0% found this document useful (0 votes)
7 views56 pages

混凝土2

Uploaded by

bianwei9688
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views56 pages

混凝土2

Uploaded by

bianwei9688
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 56

Mombasa-Nairobi Standard Gauge Railway Project

R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection


Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-28
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.7 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180307- ;The strength is 70.9MPa,
67.4MPa, 64.1MPa, 63.7MPa, 66.6MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180227-006(ZZ) ,The
condition
strength is 62.6MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180227-007(ZZ) ,The
elasticity modulus is 40.2MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-28
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-27
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.5 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180305- ;The strength is 64.7MPa,
66.8MPa, 68.4MPa, 68.7MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180225-008(ZZ) ,The
condition
strength is 63.4MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180225-009(ZZ) ,The
elasticity modulus is 40.9MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-27
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-26
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.2 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180303- ;The strength is 68.8MPa,
65.2MPa, 66.2MPa, 66.2MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180223-009(ZZ) ,The
condition
strength is 61.8MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180223-010(ZZ) ,The
elasticity modulus is 40.7MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-26
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-25
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.1 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180301- ;The strength is 69.7MPa,
68.3MPa, 62.7MPa, 63.2MPa, 65.5MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180221-008(ZZ) ,The
condition
strength is 64.1MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180221-009(ZZ) ,The
elasticity modulus is 40.9MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-25
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-24
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.9 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180228- ;The strength is 63.8MPa,
69.3MPa, 69.2MPa, 64.7MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180219-008(ZZ) ,The
condition
strength is 62.9MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180219-009(ZZ) ,The
elasticity modulus is 40.1MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-24
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-23
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.3 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180226- ;The strength is 67.9MPa,
69.0MPa, 64.3MPa, 64.7MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180217-011(ZZ) ,The
condition
strength is 63.7MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180217-012(ZZ) ,The
elasticity modulus is 40.4MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-23
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-22
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.8 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180224- ;The strength is 69.2MPa,
63.1MPa, 65.1MPa, 64.2MPa, 64.5MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180215-008(ZZ) ,The
condition
strength is 64.0MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180215-009(ZZ) ,The
elasticity modulus is 40.2MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-22
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-21
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.8 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180222- ;The strength is 68.5MPa,
67.6MPa, 64.9MPa, 65.7MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180211-008(ZZ) ,The
condition
strength is 63.6MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180211-009(ZZ) ,The
elasticity modulus is 40.9MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-21
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-12-20
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 9.7 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180220- ;The strength is 64.8MPa,
64.8MPa, 67.1MPa, 68.8MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180206-010(ZZ) ,The
condition
strength is 63.2MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180206-011(ZZ) ,The
elasticity modulus is 39.9MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-12-20
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-19
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.4 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180218- ;The strength is 69.2MPa,
68.1MPa, 63.0MPa, 63.4MPa, 64.7MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180204-010(ZZ) ,The
condition
strength is 63.9MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180204-011(ZZ) ,The
elasticity modulus is 43.0MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-19
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-18
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 9.8 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180216- ;The strength is 68.8MPa,
65.2MPa, 66.2MPa, 66.2MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180202-007(ZZ) ,The
condition
strength is 64.8MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180202-008(ZZ) ,The
elasticity modulus is 40.7MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-18
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-17
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.6 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180214- ;The strength is 67.8MPa,
69.4MPa, 63.2MPa, 64.6MPa, 64.5MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180131-007(ZZ) ,The
condition
strength is 63.1MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180131-008(ZZ) ,The
elasticity modulus is 44.1MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-17
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-16
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.4 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180212- ;The strength is 63.8MPa,
69.3MPa, 69.2MPa, 64.7MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180129-005(ZZ) ,The
condition
strength is 68.1MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180129-006(ZZ) ,The
elasticity modulus is 43.5MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-16
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-15
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.6 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180210- ;The strength is 67.9MPa,
69.0MPa, 64.3MPa, 64.7MPa, /
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180127-007(ZZ) ,The
condition
strength is 65.7MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180127-008(ZZ) ,The
elasticity modulus is 42.6MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-15
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-14
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 5.6 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180208- ;The strength is 65.4MPa,
68.0MPa, 65.5MPa, 67.7MPa, 62.9MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180125-007(ZZ) ,The
condition
strength is 63.5MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180125-008(ZZ) ,The
elasticity modulus is 42.3MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-14
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-13
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.9 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180206- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180123-007(ZZ) ,The
condition
strength is 63.8MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180123-008(ZZ) ,The
elasticity modulus is 42.3MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-13
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-12
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.2 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180204- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180121-005(ZZ) ,The
condition
strength is 63.5MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180121-006(ZZ) ,The
elasticity modulus is 41.5MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-12
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-11
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.7 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180202- ;The strength is 63.3MPa,
69.6MPa, 64.8MPa, 65.8MPa, 67.5MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180119-007(ZZ) ,The
condition
strength is 63.0MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180119-008(ZZ) ,The
elasticity modulus is 41.2MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-11
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-10
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.2 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180123- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180117-005ZZ) ,The
condition
strength is 63.4MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180117-006(ZZ) ,The
elasticity modulus is 41.5MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-10
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-09
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.6 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180121- ;The strength is 67.5MPa,
63.5MPa, 68.3MPa, 63.5MPa, #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180114-005(ZZ) ,The
condition
strength is 66.4MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180114-006(ZZ) ,The
elasticity modulus is 42.3MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-09
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-08
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.9 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180119- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180112-005(ZZ) ,The
condition
strength is 66.5MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180112-006(ZZ) ,The
elasticity modulus is 41.8MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-08
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-07
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 6.6 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180117- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180110-005(ZZ) ,The
condition
strength is 64.3MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180110-006(ZZ) ,The
elasticity modulus is 42.9MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-07
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-06
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.8 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180115- ;The strength is 67.1MPa,
66.1MPa, 66.3MPa, 66.3MPa, 66.0MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180105-010(ZZ) ,The
condition
strength is 62.7MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180105-011(ZZ) ,The
elasticity modulus is 42.6MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-06
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-05
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.4 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180113- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180103-009(ZZ) ,The
condition
strength is 63.6MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180103-010(ZZ) ,The
elasticity modulus is 42.4MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-05
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-04
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 5.4 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180113- ;The strength is #REF!
#REF! #REF! #REF! 65.0MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20180101-003(ZZ) ,The
condition
strength is 62.9MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20180101-004(ZZ) ,The
elasticity modulus is 42.6MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-04
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-03
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.1 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180113- ;The strength is 66.1MPa,
67.0MPa, 66.0MPa, 66.4MPa, 66.6MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20171230-009(ZZ) ,The
condition
strength is 63.7MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20171230-010(ZZ) ,The
elasticity modulus is 41.3MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-11-03
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-12-02
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 7.0 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 Meet the requirements
grade 6.4.11 NMS70-TKY-20180111- ;The strength is #REF!
#REF! #REF! #REF! #REF!
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the same


Curing specimen conditions. There are 1 copy of compressive strength test
strength grade [A] Article report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20171228-007(ZZ) ,The
condition
strength is 64.4MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20171228-008(ZZ) ,The
elasticity modulus is 42.4MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Nairobi National Park Super Major Bridge (DK5+901)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-12-02
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance
Inspection Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Mombasa Sea-crossing Major Bridge(P2DK0+505.108)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-01
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

[A] Article
6.4.9 Watering maintenance for 14 days meeting inspection
1 Concrete curing Meet the requirements
[B] Article requirements .
9.2.8

Mold removal
When mold is removed, temperature difference between
temperature [A] Article
2 concrete surface and environment is Meet the requirements
difference and 6.4.10
Conditions 8.6 ℃, the acceptance requirements are met.

5 groups standard curing specimens indwelling,


Concrete strength [A] Article 1 compressive strength test report, No.:MNS70-
3 NMS70-TKY-20180108- ;The strength is 65.9MPa, Meet the requirements
grade 6.4.11
66.7MPa, 67.1MPa, 67.3MPa, 65.8MPa,
Meet the design and inspection requirements.
Dominant items

Reserve 1 group of curing specimen which require the


Curing specimen same conditions. There are 1 copy of compressive strength
strength grade [A] Article test report for the curing specimen which require the same
4 Meet the requirements
under the same 6.4.12 conditions,
number: NMS70-TKY-20171225-003(ZZ) ,The
condition
strength is 60.2MPa; Meet the design and
inspection requirements.

Reserve 1 group elasticity modulus specimens;


[A] Article 1 copy of elasticity modulus test report,
5 Elastic modulus Meet the requirements
6.4.13 number: NMS70-TTM-20171225-004(ZZ) ,The
elasticity modulus is 42.6MPa, Meet the design
and inspection requirements.

Test piece
sampling and 1 group of anti-permeability grade test pieces is reserved; 1
retention of [A] Article copy of anti-permeability grade test report, No. MNS00-
6 Meet the requirements
concrete 6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
impermeability Meet the design and inspection requirements.
grade
Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance
Inspection Record (II) of Concrete (Construction) Inspection Lot
03011503

Name of Unit
Mombasa Sea-crossing Major Bridge(P2DK0+505.108)
Work
Name of
Post-tensioned R. C simple beam fabrication
Sectional Work
Name of Itemised
Concrete Part to be Accepted RBE16C-10-01
Work
Section No. 7 Project Site Office of Mombasa-Nairobi
Contractor Project Manager Yang ZhenWei
Standard Gauge Railway Project

[A]:"Standard for Constructional Quality Acceptance of Railway Concrete Engineering" TB10424-


Name & Reference No. of
2010
Construction Quality
[B]: "Standard for Constructional Quality Acceptance of Railway Bridge and Culvert Engineering"
Acceptance Standard
TB10415-2003

Provisions of Construction Quality Records of Inspection & Assessment by Acceptance Records by


Acceptance Standard Contractor Supervision Unit

Anti-corrosion
[A] Article
7 strengthen / /
6.4.15
measures

Concrete surface [A] Article After examination, concrete surface without cracks meets
8 Meet the requirements
crack 6.4.16 the inspection standards.
Dominant items

Allowable deviation for weighing the raw

Cement,
admixtu ±1% Weighing deviations are ≤1%, conform to the regulations
materials (one single time) (%)

re

Coarse
and fine
9 ±2% Weighing deviations are ≤ 2%, conform to the regulations Meet the requirements
aggregat
e

Water,
±1% Weighing deviations are≤ 1%, conform to the regulations
additive

Self-check result qualified.

Results of Professional Quality Inspector Name / /


Inspection &
Assessment by Technical Director of Itemised
Contractor Name / /
Work

Supervisor of Itemised Work Name / /

Acceptance
Conclusion of Consultant Engineer Name / /
Supervision Unit
Position :Experimental
Engineer