BIM Training for Construction Pros
BIM Training for Construction Pros
       What is BIM?
                                               Survey for CIC- Accredited
                                                 BIM Training Courses
      Drafting           Manufacture Site Install
      Miss drawing        Delay Process    Misfit
      Discrepancy          Misread data    Remedy Works              ideal
      Typos error          Material lost   Delay Operation
                     3
                     $
                     $
                     $
VDC
           $
                                                    Source: MacLeamy BIM Curve
BIM = Team Effort
Stage vs Challenge
Early Start BIM in the project can   BIM starts in a later stage require
bring more benefit with less         more resources to achieve little BIM
resources.                           value.
OVERVIEW OF BIM
                  HK Government Policy
Development Bureau
Mandatory BIM Adoption - DEVB
                2017                       2018                        2019                                       Now!!
Building information models (BIMs) are files (often but not always in proprietary formats and containing
proprietary data) which can be extracted, exchanged or networked to support decision-making regarding
a building or other built asset. Current BIM software is used by individuals, businesses and government
agencies who plan, design, construct, operate and maintain diverse physical infrastructures, such as
water, refuse, electricity, gas, communication utilities, roads, railways, bridges, ports and tunnels.
Building Information Modelling (BIM) is a set of technologies, processes and policies enabling multiple
stakeholders to collaboratively design, construct and operate a facility in virtual space. (CIC BIM
Dictionary, 2020)
BIM or Building Information Modelling is a process for creating and managing information on a
construction project across the project lifecycle. (NBS, 2020)
                                         What BIM can offer ?
         BETTER
                                                                     COORDINATED
         INFORMATION
                                                                          DESIGN
         QUALITY                                                Better Building Functionality
         Building Lifecycle Management
    REDUCED
    VARIATION                                                                 COLLABORATIVE
    ORDERS                                                                        APPROACH
                                                                                 Faster Project Delivery
    Budget Surety
                SEAMLESS
                                                                            ENABLING
                DATA
                                                                           DfMA & MiC
                HANDOVER                                        Fewer Accidents on Job Sites
                Reduce Loss of Value
Building Information Model –
Some of the project directors’ Perspective
• BIM is a disruptive change to the construction industry
                              Benefit
                     Invest
Building Information Model –
Some of the project directors’ Perspective
• A key source of competitive advantage is the ability
  to perceive change in the market, and being able to
  pivot strategy and retool an organization/team to
  remain relevant
• It requires rigor, tenacity & passion
BIM Management Course
                        1
             Course Objective
  To train up participant with the capabilities to be eligible as a
certified BIM Manager under the Scheme. On completion of the
course, participant should have acquired the core competencies
          of a certified BIM Manager under the Scheme.
Course Outline – Subject 1 &2
1. BIM Initiation: Ability to describe BIM concepts, BIM standards and
guidelines in Hong Kong and global contexts.
   1. BIM Concept
   2. Local & Global Contexts, BIM Standards and Guidelines
                                                              1
                                                              1
L1   Appreciation (A)
L2 Knowledge (K)
L3 Experience (E)
L4 Ability (B)
• Building information models (BIMs) are files (often but not always in
  proprietary formats and containing proprietary data) which can be
  extracted, exchanged or networked to support decision-making
  regarding a building or other built asset. Current BIM software is
  used by individuals, businesses and government agencies who plan,
  design, construct, operate and maintain diverse physical
  infrastructures, such as water, refuse, electricity, gas, communication
  utilities, roads, railways, bridges, ports and tunnels.
1.1.1       BIM definitions and terminology
L1
1.1.2   The difference between 2D CAD, 3D CAD and
BIM
                                Parametric geometry
                                 + Attributes
1.1.2 The difference between 2D CAD, 3D CAD and BIM
L1
                                                            19
     1.1.3         Concept of BIM as whole project &
     whole estate perspective
L1
                   Eight Major Benefits of BIM
1.1.4   Value and benefits of adopting BIM
     1.1.4   Value and benefits of adopting BIM
L1
     1.1.5   Value of BIM for AM & FM
L1
                 Stages of BIM deliverable to AM & FM
     1.1.5   Value of BIM for AM & FM
L1
                      3D Interactive Control
     1.1.5   Value of BIM for AM & FM
L1
                     Information in AM & FM
     1.1.6   Collaborative working in BIM
L1
                       BIM Workflow         29
     1.1.6    Collaborative working in BIM
L1
             Example of Architectural & Structural Element collaboration   30
     1.1.6   Collaborative working in BIM
L1
                  AR to review design collaboration   31
     1.1.7   Limitation of BIM
                   • BIM DISADVANTAGES
                    1. To be effective you need all major members
                       of design team on significantly earlier than
                       is often the case.
                   • BIM DISADVANTAGES
                   3. New protocols will be needed for managing
                      information transfer and commenting, potentially
                      new roles such as BIM Coordinators (much more
                      than a document handler)
L1
     1.1.8    Challenges within existing working
     practices & how BIM addresses these
     • In design stage, designer use BIM to build the
     model. In order to obtain the Information (Size,
     material, brand, etc..). The ability to impact
     cost and performance and effort in BIM
     workflow will be high at the beginning.
Design can be reviewed in the virtual world with any changes can be seen immediately
L2
                                                                                               65
     1.1.8    Challenges within existing working
     practices & how BIM addresses these
Platform for multiple users to review, update & record of information is provided
L2
                                                                                             66
     1.1.9    How BIM affect the current practice in ACEO
     industry
     BIM ADVANTAGES
     • 3D collaboration with all members of the team with
       automated detection of clashes. e.g. Is the service
       void designed by the architect sufficient for the M&E
       services.
        ASD BIM Guide for        EMSD for BIM - AM         BIM Standards Manual for
L2       Facilities Upkeep     Standard and Guideline   Development and Construction
                                                              Division of HKHA
     1.2.1.2   Government BIM standards & resources
L1
                      BIM development years in different countries
     1.2.2 Global context in BIM development
L2
     1.2.3 Global BIM standards & resources
        ISO 19650
L2
     1.2.3.1    ISO 19650
L2         ISO 19650        BIM High Level 2 is closely aligned with UK 1192 Standard
     1.2.3.1       ISO 19650
ISO 19650 BIM High Level 2 is closely aligned with UK 1192 Standard
L2
1.2.3.1   ISO 19650
1.2.3.1      ISO 19650
                      https://ukbimframework.org/standards-guidance/
          1.2.3.1               ISO 19650
                         Current                                                                 Current
           PAS 1192                                    Content                     ISO 19650                                   Content
                          Status                                                                  Status
 Part 1       NA            NA                            NA                         Yes          Active                     Definition
 Part 2       Yes       Withdrawn                   Delivery Phase                   Yes          Active                   Delivery Phase
 Part 3       Yes       Withdrawn                  Operational Phase                 Yes          Active                  Operational Phase
                                                                                               Published in
 Part 4       Yes       Withdrawn                       COBie                        Yes                        To be issued (Information Exchange)
                                                                                                Aug 2022
                                                                                                                    Organization and digitization of
                                                                                                                 information about buildings and civil
                                        A specification for security-minded                                      engineering works, including building
                                       building information modelling, digital                                      information modelling (BIM) —
 Part 5       Yes       Withdrawn                                                    Yes         Active
                                        built environments and smart asset                                     Information management using building
                                                    management                                                information modelling — Part 5: Security-
                                                                                                                   minded approach to information
                                                                                                                              management
                                     Specification for collaborative sharing and                              Specification for collaborative sharing and
 Part 6       Yes         Active        use of structured Health and Safety          Yes          Draft           use of structured Health and Safety
                                               information using BIM                                                     information using BIM
L2
     1.2.3.3     OpenBIM
     At some stage we want to share our model with the project team. If we
     issue the native model, the receiving party must have the same or
     compatible software to view it. They can also make changes to the
     model without our knowing. However, if we publish the model in an
     open exchange format, like IFC, the model data is freely viewable –
     measurable and usable. But the model content is protected. Changes
     cannot be made in an IFC file. They are made back in the original
     modelling software.
                                                https://bimconnect.org/en/wiki/what-is-openbim/
L2
     1.2.3.3         OpenBIM
     • Organizations all over the world have been encountering the collaboration issues
       detailed above. Different collaboration strategies have been used to address them,
       including in many cases open collaboration workflow. At the same time, open
       collaboration practices were used more as a necessity in a plural AEC environment rather
       then an intentional strategy to deliver better-coordinated projects.
     • The OPEN BIM movement elevates open collaboration to a strategic level where like-
       minded AEC professionals build
     • upon their plurality to deliver better coordinated building projects, with less errors and in
       higher quality.
     • Should you or your organization share these values, joining the OPEN BIM movement not
       only provides you with guidelines and best practices but also with common branding
       and international visibility to leverage and maximize the value of your projects. OPEN
       COLLABORATION → BETTER BIM!
                                                                              https://www.graphisoft.com/arc
L2                                                                            hicad/open_bim/open_bim_pro
                                                                              gram/
     1.2.3.3     OpenBIM
                                           https://bimconnect.org/en/wiki/what-is-openbim/
L2
Subject 2 – BIM Software and
Technology Trend
 1.   BIM Software
 2.   Technology Trend
                               1
                               1
2.1   BIM Software
                     5
                     6
     2.1.1     Overview of industry leading BIM software /
     applications
     Model Authoring                                                                                   4D Simulation
      Autodesk Revit, Civil 3D     Bentley Architecture /   Tekla Structures     Graphisoft ArchiCAD            Fuzor
                                     AECOsim Building
                                         Designer
                                 5D Simulation                                 Model Reviewing / Analysis
L2
     2.1.2      Characteristic, strength and limitation of
     industry leading BIM software
     • Limitation: Some of the BIM Consultant misunderstand the BIM and
       appear the situation of Half BIM and Fake BIM.
L1                                                          True BIM
     2.1.3   Versions and file formats
                                         IFC 4.0
                                           ● Latest Version support
                                                ALG
                                         ● XML-based Text file COBie
                                           ● BIM/FM Standard
                                           ● PAS 1192-4
                                         ● XLS file 13 tables XML
                                          ●    Terrain and alignments
                                          ●    XML-base Text files
L1
     2.1 BIM Software
     • To have collaborative BIM processes, there are multiple open file formats to maximize
     the transformation.
     • To maximize the transformation by supporting Interoperability, reliable data exchange is critical to
     • project collaboration. Some common interoperable software including the .ifc open file format
     and other openBIM data formats, including Construction Operations Building Information
     Exchange (COBie) for BIM data, gbXML, LandXML and more.
L2   https://bimconnect.org/en/wiki/what-is-openbim/
Autodesk Revit, Civil 3D
Multi-discipline 3D Modeling
Collaborative Working
Parametric Modeling
Clash Detection
Structure Analysis
Fabrication
Documentation
Graphisoft ArchiCAD
One-click Documentation
Construction coordination
BIM visualization
BIM performance
Fuzor
4D Modeling
Construction Planning
4D Modeling
iTWO
Design CAD/BIM
QTO
Estimating
Bidding/ Tendering
Sub-contract
Procurement
Navisworks
                         5
                         6
     2.2.1 Cloud platform
     Scan to BIM
     • A software is Scan to BIM for Revit., creating native Revit geometry from
     a point cloud.
L1                                      MS Truss C
      2.2.1 Cloud platform
     Point clouds
     • Point clouds are the product of 3D laser
     scanning, is useful for scanning large
     areas quickly and effectively,         but
     specialized software is required to turn
     them into information.
L1   https://www.engineering.com/BIM/ArticleID/11127/How-to-Create-Revit-Models-from-Point-Clouds.aspx
2.2.2 Laser Scanning
     2.2.2       Laser scanning
L2
     2.2.2          Laser scanning
     • This technology collects survey data points at a rate of 50,000 points per second.
       It has an effective range of 400’ to 500’. With several “scan” setups inside a room
       or of a building, a complete 3D model can be made of the existing conditions.
L2
Early Information – Site Data Collection
     3D Scan                 LiDAR (CEDD)
     H,V: +/- 6mm (<100m)    H: +/- 300mm
     H,V: +/- 18mm (<300m)   V: +/- 100mm
R = 275mm
                                 Early Findings
                        Clearance & Tolerance Analysis
            R = 2.75m
Clearance Detail Check in Super elevation Situation
               ?
Truss Inspection by Laser Scanning
Inspection Report
Parapet Formworks on Steel Structure
As-fit BIM design
Virtual Design & Construction (VDC)
Virtual design and construction (VDC) is the management of integrated multi-disciplinary performance models of
design-construction projects, including the product (i.e., facilities), work processes and organization of the design -
construction - operation team in order to support explicit and public business objectives.
Study to understand the liftdown of backstay
Backstay
                                               130
Legends
Blue = Original position
Yellow = Rotated position
        6.4deg                                                              6.4deg
                              Z-Axis                                                               Z-Axis
50mm                X-Axis                                                                X-Axis
         Y-Axis                                                              Y-Axis
                             1. Assume backstay
           Pivot point                                                           Pivot point
                                positioned on the RC with
                                50mm gap.
                             2. Rotate backstay along X-
                    RC          Axis at the pivot point.                                  RC
                                               Distance A
Distance B
Distance A
Distance B
Estimated distance
  Θ     Distance A   Distance B   Distance C
(deg)     (mm)         (mm)         (mm)                                 θ = Angle rotated along X-Axis
                                                                         Distance C = Gap between
 6.4      392.7        25.3           0                                  base plate bottom to the top
 6        368.4        25.0           3                                  of concrete
 5        307.5        23.6          11
 4        246.3        21.0         19.3
 3        185.0        17.4         26.5
                                                                                                               132
133
 Translate along Z-Axis by 50mm, will then
 used up grouting gap.
 Translate along Y-Axis by 10mm, will then
 used up oversized holes tolerance.
       Yellow = Translated
       position
                             Z-Axis
50mm              X-Axis
       Y-Axis
Pivot point
                       RC                    134
RETRACTABLE ROOF VIDEO
     2.2.3       Photogrammetry
L2
     2.2.3       Photogrammetry
L2
Photogrammetry
  Technology
     What is
     Photogrammetry?
                          X
                                      x
         x
P0 P1
        Photographing New York City - on a slender support 18 stories above pavement of Fifth Avenue
Normal Camera Image for PhotoMesh Photogrammetry Modelling
3D Mesh Layer of the Photogrammetry Modeled Result
Hybrid Utilization Between
Photogrammetry/Laser scanning and simulation
Steel Truss Swept Path Simulation
LOGISTICS     BIM Involvement: Vehicle Swept Path Analysis
                                                             Page | 144
PROGRESS   BIM Involvement: 3D Drone Scanning
                                                Page | 145
     2.2.4         GIS (Geographical information system/science)
Schematic Design in 3D
L2
      2.2.4             GIS (Geographical information system/science)
      Both BIM and GIS can help capture and manage information of the
      built environment, from the microscopic and macroscopic perspectives,
      respectively.
                                                           Wayfinding
         Indoor positioning
L2
     2.2.5         Application of smart devices
L2
2.2.6 VR/ AR/ MR
      2.2.6   VR (Virtual Reality)/ AR (Augmented Reality)/
      MR (Mixed Reality)
VR MR
AR AR glasses by Apple
L2   https://mp.weixin.qq.com/s/pH7y9H4yuTuQK-SBnJPCIw
Virtual Reality (VR)
      VR (Virtual Reality)
L2   https://www.youtube.com/watch?v=xpjhsOneeQQ
Other Application: Virtual Mockup
VR - Virtual Reality - Immigration Headquarters in TKO (HE201903)
Other Application: VR Safety Training
  Interactive
  Realize safety rules    Unveil potential risks
                           First-person perspective
Other Application: BIM Cave
BIM Cave - InnoCell (HE201902) & KTSP (KT201901)
Augmented Reality
     (AR)
      AR (Augmented Reality)
L2   https://www.youtube.com/watch?v=8lY4qaVvR8c
https://build.dalux.com/client/login
MR
      AR/MR CLOUD PLATFORM
A cloud platform refers to the operating system and hardware of a server in
an Internet-based data center. It allows software and hardware products to
co-exist remotely and at scale.
L2   https://www.youtube.com/watch?v=2MqGrF6JaOM
     VDC (Virtual Design and Construction)
Design Construction
     Revit was used to convey many design ideas from renderings, program layout to
     constructability studies.
L1
      VDC (Virtual Design and Construction)
Additional Software to do Virtual Design and Construction (VDC) base on BIM Model.
L1   https://www.youtube.com/watch?v=sZ1XxGXFZrk
      VDC (Virtual Design and Construction)
L1   https://www.youtube.com/watch?v=sZ1XxGXFZrk
2.2.8 RFID/ QR code/ barcode
     2.2.8            RFID
RFID Chips
L2
       RFID in site                                                                         80
      2.2.8            RFID
RFID Chips
L2   https://www.youtube.com/watch?v=5Nj9wKagRks
                                                   81
      CONSTRUCTION SIMULATION
STRUT OF BOGIE
L1
      Sketchup Integration in Fuzor      Safety clearance in Fuzor       82
       2.2.9            Gaming technology in BIM
L1
       2.2.9            Gaming technology in BIM
L1
2.2.10 Robotics
     2.2.10       Robotics
                                            屯門至赤鱲角連接路
Fully Parametric BIM Model & Automation
     The tendon exposed from bottom slab   The tendon path deviates between
                                           two duct opening creating kinks
Tendon Alignment Check
Findings:
         Before          After
Type B
Type C
Consolidated Types
Type F
Type D
                             Type CT
BIM Modeler Click buttons Revit Button Trigger software scripting Revit Write data to file
X N
Open API
                                                  BIM Modeler
                                                                Click buttons X   1
Scripting
                                                                                              X   N
                                            Automation
How open API benefit BIM?
              Open API
BIM Modeler
Automation
              Scripting
2.2.13 Modular Integrated
    Construction (MiC)
       2.2.13           MIC (Modular Integrated Construction)
     Source of MIC - BIM models with accurate shape, dimensions, material, joints and
     construction sequence
L1
       2.2.13            MIC (Modular Integrated Construction)
Modular Classroom
Modular Classroom
                                                  02              03
                                        Interior Model                 MEP Model
                                        (MC)                           (E&M SC)
                            01                       FEDERATED                     04
                       Framing Model               CONSTRUCTION                    Facade Model
                       (Module SC)                     MODEL                       (Facade SC)
                                                                                                      5. (Internal :
                                                                                                      Ceiling/ Floor/
                                                                                                      Wall)
                                                                                                      Wall Screeding,
                                                                                                      Painting,
                                                                                                      Tile laying and
                                                                                                      Placing Furinture
                                                                                                      as per approved
                                                                                                      Interior Design
                                                                                                      Dwgs.
FABRICATION   BIM Involvement: On-Off Site Works Demarcation
                    PRC
                       to HK
     2.2.14       Indoor positioning
         Indoor positioning
                                                 Location finding
                              Senor technology interacts with mobile devices and overlap onto BIM
                              model.
L1
           Wayfinding                                                                               96
     2.2.14       Indoor positioning
Virtual Reality
L1
                                       97