated hydraulic system 22.7 Wmin (at 50Hz); 27.4 limin (at 60Hz) 230 bar 471 132M-4 ‘1x Bladder type 40L (120 degree slewing angle) ISO 8434-1 (DIN 2353) bite type fittings Zine chromate Cr(VI)-ree, secured with Denso tape AISI 316L SA25 ISO 129485 Marine paint system (Jotun paint system) Layer 1 Penguard universal, Alu - 190 um Hardtop XP - 50 ym RAL 9016 (Traffic white) 240 um According to contract specification ‘According to contract specification According to contract specification VIKING Projec.No. Stndaré VIKING Doe, No: 150-0046, HPU drawing ‘According to contract specification Electrical wiring diagram ‘According to contract specification Starter cabinet drawing ‘According to contract specification Product certificate According to contract specification Lubrication oil chart VIKING Norsafe standard Spareparts list VIKING Norsafe standard Operation & Maintenance manual VIKING Norsafe standard Installation manual VIKING Norsafe standard Preservation & storage procedure VIKING Norsafe standard 3. PACKING Format Packed for transport in a 40 ft standard container 4. OPTIONS Note: Some options influence davit weight and performance, some option combinations may be incompatible. Maximum SWL must not be exceeded. marking means tobe supplied by maker, C1 marking means not supplied by maker. ESET ‘Combined rescue / raft davit function (maximum handling of rescue boat and 2 rafts) Rescue boat release hook ‘Automatic release raft hook (including triangle plate) Combined raft-rescue hook Winterization / cold climate heating / canvas solutions Commissioning performed by VIKING Norsafe or VIKING Norsafe Service Partners Other options on request Sao GoBoGoe Voltage variation o Protection box for remote control o Excproof, Zone Il 2 G Ex de IIB T3 (other on request) o Star A starting method o ‘Additional electric cabinet heater a Alternative cabinet size / material / surface protection a eS Stainless steel fittings and hose fittings Stainless steel HPU tank Alternative HPU size / material / surface protection HPU heater ofaof VIKING “VIKING Project No.: Standard ‘VIKING Doc. No TSD-0046, NORSAFE Rev. Date: 08.03.2022 Rev. No: 7 Increased accumulator capacity (increased stored power slewing angle, up to max 300 degree) ANN Norsok M-501 system (VIKING Norsafe Doc. No. TSS-0030) a Other painting system and final color a a Bans) ‘Spare parts for Startup / Commissioning ‘Spare parts for Onboard spare ‘Spare parts for 1 year ‘Spare parts for 2 years ogoo PEE Factory acceptance test procedure Factory acceptance test report Inspection and test plan Shipping, handling and lifting procedure Packing & unpacking procedure Commissioning procedure TAG list Winch drawing Noise test report Weight and COG datasheet Weighing report/certificate Other drawings/documentation/procedures of oo 06 o8o0e 5, POSSIBLE BOAT FITTING THIS DAVIT SYSTEM The VIKING Norsafe boats and liferafts fit the NDSC-25 davit types and variants. POE Matrix-450 MKT ‘Midget-500 MKIL ‘Midget-530 MKIl (Others on request) 20 DKF+ 25 DKF+ 25 DKFS, (Others on request) VIKING “VIKING Project No.: Standard ‘VIKING Doc. No TSD-0046, NORSAFE Rev. Date: 08.03.2022 Rev. No: 7 6. YARD SUPPLY / RESPONSIBILITY Deck foundations / reinforcement, Assembly, erection and welding to deck Wire routing on davit and termination All cables to starter cabinet and agreed interface Hydraulic oi filing Testing according to regulation after installation onboard Preservation and maintenance after davit arrived yard and installed & VIKING “VIKING Project No.: Standard ‘VIKING Doc. No TSD-0046, NORSAFE to bam (98.03.2022 Rev. No: 7

You might also like