Plot No. A-27/4 & A-28, Park View City, Islamabad: Project
Plot No. A-27/4 & A-28, Park View City, Islamabad: Project
UMAIR MAJEED
CONSULTING ENGINEER
PEC REGISTRATION NO : CONSULT / 1816
DHA REGISTRATION NO : SE - 0254
CDA REGISTRATION NO : STRUCTURES - 220/696
RDA REGISTRATION LTR NO: RDA / LU&BC / F - 371556
GULBERG REGISTRATION NO : GI / STR / 039 / 2018
1. ALL FOOTING EXCAVATIONS SHALL BE CLEANED OF LOOSE MATERIAL AND WATER. 7. USE SEPARATOR BARS #8 FOR PLACING REINFORCEMENT IN LAYERS IN BEAMS.
2. ALL FOUNDATION MATERIAL SHALL BE INSPECTED BY THE CONSULTING ENGINEER BEFORE ANY CONCRETE IS PLACED. 8. CRANK IN COLUMN REINFORCEMENT IS ALLOWABLE UPTO 3" OTHERWISE EXTEND BARS INTO COLUMNS UPTO
3. WHERE VERIFIED FOUNDATION MATERIAL IS FOUND LOWER THAN THE UNDERSIDE OF FOOTINGS AS DETAILED, BACKFILL THE DEVELOPMENT LENGTH OF 30" UPTO #6 BARS AND 48" FOR #8 BARS.
SPACE BETWEEN FOUNDING MATERIAL AND FOOTING SOFFIT WITH LEAN CONCRETE.
4. SOIL INVESTIGATION SHOULD BE CARRIED OUT PRIOR TO IMPLEMENTATION OF STR DWGS .RESULTS OF SOIL REPORT FORMWORK REMOVAL AND SHORING
SHOULD BE DISCUSS WITH CONSULTING ENGINEER FOR REVIEW / REVISION ACCORDINGLY. 1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND SAFETY OF THE FORMWORK AND
5. FOOTING SHOULD BE LAID ON HARD AND WELL COMPACTED EARTH. SHORING.
6. THE DESIGN IS IN ACCORDANCE TO THE SEISMIC ZONE II-B. 2. NO CONSTRUCTION LOAD EXCEEDING THE CONSTRUCTION OF SUPERIMPOSED DEAD LOAD PLUS SPECIFIED LIVE LOAD SHALL BE
7. FOUNDATION HAS BEEN DESIGNED FOR EIGHT STOREYS+MUMTY WITH BEARING CAPACITY OF 1.67 TSF FOR RAFT SUPPORTED DN ANY UNSHORED PORTION OF THE STRUCTURE UNDER CONSTRUCTION, UNLESS ANALYSIS INDICATES ADEQUATE
FOUNDATION. PILES HAVE BEEN PROPOSED IN ACCORDANCE WITH PILE CAPACITIES MENTIONED IN SOIL INVESTIGATION STRENGTH TO SUPPORT SUCH ADDITIONAL LOADS.
REPORT. 3. REMOVAL OF SHUTTERING AS FOLLOWS.
S.NO. REMOVAL COLD WEATHER NO.OF DAYS NORMAL WEATHER NO.OF DAYS
1- BEAMS SIDES COLUMNS (UNLOADED) 4 2
2- SLAB SOFFITS 15 10
3- BEAMS SOFFITS 21 14
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD GENERAL NOTES Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar
Rawalpindi.
DRAWN BY DATE DRAWING ID ISSUED FOR
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-01 CONSTRUCTION
GENERAL DETAILS
COLUMN BARS S1
3 Nos #4 'U' Ties EXTRA
3 Nos #4 'U' Ties EXTRA 3 Nos #4 'U' Ties EXTRA
TOP BARS OF TOP BARS
BEAMS OF BEAMS TOP BARS OF BEAMS
TOP BARS OF BEAMS
TENSION
LAP
SPLICES
S1
CENTER HALF OF AT So1 FOR THE DEPTH OF THE
BEAM SHEAR BEAM SHEAR 2#5 CLEAR COLUMN HEIGHT LOWEST BEAM WHEN BEAMS
STIRRUPS STIRRUPS BOTTOM BARS OF BEAMS WITH WIDTH < 34 TIMES THE
WIDTH OF THE COLUMN FRAME
BOTTOM BARS BOTTOM COLUMN BARS BOTTOM BARS OF BEAMS INTO ALL OTHER CONDITIONS.
OF BEAMS COLUMN BARS USE HOOP SPACED AT So1 C/C
BARS OF BEAMS
COLUMN BARS
2"
TYPICAL COLUMN BEAM JOINT
HOOPS
JOINT
°
135
TYPICAL COLUMN BEAM JOINT OUTER SUPPORT 6db 3" (75mm)MIN.
BEAM TOP BARS
TYPICAL COLUMN BEAM JOINT 2"
1.D. = 4db FOR #3,#4,#5,[#6,#8]
OUTER MIDDLE db
HOOPS
1
COL.
6 ( CLEAR SPAN )
S1
VI
PRIMARY BEAM l o 18"
BEAM HOOPS
1 1/2" CL.
4#5(T/B)
4#5(T/B)
TO END OF HOOKS
ON BEAM BARS BEAM BARS DUCT OPEN
S2
CLEAR HEIGHT
3'-0" 3'-0"
2" 2"
OF COL.
INTERIOR BEAM HOOPS TENSION
COL.
TIES
BEAM BOTTOM BARS (SMALLER SECTION BEAM) LAP 6db 3" (75mm)MIN.
SECTION AT M-M SPLICES
M M 4#5(T/B)
S1
6db
135° 90°
db
LARGER OF h1 or h2
221" 221" 212" HOOPS 1
(EXTEND REINFORCEMENT UPTO
VI
6 ( CLEAR SPAN )
l o 18"
HOOPS
COL.
h
S1
PLAN OF BEAM TO BEAM DETAIL 2h HOOPS < d/2 2h 2h
HOOPS HOOPS HOOPS
d/4 F.F.L
< 8db LONGITUDNAL BAR
SPACING < d/4 or 4 in 12"[300mm] MIN.
24dt ( HOOPS BAR ) RAFT REINFORCEMENT
d = EFFECTIVE DEPTH
12" AS PER DESIGN
TYPICAL BEAM DETAILING
PCC(1:4:8)
BAR
h2
BEAMS / SLABS
A COLUMNS
DIA
A J D A D TOP BARS BOTTOM BARS h1
180°
#3 7" 234" 241" 7" 241" HOOK #3 - 18" 18" COLUMN SECTION
6db
#4 8" 341" 3" 8" 3"
or 221" #4 33" 33" 33"
#5 941" 421" 341" 1021" 341" #5 39" 39" 39"
521" 421" 1321" D
#6 12" 421" #6 48" 48" 48"
12db
A
#7 13" 641" 541" 1434" 541" #7 54" 54" 54"
#8 15" 7" 6" 18" 6" #8 61" 61" 61"
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD GENERAL NOTES Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-02 CONSTRUCTION
1 2 3 4 5 6 7 8 9
A
C-1 C-2 C-2 C-2
5'-1021"
C-1 LIFT
6'-0"X6'-0"
2'-121"
B
C-4
2'-3"
7'-1121"
LIFT
6'-0"X6'-0"
1
1'-2 "2
C
521" 1
"
7'-7"
1 2
5" "
2
121"
"
"
"
1
1
2
2
1
2
D
SW-1 C-3 C-6 C-6 C-3 SW-1
22'-1"
1 2'-121"
1
11 " 1021" 4" "
2
2 1'-821"
C-7
121"
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
COLUMN LAYOUT PLAN
PARK VIEW CITY, ISLAMABAD Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-03 CONSTRUCTION
SCHEDULE OF COLUMNS
TIES
UPTO BASEMENT UPTO GROUND UPTO FIRST UPTO SECOND UPTO THIRD UPTO FOURTH UPTO 5TH UPTO 6TH
COLUMN FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB FLOOR SLAB S1 S2
NO.
1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"
8#6 8#6 8#6 8#6 8#6 8#6 8#6 8#6
C-1
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
#3@6" #3@8"
1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
2' 2' 2'
1'-9" 1'-9" 1'-9" 1'-9" 1'-9"
4#8+8#6 4#8+8#6 4#8+8#6 12#6 12#6 12#6 12#6 12#6
C-3 #3@6" #3@8"
1'-9"
1'-9"
1'-9"
1'-9"
1'-9"
2'
2'
2'
1'
1'
1'
1'
1'
1'
1'
2' 2' 2' 2' 2' 2' 2' 2'
4#8+8#6 4#8+8#6 4#8+8#6 4#8+8#6 4#8+8#6 4#8+8#6 4#8+8#6 4#8+8#6
C-5 #3@6" #3@8"
2'
2'
2'
2'
2'
2'
2'
2'
1'-9"
1'-9"
1'-9"
1'-9"
2'
2'
2'
18"
#3@4"
D/R
2' 2' 2' 2' 2' 2' 2' 2'
12#8+4#6 12#8+4#6 12#8+4#6 12#8+4#6 4#8+8#6 4#8+8#6 4#8+8#6 4#8+8#6
#3@6" #3@8"
2'
2'
2'
2'
2'
2'
2'
2'
C-7 #4@7"
#3@6"
(Rings)
3'
(Alternate Bars)
#6@9"
8#6
#3@4"
18"
D/R
SW-1
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
COLUMN SCHEDULE
PARK VIEW CITY, ISLAMABAD Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-04 CONSTRUCTION
1 2 3 4 5 6 7 8 9
3" 27"
3" 27"
2'-10"
B
4'-7"
P-1
7'-1121"
P-1
11"
P-1
24"
24"
2'-10"
1'-2" P-1
C
7'-7"
P-1 P-2
P-2 P-1 P-1 GRANULAR MATERIAL
D COMPACTED
P-1 IN 8" THICK LAYER
10'-9"
10'-9"
11'-2"
P-1
P-1 4'-10"
P-1
6'-9"
2'-1"
1'-10" 4'-7"
6' 9'-10" 8'-9"
P-1 P-1 P-2 P-1
P-1 P-1 P-2
E
P-2
16#8
12#8
TYPICAL SEC. TYPICAL SEC.
#3@3"c/c OF PILE OF PILE
39"Ø
#3@3"c/c NOTE:-
30"Ø
1- TEST PILES SHOULD BE LOADED TO AT LEAST 2.5 TIMES THE
DESIGN LOAD, AND PREFERABLY TILL FAILURE.
PLAN OF P-1 PLAN OF P-2 2- PILE LOAD TEST SHALL BE CARRIED OUT TO CONFIRM PILE
CAPACITEIS PRESENTED IN SOIL INVESTIGATION REPORT.
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PILE LAYOUT PLAN
PARK VIEW CITY, ISLAMABAD Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-05 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
A
#6@8"
5'-1021"
8'
#6@8" Extra
Extra
4' 4'
4' 4'
B
#6@8" 6'
7'-1121"
Extra
6'
4'
6'
8'
8'
C 12'
8' 8' 8'
4'
4'
4'
#6@8"
7'-7"
Extra #6@8" #6@8" #6@8"
Extra Extra Extra
12'
8'
8'
8'
D
#6@8" #6@8"
Extra Extra
#6@8"c/c
4'
4'
Through B/W
33" TH
2'
22'-1"
C C C C
D 2' 2' D
#6@8" #6@8"
Extra B B Extra
8' 8'
E
A
FOOTING LAYOUT PLAN
27"THICK RAFT (EXCEPT SPECIFIED)
(BOTTOM BARS)
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
A
#6@8"
5'-1021"
8'
#6@8" Extra
Extra
4'
4' 4'
B
7'-1121"
4'
C
7'-7"
D #6@8"c/c
Through B/W
#6@8"
Extra at top
22'-1"
4'
16'-6"
E
A FOOTING LAYOUT PLAN
27"THICK RAFT (EXCEPT SPECIFIED)
(TOP BARS)
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
FOUNDATION LAYOUT PLAN
PARK VIEW CITY, ISLAMABAD Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-06 CONSTRUCTION
#6@8"c/c extra #6@8"c/c extra
B.F.F.L -10'-10" #6@9"c/c Through #6@8"c/c Through
#6@8"c/c extra
B/W B/W
14"
#6@8"c/c extra
#4@8" #4@8"
2'
#3@8" #3@8"
9"
27"
3"
3"
-14'-6" as per raft rft
3"TH PCC(fc'=1500 psi) SECTION AT B-B
24"
GRANULAR MATERIAL
-16'-6" P-1 P-1 P-1 P-1
#6@8"c/c Through
27"
27"
33"
3"
3"
27"
PCC (fc'=1500 psi )
3"
PCC (fc'=1500 psi )
P-1 P-1 P-1 P-1
#6@8"c/c
extra
SECTION AT D-D #6@9"c/c Through
P-1
B/W
SLAB REINFORCEMENT SLAB REINFORCEMENT SECTION AT C-C
24"x24" M.H COVER
1"
4#4 TOP & BOTTOM 4#4 TOP & BOTTOM
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
FOUNDATION DETAILS
PARK VIEW CITY, ISLAMABAD Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-06a CONSTRUCTION
2
1
F.F.L
GROUND FLOOR SLAB GROUND FLOOR SLAB
AS PER ARCH
9" AS PER ARCH 9" 9" AS PER ARCH 9"
1'-6" #6@6"(EACH FACE) 1'-6" 1'-6" #4@6"(EACH FACE) 1'-6" 9" 9" VENTILATOR VENTILATOR
A
R.L ±0'-0"
8#6 8#6 8#6 8#6
AS PER ARCH
9"
9"
1'-6"
1'-6"
1'-6"
1'-6"
(EACH FACE)
(EACH FACE)
4#6
4#6
4#6
4#6
#3@6" #3@6" #3@6" #3@6"
#4@6"
#4@8"
RINGS RINGS RINGS RINGS BASEMENT
FLOOR LEVEL
#4@6" #4@6" #4@8" #4@8"
AS PER ARCH
AS PER ARCH
(EACH FACE) (EACH FACE) (EACH FACE) (EACH FACE)
(EACH FACE)
(EACH FACE)
(EACH FACE)
(EACH FACE)
#6@6"
#6@6"
#4@6"
#4@6"
B.F.F.L
Refer Foundation Refer Foundation
5'-0"
LIFT LIFT RAFT AS PER PLAN RAFT AS PER PLAN
#6@5" Thr.
#4@6" #4@6"
B/W
#3@6" #3@6" #3@6" #3@6" TYPICAL RCC WALL ELEVATION
4#6
4#6
4#6
4#6
1'-6"
1'-6"
1'-6"
1'-6"
RINGS RINGS RINGS RINGS #6@6" #6@6"
MACHINE ROOF
9"
"
as per site
33
B/W
8#6 3'-6" 8#6 8#6 3'-6" 8#6
A
A
MACHINE ROOM
3"
2' 2' 2' 2'
DOOR OPENING DOOR OPENING
#4@6"
#4@6"
9" AS PER ARCH 9" 9" AS PER ARCH 9"
7"
#4@6"
#4@6"
LIFT WELL REINFORCEMENT LIFT WELL REINFORCEMENT
#4@8"
#4@8"
#4@8"
#4@8"
DETAIL FROM RAFT TO DETAIL FROM SECOND FLOOR 1'-6" 1'-6"
SECTION LIFT SHAFT
SECOND FLOOR SLAB SLAB TO ROOF FLOOR SLAB
#4@6"
(EACH FACE)
#4@8"
#4@8"
9" As per Architectural
2#6 6" Drawings
#3@3"
12"
As Per Arch
2#6
#4@7"
SECOND FLOOR
#5@6"
2#6
#3@3" #4@6"c/c
2#6
7" THICK 9"
#4@6"c/c
AS PER ARCH
AS PER ARCH
AS PER ARCH
DOOR OPENING VENTILATOR SEE SECTION X-X
#4@6" #4@5" FIRST FLOOR
#4@7"
X "
18 P.) As per Architectural
( TY
12"
9" Drawings 9" ±0'-0" ±0'-0" ±0'-0"
R.L #3@8" R.L R.L
LIFT TOP SLAB #4@6" #6@6"
AS PER ARCH
AS PER ARCH
As per Architectural OUTER FACE
#4@6"
#4@6"
#5@6"
Drawings #3@8"
POLY THENE SHEET 0.008" THICK.
OF HOT BITUMEN +1LAYER #3@8"
POLY THENE SHEET 0.008" THICK.
OF HOT BITUMEN +1LAYER #3@8"
4#6 4#6 @1 KG/50KG CEMENT+2.COATS @1 KG/50KG CEMENT+2.COATS
MIXED WITH SIKALITE MIXED WITH SIKALITE
9"
9"
PLASTER 3/4" THICK (1:4 C.M) PLASTER 3/4" THICK (1:4 C.M)
As per Architectural
As per Architectural
GROUND FLOOR
Drawings
Clear Cover 1" Clear Cover 1" POLY THENE SHEET 0.008" THICK.
OF HOT BITUMEN +1LAYER
2'-3" 2'-6" 2'-3" @1 KG/50KG CEMENT+2.COATS
OUTER FACE
#4@6"c/c
LIFT WELL DETAIL FOR COUPLING BEAM (elevation) B.F.F.L B.F.F.L B.F.F.L
#4@6"
#4@6"
9"
9"
RAFT AS PER PLAN RAFT AS PER PLAN RAFT AS PER PLAN BASEMENT FLOOR LEVEL
12" 12" 12"
As per Architectural
3" PCC (fc'=1500psi) 3" PCC (fc'=1500psi) 3" PCC (fc'=1500psi)
9" Drawings 9" Refer Foundation Refer Foundation
WELL COMPACTED EARTH WELL COMPACTED EARTH WELL COMPACTED EARTH
5'
LIFT TOP SLAB
TOP BARS
SEC-1 VALID UPTO 11' SEC-2 VALID UPTO 11' RW-1 VALID UPTO 10' Refer Foundation
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD RCC WALL AND LIFT WALLS Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
REINFORCEMENT DETAIL Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-07 CONSTRUCTION
2#4 Thr.
1 2 3 4 5 6 7 8 9
15"
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
#3@6"
A
3#6 Thr.
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
9"
B
TYPICAL DETAIL OF SUNKEN BEAM
7'-1121"
MIDDLE
STRIP
10'-6"
C
7'-7"
5'-6"
12"
8' 8' 8' 8'
COL STRIP
8'
8'
8'
8'
5'-6"
2#4 Thr.
#3@6"
#3@8"
6'-3"
E #4@8"
2#4 Thr.
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
4'-3"
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP 5'
TYPICAL DETAIL OF LINTEL SHADE
(2#6+2#8) Thr
COLUMNS AND MIDDLE STRIP MEASURMENT PLAN
#4@6"
9"
1 2 3 4 5 6 8 8 9 3' 3'
1 1
17'-3" 15'-2" 6'-9" 21'-5 "
2 10'-7" 7'-1 "
2 9'-2" 20'-5" RCC COLUMN
1'-6" as per slab extra rft as per slab rft 1'-6" (2#6+2#8) Thr
A
21"
9"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
upto ld upto ld
#4@8" X SEC OF CB-1
6"
B
CB-2 #4@8" 3#6 Thr
#4@8"
CB-1
7'-1121"
CB-1
MIDDLE
2'
STRIP
10'-6"
#4@8" 8'
CB-2
9"
#4@8" B/W RCC COLUMN
C 3'
#4@8" 3'-6" #4@8" 3'-6" 2'-9" X SEC DETAIL AT A
3' 3#6 Thr
7'-7"
5'-6"
3'
3'
3'
3'
2'
CB-1 CB-1
D
5'
8'
8'
8'
8'
5'-6"
X SEC OF CB-2
3'
3'
3'
3'
3'
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A DETAIL-A
3'-6" 3'-6"
2'-9" 2'-9"
#4@8"
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
#4@8"
2'-3" #4@8" 2'-9"
#4@8"
#4@8" #4@8"
6'-3"
#4@8" #4@8"
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, GROUND FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-07a CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#4@8"
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
6'-3" #3@8" #3@8" #3@8"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
7'-7"
#4@8"
D
3' 3' 3' 3'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
LIFT
6'-0"X6'-0"
GB-2(9"x18")
GB-2(9"x18")
7'-1121"
MIDDLE
STRIP
10'-6"
C +3#8
2#6 Thr
at col / wall support
7'-7"
5'-6"
8'
8'
8'
8'
5'-6"
#3@(4"-6")
24"
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
GB-2(9"x18")
GB-2(9"x18")
MIDDLE
STRIP
22'-1"
11'-1"
3' 3'
RCC COLUMN
1'-6" as per slab extra rft as per slab rft 1'-6"
(2#6+2#8) Thr
9"
6'-3"
upto ld upto ld
9"
6"
E
GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24")
#4@5"
8' X SEC OF GB-1
7'-7" 5'-6" 5'-6" 11' 5'-6" 5'-6"
9'-2" 6'-9" 6'-9" 13'-4" 8'-8 " 1
B/W RCC COLUMN +2#8
MIDDLE MIDDLE MIDDLE MIDDLE
6'-9" 6'-9"
MIDDLE
2 X SEC DETAIL AT A 2#6 Thr
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5' at wall support
COLUMNS AND MIDDLE STRIP MEASURMENT PLAN
18"
1 2 3 4 5 6 7 8 9 #3@6"
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
LIFT
6'-0"X6'-0"
9"
GB-2(9"x18")
B
CB-2 #4@8"
GB-2(9"x18")
(2#6+2#8) Thr
CB-1
#4@8"
X SEC OF GB-2
7'-1121"
CB-1
MIDDLE
STRIP
10'-6"
#4@8"
CB-2
#4@8" #4@8"
2'-9" 2'-9" #4@8" CB-2
#4@8"
C 2' #4@8"
#4@6" +2#6
2#6 Thr
9"
3'-6" #4@8" 3'-6" 2'-9"
#4@8"
3' 3'
7'-7"
at col support
5'-6"
3'
3'
3'
3'
2'
CB-1 CB-1
D (2#6+2#8) Thr
5'
21"
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
3'
18"
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A DETAIL-A #3@6"
3'-6" 3'-6"
2'-9" 2'-9"
GB-2(9"x18")
GB-2(9"x18")
#4@8" X SEC OF CB-1
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
#4@8" 3#6 Thr 4#6 Thr
2'-3" #4@8" 2'-9"
#4@8" 9"
#4@8" #4@8"
#3@6"
6'-3"
9"
#4@8" #4@8" X SEC OF GB-2
E
GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24")
3#6 Thr
7'-7" 5'-6" 5'-6" 11' 5'-6" 5'-6"
9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
18"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, GROUND FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-08 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#4@8"
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
#3@8" #3@8" #3@8"
6'-3"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
3'
3'
7'-7"
#4@8"
D
3' 8' 3' 3' 3'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, GROUND FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-09 CONSTRUCTION
1 2 3 4 5 6 7 8 9
LIFT
6'-0"X6'-0"
GB-2(9"x18")
GB-2(9"x18")
7'-1121"
MIDDLE
STRIP
+3#8
10'-6"
C
2#6 Thr
at col / wall support
7'-7"
5'-6"
8'
8'
8'
8'
5'-6"
#3@(4"-6")
24"
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
GB-2(9"x18")
GB-2(9"x18")
MIDDLE
STRIP
22'-1"
11'-1"
3' 3'
RCC COLUMN
1'-6" as per slab extra rft as per slab rft 1'-6"
9"
6'-3"
6"
E
GB-1(9"x24") GB-1(9"x24")
GB-1(9"x24") GB-1(9"x24") GB-1(9"x24") GB-1(9"x24")
9"
8'
#4@5"
5'-6" 5'-6" B/W
7'-7"
MIDDLE
5'-6" 5'-6" 11'
MIDDLE
9'-2"
MIDDLE
6'-9" 6'-9" 13'-4"
MIDDLE
6'-9" 6'-9" 8'-821"
MIDDLE X SEC DETAIL AT A
RCC COLUMN
X SEC OF FB-1
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
18"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#3@6"
FB-2(9"x18")
FB-2(9"x18")
CB-2 #4@8"
(2#6+2#8) Thr
CB-1
#4@8"
7'-1121"
CB-1
MIDDLE
STRIP
10'-6"
#4@8"
CB-2
#4@8" #4@8"
C
#4@8"
2'
2'-9" 2'-9" #4@8" CB-2
#4@8" 4#6 Thr
#4@8"
3'-6" #4@8" 3'-6" 2'-9" #4@6" 9"
9"
3' 3'
7'-7"
5'-6"
3'
3'
3'
3'
2'
CB-1 CB-1
D
(2#6+2#8) Thr X SEC OF FB-2
5'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
3'
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A DETAIL-A
21"
2'-9" 2'-9"
3'-6" 3'-6" +2#6
FB-2(9"x18")
FB-2(9"x18")
#4@8"
2#6 Thr
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
#4@8"
#4@8"
X SEC OF CB-1 at col support
2'-3" 2'-9"
#4@8"
#4@8"
#4@8" 3#6 Thr
6'-3"
#4@8" #4@8"
18"
E #3@6" #3@6"
9"
FB-1(9"x24") FB-1(9"x24") FB-1(9"x24") FB-1(9"x24") FB-1(9"x24") FB-1(9"x24")
5'-6" 5'-6"
7'-7"
MIDDLE
5'-6" 5'-6" 11'
MIDDLE
9'-2"
MIDDLE
6'-9" 6'-9" 13'-4"
MIDDLE
6'-9" 6'-9" 8'-821"
MIDDLE 3#6 Thr
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
18" 4#6 Thr
9"
REINFORCEMENT PLAN OF FIRST FLOOR (BOTTOM BARS)
X SEC OF CB-2
THICKNESS OF SLAB =9" X SEC OF FB-2
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, FIRST FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
REINFORCEMENT DETAILS Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-10 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#4@8"
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
#3@8" #3@8" #3@8"
6'-3"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
3'
3'
7'-7"
#4@8"
D
3' 8' 3' 3' 3'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
LIFT
6'-0"X6'-0"
SB-2(9"x18")
SB-2(9"x18")
7'-1121"
MIDDLE
STRIP
10'-6"
+3#8
C
2#6 Thr
at col / wall support
7'-7"
5'-6"
8'
8'
8'
8'
5'-6"
24"
SB-2(9"x18")
SB-2(9"x18")
MIDDLE
STRIP
22'-1"
11'-1"
3' 3'
RCC COLUMN
1'-6" as per slab extra rft as per slab rft 1'-6"
9"
6'-3"
E
upto ld upto ld (2#6+2#8) Thr
6"
SB-1(9"x24") SB-1(9"x24") SB-1(9"x24") SB-1(9"x24") SB-1(9"x24") SB-1(9"x24")
9"
8'
5'-6" 5'-6" #4@5"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821" B/W
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE RCC COLUMN
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5' X SEC DETAIL AT A X SEC OF SB-1
COLUMNS AND MIDDLE STRIP MEASURMENT PLAN +2#8
2#6 Thr
1 2 3 4 5 6 7 8 9 at wall support
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
18"
6'-1"
5'-1021"
LIFT
#3@6"
6'-0"X6'-0"
SB-2(9"x18")
SB-2(9"x18")
B
CB-2 #4@8"
CB-1
#4@8"
7'-1121"
(2#6+2#8) Thr
CB-1
MIDDLE
STRIP
10'-6"
#4@8"
CB-2
#4@8" #4@8"
2'-9" 2'-9" #4@8" CB-2
C
#4@8"
2' #4@8" 4#6 Thr
3'-6" #4@8" 3'-6" 2'-9"
#4@8"
3' 3' #4@6" 9"
9"
7'-7"
5'-6"
3'
3'
3'
3'
2'
CB-1 CB-1
D
(2#6+2#8) Thr X SEC OF SB-2
5'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
3'
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A DETAIL-A 21"
2'-9" 2'-9"
3'-6" 3'-6" +2#6
SB-2(9"x18")
SB-2(9"x18")
#4@8"
2#6 Thr
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
#4@8"
#4@8" X SEC OF CB-1 at col support
2'-3" 2'-9"
#4@8"
#4@8"
#4@8" 3#6 Thr
6'-3"
#4@8" #4@8"
18"
E
SB-1(9"x24") SB-1(9"x24") SB-1(9"x24") #3@6" #3@6"
9"
SB-1(9"x24")
5'-6" 5'-6"
7'-7" 11' 9'-2" 13'-4" 8'-821"
MIDDLE
5'-6" 5'-6"
MIDDLE MIDDLE
6'-9" 6'-9"
MIDDLE
6'-9" 6'-9"
MIDDLE 3#6 Thr
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
18" 4#6 Thr
9"
REINFORCEMENT PLAN OF SECOND FLOOR (BOTTOM BARS)
THICKNESS OF SLAB =9" X SEC OF CB-2 X SEC OF SB-2
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, SECOND FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-12 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#4@8"
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
#3@8" #3@8" #3@8"
6'-3"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
3'
7'-7"
#4@8"
D
3' 3' 3' 3'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, SECOND FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-13 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3"
TB-1(9"x24")
15'-2"
TB-1(9"x24")
6'-9" 21'-5 " 1
2
TB-1(9"x24")
10'-7" 7'-1 "
TB-1(9"x24")
1
2 9'-2" 20'-5"
TB-1(9"x24")
(2#6+2#8) Thr
A 6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
TB-2(9"x18")
TB-2(9"x18")
21"
7'-1121"
#3@6"
MIDDLE
STRIP
10'-6"
C +3#8
2#6 Thr
7'-7"
D
(2#6+2#8) Thr
9"
8'
8'
8'
8'
5'-6"
24"
TB-2(9"x18")
TB-2(9"x18")
MIDDLE
STRIP
22'-1"
11'-1"
3' 3'
RCC COLUMN
1'-6" as per slab extra rft as per slab rft 1'-6"
6'-3"
(2#6+2#8) Thr
9"
E upto ld
TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") upto ld
9"
6"
7'-7"
MIDDLE
5'-6" 5'-6" 11'
MIDDLE
5'-6" 5'-6"
9'-2"
MIDDLE
6'-9" 6'-9" 13'-4"
MIDDLE
6'-9" 6'-9" 8'-821"
MIDDLE
#4@5"
B/W
8'
X SEC OF TB-1
RCC COLUMN
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5' X SEC DETAIL AT A
+2#8
COLUMNS AND MIDDLE STRIP MEASURMENT PLAN 2#6 Thr
at wall support
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
18"
TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24")
A #3@6"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#4@8"
TB-2(9"x18")
(2#6+2#8) Thr
TB-2(9"x18")
B
#4@8" CB-2 #4@8"
4#6 Thr
CB-1
2'
7'-1121"
CB-1
MIDDLE
STRIP
10'-6"
#4@8"
#4@6" 9"
CB-2
#4@8" #4@8"
CB-2
9"
2'-9" 2'-9" #4@8"
C #4@8"
3'-6" #4@8" 3'-6" 2'-9"
#4@8"
3' 3'
(2#6+2#8) Thr X SEC OF TB-2
7'-7"
5'-6"
3'
3'
3'
3'
2'
CB-1 TB-3
21"
D +2#6
2#6 Thr
5'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
3'
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A DETAIL-A X SEC OF CB-1 at col support
3'-6" 3'-6"
2'-9" 2'-9"
3#6 Thr
TB-2(9"x18")
TB-2(9"x18")
#4@8"
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
18"
#4@8"
2'-3" #4@8" 2'-9" #3@6" #3@6"
9"
#4@8"
#4@8" #4@8"
6'-3"
#4@8" #4@8"
E
3#6 Thr
TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") TB-1(9"x24") 4#6 Thr
18"
9"
11' 5'-6" 5'-6" 9'-2" 13'-4" 1
7'-7" 5'-6" 5'-6" 6'-9" 6'-9" 6'-9" 8'-8 "
6'-9" 2
4'-3"
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP COL STRIP
MIDDLE
STRIP 5'
X SEC OF CB-2 X SEC OF TB-2
REINFORCEMENT PLAN OF THIRD FLOOR (BOTTOM BARS)
THICKNESS OF SLAB = 9"
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, THIRD FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-14 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A #4@8"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
7'-1121"
MIDDLE
STRIP
#4@8"
10'-6"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
#3@8" #3@8" #3@8"
6'-3"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
3'
7'-7"
#4@8"
D
3' 3' 3' 3'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
LIFT
6'-0"X6'-0"
21"
#3@6"
F/B-2(9"x18")
B
+3#8
F/B-2(9"x18")
7'-1121"
2#6 Thr
MIDDLE
STRIP
10'-6"
C
at col / wall support
7'-7"
(2#6+2#8) Thr
5'-6"
D 9"
#3@(4"-6")
24"
8'
8'
8'
8'
5'-6"
F/B-2(9"x18")
MIDDLE
STRIP
22'-1"
11'-1"
3' 3'
1'-6" as per slab extra rft
RCC COLUMN
as per slab rft 1'-6" (2#6+2#8) Thr
9"
6'-3"
9"
E upto ld upto ld
F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24")
6"
F/B-1(9"x24")
8'
X SEC OF F/B-1
5'-6" 5'-6" #4@5"
7'-7"
MIDDLE
5'-6" 5'-6" 11'
MIDDLE
9'-2"
MIDDLE
6'-9" 6'-9" 13'-4"
MIDDLE
6'-9" 6'-9" 8'-821"
MIDDLE B/W RCC COLUMN +2#8
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5' X SEC DETAIL AT A
2#6 Thr
COLUMNS AND MIDDLE STRIP MEASURMENT PLAN at wall support
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
18"
F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") #3@6"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
#4@8"
F/B-2(9"x18")
B
4#6 Thr
F/B-2(9"x18")
CB-2 #4@8"
#4@8"
CB-1
7'-1121"
CB-1
MIDDLE
2'
9"
STRIP
(2#6+2#8) Thr
10'-6"
#4@8"
CB-2
#4@8" #4@8"
2'-9" 2'-9" #4@8" CB-2
C #4@8"
3'-6" #4@8" 3'-6" 2'-9"
#4@8"
3' 3'
#4@6" X SEC OF F/B-2
7'-7"
9"
5'-6"
3'
3'
3'
3'
2'
CB-1 F/B-3
D
+2#6
(2#6+2#8) Thr
5'
8'
8'
8'
8'
5'-6"
2#6 Thr
3'
3'
3'
3'
3'
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A
3'-6"
DETAIL-A
3'-6"
21" at col support
2'-9" 2'-9"
F/B-2(9"x18")
F/B-2(9"x18")
#4@8"
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
#4@8" X SEC OF CB-1
18"
2'-3" #4@8" 2'-9"
#4@8"
#4@8" #4@8" 3#6 Thr #3@6"
6'-3"
#4@8" #4@8"
E
F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") F/B-1(9"x24") #3@6"
9"
F/B-1(9"x24")
4#6 Thr
5'-6" 5'-6" 9"
7'-7"
MIDDLE
5'-6" 5'-6" 11'
MIDDLE
9'-2"
MIDDLE
6'-9" 6'-9" 13'-4"
MIDDLE
6'-9" 6'-9" 8'-821"
MIDDLE 3#6 Thr
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
18" X SEC OF F/B-2
REINFORCEMENT PLAN OF FOURTH FLOOR (BOTTOM BARS)
THICKNESS OF SLAB =9"
X SEC OF CB-2
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, FOURTH FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-16 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A #4@8"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
7'-1121"
MIDDLE
STRIP
#4@8"
10'-6"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
#3@8" #3@8" #3@8"
6'-3"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
3'
7'-7"
#4@8"
D
3' 3' 3' 3'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
LIFT
6'-0"X6'-0"
2#6 Thr
21"
#3@6" at col / wall support
F//B-2(9"x18")
F//B-2(9"x18")
7'-1121"
MIDDLE
STRIP
10'-6"
24"
7'-7"
5'-6"
D
9"
8'
8'
8'
8'
5'-6"
F//B-2(9"x18")
(2#6+2#8) Thr
MIDDLE
STRIP
22'-1"
11'-1"
9"
3' 3'
as per slab extra rft
RCC COLUMN
as per slab rft X SEC OF F//B-1
6'-3"
1'-6" 1'-6"
E
F//B-1(9"x24") F//B-1(9"x24") F//B-1(9"x24") +2#8
9"
F//B-1(9"x24") F//B-1(9"x24") F//B-1(9"x24")
upto ld upto ld 2#6 Thr
6"
7'-7" 5'-6" 5'-6" 11' 5'-6" 5'-6" 9'-2" 6'-9" 6'-9" 13'-4" 8'-821"
at wall support
6'-9" 6'-9"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5' 8'
#4@5"
B/W RCC COLUMN
COLUMNS AND MIDDLE STRIP MEASURMENT PLAN X SEC DETAIL AT A
18"
#3@6"
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
#4@8"
LIFT
6'-0"X6'-0"
9"
F//B-2(9"x18")
F//B-2(9"x18")
CB-2 #4@8"
#4@8"
X SEC OF F//B-2
CB-1
CB-1
MIDDLE
2'
STRIP
10'-6"
#4@8" #4@8"
2'-9" 2'-9" #4@8" CB-2
#4@8"
#4@8"
3'-6" #4@8" 3'-6" 2'-9" +2#6
3' 3'
#4@6" 2#6 Thr
9"
5'-6"
3'
3'
3'
3'
at col support
2'
CB-1 F//B-3
5'
(2#6+2#8) Thr
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
3'
#4@8"
Extra
DETAIL-A DETAIL-A DETAIL-A DETAIL-A 21"
18"
3'-6" 3'-6"
F//B-2(9"x18")
F//B-2(9"x18")
2'-9" 2'-9"
#4@8" #3@6"
MIDDLE
2'-9" 2'-9"
STRIP
11'-1"
#4@8"
#4@8"
2'-3" #4@8"
#4@8"
2'-9"
X SEC OF CB-1
#4@8"
#4@8" #4@8" 3#6 Thr
4#6 Thr
6'-3"
#4@8" #4@8"
9"
F//B-1(9"x24") F//B-1(9"x24") F//B-1(9"x24") #3@6"
9"
F//B-1(9"x24")
X SEC OF F//B-2
5'-6" 5'-6"
3#6 Thr
1
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 8'-8 "
6'-9" 6'-9" 2
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
18"
A #4@8"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
7'-1121"
MIDDLE
STRIP
#4@8"
10'-6"
C #3@8"
#4@8"
7'-7"
5'-6"
8' 8' 8' 8'
COL STRIP
D
8'
8'
8'
8'
5'-6"
#4@8"
MIDDLE
STRIP
22'-1"
11'-1"
#4@8" #4@8" #4@8" #4@8"
#3@8" #3@8" #3@8"
6'-3"
#4@8"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
A
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B
7'-1121"
MIDDLE
STRIP
10'-6"
#4@8"
3'
3'
3'
7'-7"
#4@8"
D
3' 3' 3' 3'
8'
8'
8'
8'
5'-6"
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
E
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
24"
LIFT
6'-0"X6'-0"
18"
18"
#3@5" #3@5"
RB-2(9"x18")
RB-2(9"x18")
7'-1121"
MIDDLE
(2#6+2#8) Thr
STRIP
10'-6"
21"
7'-7"
#3@6"
5'-6"
2#6 Thr
D at wall support
8'
8'
8'
8'
5'-6"
(2#6+2#8) Thr
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
9"
21"
+2#6 #3@6"
X SEC OF UB 2#8 Thr (2#6+2#8) Thr
RB-2(9"x18")
RB-2(9"x18")
MIDDLE
STRIP
22'-1"
11'-1"
4#6 Thr
9"
21"
21"
#3@(4"-6") #3@6"
X SEC OF RB-2
6'-3"
+2#6
E 2#6 Thr
RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") 4#8 Thr (2#6+2#8) Thr at col support
9" 9"
21"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE #3@6"
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
9"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0" upto ld upto ld
6"
#4@6"
RB-2a
RB-2b
RB-2c
#4@8"
9"
RB-2(9"x18")
RB-2(9"x18")
CB-2 #4@8" #4@6"
7'-1121"
8'
15" TH SLAB
CB-1
MIDDLE
#4@8"
(2#6+2#8) Thr
STRIP
#4@5"
UB
UB
10'-6"
RB-2a
2' 3'
CB-2
CB-2
5'-6"
3'
3'
3'
3#6 Thr
2'
8'
8'
5'-6"
3'
3'
3'
3'
#3@6"
9"
#4@8"
DETAIL-A DETAIL-A Extra DETAIL-A DETAIL-A
3'-6"
2'-9" 2'-9" 3#6 Thr
RB-2(9"x18")
RB-2(9"x18")
RB-2d
#4@8"
MIDDLE
2'-9" 2'-9"
STRIP
22'-1"
11'-1"
#4@8"
#4@8"
18"
RB-2d
#4@8"
2'-3" #4@8" 5'-3"
X SEC OF CB-2
#3@8"
#3@8"
4'-9"
#4@8" 5'-6"
#4@8" #3@6"
#3@8"
LIFT
6'-0"X6'-0" #3@8"
6'-3"
#4@9" #3@6"
#4@8"
E #3@8"
RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") RB-1(9"x24") RB-1(9"x24")
LIFT
6'-0"X6'-0"
#3@8" 6'-9"
#4@9"
as per
5'-3"
slab rft
#4@9"
5'-6" 5'-6"
6'-3"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821" #4@9"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
#3@8"
#3@8"
#3@8"
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
ROOF FLOOR BEAM 02
PLOT NO. A - 27/4 & A - 28, FRAMING PLAN AND SLAB UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD REINFORCEMENT DETAILS AND Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
MUMTY FLOOR SLAB E- mail: umairmce@yahoo.com ; umairmce@gmail.com
REINFORCEMENT DETAILS Contact # : + 92 332 5056097
SAFI 8/29/2023 S-20 CONSTRUCTION
1 2 3 4 5 6 7 8 9
17'-3" 15'-2" 6'-9" 21'-521" 10'-7" 7'-121" 9'-2" 20'-5"
#3@6"
A #4@8"
6'-1"
5'-1021"
LIFT
6'-0"X6'-0"
B 5"
#4@7"
7'-1121"
MIDDLE
STRIP
15" TH SLAB
#4@8"
10'-6"
#3@8"
#4@8"
7'-7"
5'-6"
8'
8'
8'
8'
5'-6"
#4@8" #3@8"
#4@7"
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
MIDDLE
STRIP
22'-1"
11'-1"
#4@8"
#3@6"
15"
12"
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4"
6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5' 2#6 Thr
LIFT
6'-0"X6'-0"
B
7'-1121"
15" TH SLAB
MIDDLE
STRIP
10'-6"
#4@8"
3'
4'-3"
7'-7"
D
3' 3' 3' 3' CB-2
#3@6"
#4@8"
8'
8'
8'
8'
5'-6"
9"
#3@6"
CB-2
CB-2
3'
3'
3'
3'
DETAIL-A DETAIL-A DETAIL-A DETAIL-A
3#6 Thr
MIDDLE
18"
STRIP
22'-1"
11'-1"
6'
6'
6'
6'
5'-6" 5'-6"
7'-7" 5'-6" 5'-6" 11' 9'-2" 6'-9" 6'-9" 13'-4" 6'-9" 6'-9" 8'-821"
MIDDLE MIDDLE MIDDLE MIDDLE MIDDLE
4'-3" STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP COL STRIP STRIP 5'
REINFORCEMENT PLAN OF DOME
REINFORCEMENT PLAN OF ROOF FLOOR (TOP EXTRA BARS) THICKNESS OF SLAB =6"
THICKNESS OF SLAB =9"
NOTE: A. PROVIDE #3@12"c/c AS BINDING BARS FOR TOP REINFORCEMENT
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, ROOF FLOOR BEAM UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD FRAMING PLAN AND SLAB Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
REINFORCEMENT DETAILS E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-21 CONSTRUCTION
FLOOR LEVEL
#4@8"
Ground Floor
#4@6"
#4@8" "
@9
#3
Slab Reinforcement
#4@6" #4@8"
9"
#3@ #3@9"
6"
#4@4"
#3@6"
#4@6"
G.L
#4@6"
8" Waist #4@8"
#3@9"
#4@6" Foot Path Level
2'-6"
2#4 #4@6" "
@9
#3
#4@6" #4@6"
1'-6"
#4@8"
18"
9"
#3@8"
PCC(1:4:8)
3"
#3@9"
#4@8" #3@6"
2#4 3#3
3"
3" 9"
3" 2'-6" #4@8" #3@9"
LANDING BEAM 9"
#4@4" #3@
9"
Detail of Stair-1 #4@6"
2'-6" #4@6"
(Footpath to G.F.)
Detail of Stair-2
#3@6"
(Floor To Floor) 8" Waist Basement Level
#3@9"
#4@6" 2#6
VAR
3-#4 2-#4
9"
VAR
VAR
# 3 @ 12" C/C
4"TH PARAPET
RCC SLAB
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD RCC STAIR & PARAPET Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
WALL DETAILS Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-22 CONSTRUCTION
9" as per arch 9" as per arch 9"
9"
PED PED PED
as per arch
MH MH
2'X2' 2'X2'
PED
9"
PED O.H.W.T PLAN
PED 9"
#3@6"
9"
9" AS PER ARCH 9"
4#4 4#4
4#6
7"
#4@6"
PED DETAIL
#4@6" #4@6"
#3@6"c/c
BRICK
AS PER ARCH
WALL
#3@6" #3@6"
#4@6"c/c
2" Thermopore
#4@12" #4@12"
PROJECT SHEET TITLE STRUCTURAL CONSULTING ENGINEER CHECKED BY DESIGN BY SCALE REVISION NO. STAMP:
02
PLOT NO. A - 27/4 & A - 28, UMAIR MAJEED CONSULTING ENGINEER ENGR. M.UMAIR MAJEED ENGR. M.UMAIR MAJEED N.T.S 06-08-2023
PARK VIEW CITY, ISLAMABAD WATER TANKS DETAILS Office Address: # S-50,51,76,116,117,118,119 2nd Floor City Center Bank Road Saddar DRAWN BY DATE DRAWING ID ISSUED FOR
Rawalpindi.
E- mail: umairmce@yahoo.com ; umairmce@gmail.com
Contact # : + 92 332 5056097
SAFI 8/29/2023 S-23 CONSTRUCTION