नई दिल्ली
New Delhi
                          यादिका संख्या./ Petition No. 269/MP/2021
                      कोरम/ Coram:
                      श्री आई. एस. झा, सिस्य/ Shri I. S. Jha, Member
                      श्री अरुण गोयल, सिस्य/ Shri Arun Goyal, Member
                      श्री पी. के. दसंह, सिस्य / Shri P. K. Singh, Member
                      आिे श दिनांक/ Date Of Order: 28th of June, 2022
   IN THE MATTER OF:
   Petition under section 79(1) (b), (c) and (k) of the Electricity Act, 2003 seeking approval of
   the terms of the Tripartite Power Sale Agreement dated 01.12.2021 between SECI,
   APDISCOMS and GoAP, for purchase of 7000 MW Solar Power with an annual ceiling
   quantum of 17000 MU for 25 years.
   AND IN THE MATTER OF:
1. Southern Power Distribution Company of Andhra Pradesh Limited
   Besides Srinivasa Kalyanamandapam,
   Tiruchanur Road,
   Tirupathi – 517501
2. Eastern Power Distribution Company of Andhra Pradesh Limited
   P&T Colony, Seethammadhara,
   Vishakhapatnam – 530 020
3. Andhra Pradesh Central Power Distribution Corporation Limited
   YSR Vidyut Bhavan, ITI-Road,
   Vijayawada- Andhra Pradesh
4. Government of Andhra Pradesh
   Through Deputy Secretary, Energy Department
   Order in Petition No. 269/MP/2021                                                  Page 1 of 7
     2nd Block AP Secretariat
     Velagapudi – Guntur District
     Andhra Pradesh.
                                                                                   ...Petitioners
                                               Versus
1.   Solar Energy Corporation of India Limited
     6th Floor, Plate-B
     NBCC Office Block Tower-2
     East Kidwai Nagar, New Delhi-110023
2.   Ministry of Power
     Through Secretary
     Shram Shakti Bhawan
     Rafi Marg, New Delhi-110001
3.   Andhra Pradesh Green Energy Corporation Limited
     Renamed as ‘AP Rural Agriculture Power Supply Company Limited’
     C/O APGENCO, 3rd Floor Vidyut Soudha,
     Gunadala, Vijayawada, Krishna District,
     Andhra Pradesh 520004
                                                                                …Respondents
     Parties Present :   Shri Sidhant Kumar, Advocate, AP Discoms
                         Ms. Manya Chandok, Advocate, AP Discoms
                         Shri M. G. Ramachandran, Sr. Advocate, SECI
                         Ms. Tanya Sareen, Advocate, SECI
                         Ms. Neha Singh, SECI
                         Shri Atulya Kumar Naik, SECI
                         Shri Shibasish Das, SECI
                         Shri Mudit Jain, SECI
                                          आिे श/ ORDER
     The Petitioners, Southern Power Distribution Company of Andhra Pradesh Limited, Eastern
     Power Distribution Company of Andhra Pradesh Limited and Andhra Pradesh Central Power
     Distribution Corporation Limited are distribution licensees of Andhra Pradesh (collectively
     referred to as ‘APDISCOMS’). APDISCOMS are the Buying Entities, along with Andhra
     Pradesh Rural Power Supply Company Limited under the Tripartite Power Sale Agreement
     Order in Petition No. 269/MP/2021                                               Page 2 of 7
   (PSA). The Petitioner No. 4 is the Government of Andhra Pradesh (GoAP), represented
   through Deputy Secretary, Energy Department. The Petitioners have filed the petition under
   Section 79(1)(b), (c) and (k) of the Electricity Act, 2003 (the Act) seeking approval of the
   terms of the Tripartite Power Sale Agreement (Tripartite PSA) dated 01.12.2021 executed
   between Solar Energy Corporation of India (SECI), Andhra Pradesh Green Energy
   Corporation Limited (renamed as AP Rural Agriculture Power Supply Company Limited)
   and the Petitioners, for procurement of 7000 MW Solar Power from SECI with an annual
   ceiling limit of 17000 MU under II, III and IV tranches of the 9000MW Project.
2. The Respondent No.1, Solar Energy Corporation of India (SECI), is a nodal agency for
   implementation of the MNRE Scheme for ISTS Connected Solar PV Projects (for an
   aggregate capacity upto 6 GW) linked with setting up of Solar Manufacturing Plant (for an
   aggregate capacity of 2GW) in India on “Build Own Operate” basis (Manufacturing linked
   Solar Scheme). SECI is the Buyer under the Tripartite PSA and acts as the Intermediary
   Procurer under the Guidelines for Tariff Based Competitive Bidding Process for Procurement
   of Power from Grid Connected Solar PV Power Projects issued by the Ministry of Power.
3. The Respondent No.3, AP Rural Agriculture Power Supply Company Limited, is a public
   undertaking under the complete control of GoAP, specifically established upon the directions
   of Petitioner No. 4, vide Order No. 152 dated 03.11.2021, by renaming Andhra Pradesh
   Green Energy Corporation Ltd. specifically for the purpose of supplying uninterrupted 9
   hours daytime power supply to the farming community on a sustainable basis under the
   Tripartite PSA. At present, Respondent No.3 does not hold a distribution license. However,
   once it becomes operational as a distribution licensee, Respondent No.3 shall act as the
   Buying Entity in place of the APDSICOMS and shall be taking over the function of supply
   and distribution of power under the Tripartite PSA.
4. The Petitioner has made the following prayers:
     a) Allow the present Petition;
     b) Grant approval of the terms of the Tripartite Power Sale Agreement dated 01.02.2021
        executed between the Petitioners and Respondent No.s 1 and 3;
     c) Pass any other or further order(s) as this Hon’ble Commission may deem fit and proper
        in the interest of justice.
   Order in Petition No. 269/MP/2021                                                Page 3 of 7
5. The present matter came up for hearing before this Commission on 24.05.2022. As per
   Record of Proceedings dated 24.05.2022, it was held as under:
         “2. Learned counsel for the Petitioners submitted that the present matter is squarely covered by
         the decision of the Commission dated 2.4.2022 in Petition No. 286/AT/2021 (SECI v. Azure
         Power India Pvt. Ltd. and Ors.) and accordingly, the Commission may pass an appropriate
         order in terms of the said order.
         3. Learned senior counsel for the Respondent, SECI submitted that the Commission may
         dispose of the present matter in terms its order dated 2.4.2022 in Petition No. 286/AT/2021,
         wherein the Commission has already adopted the tariff under the Power Purchase Agreements
         (PPAs) entered into between SECI and the Solar Developers on the basis of the Power Supply
         Agreements (PSAs) entered into between the SECI and the Distribution licensees including the
         Petitioners herein. Therefore, the present Petition is redundant at this stage. Learned senior
         counsel further submitted that the PSA between the Petitioners and SECI has already been
         approved by the Andhra Pradesh State Electricity Regulatory Commission and this has also
         been recorded by the Commission in its order dated 2.4.2022”
6. We observe that as per Order dated 02.04.2022 in Petition no. 286/AT/2021, the Commission
   held as under:
         “47. As regards Package-II, Package-III and Package-IV, Adani Green and Azure Power vide
         their respective undertakings dated 3.11.2021 reduced the quoted tariff to Rs.2.42/kwh for
         these packages. Till date, SECI has signed PSAs with the following buying utilities/distribution
         companies for Packages II to IV:
          Sr.                                              Date of Capacity of Applicable Tariff
          No.     STATE               Buying Utilities     PSA         Project       to Buying Utility
                                                           signing      (MW)         (Rs./kWh)
                              (1) Andhra Pradesh
                              Central             Power
                              Distribution Corporation
                              Limited
                              (2) Andhra         Pradesh
                              Southern            Power                              Rs.2.42/kWh (Tariff
                              Distribution     Company                               payable              to
                              Limited                                                Developer)
         1.      Andhra       (3) Andhra         Pradesh 01.12.2021      7000      +
                 Pradesh      Eastern             Power                              Rs.0.07/kWh
                              Distribution     Company                               (Trading Margin)
                              Limited
                              (4) AP Rural Agriculture
                              Power Supply Company
                              Limited        [Permitted
                              successor of (1), (2), (3)]
                              (5)    Government         of
                              Andhra Pradesh
         48. On the basis of above PSAs, PPAs have been signed with the following successful bidders/
         Project Company formed by the successful bidder:
   Order in Petition No. 269/MP/2021                                                          Page 4 of 7
           Package II:
    Sr.    Name of the Project Company formed              Date     of Capacity of Applicable
    No.    Successful       by the successful bidder for   PPA          Project    Tariff
           Bidder           executing the PPA              signing       (MW)      (Rs./kWh)
     1.                     Adani Green Energy Twenty      14.12.2021                  2.42
                            Four A Limited                                250
     2.                     Adani Green Energy Twenty      14.12.2021                  2.42
                            Four A Limited                                250
     3.                     Adani Green Energy Twenty      14.12.2021     250          2.42
            Adani     Green Four B Limited
     4.     Energy     Four Adani Green Energy Twenty      14.12.2021      250          2.42
            Limited         Four B Limited
     5.                     Adani Green Energy Twenty      14.12.2021      250          2.42
                            Four Limited
     6.                     Adani Green Energy Twenty      14.12.2021      250          2.42
                            Four Limited
     7.                     Adani Green Energy Twenty      14.12.2021      250          2.42
                            Five Limited
     8.                     Adani Green Energy Twenty      14.12.2021      250          2.42
                            Five Limited
     9.                     Azure Power Fifty Three        16.12.2021      125          2.42
                            Private Limited
     10.                    Azure Power Fifty Three        16.12.2021      125          2.42
                            Private Limited
     11.                    Azure Power Fifty Three        16.12.2021      125          2.42
                            Private Limited
     12.    Azure Power Azure Power Fifty Three            16.12.2021      125          2.42
            India Private Private Limited
     13.    Limited         Azure Power Fifty Four         16.12.2021      125          2.42
                            Private Limited
     14.                    Azure Power Fifty Four         16.12.2021      125          2.42
                            Private Limited
     15.                    Azure Power Fifty Four         16.12.2021      125          2.42
                            Private Limited
     16.                    Azure Power Fifty Four         16.12.2021      125          2.42
                            Private Limited
                Total                                                      3000
         PACKAGE III:
     Sr.   Name of the Project Company formed by           Date     of Capacity of Applicable
     No.   Successful    the successful bidder for         PPA         Project     Tariff
           Bidder        executing the PPA                 signing     (MW)        (Rs./kWh)
     1.   Adani    Green Adani Green Energy Twenty         14.12.2021                   2.42
          Energy    Four Five C Limited                                250
     2.   Limited        Adani Green Energy Twenty         14.12.2021                   2.42
                         Five C Limited                                250
     3.                  Adani Green Energy Twenty         14.12.2021                   2.42
                         Five B Limited                                 250
     4.                  Adani Green Energy                14.12.2021                   2.42
                         Twenty Five B Limited                          250
     5.                  Adani Green Energy Twenty         14.12.2021                   2.42
                         Five A Limited                                 250
Order in Petition No. 269/MP/2021                                                   Page 5 of 7
     6.                     Adani Green Energy                14.12.2021                       2.42
                            Twenty Four C Limited                             250
     7.                     Adani Green Energy Twenty         14.12.2021                       2.42
                            Four C Limited                                    250
     8.                     Adani Green Energy                14.12.2021      250              2.42
                            Twenty Five A Limited
     9.                     Azure Power Fifty Nine            16.12.2021      125              2.42
                            Private Limited
     10.                    Azure Power Fifty Nine            16.12.2021      125              2.42
                            Private Limited
     11.                    Azure Power Fifty Nine            16.12.2021      125              2.42
                            Private Limited
     12.    Azure Power Azure Power Fifty Nine                16.12.2021      125              2.42
            India   Private Private Limited
     13.    Limited         Azure Power Sixty Private         16.12.2021      125              2.42
                            Limited
     14.                    Azure Power Sixty Private         16.12.2021      125              2.42
                            Limited
     15.                    Azure Power Sixty Private         16.12.2021      125              2.42
                            Limited
     16.                    Azure Power Sixty Private         16.12.2021      125              2.42
                            Limited
                Total                                                         3000
           PACKAGE IV:
     Sr.     Name of the Project Company formed by            Date     of Capacity of Applicable
     No.     Successful     the successful bidder for         PPA         Project     Tariff
             Bidder         executing the PPA                 signing     (MW)        (Rs./kWh)
     1.     Adani     Green Adani Green Energy Twenty         14.12.2021                     2.42
            Energy     Four Seven A Limited                                   250
     2.     Limited         Adani Green Energy                14.12.2021                     2.42
                            Twenty Seven A Limited                            250
     3.                     Adani Green Energy Twenty         14.12.2021                     2.42
                            Six B Limited                                     167
     4.                     Azure Power Sixty Two             16.12.2021       83            2.42
            Azure Power Private Limited
     5.     India Private Azure Power Sixty Two               16.12.2021        125              2.42
            Limited         Private Limited
     6.                     Azure Power Sixty Two             16.12.2021        125              2.42
                            Private Limited
                Total                                                      1000
     49. Andhra Pradesh Electricity Regulatory Commission vide Order dated 11.11.2021 granted
     approval for procurement of 7000 MW Solar Power in three Package-II, PackagIII &
     Package-IV under manufacturing linked tender to Andhra Pradesh Discoms and permitted
     execution of PSA.
     50. The Petitioner has submitted that it is still in the process of identifying and finalizing the
     PSAs in respect of remaining 2000 MW under Package IV.”
     …
     70. It emerges that selection of the successful bidders has been done and the tariff of solar
     power projects has been discovered by the Petitioner, SECI through a transparent process of
Order in Petition No. 269/MP/2021                                                          Page 6 of 7
         competitive bidding in accordance with Guidelines dated 3.8.2017 issued by Ministry of Power
         and suitably modified vide communications dated 20.4.2018, 14.8.2019, 9.10.2019 and
         22.5.2020. It is also noted that, in accordance with Clause 20 of the Guidelines dated 3.8.2017,
         all the modification letters were issued by Ministry of New & Renewable Energy with the
         approval of Minister of State (I/C) for Power & MNRE. Admittedly, the Petitioner has been
         able to enter into PPA for a total capacity of 8900 MW i.e. 1900 MW under Package-I and
         7000 MW under Package-II to Package-IV. Since the Petitioner is still in the process of
         identifying and finalizing the PSAs for balance capacity of 3100 MW, we deem it appropriate
         to restrict adoption of tariff, as prayed for by the Petitioner, only with respect to the quantum
         for which PPA has been executed with solar power developers for supply of power to the
         identified distribution licensees through PSA with the Petitioner. Therefore, in terms of
         Section 63 of the Act, the Commission adopts the individual tariffs for the solar power projects,
         as agreed to by the successful bidder(s), and for which PPA has been entered into by SECI on
         the basis of the PSAs with the distribution licensees, which shall remain valid throughout the
         period covered in the PPA and PSAs as under
               …”
7. From the above, we note that Andhra Pradesh Electricity Regulatory Commission vide its Order
   dated 11.11.2021 has already granted approval for procurement of 7000 MW Solar Power in three
   packages viz. Package-II, Package III & Package-IV under manufacturing linked tender to Andhra
   Pradesh Discoms and permitted execution of Tripartite PSA. In compliance to the approval
   granted by APERC, the AP DISCOMS and GoAP have entered into the Tripartite PSA dated
   01.12.2021 with SECI for purchase of 7000 MW solar power. Further, the learned counsel of
   the Petitioners and Respondents during the hearing held on 24.05.2022 have submitted that
   the Commission may dispose of the present matter in terms its order dated 2.4.2022 in
   Petition No. 286/AT/2021, wherein the Commission has already adopted the tariff under the
   PPAs on the basis of the PSAs and the present Petition is redundant at this stage.
8. In the light of the above, Petition No. 269/MP/2021 is hereby disposed of in terms of the
   discussion at para 7 of this Order.
        Sd/                                    Sd/                                       Sd/
   पी. के. दसंह                            अरुण गोयल                                  आई. एस. झा
    (सिस्य)                                 (सिस्य)                                    (सिस्य)
   Order in Petition No. 269/MP/2021                   CERC Website S. No. 352/2022           Page 7 of 7