0% found this document useful (0 votes)
20 views7 pages

Golu

Uploaded by

rohitksharmawork
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views7 pages

Golu

Uploaded by

rohitksharmawork
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

GOLU SAINI

Mobile: 6261878797

E-Mail: Golu.saini0712@gmail.com

Address: 17/1 Raghogarh dist.Guna (m.p) pin- 473226

To strive for Excellence with dedication, focus, proactive approach, positive attitude and
passion and to utilize my knowledge and technical skill in the best possible way for the
fulfillment of organizational goals.

PROFESSIONAL
SYNOPSIS

 Currently Working as a Project Manager to Implement Project & O&M Telecom in


Mathura -Agra Location.

 Worked as a Team lead under (NOFN (WIFI Project) of BBNL phase 2 for connecting all
blocks NLD Route (700km) to Gram panchayat for E-Governance scheme.
 Worked as a Project Coordinator for Shahdol–Anuppur Route Pratap Technocrats – 50 KM NLD
route fromApril-2018 to Aug-2018
 As An Project Engineer in Kutumbh care (Jio) from 08/06/2015 To 24/03/2018 in Srinagar (J&K).

 More than 10 years’ experience for multiple projects on Telecom &Fiber maintenance & others.

 Worked as Electrical Engineer Trident Group 11/11/2013 to 28/03/2014 buddhi for Towel plant.

Current
Employee
: Backhaul pvt. ltd
Company

Department : Project & O&M – NFS (Army)

Duration Aug 2022 - Present

 Responsible For Ensuring overall Project Deployment as per Quality Standards.


 Handling all over Project Related Activity of ofc & managing Vendor, Labors, Local Authority etc.
 Vendor Management for timely completed of Quality work.
 Liaison with Government Authorities for facilitating Quick and Smooth Flow of work on the ground.
 Responsible of Trancing work (HDD work, ducting, blowing, DIT, OFC Splicing etc.
 Kick of Meeting attended for project progress with Client & also update the daily progress report
to client.
 Acceptance & Testing of sites as per the pre – agreed term & condition with costumers & vendors.
 Material management trace ability for updating data.
 Tracking Row clearance from Govt. department for execution project in given timeline.
 Assigned task to Engineers &FRT team for Maintenance purpose.
 Coordination for billing with Client.
 Handling technical & administrative tasks of the project in accordance with operations
Objective Schedule & targets to ensure smooth & efficient work flow.
Previous
Employee
: HFCL (Roll of Talent pull & Infrastructure
Company Pvt. ltd)

Departme : Project NOFN (National optic fiber


nt networking)

Duratio Aug 2018-Sep 2022


nn
 Planning of Path survey & forecasting such as detailed survey area classifying them, commercial,
institutional usage with plotting and sketching of exact point of subscriber & utility point.
 Analyzed Route path through Google earth for taking minimized distance for Optic fiber laying.
 Execution of projects as per proposed plan for Utilization of Dark & Live Fiber.
 Checking/Verifying Inventory records i.e SAT, Reconciliation of Material.
 Project Monitoring coordinating for the Litting, Acceptance testing of OFC.
 Examine/ Validation OF ABDs, RIDs or diagram, Line diagram, link budget & kml files submitted by PIAs
 Managing of execution of OSP Fiber from OLT to ONT from Backhaul site to Gram panchayats as
per Proposed Plan with KMZ file.
 Checking the Material & service Invoices of PIAs
 Backbone cable laying & distribute cable through fiber distribution plan for GP’S and FDMS termination
At OLT& ONT end.
 Coordination with Installation and commissioning of OLT and ONT equipment vendor as per the planning
 Link loss budgeting, Route loss budgeting as per standard by company norms.
 Documents verification including SAT, Material Inspection.
 Route finalized Report as per SLD, ABD with physical AT, Fiber AT with handover to O&M team.
 Quantity certificate summary all location to partner as per work done with proposed path.
 Responsible for Cable locating by Locator during Road expansion, drainage construction & other Type of
construction activity.
 Monitoring & liasioning to take protection for other utility like gas pipeline, utility.
Previous Employee
Company :Pratap Technocrats pvt Lmt.

Designation : fiber Engineer


Department : Project
Ring : NLD/ACCESS
Duration :April 2018-to -Aug-2018

 Managed project on a budgetary & Priority level


 Updating on daily basis of T&D, ROW, Cable Blowing and ABD Of OFC Network
 Power level tested through LSPM & updated same for Link loss budget report
 Planning for aerial & underground optical fiber laying as per Level.
 Responsible for Cable locating by Locator during Road expansion, drainage construction
 Activity on regular basis of with Vendors.

 Responsible for site connectivity with proper depth of1.65 m through fiber.
 Supervision of fiber laying as per Company guideline.

 Daily follow-up with vendor for work completion.

 Corrective & preventive checks as per laid down procedures.

 Good knowledge of project related Construction equipment like HDD machine.

 Good knowledge of Fiber tools like OTDR, Splicing machine LSPM etc.

 To supervise vendors for quality job related to fiber laying, Interaction with Govt authorities for ROW per-
mission with vendor.

 Working knowledge of Project related activities Trenching, Ducting, DIT, OFC Blowing, Splicing and FMS
termination.

 Liaison with government authorities for facilitating quick and smooth flow of work on the ground.
Previous
Employee
Company : K u t u m b h c a r e p v t l t d (jio off roll)

Departme : Project – Access /Nld


nt

Duratio june 2015 – mar 2018


nnnnnn

 Planning of Path survey of Nld and Access Route given diagram by office.
 Analyzed Route path through Google earth for taking minimized distance for Optic fiber
 Execution of projects as per proposed plan.
 Project Monitoring coordinating with PIAs for the Litting, Acceptance testing of OFC.
 Examine/Validation OF ABDs, RID, Line diagram, link budget & kml files submitted by PIAs
 Backbone cable laying & distribute cable through fiber distribution plan for FDMS termination And Last
mile.
 Coordination with Installation and commissioning of FAMEs.
 Civil AT ,Fiber blowing ,DIT & Responsible for HOTO.
 Liaison with government authorities for facilitating quick and smooth flow of work on the ground.
 Daily follow-up with vendor for work completion.
 Documents verification Liked, blowing, otdr testing ect.
 Supervision of fiber laying as per Company guideline
Previous
Employee
: TRIDENT BUDHNI
Company

Departme : Project – Towel plant


nt

Duratio Nov 2013 – mar 2014


nnnnnn

Previous Experience & Responsibility-

Work with Trident Group from 11/11/2013 TO 28/03/2014 As a electrical & instrumentation engineer.
A) Insure all Electrical Materials & Quantity .
B) Team management & work with Quality.
C) Solve issue Related materials, technical flats, connection of motor, panels wiring, cable undergrounding.
D) Work according given by managements & Requirements.
E) Installation of RTD, Transmitter, pressure gauge, thermocouple, thermistor, etc.

Skills:

 Management capability
 Technical analytical skill
 Able to work under pressure
 Hyperactivetolearntheessentialrelatedactivitytomyprofessionaldevelopment
 Fast learner & creative mind.
 Capability to interaction with our management as well as client.
 Coordination

PROFESSIONAL SKILLSET:
Subject of Interest:
A) Instrumentation
B) Electrical
C) Telecom (OFC)
PROJECTS DIPLOMA:

PROJECT 1: AM/FM Receiver


Description: -this project is very usable for audio signal.

ACADEMIC PROJECTS B.E.:

PROJECT 1: NETWORK LEAD TEASTER:


Description: -This Project very useful for testing computer cable.

ACADEMIC TRAINING BE:

Major Training: - 30 days practical Training Instrumentation Dept. sugar factory Narayan Pura Vijaipur Distt.
GUNA (M.P.)
Minor Training: - 15 days practical Training Instrumentation Dept. at Co-operative Sugar Factory Narayan Pura
Raghogarh Dist. GUNA (M.P.)

HOBBY:

Reading books
Cricket
Watching movies
Running
TECHNICALPROFICIENCY

OperatingSystems :Windows ,XP, Windows 7and8,


OtherApplications :MS Office (Word ,Excel) Google Earth, GPX viewer

SCHOLASTICS

Year Course University Percentage

2012 B.E in Electronics & Instrumentation (RGPV) 68 %

2009 Diploma in Electronics & instrumentation (RGPV) 75%

PERSONALDETAILS

DATE OF BIRTH:- 14/01/1991


FATHER’SNAME: - Mr.Babu lal saini
PERMANENTADDRESS: - 17/1 Jawahar road raghogarh dist. guna.(M.P) Pin -473226

PLACE: Raghogarh GOLU SAINI