Joint Inspection Report
It is to certify that a Grid Connected Solar PV Power Plant has been installed with following
details:
1. Name of the beneficiary:
2. Address of installation with pin code:
3. Electricity consumer number:
4. Solar PV module capacity (DC): kWp
5. Inverter capacity (AC) (Nominal output power): kW
6. Date of installation:
7. Date of commissioning (after installation of net-meter):
8. Date of Joint inspection:
9. Metering arrangement: (Net meter/Gross meter/Net billing)
The above system is as per BIS/MNRE specifications and has been checked for its
performance on and it is working satisfactorily.
Sl.No. Description DISCOM Empanelled Agency Consumer
1 Name
2 Designation
3 Date
4 Sign
5 Seal
It is to certify that the above system has been purchased with following details:
1. Total project cost ₹
2. CFA amount ₹
3. Amount paid by beneficiary ₹
Sl.No. Description DISCOM Empanelled Agency Consumer
1 Name
2 Designation
3 Date
4 Sign
5 Seal