0% found this document useful (0 votes)
58 views1 page

Opr Coc 1301

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views1 page

Opr Coc 1301

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Ministry of Public Works


OFFICE OF THE BUILDING OFFICIAL

CERTIFICATE OF COMPLETION
THE BUILDING OFFICIAL
AREA CODE NO.____________

THIS IS TO CERTIFY THAT THE CONSTRUCTION OF THE BUILDING COVERED BY


BUILDING PERMIT NO.______________ ISSUED ON___________ HAS BEEN COMPLETED IN
ACCORDANCE WITH THE APPROVE PLANS AND SPECIFICATIONS ON FILE WITH THE OFFICE
OF THE BUILDING OFFICIAL AND THE “NATIONAL BUILDING CODE” (P.D. 1096).

THAT THE SAID BUILDING AND/OR STRUCTURE IS READY FOR THE INSPECTION
FOR THE ISSUANCE OF THE “CERTIFICATE OF OCCUPANCY”.

NAME OF OWNER: ___________________PROMINENCE PROPERTIES INCORPORATED_________________


ADDRESS OF OWNER: UNIT 115 G/F TYCOON CENTRE PEARL DRIVE, ORTIGAS CENTER PASIG CITY
LOCATION OF CONSTRUCTION: B13 L01 ORCHARD PLACE RESIDENCES. BRGY. PINAGBARILAN BALIWAG BUL.
USED OR TYPE OF OCCUPANCY: __________________________RESIDENTIAL___________________________
DATE OF START OF OCCUPANCY: __________________________________________________________________
PROPOSED: _________________________ ACTUAL ______________________________
DATE OF COMPLETION: ____________________________________________________________________________
EXPECTED: ___NOVEMBER 05, 2020_____ ACTUAL ____________________________
NO. OF STORIES: ________(2)TWO_STOREY__________ ACTUAL HEIGHT: _____6.41 METERS_____________
ESTIMATED COST: ___________________________________________________________
ACTUAL COST: ______________________________________ (for statistical purposed only)
a.) MATERIALS (TOTAL COST) __________________________
1. CEMENT (bags) _________________________
2. LUMBER (cubic meter) __________________________
3. REINFORCING BAGS (kg.) _________________________
4. NO. OF G.I. SHEETS __________________________
5. PRE-FAB STRUCTURAL STEEL (kg.) __________________________

b.) DIRECT LABOR (TOTAL COST) ___________________________________


This includes compensation whether by salary or contract for Architect/Engineer/down to laborers.
c.) RENTAL OF EQUIPMENT(IF ANY) ________________________________
d.) OTHER COST _____________________________________________________
This includes professional services fees, permits and other fees

IF CONSTRUCTION IS UNDERTAKEN BY CONTRACT:

____ROBERTO NOLLORA JR.______ ____________________________________________


ARCHITECT/CIVIL ENGINEER CONTRACTOR
(In-charge of construction) PRC Reg. No. _______________ Class __________

CONFORME: TIN _______________________________


ADDRESS _________________________
_________________________
OWNER/APPLICANT