THIS SITE
TABLE OF HEADQUARTERS PHILIPPINE NAVY
CONTENTS 4TH SUPPORT SERVICE BATTALION
Naval Station Jose Francisco
N
Fort Bonifacio, Taguig City
SHEET ARCHITECTURAL
NO. DRAWINGS LAND USE & ZONING
A-01 PERSPECTIVES
GENERAL NOTES: SITE LOCATION PLAN
1. DETAILED DRAWINGS SHALL TAKE PRECEDENCE OVER SMALL A-02 FUNCTION HALL
SCALED DRAWINGS WHERE CONFLICTS OF INFORMATION MASTER PLAN
OCCURS. LINE & GRADE
A-03 OGBINAR HALL
2. ANY CONFLICT BETWEEN ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS SHALL BE COORDINATED WITH THE A SITE LOCATION PLAN
ARCHITECT FOR RESOLUTIONS. A 01 SCALE: NTS
A-04 HALL IN ONE
PLAN
3. DO NOT SCALE DRAWINGS; PRINTED DIMENSIONS SHALL
PREVAIL OVER SCALED DRAWINGS.
A-05 ALANO HALL 1 PLAN ARCHITECTURAL
4. REFER TO ENGINEERING DRAWINGS. FOR THE LOCATION OF
STUB OUTS REQUIRED FOR THE MECHANICAL, PLUMBING
AND ELECTRICAL. A-06 ALANO HALL 2 PLAN
5. AS PER PD49 INTELLECTUAL PROPERTY
THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS THE A-07 ALANO HALL 3 PLAN
PROPERTY OF ARCHITECTS, ENGINEERS AND AS SUCH
MUST NOT BE REPRODUCED OR COPIED IN PART OR IN STRUCTURAL
WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE SECTION A
TO BE RETURNED WHEN NO LONGER IN USE. OGBINAR HALL ALANO HALL 1 A-08 3D OF SECTION A
6. SEC 33 OF RA 9266
SECTION B
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT A-09 3D OF SECTION B
DOCUMENTS DULY SIGNED, STAMPED OF SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL
PROPERTY AND DOCUMENTS OF THE ARCHITECT, SANITARY
WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR
OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT HALL IN ONE ALANO HALL 2
OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS
ADDITIONAL NOTES: ELECTRICAL
1. NO AVAILABLE REPORTS PREPARED BY OTHERS.
2. BOUNDARIES NOT DEFINED.
3. NO AVAILABLE TECHNICAL DESCRIPTION OF THE PROPERTY.
4. NO AVAILABLE GENERAL TOPOGRAPHIC SURVEY.
5. NO AVAILABLE SOIL BORING & PLATE LOAD TEST.
6. NO AVAILABLE GEO-RESISTIVITY SURVEY. MECHANICAL
7. TERRAIN WAS ASSUMED FLAT. HALL IN ONE ALANO HALL 3
A PERSPECTIVES
A 01 SCALE: NTS
PROJECT TITLE & LOCATION: DESIGNED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: CADD BY: SHEET NO.
ENGINEER
1
BA
T I
A
NG
PN
M
I PROVEMENTOFPNGC
VAL COM
PHILIPPINE NAVY N
PC
R
U
ZA
D
M
LSEA
EA
F
BRIGADE
Naval Combat Engineer Brigade
9
Naval Station Jose Francisco
FUNCTOI N-HAL PRINCESS MAE B HALLARE JOVANI V DOMINGO LORENZO REYNALDO P ROBREDILLO JR AS SHOWN SURVEY DATE:
NA
Fort Bonifacio, Taguig City
SEABEES
ENS PN LT PN LCDR PN 4SSB CONTROL NUMBER
19 6 7 DATE STARTED :
PL. SSC, 4SSB CO. SSC, 4SSB Battalion Commander, 4SSB
YTCIGATUIO,ACIFO
BNOIFRT,FNJSN
PGC,
ARCHITECT, PRC NO: 0061089 CIVIL ENGINEER, PRC NO. 0135383 ARCHITECT, PRC NO. 030696 DATE FINISHED: