QUALITY ASSURANCE VIOLATION CLAUSES
S.No                                     Description                                            1st Instance                 2nd Instance             3rd Instance                     Remarks
                                                                                                                                                                             20k for each violation+ Hold
 1     Violation to work sequence                                                                   NCR                 Repetitive NCR+Penalty            SWN              Amount- 1.5 times of estimated
                                                                                                                                                                                      repair cost
       Work commencement without MLDL/ PMC approval (work method Statement,                                                                                                 Work to start only after MLDL/
 2                                                                                                   Obs                          NCR                     SWN
       ITP, Checklist and mock-up Approval)                                                                                                                                         PMC approval
                                                                                                                                                                             10k for each violation+ Hold
 3     Work commencement without stage clearance                                                    NCR                 Repititive NCR+Penalty            SWN              amount against estimated repair
                                                                                                                                                                                         cost
       Work Commencement without Quality Induction to Engineer, Supervisor,
 4                                                                                                   Obs                          NCR                 NCR+ Penalty               10K for each violation
       Workmen who is new to site
 5     Work commencement ( For RCC ) without structural consultant approval                         NCR                 Repititive NCR+Penalty            SWN                    10K for each violation
 6     Work commencement ( For Civil ) without Architect approval                                   NCR                 Repititive NCR+Penalty            SWN                    10K for each violation
 7     Work commencement ( For Finishes ) without Architect approval                                NCR                 Repititive NCR+Penalty            SWN                    10K for each violation
       Work commencement without approved GFC drawings / approved sketches /
 8                                                                                                  NCR                 Repititive NCR+Penalty            SWN                    10k for each violation
       approved shop drawings
       Work Commencement without Conducting Training for Engineers, Supervisors
 9                                                                                                   Obs                          NCR                    Penalty                 10k for each violation
       and Workmen while starting New activity
10 Work Commencement without Quality Tool Box Talk for every trade                                   obs                          NCR             Repititive NCR+Penalty         5k for each violation
11                                                                                                   Obs                          NCR                     SWN
   Use of unapproved / Substandard materials (Without approved test Reports)
   Contractual Documents : Work commencement without BOQ / LOI / Contractual
12                                                                                                  NCR                           SWN                       -
   documents etc
   Documents : Incomplete / non updated documents ( Like Concrete cube register
   / Concrete pour register / Incoming material register / Material rejection register
13 / Concrete pour cards / Pour log sheet / Curing time sheet / Lab testing formats /                Obs                          NCR             Repititive NCR+Penalty         20k for each violation
   Work process checklist / Incoming material checklist / Drawing register / WMS /
   MAS / ITP's etc. )
   Structures : Structure defects like Honey comb / offsets / deviation in plum /                                                                                             Hold Amount- 1.5 times of
   deviation in alignment / Waviness / undulations / Exposed steel on surface/                                                                                              estimated repair cost for each
14                                                                                                  NCR                     Repetitive NCR        Hold amount +Penalty
   Corrosion in tensile members/ Any foreign material embeded in casted                                                                                                                violation
   concrete etc.                                                                                                                                                            Penalty- 20k for each violation
                                                                                                                                                                           10k for each violation+ 1.5 times
15 Materials : Improper / substandard material stacking / presevation / handling                     Obs                          NCR             Hold amount +Penalty      Hold amount against estimated
                                                                                                                                                                                      repair cost
                                                                                                                                                                           Unloaded material not to be used
                                                                                                                                                                             unless tested and approved by
                                                                                                                                                   Repititive NCR+ Hold
16 Incoming material unloading without checking / intimation to MLDL/ PMC                            Obs                          NCR                                        MLDL/ PMC, Hold amount- 1.5
                                                                                                                                                          Amount
                                                                                                                                                                           times of estimated repair cost for
                                                                                                                                                                                      each violation
                                                                                                                                                                             10k for each violation+ Hold
                                                                                                                                                                            amount minimum 1.5 times of
17 Non closure of FOR ( Field Observations ) within the stipulated time                    1st reminder for closure    2nd reminder for closure   Penalty+ Hold amount
                                                                                                                                                                            estimated repair cost for each
                                                                                                                                                                                       violation
                                                                                                                                                                             20k for each violation+ Hold
       Non closure of NCR within the stipulated time, Non-implementation of                                                                                                 amount minimum 1.5 times of
18                                                                                         1st reminder for closure    2nd reminder for closure   Penalty+ Hold amount
       Correction/Corrective Action approved by MLDL/ PMC QA                                                                                                                estimated repair cost for each
                                                                                                                                                                                       violation
                                                                                                                                                                              Hold Amount- 1.5 times of
   Concrete quality ( Cube failure / variation in cube strength / yield / standard
                                                                                                                                                                            estimated repair cost for each
19 deviation / Curing / skippence of testing / slab cracks / unfinished slab surface etc            NCR                     Repetitive NCR        Hold amount +Penalty
                                                                                                                                                                                       violation
   )
                                                                                                                                                                            Penalty- 20k for each violation
       Deployment of non qualified / inexperienced / unskilled staff / labour where
20                                                                                                   Obs                          NCR                    Penalty                 5k for each violation
       Skilled workmen is required e.g. Use of Helper as Mason/Fitter/Carpenter
21 Use of non-calibrated equipment/apparatus/instrument                                              obs                          NCR                 Repititive NCR           Penalty for Repititive NC
22 Use of non specific construction tools                                                            Obs                          NCR                 Repititive NCR           Penalty for Repititive NC
                                                                                                                                                                              Hold Amount- 1.5 times of
   Deviation of Process and Product requirements mentioned in PQP/Quality                                                Repititive NCR+ Hold                               estimated repair cost for each
23                                                                                                  NCR                                                  Penalty
   Assurance Plan/ITP/Formats/Checklist                                                                                         amount                                                 violation
                                                                                                                                                                            Penalty- 10k for each violation
   Non-compliance to activity checklists (inspections not being done as per
24                                                                                                   Obs                          NCR             Repititive NC+ Penalty         5k for each violation
   approved checklists)
   Contractor's QAQC Engineer's absence in Planned & Communicated Quality
25                                                                                           Written Instruction                Penalty                  Penalty                 5k for each violation
   Walk/Quality Meetings
26 No Internal NC system implementation at site                                              Written Instruction                  NCR                 Repititive NC            Penalty for Repititive NC
27 Repititive NC                                                                                 10k Penalty                  20k Penalty              40k Penalty         NC repiting with same root cause
28 Manipulation of official records and reports                                                     NCR                      Repititive NC             20k Penalty
   Non followance of site instructions of MLDL/ PMC Staff in terms of quality
29 management systems                                                                        Written Instruction                Penalty                  Penalty                 20k for each violation
                                            Notes                                                                            Abbrevations
       All penalty is applicable and will be imposed to Contractor/Agency, this Penalty
 1                                                                                                                    NCR - Non Conformance
       matrix is not for the Individuals/Workers
       Any field oservation/ NCR/ Stop Work Notice/ Penalty will be imposed by MLDL/
 2     PMC staff to the Contractor based on 1st/2nd/3rd instances as per Categorization                               SWN- Stop Work Notice
       done in above Penalty matrix.
 3     Penalty amount mentioned is for each violation                                                                 Obs - Field Observation
       Contractor has to perform applicable correction / Corrective Action at his own
 4                                                                                                                    K - Thousand ( rs. )
       cost in addition to Imposed penalty
       Contractor on repeated Process violation shall be blacklisted from MLDL in future
 5
       Prequalifications
       Hold amount in RA Bill during Quality certification until closure of NCR with
 6
       appropriate and approved corrections and corrective actions