0% found this document useful (0 votes)
48 views5 pages

Summer Training Report

Uploaded by

ASHUTOSH YADAV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views5 pages

Summer Training Report

Uploaded by

ASHUTOSH YADAV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

SUMMER TRAINING PROJECT REPORT

On
EXECUTION OF ROAD-WORK
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS
FOR THE AWARD OF DEGREE OF

BACHELOR OF TECHNOLOGY
SUBMITTED TO:

Er. SARFARAZ AHMED KHAN


Assistant Professor.

DEPARTMENT OF CIVIL ENGINEERING

SUBMITTED BY:

Name: Ashutosh Yadav


(Roll No.: 2201410009009)
CIVIL ENGINEERING VII SEMESTER

DEPARTMENT OF CIVIL ENGINEERING

Sagar Institute Of Technology & Management Barabanki,


Affiliated to Dr. APJ Abdul Kalam Technical University, Lucknow

Session 2024-25
NSC PROJECT PVT.LTD.
ENGINEERS
NEERS & ARCHITECTS
87, Street No - TC, Mahipalpur Ext., New Delhl
Regd. office: L-87, Delhl-110037
Ph.: +91-8800632291
8800632291 Fax : 26782191, Email : narbirsing97T@gmail.com
Website : www.nscprojects.com
www.nscprojects.com

Runways Infrastructure Highways

TO WHOMSOEVER IT MAY CON


CONCERN
This is to certify that Mr. Ashutosh Yadav S/o Mr. Devendra Yadav student of
B.Tech in Civil Engineering from Sagar Institute Of Technology & &Management
Barabanki has successfully completed two month Industrial Training from 10th
July 2024 to 9thth September 2024
2024. During this training, He worked on
“Execution of Road-Work”Work” in site execution under Guidance of Er.Sikander
Singh. We found him sincere, Hardworking, Technically sound and result
oriented. He worked as part of a team during his tenure.

We take this opportunity to thank him and wish him all the Best for future.

With best regards:

For NSC Projects Pvt. Ltd.

Authorized Signatory
DECLARATION
I Ashutosh Yadav, hereby declare that the internship assessment/
training report entitled “Execution of Road Work" submitted to Sagar
Institute Of Technology & Management Barabanki, is a record of my
internship assessment undertaken during the training period at NSC
PROJECTS PVT.LTD, from 10 July 2024 to 09 September 2024.

This report has not been submitted earlier to any other institution or
organization for any academic or professional purpose. All the work
presented in this report is based on the knowledge, skills, and
experiences gained during the training.

I further declare that all information in this report has been obtained and
presented in accordance with ethical academic standards.

Date:_______________ Ashutosh Yadav


(Roll No. 2201410009009)
ACKNOWLEDGEMENT

First and foremost, I wish to express my sincere thanks and gratitude to


my esteemed Mentor “Mr. Sikandar Singh” who has contributed so much
for successful completion of my Industrial Training by his thoughtful
reviews and valuable guidance.

I am very thankful to my faculty Coordinator/s “Er. Sarfraz Khan” for


their constant support and valuable guidance throughout the training
period.

Next I would like to tender my sincere thanks to “Er. Sarfraz Khan


HOD”
(Head of Civil Engineering Department) for his co-operation and
encouragement.

Ashutosh Yadav
(Roll No. 2201410009009)
Introduction:
National Highway 5 (NH-5) is a major National Highway in India that
runs along India’s east coast through the states of Orissa, Andhra Pradesh
and Tamil Nadu. The northern terminal is at Jharpokharia in Orissa and
the southern terminal is at Chennai in Tami] Nadu. NH 5 is a part of the
golden quadrilateral project undertaken by National Highways
Development Project. Under the new national highway numbers NH 5 is
renamed as NH 16. NH 5 runs for a distance of 1533 km.
In Tamil Nadu NH 5 starts from Chennai and shortly enters Andhra
Pradesh from Gummidipundi. In Andhra Pradesh, it passes through most
of the coastal towns in nine coastal districts including Nellore, Ongole,
Chilakaluripet,Guntur, Vijaywada,Eluru,Tanuku,Rajahmundry, Tuni
,Visakhapatnam, Srikakulam, Tekkali and Palasakasibugga. In Orissa, it
passés through Baripada, Balasore, Bhadrak, cuttack, Bhubaneswar and
Berhampur Our project is on Six Laning of Chilakaluripet - Nellore
section of NH 5 from km 1182.802 to km 1366.547 (approx length-
183.620 km) in the state of Andhra Pradesh under NHDP to be executed
as BOT project on DBFOT pattern. The project was awarded to M/s.
KMC-BSCPL JV. BSCPL share is 50 %.