Sage X3 - Stocks
Sage X3 - Stocks
2010
V6.5
Notes
Stocks
/ © Sage 2010
Warehouses
Warehouses
/ © Sage 2010
Hervé ANTONIO-MOTA
Stock vocabulary : Without warehouses
Site
Site A
DOC1 DOC2
DOC (Dock awaiting)
STO (Internal)
Location MAN (Internal)
STO01 STO02 STO03 STO07 STO08 STO09 type FIN (Internal)
PICK (Internal)
Receipt,
Location
Storage,
category
Manufacturing,
MAN01 MAN02
Picking, …
PICK1 PICK2
/ © Sage 2010
Stock vocabulary : Without warehouses
Site
Location category
Location type
Location
/ © Sage 2010
Stock vocabulary : With warehouses
Site
Site A
DOC1 DOC2
DOC (Dock awaiting)
STO (Internal)
Location MAN (Internal)
STO01 STO02 STO03 STO07 STO08 STO09 type FIN (Internal)
PICK (Internal)
Receipt,
Location
Storage,
category
Manufacturing,
MAN01 MAN02
Picking, …
PICK1 PICK2
/ © Sage 2010
Stock vocabulary : With warehouses
Site A Site
/ © Sage 2010
Stock vocabulary : With warehouses for consignment
Site A Site
Consigned
Internal locations Warehouse
stock
Stock « loaned »
STO01
by supplier A
… …
/ © Sage 2010
Warehouses – Automatic selection of WRH and locations in V9
Px
entries Warehouse
Locations
User’s Yes
WRH?
No
No
Site’s locations
Wrh in the stock line? Site’s location compliant
(manualy entered) with warehouse?
Yes Yes
? ?
No No
Default location
for the product-site? Yes
?
No
X
(no suggestion)
/ © Sage 2010
Hervé ANTONIO-MOTA
Warehouses – Automatic selection of WRH and locations in V9
Px
issues Warehouse
Locations
User’s Yes
WRH?
No
No
Yes
Site’s Site’s locations
WRH?
Site’s location compliant
with warehouse?
No Yes
Wrh in the stock line? ?
(manualy entered) Yes
No
No
Default location
for the product-site? Yes
?
No
X
(no suggestion)
/ © Sage 2010
Hervé ANTONIO-MOTA
Warehouses – Automatic selection of WRH and locations in V9
Px
allocations for a sales order Warehouse
Locations
User’s Yes
WRH?
No
No
Site’s locations
Wrh in the stock line? Site’s location compliant
(manualy entered) with warehouse?
Yes Yes
? ?
No No
Default location
for the product-site? Yes
?
No
X
(no suggestion)
/ © Sage 2010
Hervé ANTONIO-MOTA
Locations management
Locations
management
/ © Sage 2010
Hervé ANTONIO-MOTA
Location types
Site
(Internal) (Internal)
MAN01 MAN02
(Internal) (Internal)
PICK1 PICK2
/ © Sage 2010
Stock vocabulary : Internal & external location
Internal site
Site
(Internal)
MAN01
External site : Subcontracting
(Internal)
PICK1
/ © Sage 2010
Location types : Formats
4 A B C
4
4
4
3
3
3
S6 3
2
2
2
2
1
L R
1
1
1
L R L R
1
Example: Location format = ABCDD
-A = Aisle (A to C), AL1S1 AL2S1
-B = Side (Left and Right), AL1S2 AL2S2
-C = Cupboard (1 to 4), AL1S3 AL2S3
AL1S4 AL2S4
-DD = Shelf (S1 to S6).
AL1S5 …
AL1S6
/ © Sage 2010
Example of Automotive manufacturing location
STO01 MAN01
Internal
Single-product
Dedicated (Car door)
enish (Car door = Max. 30/Tr. 10)
Authorized substatuses : A*
Capacity managed (30 UN)
X30 UN
/ © Sage 2010
Stock management rules (FUNSTORUL)
Stock management
Product-categories
rules
(GESITG)
(FUNSTORUL)
/ © Sage 2010
A*,Q*,R*
Q
Stock change Stock change
(GESSCS) (GESSCS)
Quality control
(GESSTQ)
A R
Stock change
(GESSCS)
/ © Sage 2010
Main stock tables : GESSMR/GESSMO
SMVTH
Header
SMVTD
Stock movements Detailed stock
(CONSSMV) (CONSSDE)
Lines(s)
STOJOU STOCK
Detail(s)
(Entry mvt)
STOSER STOLOT
/ © Sage 2010
THREE DIFFERENT METHODS TO CREATE Product Sites
Product-site Product
• (GESITF) • (GESITM)
Product site
creation
• (CREITFMA)
1 task
/ © Sage 2010
Allocation and Issue rules
Site
Location category
STO12 STO12
Location category
Location category
/ © Sage 2010
Training exercise – Product BMSTR-001
TR013 TR014
TR131
(Dock awaiting)
6
+20UN DOC1
4
1 Inter-site transfer
+100UN +10UN Site
5 +1CAR
+1PAL
TR132
Stock issue
21 / © Sage 2010
Put-away plan
Put-away plan
/ © Sage 2010
Hervé ANTONIO-MOTA
Site A
DOC1
(Dock)
Put-away
plan
(FUNSSL)
/ © Sage 2010
LPN
LPN
/ © Sage 2010
Hervé ANTONIO-MOTA
/ © Sage 2010
(CRELPNMA)
(GESLPN) (GESLPNAFF)
Mass process LPN creation
LPN manual creation Assign stock to existing LPN
(indicate number of LPN)
(GESLPNOPE)
To group, split or unlink LPNs
(GESSCSL)
-Be able to move a LPN from a location to another location, including all the contents of that LPN.
-Be able to change the stock line status (A*,Q*,R*) of a LPN.
/ © Sage 2010
Quality control
Quality control
/ © Sage 2010
Hervé ANTONIO-MOTA
Issue rules : GESITG
What ?
28 / © Sage 2010
Issue rules : GESITF
Where ?
29 / © Sage 2010
Issue rules
Issue rules
/ © Sage 2010
Hervé ANTONIO-MOTA
Quality control
Management (V9.xx)
/ © Sage 2010
Quality control
Quality control management in stock entry (V9.xx)
Default
No Yes
Default
QC management QC management Or QC management
Quality control record Default Quality control record Quality control record
(Technical sheet) (Technical sheet) (Technical sheet)
Default
No and No = No
No and QC = QC
QC and No = QC
QC and QC = QC
/ © Sage 2010
Quality control
Expiration management afterwards (Lots) (V9.xx)
Default
Expiry management Expiry management
Default
Expiry status Expiry status
Re-control date rules (check lead time Default Re-control date rules (check lead time
& …days & Re-control status) & …days & Re-control status)
/ © Sage 2010
Quality control
Sampling
Sampling
General level
AQL
Sampling mode
/ © Sage 2010
V9
Quality control in stock entries (GESITG) … Px
Q No Same
✓
✓
✓ ✓
✓ ✓
✓ ✓ ✓
/ © Sage 2010
Statistical reordering
Product-site (GESITF)
Purchase Sub-contracting
Manufacturing Inter-site
/ © Sage 2010
GESITF > Planning > Stock management > Demand period
/ © Sage 2010
Quality control
Quality control
/ © Sage 2010
Hervé ANTONIO-MOTA
Quality control
Analysis requests
Analysis requests (GESQCR) Quality control (GESSTQ)
Automatic
method
Q*
1
A*, R*
(Validation)
Manual method
(Auto)
A*, Q*, R* Q*
2
/ © Sage 2010
Training exercise : Quality control
TR013
TR131
Quality control Q*, R*
Warehouse
(Internal) (Internal) (Internal) (Internal) (Internal)
QCX06 QCX07 QCX08 QCX09 QCX10 Location type
Location
(Internal) (Internal) (Internal) (Internal) (Internal)
QCX11 QCX12 QCX13 QCX14 QCX15 Location category
2 Storage A*
SXX
/ © Sage 2010
Reordering
Reordering
/ © Sage 2010
Hervé ANTONIO-MOTA
Reodering
/ © Sage 2010
Stock valuation
Stock valuation
/ © Sage 2010
Hervé ANTONIO-MOTA
Valorisation des stocks
Stock insuffisant et MAXABSCOD = Absor.
Module Stocks V7 45
Valorisation des stocks
Stock insuffisant et MAXABSCOD = Absor.
TESTED !
OK
(25/11/2016)
Module Stocks V7 46
Valorisation des stocks
Stock insuffisant et MAXABSPER = 100%
Module Stocks V7 47
ABC class calculation
/ © Sage 2010
Hervé ANTONIO-MOTA
V12
P15
Formula:
[F:ITH]YEAISSAMT
=Annual amount issued
per product/site.
Product No. of issues X Value = Result Produc = Result Total cumulated Total percentage Class
(UN) (€) (€) t (€) (€) cumulated
/ © Sage 2010
Requirements parameters
Requirements
parameters /
Replanning rules
/ © Sage 2010
Hervé ANTONIO-MOTA
V12
P16
POS
5UN
/ © Sage 2010
V12
P16
POS
5UN
POS
3UN
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 Increase/decrease Early/late
POF +8
18UN
/ © Sage 2010
V12
P16
POS
5UN
POS
3UN
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 Increase/decrease Early/late
POF +5
15UN
POS
3UN
/ © Sage 2010
V12
P16
POS
5UN
POS
3UN
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 Increase/decrease No
/ © Sage 2010
V12
P16
POS
5UN
POS
3UN
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 No Early/late
POF
10UN
POS
5UN
POS
3UN
/ © Sage 2010
V12
P16
POS
5UN
POS
3UN
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 Increase/Decrease Late
POF
13UN
POS
5UN
/ © Sage 2010
V12
P16
Replanning rules: Example : Ignore reorder policy in
replanning
ERD = Expected Receipt date
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day Day Day Day Day
10 11 12 13 14
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 Increase/decrease Early/late
POF +17
27UN
POS
7UN
/ © Sage 2010
V12
P16
Replanning rules: Example : Ignore reorder policy in
replanning
ERD = Expected Receipt date
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day Day Day Day Day
10 11 12 13 14
Type Method Backward lead time Forward lead time Replan qties Replan dates
POF Simulation 4 4 Increase/decrease Early/late
POF +8
18UN
/ © Sage 2010
Requirements parameters
Requirements
parameters /
Forecasts offset
/ © Sage 2010
Hervé ANTONIO-MOTA
Forecasts offset
/ © Sage 2010
Requirements parameters
Requirements
parameters /
Coverage
/ © Sage 2010
Hervé ANTONIO-MOTA
MRP
Coverage
Coverage 5 weeks and Resources in coverage = Unticked
Initial
Period 0 1 2 3 4
inventory
Forecast 10
Scheduled
POP/F EOP/F WOP/F 5 9
receipt
S
Projected
Projected
Initial stock 2 46
2 39
-10 29
-29 29
-29 14
-44
final
stock**
stock
Net
44 0 0 0 0
requirements
End
POS WOS EOS suggestion 44 0 0 0 0
date
R
Start
suggestion 0 0 0 0 0
date
V7 Manufacturing
/ © Sage 2010Module 62
MRP
Coverage
Coverage 5 weeks and Resources in coverage = Ticked
Initial
Period 0 1 2 3 4
inventory
Forecast 10
Scheduled
POP/F EOP/F WOP/F 5 9
receipt
S
Projected
Projected
Initial stock 2 32
2 25
-5 15
-15 15
-15 0
-30
stock
stock **
result
Net
30 0 0 0 0
requirements
End
POS WOS EOS suggestion 30 0 0 0 0
date
R
Start
suggestion 0 0 0 0 0
date
Version
/ ©7 Sage
Inventory
2010Module 63