Reinforcement Checklist

Uploaded by

Shivam joshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

Reinforcement Checklist

Uploaded by

Shivam joshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT : Construction of Road Bed, Major Bridges, Minor Bridges, ROBs, RUBs, including road approaches, Station

Buildings, Staff Qtrs, Other Service buildings, HL Platforms, COPs, FOBs, General electrical work and other works related to
construction of Yavatmal-Nanded New BG Line from Km: 157 to Km: 169 of Central Railway in Maharashtra State including
construction of two tunnels: T1 (1290m) & T2 (2505 m) with BLT in tunnels"
Client : RAIL VIKAS NIGAM LIMITED
PMC : TYPSA
Contractor : MAX INFRA PRIVATE LIMITED
INSPECTION CHECKLIST FOR REINFORCEMENT
Location :- Chainage :-
Date :- From To
Checked Remarks
Sr. no Description of Activity/Item
Yes No

1 Bar bending Schedules approved

2 Construction drawing checked & approved

Reinforcement Material approved & Tested From


3
NABL Lab

4 Material Testing Certificate Checked

5 Bar Size as per drawing.

6 Bar spacing as per drawing.

7 Bar lap length as per drawing.

8 Sufficient Chairs provided to support the reinforcement

9 Bar Laps at staggered Locations

10 Bar tied as specified

11 Bar assembly rigid and adequately supported

12 Steel free from rust or pitted


Reinforcement is thoroughly cleaned and provided with
13
protective coating or cement slurry.
Cover block of approved quality tied to reinforcement
14
in
15 Cover is of the same grade as of concrete

16 Cover to bottom bars as per drawing

17 Cover to side bars as per drawing

18 Cover to top bars as per drawing

19 Embeded items (if any) inserted as per drawing.

Embeded items (if any) inspection done by concered


20
dept .
Remarks/Notes/Observation:

Prepared by :- (Contractor) Checked by :- (Contractor) Approved by :- (PMC)

Sign Sign Sign

Name Name Name

Designation Designation Designation

Date Date Date