0% found this document useful (0 votes)
132 views4 pages

Lifting Plan-Formwork

Uploaded by

oldsam0603
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views4 pages

Lifting Plan-Formwork

Uploaded by

oldsam0603
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SOCAR HEYDAR ALIYEV OIL REFINERY MODERNIZATION AND

RECONSTRUCTION PROJECT

LIFTING PLAN FOR CRITICAL OPERATIONS


№ XXX-XX

Unit 67 TWRU construction


Date: Issued PTW: Location:
area

A "critical lift" is defined as any non-routine crane lift requiring detailed planning and additional or unusual safety
precautions. Critical lifts include: lifts made where the load weight is greater than 75% of the rated capacity of the crane;
lifts which require load to be lifted, swung or placed out of the operator's view; lifts made with more than one crane; lifts
involving non-routine/technically difficult rigging arrangement; hoisting personnel with a crane or derrick; or lifting
operation to be conducted exceeding the safe distance near by the live electrical lines.

A. TOTAL LOAD B. CRANE PLACEMENT

1 Load weight 0,45 tons Tick YES or NO which is applicable YES NO

2 Weight of auxliary lifting accessories 0,05 tons 1 Ground condition is suitable x

3 Weight of mian block 0,4 tons 2 Safe distance from electrical lines x

4 Weight of lifting beam 0 tons 3 Any obstructions to the lifting operation x

5 Weight of jib/ extented beam 0 tons 4 Travel with suspended load required x

6 Other: 0 tons Other construction activites are


5 x
Total weight 0,9 tons considered prior installation of crane

Note: Drawings must be attached to this lifting plan

C. CRANE D. Pre - Lift Check

1 Make & model of crane: Liebher 1055 3.1 Tick YES or NO which is applicable YES NO

The weather condition is considered and


2 Crane's required boom length: 36 m 1 X
being monitored

3 Cranes' required working radius: 26 m 2 Inspection of crane is conducted X

4 Cranes's required counterweight: 7,9 t 3 Inspection of lifting accessories is conducted X

Max load/ lifting capacity of crane


5 2,4 t 4 Ground condition is checked and verified X
within this configuration:
6 Lift is less than 80% of the crane's rated capacity 5 Crane is installed in accordance with drawing X

7 If jib/extended beam is to be used: N/A 6 Lifting area is barricaded and signed X

7A Length: N/A 7 TBT, TSTI is conducted X

7B Offset: N/A 8 PTW is issued and valid X

7C Rated capacity of jib/ext beam: N/A 9 Site control completed X

Note: In case if will be involved more than one crane to the


Appropriate communication among the crew
operation this section can be duplicated to indicate the 10 X
is established
specifications of that crane

Prepared Checked Approved


Name surname

Position

Signature

Date

HS594222-67-HSE-FR-017-Lifting plan Page 1 Date:12.01.2024 | Rev.0


HS594222-67-HSE-FR-017-Lifting plan Page 2 Date:12.01.2024 | Rev.0
SOCAR HEYDAR ALIYEV OIL REFINERY MODERNIZATION AND
RECONSTRUCTION PROJECT

LIFTING PLAN FOR CRITICAL OPERATIONS


№ XXX-XX

Unit 67 TWRU construction


Date: Issued PTW: Location:
area

A "critical lift" is defined as any non-routine crane lift requiring detailed planning and additional or unusual safety
precautions. Critical lifts include: lifts made where the load weight is greater than 75% of the rated capacity of the crane;
lifts which require load to be lifted, swung or placed out of the operator's view; lifts made with more than one crane; lifts
involving non-routine/technically difficult rigging arrangement; hoisting personnel with a crane or derrick; or lifting
operation to be conducted exceeding the safe distance near by the live electrical lines.

A. TOTAL LOAD B. CRANE PLACEMENT

1 Load weight 0,45 tons Tick YES or NO which is applicable YES NO

2 Weight of auxliary lifting accessories 0,05 tons 1 Ground condition is suitable x

3 Weight of mian block 0,37 tons 2 Safe distance from electrical lines x

4 Weight of lifting beam 0 tons 3 Any obstructions to the lifting operation x

5 Weight of jib/ extented beam 0 tons 4 Travel with suspended load required x

6 Other: 0 tons Other construction activites are


5 x
Total weight 0,87 tons considered prior installation of crane

Note: Drawings must be attached to this lifting plan

C. CRANE D. Pre - Lift Check

1 Make & model of crane: XCMG QY70K Tick YES or NO which is applicable YES NO

The weather condition is considered and


2 Crane's required boom length: 36 m 1 X
being monitored

3 Cranes' required working radius: 26 m 2 Inspection of crane is conducted X

4 Cranes's required counterweight: 6t 3 Inspection of lifting accessories is conducted X

Max load/ lifting capacity of crane


5 2t 4 Ground condition is checked and verified X
within this configuration:
6 Lift is less than 80% of the crane's rated capacity 5 Crane is installed in accordance with drawing X

7 If jib/extended beam is to be used: N/A 6 Lifting area is barricaded and signed X

7A Length: N/A 7 TBT, TSTI is conducted X

7B Offset: N/A 8 PTW is issued and valid X

7C Rated capacity of jib/ext beam: N/A 9 Site control completed X

Note: In case if will be involved more than one crane to the


Appropriate communication among the crew
operation this section can be duplicated to indicate the 10 X
is established
specifications of that crane

Prepared Checked Approved


Name surname

Position

Signature

Date