100% found this document useful (1 vote)
2K views2 pages

Borang QT4a

this is msmsa 2 for design msma jps whatever that is not me is not you while im not me that means im not you

Uploaded by

Ikmal Hadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
2K views2 pages

Borang QT4a

this is msmsa 2 for design msma jps whatever that is not me is not you while im not me that means im not you

Uploaded by

Ikmal Hadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
Form QT4(a) HYDROSTATIC PRESSURE TEST & LEAKAGE TEST REPORT Page tof 2 EXTERNAL PIPELINE Name of ; CADANGAN PEMBANGUNAN 2 BLOK PANGSAPURI PERKHIDMATAN 41 TINGKAT YANG Development MENGANDUNG! :- |. BILIK-BILIK MEKANIKAL & ELEKTRIKAL, KEBUK SAMPAH DAN 7 UNIT RUANG PERNIAGAAN (ARAS P1) Il. 4 TINGKAT BESMEN TEMPAT LETAK KERETA DAN MOTORSIKAL (ARAS P1) lll 8 TINGKAT PODIUM TEMPAT LETAK KERETA DAN MOTORSIKAL (ARAS P1A ~ ARAS P7A) IV. TINGKAT BAWAH-SATU TINGKAT KEMUDAHAN KOMUNITI \V. TINGKAT 4 HINGGA 35 (700 UNIT KEDIAMAN) Vi. SEBUAH PONDOK PENGAWAL DI ATAS LOT P.T. 24012, MUKIM BATU, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK ‘TETUAN MAYLAND SUPREME SDN. BHD. Project Reference No. ; 702024030030 /RT2025110040 1. Pressure Test Testing Date : 08/04 [2024 time: 10-00-F8 1).00 yn A fe, Satisfactory / Net Satisfactory Preperations for Test oe Pressure | (ii) Description Of Pipeline | Max Lenght 0) Pipe Material Test | Leakage (Bar) _| Test (Bar) “Trunk Main 3km HOPE (PN12.6)_| 120 80 Reticulation Pi 2m v Steel 15.0 120 i Ductile ron / | 15.0 120 ABS (CL 12) 12.0 80 p init Final ce Pipe Location fata gpeoted | ,rrereue Result Material | From: 1 Pipe Dia Pressure | M1 0m eae PLICH,/ Node | Pt/CHi/ Node | _(mm)- (Bar) Bante a DI PIPE] Nope 4 NoDe 2 2s0m™] lon \S 1S v. : i Te ITEM * Steel Pipe : The pressure must stand at 16 Bar for 10 minutes with no allowable drop. yay * HOPE Pipe: The pressure must stand at 12 Bar for 1 hour with the allowable drop of 0.‘bar (max) Agauaeys® 2. Leakage Test ~ External Pipeline & Main Pipe ae Testing Date : 0 /o4 [2024 Time yo-2e-AM |:260m fear Preperations for Test : Satisfactory / Net Satisfactory- “ Ww «i Allowable 0.34 liter x internal pipe dia. (mm) x_ pipe length (m) x total test durajion (hour) x leakage test (bar) _(Liters)_ Leakage For = Steel Pipe, 034x250 X10 x24 x LZ _10% 100024 hr 1 bar = “Ter to00 x 34 = hogpiter Initial Total Pipe Location vale spe ebal | nakeup Result From, To, Leakager | Pressure | “gary water [Pass] pai x Pt CH Node _| Pt CH. Node. ie. (liter) v Nope | nope 2 | 1.034 | 12.20 | 115 OL Z Stee! Pipe : The pressure must stand at 12 Bar for 24 hrs with the alowable drop within the specified rate * HDPE Pipe : The pressure must stand at 8 Bar for 2 hrs with no allowable drop Form QT4(a) HYDROSTATIC PRESSURE TEST & LEAKAGE TEST REPORT paren EXTERNAL PIPELINE Note: The pressure chart recorder result shall be attached with this report Checked By Name :IR. PHOA BOON TING Firm : ASIA PACIFIC ENGINEERING CONSORTIUM SDN. BHD. CP Registration No : C16962 NP". No. +: 90305-01-6197 ‘Signature of Competent Person Date cetdinoy! Witnessed By Name Poet FAOWAD B.A yc, Staff No 1 AISODe10 ii Sigqatufe of Air Selangor Executives! Technician Development Unit Date Sry

You might also like