0% found this document useful (0 votes)
526 views1 page

Joint Completion Report

Joint Completion Report (1)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
526 views1 page

Joint Completion Report

Joint Completion Report (1)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Joint Inspection Report

It is to certify that a Grid Connected Solar PV Power Plant has been installed with following
details:

1. Name of the beneficiary:


2. Address of installation with pin code:
3. Electricity consumer number:
4. Solar PV module capacity (DC): kWp
5. Inverter capacity (AC) (Nominal output power): kW
6. Date of installation:
7. Date of commissioning (after installation of net-meter):
8. Date of Joint inspection:
9. Metering arrangement: (Net meter/Gross meter/Net billing)

The above system is as per BIS/MNRE specifications and has been checked for its
performance on and it is working satisfactorily.

Sl.No. Description DISCOM Empanelled Agency Consumer


1 Name
2 Designation
3 Date

4 Sign

5 Seal

It is to certify that the above system has been purchased with following details:
1. Total project cost ₹
2. CFA amount ₹
3. Amount paid by beneficiary ₹

Sl.No. Description DISCOM Empanelled Agency Consumer


1 Name
2 Designation
3 Date

4 Sign

5 Seal