Warehouse E2

Uploaded by

zacc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

Warehouse E2

Uploaded by

zacc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

G E N E R A L N O T E S :

1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE


WITH THE LATEST PROVISIONS OF THE LATEST ISSUE OF THE
NATIONAL ELECTRICAL CODE.
1 2 3 4 5 2. ALL UNDERGROUND CABLES SHALL BE TYPE AWG "RA" AND
ALL OTHER CONDUCTION TO BE USE SHALL BE INSULATED
TYPE THW STRANDED AND SHALL BE EMBEDDED AT A
MINIMUM DEPTH OF 18" FROM THE GROUND SURFACE.
ROOF LINE ROOF LINE ROOF LINE ROOF LINE
3. ALL SWITCH AN D CONDUITS SHALL BE EMBEDDED TO THE
WALL WITH A MINIMUM DEPTH OF 2' FROM THE SURFACE OF
THE WALL AND SHALL BE CONCRETE FINISH.

4. USE WEATHER PROOF TYPES WAITCH AND CONVENIENCE


OUTLET WITH A MINIMUM AMPERAGE OF 15AMP AND 250V.

A 5. ALL WIRING ON THE CEILING OR TO THE WALL SHALL BE


INSTALLED INSIDE THE EMT, RSC & IMC PIPE ELECTRICAL
CONDUITS AS SPECIFIED ON THE PLAN.

6. USE DEEP BOXES AS PULL BOXES WITH A MINIMUM


DIMENSION OF 3" x 3"

PB1 7. ALL SPLICING OF CABLES/WIRES SHALL BE DONE INSIDE THE


PULL BOXES ONLY NO SPLICING OF CABLE/WIRE INSIDE PVC
4 CONDUITS SHALL EXPOSED.

8. ALL MATERIALS TO BE USED SHALL BE NEW AND ONLY


SPECIFIED BRAND MATERIALS BE ACCEPTED

9. ALL WORKS SHALL BE DONE WITH THE SUPER VISION OF


B REGISTERED ELECTRICAL ENGINEER OR MASTER ELECTRICAL.

10. THE CONTRACTOR IS ADVISED TO VISIT THE SITE AND SATISFY


HIMSELF AS TO LOCAL CONDITIONS AND ASCERTAIN SUCH
OTHER CONDITIONS AS MAY EFFECT HIS WORK. HE WILL BE
DEEMED TO HAVE DONE THIS BEFORE PREPARING HIS
PROPOSAL AND NO SUBSEQUENT CLAIM DUE TO GROUND OF
INADEQUATE OR INACCURATE INFORMATION WILL BE
ENTERTAINED.

11. CIRCUIT BREAKER TO BE PROVIDED SHALL BE OF COMMON


TRIP TYPE. SINGLE POLE BREAKERS COMMON IN TO 2 POLE OR
3 POLE WITH TIE-HANDLE IS NOT ACCEPTABLE.

12. THE CONTRACTOR SHALL REMOVED ALL EXISTING


C ELECTRICAL MATERIALS (LIGHTING FIXTURES, DEVICES,
WIRES, ETC.) & SHALL BE TURN-OVER TO BUILDING
ADMINISTRATION FOR SAFE-KEEPING. PROVIDE INVENTORY
LISTS BEFORE AND AFTER THE REMOVAL OF FIXTURES.

13. THE CONTRACTOR SHALL SECURE WRITTEN PERMIT FOR ANY


DISCONNECTION OR CONNECTION OF POWER AND
VOICE/DATA LINES TO THE BUILDING ADMINISTRATION PRIOR
TO IMPLEMENTATION.
PB1
3 14. SAMPLE OF ELECTRICAL MATERIALS SHALL BE SUBMITTED
PB1

TO THE CONSULTANT FOR APPROVAL PRIOR TO


INSTALLATION. ANY MATERIALS INSTALLED NOT CONFORMING
TO THE PLANS AND SPECIFICATION SHALL BE REMOVED
IMMEDIATELY. THE CONTRACTOR SHALL SUBMIT WRITTEN
D REQUEST FOR APPROVAL FOR ANY SUBSTITUTION OF
EQUIVALENT MATERIALS.
15. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
15.1. LIGHT CONTROL SWITCH - 1.40M ABOVE FLOOR AT
CENTER
15.2. CONVENIENCE OUTLET - 0.30M ABOVE FLOOR AT
ROOF LINE ROOF LINE ROOF LINE ROOF LINE CENTER FOR NON-WEATHER PROOF OUTLET
15.3. SPECIAL PURPOSE OUTLET - AS REQUIRED BY
EQUIPMENT SERVED
15.4. PANEL BOARDS, ATS, ALARM SUPERVISORY AND
CONTROL PANEL CABINETS, NON-FUSIBLE
DISCONNECT SWITCH - 1.40M ABOVE FLOOR AT
CENTER

WAREHOUSE
P O W E R L A Y O U T
SCALE 1:125

APPROVED BY: SEAL: PRC NO.: PROJECT TITLE: CONFIRMED BY: SHEET CONTENT: SHEET NO.:
PTR NO.: - AS SHOWN
DATE ISSUED:
E-2
PLACED ISSUED: PROJECT LOCATION: -
PROFESSIONAL ELECTRICAL ENGINEER TIN: - OWNER