0% found this document useful (0 votes)
30 views1 page

DGR 09-12-2024

Uploaded by

Ravi mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

DGR 09-12-2024

Uploaded by

Ravi mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Daily Generation Report (09-12-2024)

Bundelkhand Saur Urja Limited

Kalpi Solar Power Project (65 MW)

Sl. No. Parameters Generation data at a glance Weather station Data

Remarks
Max. CUF of the
Max
Cumulative up to active CUF of connected Ambient Relative
Daily Generation Monthly Generation Cumm.GHI Irradiation
date (2024-25) power the day capacity Temperture Humidity
of the day of the day
1 20 Inverters (3.25 MW each) flow 83.8 MWp

Target Actual Target Actual Target Actual


( MW) (%) (%) (KWH/m2) (W/m2) (degree Cel. ) ( %)
(MU) (MU) (MU) (MU) (MU) (MU)

A Segment A - 26 MW Capacity
0.372 0.259 11.54 2.48 103.24 57.70 45.61 16.6 18.69 3.76 640 28 43%

B Segment B- 39 MW Capacity

Module Status

Supplied Installed Connected Total Capacity yet to be supplied

93.95 MWp 88.5 83.8 94 MWp 0.05

* Target as per EPC contract agreement