Typical Detail of Wall & Wall Footing
Typical Detail of Wall & Wall Footing
F.G.L.
PLAN
SEE SCHEDULE OF WALL FOOTING
GRAVEL BED
COMPACTED SUBGRADE
NUEVA ECIJA UNIVERSITY OF SCIENCE DRAWN BY: PROJECT NAME: INSTRUCTOR: SHEET CONTENT: DATE: SHEET NUMBER:
AND TECHNOLOGY
Jayson Gabriel S. Cato PROPOSED TWO-STORY S-5
COLLEGE OF ENGINEERING Engr. Erish Ken F. Domingo 05 / 15 / 24
Sumacab, Cabanatuan City CE SHOP
RESIDENCE
SUBJECT AND SECTION: STRUCTURAL
BSCE - 3C
D
C
A
B
5
4
3
2
1 5743
1680
2217
2633
2458
2200
2607
2463
3 447
D
C
A
B
5
4
3
2
1 5743
1680
2217
2633
2458
2200
2607
2463
3 447
5
4
3
2
1 7271
D
C
A
B
5
4
3
2
1 7271
1680
2190
2633
2448
5
3 225
675
D
C
B 3675
5225
1680
2190
2633
2448
FRAMING PLAN
PLAN
:OUNDATION
:ECOND
100 OF SCIENCE
Gabriel S. CatoTECHNOLOGY
BY: UNIVERSITY
TWO-STORY
Cabanatuan
NAME:
SECTION:
OF ENGINEERING
City
24FLOOR PLAN
CONTENT:
NUMBER:
/ 15 /FRAMING AND
TECHNOLOGY
KenS.
Gabriel Domingo
F.Cato
F.Cato
TWO-STORY
KenS. Domingo
Jayson
S
2
6
1 RESIDENCE
PROPOSED
PROJECT
COLLEGE
Sumacab,
DRAWN
NUEVA
AND
6105
4874
3265
1563
5 - 3C
SUBJECT
CE SHOP
313
BSCE ECIJA
AND
PLAN PLAN
24FRAMING
CONTENT:
/ 15 /NUMBER:
1
S SECOND
STRUCTURAL
SHEET
ROOF
DATE:
5313
6105
4874
3265
1563
05
AND
4874
6
Sumacab, UNIVERSITY
Cabanatuan
OF ENGINEERING
City OF SCIENCE
F
1
6
1 100
Jayson
Engr. Erish INSTRUCTOR:
RESIDENCE
PROPOSED
PROJECT
DRAWN BY: TWO-STORY
NAME:
S -: 2100
AND TECHNOLOGY
1 FOUNDATION
STRUCTURAL
GROUND
SHEET
DATE:
5225
4828
05
COLLEGE
Sumacab,
05 /-152/NUMBER:
SHEET
DATE:
S CONTENT:
SEWER LINE
GF SEWER
SF 24 LAYOUT
LINE LAYOUT
NUEVA ECIJA
COLLEGE
STRUCTURAL