0% found this document useful (0 votes)
112 views1 page

Looping

LOOPING

Uploaded by

chitrodaneha04
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views1 page

Looping

LOOPING

Uploaded by

chitrodaneha04
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LOOPING

LAYOUT
GENERAL NOTES
· ALL DIMENSION ARE IN MILLIMETERS
EXCEPT WHERE MENTIONED
OTHERWISE.
· THE WRITTEN DIMENSIONS ARE
STRICTLY TO BE FOLLOWED.
· ALL DIMENSIONS ARE FROM FINISHED
TO FINISHED.
NOTE: ALL SWITCHBOARDS ARE CONNECTED WITH THE MDB · ALL BOUNDARIES , DIMENSIONS AND
LEVELS ARE TO BE CHECKED ON SITE
BEFORE CONSTRUCTION AND ANY
LEGEND DISCREPANCIES ARE TO BE REPORTED
TO INTERIOR DESIGNER
· ANY DISCREPANCIES WITH SITE OR
OTHER INFORMATION IS TO BE
INDICATION MEANING ADVISED TO THE INTERIOR DESIGNER
AND DIRECTION OR APPROVAL IS TO BE
SOUGHT BEFORE THE
IMPLEMENTATION OF THE DETAIL.
LIGHT TO LIGHT · ALL DRAWINGS TO BE CHECKED
THOROUGHLY BY THE SITE
SUPERVISOR BEFORE THE EXECUTION
OF WORK.
LIGHT TO SWITCHBOARD · DO NOT SCALE THIS DRAWING.
REFERENCE :-
SWITCHBOARD

MDB
EMERGENCY LIGHTS
CONNECTED TO THE UPS
UPS

+-150 +-150
+-150 UP +-150 UP
+-150 +-150
+-150 +-150

ENTRY FOR ENTRY FOR


RESIDENCE RESIDENCE
SB22 SB32

UP UP
L1 L1
LIFT LIFT
7182

7182
L1 L1

WASHROOM STAIRCASE
SB21 SB20
STAIRCASE SB30 SB31
FIRE

FIRE
PLUMBING PLUMBING PLUMBING PLUMBING
L6
SHAFT SHAFT SHAFT SHAFT
1418

1418
L3
4080 SB16 4080

L2 L1 L2
L3 L3
L5 L1 L1
L3 L2 L1 L3 L2 L1 L3 L2 L1 L3 L2 L1 L3 L2
L7 L7
L1
SB19
3125

3125
L2
L2 L2
L3
L1 L2
L4 L3 L2 L3 L2 L1
L1 L6
L6
L1 L1
450

450
L4 L3 L2 L1 L1
1186

1186
1450 L2 1450
L5
L2 L3
L5
L3 L1 L2 L1 L1 L2
L6 L3 L1 L3
1200

1200
L5 L4 L2 L3
SB18
A L4 L3 L2 L1
A
L1
L1 L4
L4
STATUS OF RELEASED DRAWING
L2 L2
2164

2164
L2
1920 L4 L6 1920 STUDY
L6 L5 L4 L3 L1 L3
L2
L1 L1 APPROVAL
450

L4 L3 L2 L1
PLUMBING SB15 PLUMBING
1500

1500
450
ADVANCE COPY
SHAFT L3 L3
SHAFT
L2
L1 GOOD FOR CONSTRUCTION
1686

1686
L5 L5
SB17 L6 L2
L1
L5 L4 L3 L2 SIGNATURE SHEET. DATE:-
L3 L2 L1 L2
L4 L3 L2 L1 L3
L1 L3 OF STUDENT: NO:-
4080 L2 L2 4080
1200

1200
GROUND FLOOR:9500SQFT 12/12/24
L4
L6 L2
L6 L5 L4 L3 L2 L1 L1
L2 SCALE:-
1664

1664
L2 L1
L1
1:100/ 1:50
450

450
L1 L1
L3
450

L3 L2 L1 HOST STATION AND BOUTIQUE

450
SB25
L6 L5 L4 L3 L2 L1 L1 L3 STAMP & CERTIFICATION OF
L2 SB14
ENTRY FOR L1 L2 L3
COLLEGE:
1150

1150
L6 L5 L4 L3 L2 L1 RESIDENCE SB1
L1 L2 L3 L4
SB3
L5
SB2 SB23 L1 L2 L3 L4 L5 L6

PLUMBING SB4
PLUMBING
SHAFT L1 L2 L3 L4 L5 L6 L7 L1 L2 L3 L4 L1 L2 L3 L4 L5 L6
L1 L2 L3 L4 L5 L6
L1 L2 L3 L4 L5 L6 L7 L8
SHAFT
L1 L2 L3 L4 L5 L6 L1 L2 L3
SB13
L5 L6 L6 L5 L1 L2 L3 L4 L5 L6 L1 L2 L3 L4 L5 L6
L1 L2 L3 L4 L5 L6 L1 L2 L3 L4 L5 L6 L7 L1 L2 L3 L4 L5 L6 L7 L8

L1 L2 L3 L4 L5 L6 L1 L2 L3 L4
L4 L3 L2 L1 L1 L2 L3 L4 L5 L6 SB6 SB5 SB8 SB9 L3 L4 SB10 L5 L6 SB26
SB24
L1 L1 L1 L1 L1 L2 L1 L1
L8 L7 L6 L5 L1 L2 L3 L4 L5 L6 L1 L2 L3 L4 L5 L6 L3 MDB
L2 L2 L2 L2 L1 L2 SIGNATURE OF PROFESSOR:
L3 L3 L3 L3 L1 L2 L3 L4 L5 L6 INVERTER
L1 L2 L3 L4 L1 L2 L3 L4 L5 L6 L1 L2 L3
UPS
L2 L2
L1 L2 L3 L4 L5
NAME: NEHA CHITRODA
SB7 SB11 SB12
SB29
ROLL NO: ID-22-10
SEMESTER: 05 BATCH: 2022-25
WILL BE DESIGNED BY UP MAIN ENTRY UP
L1 L2 L3 L4 L5 L6
BACHELOR OF VOCATION
KITCHEN CONSULTANT (INTERIOR DESIGN)
+-150
+-150
+-150
+-150

+-150
+-150
+-150
+-150

SB27
SB28
1350

1350

N
RAMP +-150 RAMP
+-150
+-150
+-150

UP

You might also like