Labour Cost Landscape
Labour Cost Landscape
_________________________ ________________________
CONTRACTOR SUPERVISOR
TAKE OFF SHEET
Client: Ethiopian Shiping and Logistics
Project Houses Maintenance work
Location Dire Dawa Melka Jebedu kebele 01
Contrctor Legessa Arega B.C
DESCRIPTION DESCRIPTION
Super-Structure
Concrete Work 7, Carpentary and Joinary
To Top Tie beam 3.00 10.00 7.01,dia12 euqulptus
3.00 0.20 4.50 5pcs truss on each site
0.20 675.00ml
20.00 2.40m3
1.02, Form work 3.00 17.00 vertical 7.02,dia 8-10 diagonal & vertical member
18.00 3.50 a,Elevation Column 24.00 diagonal 5pcs truss on each site
0.60 123.00ml
37.80m2
3.00 48.00 7.2,7*5cm zigba purline
b,Lintel beam 49.50
3.00 0.30 Window 292.50ml
1.50
3.00 5.60 7.3 Chipwood ceilling
1.35m2 3.60
60.48ml
b,Top Tie beam 3.00 6.00 7.04,2.5x25 facia board
3.00 20.00 1.00
0.60 18.00ml
_________________________ _____________________________
CONTRACTOR SUPERVISOR
TAKE OFF SHEET
Client: Ethiopian Shiping and Logistics
Project Houses Maintenance work
Location Dire Dawa Melka Jebedu kebele 01
Contrctor Legessa Arega B.C
DESCRIPTION DESCRIPTION
Super-Structure
10, Finishing Work 14.Electrical Installation Works
Plastering work 14.1.2,Distribution Board
3.00 20.00 10.1, to internal wall 3.00 1.00
3.80 3.00NO
227.80m2
deduct window & door 14.2.1 Light point
2.52door 3.00 4.00
1.20win 12.00Pcs
236.08m2 total
11.Painting Work
Apply three coats of plastic emulsion paint to
all internal surface including ,beams &
columns.
236.08m2 total
72.00m2 total
13.Glazing
4mm clear Glass
3.00 0.90 Door
1.80
4.86m2
_________________________ _____________________________
CONTRACTOR SUPERVISOR
Client: Ethiopian Shiping and Logistics
Project Houses Maintenance work
Location Dire Dawa Melka Jebedu kebele 01
Contrctor Legessa Arega B.C Bar Schedule
Location Ref Shape Dia Length No of Bars Dia Dia Dia Dia Dia
No dia 6 dia 8 dia 10 dia 12 dia 14 Remarks
Location Ref Shape Dia Length No of Bars Dia Dia Dia Dia Dia
No dia 6 dia 8 dia 10 dia 12 dia 14 Remarks
3. CONCRETE WORK
3.1 50mm lean concrete quality C-5, 150 kg of cement/m3,
9.1 20x20x2cm Terazzo tile floor finish surface price include m² 1,008.0 400.0 403,200.0
3cm cement screed 1:3 cement sand ratio.
9.2 10cm height tile skirting m² 165.0 100.0 16,500.0
9.3 10cm thick precast concrete pavement around the m² 61.3 300.0 18,390.0
compound.
9.4 pre-cast 1/2 concrete pipe.size dia 30cm ml 115.4 200.0 23,080.0
Hexagonal Precast pot 80x80*50 no 6.0 4,000.0 24,000.0
Rectangular Precast pot 100x50x50 no 8.0 4,000.0 32,000.0
Rectangular Hcb pot 230x80x50 no 8.0 6,000.0 48,000.0
Rectangular Fountain with all necessary Work no 2.0 15,000.0 30,000.0
Odua area work no 1.0 30,000.0 30,000.0
Total Carried to Summary - 625,170.0
10.FINISHING -
Apply three coats of plastering in cement mortar -
(1:3)Price shall include exposed surface of beams &
column,pre-cleaning and preparation of the surface.
10.1 To internal wall surface. m² 724.0 250.0 181,000.0
10.5 apply one coat of gypsum for internal wall surface m² 435.0 250.0 108,750.0
Total Carried to Summary 289,750.0
11. PAINTING
11.1 Apply three coats of plastic emulsion paint to all internal m2 724.0 72,400.0
surface including ,beams & columns. 100.0
11.2 ditto but for chipwood ceilling m2 435.0 100.0 43,500.0
11.3 Ditto but Quartiz paint for External wall Surface. m2 192.0 500.0 96,000.0
Total Carried to Summary 211,900.0
12.Sanitary work
12.1 Turkish type WC (RAK) for toilet price include all pcs 5.0 3,000.0 15,000.0
necessary works as ordered by the engineer.
Hand Wash double pcs 2.0 3,000.0 6,000.0
12.2 dia 100cm concrete pipe for toilet including dia12 mesh ml 20.0 750.0 15,000.0
with C-25 concret.
Total Carried to Summary 36,000.0
13.Glazing Work
14.5 16A/1P socket outlet points fed through PVC insulated NO 6.0 1,000.0 6,000.0
conductors of3x2.5mm² inside PVC conduits of 16mm
diameter including junction boxes withcovers, and
insulating screw cap connectors all for flush mounting.
25A/1P socket outlet points fed through PVC insulated NO 8.0 1,000.0 8,000.0
conductors of3x2.5mm² inside PVC conduits of 16mm
diameter including junction boxes withcovers, and
insulating screw cap connectors all for flush mounting.
Light Fittings and Lamps
Qoutation
# Item QTY Price
LED V36 60W 3 COPPER
1 100 54
12/24V H7
LED V36 60W 3 COPPER
2 200 64
12/24V H4
LED V36 120W 3 COPPER
3 200 64
12V H4
LED V36 120W 3 COPPER
4 100 54
12V H7
LED V36 120W 3 COPPER
5 40 54
12V H11
LED V36 120W 3 COPPER
6 30 54
12V H1
LED V36 120W 3 COPPER
7 30 54
12V H3
LED V36 120W 3 COPPER
8 50 54
12V 9005
LED V36 120W 3 COPPER
9 50 54
12V 9006
LED LASER GUN BIG SIZE
10 WHITE YELLOW 500 8
CUSTOMER BRAND BOX
Sub Total
Discount
Total
Item Count
Tender
Change
Balance
Added To Account
Current Balance
Subtotal
5400
12800
12800
5400
2160
1620
1620
2700
2700
4000
51200
0%
51200
1300
1000AED 1200AED
76600AED
0AED
0.00AED
Grand Summary of Statement #1
Client: Ethiopian Shiping and Logistics
Project Houses Maintenance work
Location Dire Dawa Melka Jebedu kebele 01
Contrctor Legessa Arega B.C