Assignment 2

Uploaded by

Ahmar Shahzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ASSIGNMENT NO 2

1- A two lane highway goes from normal crown of 2.5% to 10 % SE by means of a spiral
curve. Determine minimum length of spiral if difference in grade between center line
edges of the road is limited to 'l/200. Draw SE diagram taking Stations of TS as 160+00.
Width of one lane is 3.5 m.

2- Same as problem -1 except that SE is' 7.5% and Station of TS is 80+00.

3- A 2 lane highway with design speed of 100 km/h has a 400 m radius. Horizontal curve
connects tangents with bearings of N 75 E and S 78 E, determine SE rate and length of
Spiral, if difference in grade between center line and edge of the road is limited to 1/200
also sketch SE diagram take Stn. of TS as 100+00. Rotation at the inner edge of the
pavement

4- For a SE of 0.08 compute minimum possible radii of curves for a road of 30, 40, 50, 60,
70 km/h.

5- Vehicle performance is being tested on a large flat paved area. For this situation,
 What coefficient of side friction must be developed to hold a car going 60 miles/h
on a 1000 ft radius curve.
 What minimum radius of curve is required for a vehicle traveling at 60 miles/h if
co-efficient of side friction is 0.40?

6- An existing horizontal curve on a highway has a radius of 268 ft which restricts the
maximum speed on this section of the road to only 60% of the design speed of highway.
If curve is to be improved so that its maximum speed will be the design speed of highway
determine radius of the new curve. Assume f = 0.15 for the existing curve and e = 0.08
for both the existing and new curve to be designed.

7- Determine min. radius required at a curved Section of highway if design speed is 70


miles/h and SE = 0.08

8- Curve is to be designed for highway having design speed 60 miles/h. If physical conditions
restrict the radius of curve to be 500 ft, what SE is required for this curve? Will this be a
good design?

9- Radius of horizontal curve on an existing highway is 750 m. If SE = 0.08 and max. speed
limit is 105 km/h, is this a hazardous location on highway? If so what action would you
recommend to correct the situation?

10- Radius of horizontal curve on an existing highway is 750 ft. If SE = 0.08 and max. speed
limit is 100 km/h, is this a hazardous location on highway? If so what action would you
recommend to correct the situation?

10- A section of highway has e = 0.05 and curve with a radius of 300 ft what speed limit
would you recommend at this section of highway, take f = 0.15.

11- A new highway is being built with a design speed 120 km/h for one of the horizontal
curves radius of horizontal curve is being planned as 300 m. What “e” is required for
this curve?

12- Determine proper SE rate for a gravel road with a design speed of 50 miles/h, and D = 8°.

13- Find max degree “D” of a horizontal curve for a roadway. Given: V = 65 m.p.h. f and e,
are in the range of 0.1 to 0.15 and 0.08 to 0.1.

14- A l two lane highway has 6° horizontal curve what should be e to develop maximum
permissible side friction on this section at V = 65 m.p.h.. Schematically show the
method of attaining SE by revolving pavement about outside edge, take f = 0.11.