混凝土2
混凝土2
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-28
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.7 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-28
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-27
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.5 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-27
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-26
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.2 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-26
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-25
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.1 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-25
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-24
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.9 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-24
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-23
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.3 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-23
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-22
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.8 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-22
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-21
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.8 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-21
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-12-20
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  9.7 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-12-20
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-19
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.4 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-19
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-18
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  9.8 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-18
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-17
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.6 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-17
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-16
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.4 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-16
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-15
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.6 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-15
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-14
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  5.6 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-14
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-13
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.9 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-13
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-12
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.2 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-12
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-11
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.7 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-11
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-10
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.2 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-10
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-09
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.6 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-09
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-08
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.9 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-08
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-07
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  6.6 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-07
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-06
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.8 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-06
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-05
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.4 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-05
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-10-04
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  5.4 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-10-04
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-11-03
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.1 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-11-03
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                       Part to be Accepted        RBE16C-12-02
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                       Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                               Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                             Meet the requirements
                          difference and     6.4.10
                            Conditions                  7.0 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                  Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
        Mombasa-Nairobi Standard Gauge Railway Project
R. C & Prestressed R. C Simple Beam Quality Acceptance Inspection
       Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                           03011503
   Name of Unit
                 Nairobi National Park Super Major Bridge (DK5+901)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                            Part to be Accepted       RBE16C-12-02
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                           Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                           /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article                                          After examination, concrete surface without cracks meets
                    8                                                                                                                                      Meet the requirements
                              crack         6.4.16                                                             the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations    Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                /       /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer
                       Mombasa-Nairobi Standard Gauge Railway Project
                    R. C & Prestressed R. C Simple Beam Quality Acceptance
                 Inspection Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                       03011503
   Name of Unit
                 Mombasa Sea-crossing Major Bridge(P2DK0+505.108)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                        Part to be Accepted        RBE16C-10-01
    Work
                                Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                        Project Manager          Yang ZhenWei
                                Standard Gauge Railway Project
                                         [A] Article
                                           6.4.9     Watering maintenance for 14 days meeting inspection
                    1    Concrete curing                                                                                Meet the requirements
                                         [B] Article requirements .
                                           9.2.8
                          Mold removal
                                                       When mold is removed, temperature difference between
                           temperature     [A] Article
                    2                                  concrete surface and environment is                              Meet the requirements
                          difference and     6.4.10
                            Conditions                  8.6 ℃, the acceptance requirements are met.
                            Test piece
                          sampling and                 1 group of anti-permeability grade test pieces is reserved; 1
                           retention of    [A] Article copy of anti-permeability grade test report, No. MNS00-
                    6                                                                                                   Meet the requirements
                             concrete        6.4.14 TKS-S70-20160104-001; anti-permeability grade is ≥P20.
                         impermeability                Meet the design and inspection requirements.
                              grade
                       Mombasa-Nairobi Standard Gauge Railway Project
                    R. C & Prestressed R. C Simple Beam Quality Acceptance
                 Inspection Record (II) of Concrete (Construction) Inspection Lot
                                                                                                                                                          03011503
   Name of Unit
                 Mombasa Sea-crossing Major Bridge(P2DK0+505.108)
       Work
     Name of
                 Post-tensioned R. C simple beam fabrication
  Sectional Work
Name of Itemised
                 Concrete                                                                                                             Part to be Accepted       RBE16C-10-01
    Work
                                                                     Section No. 7 Project Site Office of Mombasa-Nairobi
                 Contractor                                                                                                            Project Manager          Yang ZhenWei
                                                                     Standard Gauge Railway Project
                          Anti-corrosion
                                                                                 [A] Article
                    7      strengthen                                                                                     /                                              /
                                                                                   6.4.15
                            measures
                         Concrete surface [A] Article After examination, concrete surface without cracks meets
                    8                                                                                                                                       Meet the requirements
                              crack         6.4.16                    the inspection standards.
Dominant items
                                                                      Cement,
                                                                      admixtu       ±1%        Weighing deviations are ≤1%, conform to the regulations
                               materials (one single time) (%)
re
                                                                       Coarse
                                                                      and fine
                    9                                                               ±2%        Weighing deviations are ≤ 2%, conform to the regulations     Meet the requirements
                                                                      aggregat
                                                                         e
                                                                       Water,
                                                                                    ±1%        Weighing deviations are≤ 1%, conform to the regulations
                                                                      additive
       Acceptance
      Conclusion of                                                    Consultant Engineer                                    Name                                 /         /
     Supervision Unit
                                                                       Position :Experimental
                                                                       Engineer