0% found this document useful (0 votes)
30 views1 page

Site Protocol - Commissioning

Uploaded by

AKSHAY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Site Protocol - Commissioning

Uploaded by

AKSHAY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Date: 25/10/2018

SITE PROTOCOL
Equipment: 100T / 10T (Electric Hoist) x 14 M Span DG EOT Crane

Sale Order NO: 14522

Location: Power House - Rasuwagadhi Hydro Power Plant

--------------------------------------------------------------------------------------------------------------------------------------------------

1) Megger Test for Motors with Testing Equipment: 500V Megger

Sr.
Sequence of check R-E Y-E B-E
No.
1. Main Hoist 20 M Ohms 22 M Ohms 21 M Ohms
2. Cross Travel-1 8 .5 M Ohms 8 M Ohms 8 .5 M Ohms
3. Cross Travel-2 10 M Ohms 9.5 M Ohms 10 M Ohms
4. Long Travel -1 12 M Omhs 10M Ohms 10 M Ohms
5. Long Travel-2 8 M Ohms 10 M Ohms 9.5 M Ohms
6. 10 Hoist - Hoist Motor 50 M Ohms 45 M Omhs 48 M Omhs
7. 10T Hoist CT motor 15 M Omhs 12M Omhs 15 M Omhs

2) Checks for Safety Limit Switches / Interlocks on Crane:

Sr.
Description Remark
No.
1 Counter gravity limit switch Ok
2 Main Hoist Rotary Gear Limit Switch for UP & DN Motion Ok
3 MH Slack rope Limit Switch under the Rope Drum Ok
4 Cross Travel Roller Lever Limit Switch for CT FWD & REV Motion Ok
5 Long Travel Roller Lever Limit Switch for LT Left & Right Motion Ok; Strikers to be set at both end.
6 Master Controller Zero Position Interlock Ok
7 4 nos. Crane Corner Switches Ok
8 Emergency Stop in Cabin / On Pendent / On RRC Ok
9 10T Hoist Gravity Limit Ok
10 10T Hoist Rotary Gear Limit for UP & DN Motion Ok
11 10T Hoist Roller lever Limit for CT FWD & REV Motion Ok; Strikers to be set at both end.
12 Complete Operation of Crane & 10T Hoist
From Operator Cabin Ok
From Pendent Ok
From RRC Remote Ok