Daily Generation Report (09-12-2024)
Bundelkhand Saur Urja Limited
Kalpi Solar Power Project (65 MW)
Sl. No. Parameters Generation data at a glance Weather station Data
Remarks
Max. CUF of the
Max
Cumulative up to active CUF of connected Ambient Relative
Daily Generation Monthly Generation Cumm.GHI Irradiation
date (2024-25) power the day capacity Temperture Humidity
of the day of the day
1 20 Inverters (3.25 MW each) flow 83.8 MWp
Target Actual Target Actual Target Actual
( MW) (%) (%) (KWH/m2) (W/m2) (degree Cel. ) ( %)
(MU) (MU) (MU) (MU) (MU) (MU)
A Segment A - 26 MW Capacity
0.372 0.259 11.54 2.48 103.24 57.70 45.61 16.6 18.69 3.76 640 28 43%
B Segment B- 39 MW Capacity
Module Status
Supplied Installed Connected Total Capacity yet to be supplied
93.95 MWp 88.5 83.8 94 MWp 0.05
* Target as per EPC contract agreement